5477

5500
ECTS

ECTS
42100

47600

46800
41000
35220

35220
33600

33600
GM/F +22.15
G/F +18.40 G/F +18.40 +17.40
+15.90 +15.90 +14.60
56300 49400
TC2 TC1 TC2 TC3
STAGE 1 STAGE 2 - Upon GM/F Completion
- Install TC2 with jib length 75m - Install TC1 & TC3 after GM/F
complete.
- Change TC2 jib to shorter 40m-Long
jib
Guide Section

5500
Guide Section

ECTS
Mounting Device

1st 2.9m Tower Section

42100

47600
Lower working platform

46800
41000 will be removed

35220

33600
1M/F +30.15
1/F +26.00
GM/F +22.15
G/F +18.40 +17.40
+15.90 +14.60
56300 49400
TC1 TC2 TC3
STAGE 3 - Upon GM/F / 1M/F Completion
- Install Guide Section on TC2 after GM/F or 1M/F
Slab is finished.
- TC2's 1st Climb up 2.9m

76600

76600
71900

71900
75800

75800
70000

70000

ECTS
ECTS

Wall Tie 2nd 2.9m Tower Section Collar Frame Wall Tie Collar Frame
3/F +44.00 3/F +44.00
639

2M/F +39.15 2M/F +39.15

38120

36500
38120

36500

420 500
2/F +35.00 2/F +35.00 Collar Frame

1M/F +30.15 1M/F +30.15


1/F +26.00 1/F +26.00
GM/F +22.15 GM/F +22.15
G/F +18.40 +17.40 G/F +18.40 +17.40
+15.90 +14.60 +15.90 +14.60
56300 49400 56300 49400
TC1 TC2 TC3 TC1 TC2 TC3
STAGE 4 - Upon 3/F Completion
- Install collar frame at 2/F after TC2's 2nd
- TC1 & TC3 Climbing to full height climbing
- Guide section will be removed after climbing
- TC2's 2nd Climb up 2.9m
18357
19558

ECTS

4639
9700
TR/F +73.65
UR/F +69.60 UR/F +70.70

R/F +65.00

5/F +58.60

78000
71900

75800
70000

4/F +53.00
64200

62600
3M/F +48.15
Wall Tie Collar Frame
3/F +44.00
2M/F +39.15
2/F +35.00 Collar Frame

1M/F +30.15
1/F +26.00
GM/F +22.15
G/F +18.40 +17.40
+15.90 +14.60
56300 49400
TC1 TC2 TC3
STAGE 5
- Continue TC2 Climbing to Full height
- Guide section will be removed after
climbing completion