This checklist is used to inspect structural concrete after forms have been removed. It contains 7 items to check, including whether the concrete has achieved the required strength, if any damage occurred during form removal, if dimensions are within tolerances, if any cracks or honeycombing are present, if a repair methodology was approved, if approved materials were used for repairs, and if proper curing is in place. The inspector marks Yes, No, or N/A for each item to indicate if inspection criteria are satisfied.
This checklist is used to inspect structural concrete after forms have been removed. It contains 7 items to check, including whether the concrete has achieved the required strength, if any damage occurred during form removal, if dimensions are within tolerances, if any cracks or honeycombing are present, if a repair methodology was approved, if approved materials were used for repairs, and if proper curing is in place. The inspector marks Yes, No, or N/A for each item to indicate if inspection criteria are satisfied.
This checklist is used to inspect structural concrete after forms have been removed. It contains 7 items to check, including whether the concrete has achieved the required strength, if any damage occurred during form removal, if dimensions are within tolerances, if any cracks or honeycombing are present, if a repair methodology was approved, if approved materials were used for repairs, and if proper curing is in place. The inspector marks Yes, No, or N/A for each item to indicate if inspection criteria are satisfied.
CHECKLIST- STRUCTURAL CONCRETE – POST POUR INSPECTION
S.N PARTICULARS YES NO N/A
. 1 Has the required cube strength as given in IS 456 achieved at the time of de-shuttering ? 2 Is it any corner of structure damaged during de-shuttering? 3 Has the alignment and dimensions within tolerance limit as per approved drawing? 4 Has any cracks or Honeycomb observed on the deck and on internal or external face of structure ? 5 Has the methodology approved by The Engineer for repairing of the structure? 6 Has the approved material used for the repairing of the structure, if any? 7 Has proper curing arrangement provided in place?