BAR BENDING SCHEDULE FOR SLAB

BAR SPACIN NO. OF NO. OF TOTAL LENGTH TOTAL WEIGHT


BAR MARK SIZE G BARS MEMBERS NUMBER BENDING SKETCH (MM) LENGTH (KG) REMARKS

01 T12 150 54 1 54 12,000.00 648.00 575.42 Mid section of 8m


span

01a T12 150 54 1 54 12,000.00 648.00 575.42

01 T12 150 27 2 54 6,780.00 366.12 325.11 Edge section of 4


m

01a T12 150 27 2 54 6,780.00 366.12 325.11

Foot path section


02 and 02a T12 150 11 2 22 26,000.00 572.00 507.94 - 1.5 m span

Midsection - 4.0
m span upto
02 and 02a T12 150 27 2 54 26,200.00 1,414.80 1,256.34 center

1 2 2 2,154.00 4.31 3.83

03 T12 150 1 2 2 1,742.00 3.48 3.09 540 mm span on


footpath

1 2 2 1,329.00 2.66 2.36

11,460 mm span
03 T12 150 74 2 148 2,230.00 330.04 293.08 on footpath

04 T12 200 8 2 16 27,000.00 432.00 383.62 Footpath

01 (exp) T12 150 5 2 10 11,706.00 117.06 103.95


Slab underneath
the expansion
joint, along the
skew length of
01 a(exp) T12 150 5 2 10 11,706.00 117.06 103.95 11,707 mm -
Slab underneath
the expansion
02 (exp) joint, along the
and 02 length of 12,000
a(exp) T12 200 59 2 118 1,900.00 224.20 199.09 mm
TOTAL WEIGHT 2,857.24
TOTAL T12 PIECES 437