GENERAL PLUMBING NOTES:

1. ALL PLUMBING WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE REPUBLIC OF THE PHILIPPINES
REQUIREMENTS OF PHILIPPINE NATIONAL PLUMBING CODE AND THE RULE AND
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGULATIONS OF THE EXISTING LOCAL CODES AND ORDINANCES. NOTHING
CONTAINED ON THE DRAWING SHALL BE CONSTRUED AS TO CONFLICT WITH THE
NATIONAL AND LOCAL ORDNANCES OR LAWS GOVERNI9NG THE IMPLEMENTATION
OF THE PLUMBING WORKS. A B C D A B C D LEGEND : OBO
OFFICE OF THE BUILDING OFFICIAL
2. REFER TO ALL ELECTRICAL STRUCTURAL AND ARCHITECTURAL PLANS AND CITY OF TALISAY
SPECIFICATIONS AND INVEST DATE ALL POSSIBLE INTERFERENCES AND CONDITIONS
AFFECTING THE PLUMBING WORKS. 9.83 9.83 WC WATER CLOSET
3. IT IS NOT EXTEND THAT THE DRAWING SHALL SHOW EVERY PIPE FITTING, VALVE AND 2.90 3.45 3.48 2.90 3.45 3.48 RECOMMENDING APPROVAL :
APPLIANCES. FURNISH AND INSTALL, IF NECESSARY, ALL SUCH ITEM WHETHER LAV LAVATORY
SPECIALLY MENTIONED OR NOT, OR INDICATED ON DRAWING, TO COMPLETE THE 1.23 0.87 2.25 2.85 DATE :
SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE OF THE PLUMBING TRADE AND TO
THE SATISFACTION OF THE ARCHITECT. PROPERTY LINE
DS CB PROPERTY LINE FD FLOOR DRAIN
1 COMMON
T&B FD W
4"Ø PVC STORM PIPE S-1000
TO NEAREST CANAL1 1 DS APPROVED BY :
4. PERFORMED ALL LABOR IN A FIRST-CLASS, NEAT, WORKMANLIKE MANNER BY
GT CB SH SHOWER HEAD

2.00

2.00
SPECIALIST SKILLED IN THEIR TRADES, AND SUCH SPECIALIST AND THEIR WORK SHALL FD LAUNDRY
KITCHEN
BE SATISFACTORY TO THE ARCHITECT. 4"Ø SEWER LN. ST
WC SS TO NEAREST SEWER 1% ROOF SLOPESS
3"Ø
SV SHOWER VALVE BLDG OFFICIAL DATE :

3.10

3.10
LAV WS
5. WHERE BRANCH SERVES MORE THAN ONE FIXTURES, INCREASE THE SIZE OF THE
R R DS DS WS
R
DS DS
BRANCH PROPORTIONATELY.
WS
CO 2 2
WS LAV
R RISER

1.02
1.10
2 12 "Ø FD SS
SHO. WC CO

BASIC MATERIALS: COMMON

2.01
CB FAMILY AREA

PROPERTY LINE

PROPERTY LINE
DINING AREA BEDROOM 1 T&B

Y LINE

Y LINE
3 3 F FAUCET

1.09
1. PROVIDE MATERIALS THAT ARE NEW AND THAT CONFORM WITH THE

20mmØ PPR PN-20


STANDARD OF UNDERWRITERS LABORATORIES. INC. HB HOSE BIB FAUCET

4"Ø PVC STORM PIPE S-1000

PROPERT

PROPERT
4.95

4.95
STO.
2. FOR OTHER MISCELLANEOUS REQUIRED MATERIALS NOT SPECIFICALLY BEDROOM 4
CO CLEAN OUT

3.70

3.70
9.95

9.95

9.95
MENTIONED, PROVIDE THE BEST OF THE RESPECTIVE KIND.
GARAGE LIVING AREA

2.84

2.84
BEDROOM 2 BEDROOM 3
3. SUBMIT SAMPLES OF MATERIALS FOR APPROVAL AS REQUIRED BY THE
KS KITCHEN SINK

8.10
ARCHITECT.

0.87
4. CONFORM ALL APPLICABLE PIPES AND MATERIALS FOR VARIOUS SERVICES TO WS FD WS
CB CATCH BASIN
STANDARDS TABULATED BELOW. 4 4 4 BALCONY
4
DS DS
PLUMBING FIXTURES: CB ST SEPTIC TANK
GV
CB DS DOWNSPOUT

