Professional Documents
Culture Documents
493M GHC FM Mep 218a 1a 03
493M GHC FM Mep 218a 1a 03
1. All pipe brackets and supports should be hot dipped galvanized to minimum thickness of 65 microns.
2. Equipment and piping arrangement need to be coordinated with other services
Recheck. Heat
capacity & water
flow rate
Recheck pipe size of condenser line. As
per schematic it is 40mm dia.
Mention pipe material and insulation thickness also
Revise as per the comments given for pipe span and also
during site inspection