3.15

3.15

3.15

3.15
1. INSTALL ALL PLUMBING FIXTURES FREE AND OPEN IN A MANNER TO ACCESS
FOR CLEANING. FURNISH WITH BRACKETS, CLEATS, PLATES, AND ANCHORS M
TO
REQUIRED TO SUPPORT THE FIXTURES RIGIDLY IN PLACE.
NEAREST GV SS SOIL STACK
2. KEEP AWAY, AT A SUFFICIENT DISTANCE BUT NOT LESS ½ INCH (12.5mm.) ALL CANAL TO
SERVICES PIPES, VALVES, AND FITTINGS FROM SURFACES AND LOCATIONS PROPERTY LINE NEAREST PROPERTY LINE WS WASTE STOCK
FROM WATER CANAL 2.74 2.69
WHICH MAY REQUIRED FINISH COATS OR COVERING.
SUPPLY VTR VENT THRU ROOF
2.90 3.45 3.10 2.90 3.45 3.10
3. EXTEND THE PIPING TO ALL FIXTURES, OUTLET, AND EQUIPMENT FROM
REQUIRED GATE VALVES INSTALLED IN EACH BRANCH NEAR RISERS. 9.60 9.60
BV BRANCH VENT
SOIL, WASTE, DRAIN,
AND VENT PIPINGS : WATER LINE
G OUND LOO SECOND LOO
WASTE LINE
1. INSTALL ALL PIPING WORKS IN CONFORMITY WITH ALL PROVISIONS OF THE
LATEST EDITION OF THE PHILIPPINE NATIONAL PLUMBING CODE AND
P PLUMBING LAYOUT PLAN P PLUMBING LAYOUT PLAN
DRAINAGE LINE
APPLICABLE REQUIREMENTS OF THE EXISTING LOCAL CODES.
8 1 SCALE 1:1 M
8 2 SCALE 1:1 M

2. EXCAVATE TO REQUIRED DEPTHS AND GRACES, ALL EXCAVATIONS REQUIRED GATE VALVE
FOR THE INSTALLATION OF PLUMBING AND DRAINAGE SYSTEM WHEN ROCK IS
ENCOUNTERED, EXTEND EXCAVATION TO A DEPTH 150mm. BELOW THE PIPE
BOTTOM AND, BEFORE THE PIPE IS LAID, FILL THE SPACE BETWEEN THE CHECK VALVE
BOTTOM OF THE PIPE AND ROCK SURFACE WITH SAND AND APPROVED
MATERIAL .
M WATER METER
3. LAY WATER SUPPLY PIPES AND SEWERS IN SEPARATE TRENCHES.

SHUT - OFFS :
A B C D A B C D
1. PROVIDE THE ENTIRE SYSTEM WITH VALVE SO LOCATED THAT THE SYSTEM OR
PORTION OF IT CAN BE OPERATED, REPLACED , AND REPAIRED, AS WELL AS
AFFORDING COMPLETE CONTROL OF WATER SUPPLY TO EACH GROUP OF A
A-1
GROUND FLOOR PLAN
9.83 9.83
FIXTURES. WHEN REQUIRED, PROVIDE ALSO PRESSURE REDUCING VALVE.
2.90 3.45 3.48 2.90 3.45 3.48
JOINTS AND FITTINGS: 1.65 1.10
PROPERTY LINE PROPERTY LINE VILLA VERNA
1. MAKE ALL JOINTS AIR AND WATER TIGHT. FOR JOINING PIPES, USE THE
FOLLOWING;
1 1

AY
W
F
O
N

HT
RIG
2.00

2.00

AD
RO

AD
A. POLYVINYL CHLORIDE PIPES : HUB TYPE JOINTS WITH PVC CEMENT

RO
SS
CO
3.10

3.10
WS
B. GALVANIZED IRON AND COPPER PIPES. CAREFULLY REAMED THREADED JOINTS. R
DS DS DS DS AD
APPLY TEFLON TAPE OR PAINT WITH RED LEAD AT ALL FD
2 2 UTH
RO
WS
THIS SITE SO
1.02

JOINTS LENGTHS. COMMON


WC LAV
1.10

FD
T&B
BU
CE
PROPERTY LINE

PROPERTY LINE
C. CEMENTS PIPES : GROUT WITH CEMENT MIX ALL AROUND THE JOINT IN A
Y LINE

Y LINE
INSISTENT MANNER. DO NOT ALLOW GROUT TO BULGE 3 3
INSIDE PIPE INTERIORS. USE APPROPRIATE COUPLERS AND
BLUE AT JOINTS. ROOF DECK
PROPERT

PROPERT
4.95

4.95
ROOF SLOPE

CLEAN OUTS: ROOF DECK BEDROOM 5 ADVENTIST


3.93
3.70

3.70
ACADEMY
9.95

9.95
CEBU

AD
1. FOR CLEAN STEMMING FROM CAST IRON BELL AND SPIGOT PIPES OR PVC ASIAN COLLEGE

RO
OF
TECHNOLOGY
SUBSTITUTES THEREOF, PROVIDE WITH LONG SWEEP QUARTER BENDS OR ONE OR
8.10

8.10

TH
BULACAO

TWO EIGHT BENDS, EXTENDED TO AN EASILY ACCESSIBLE PLACE, AND GENERALLY

U
SO
WHERE INDICATED IN THE DRAWINGS. FD WS FD

BU
4 4 4 4

CE
TRAPS : DS DS
1. EXCEPT FOR THE PRESENCE OF GREASE INTERCEPTOR AND OTHER DEVICES WHERE
THE TRAP IS AN INTEGRAL PART OF THE DESIGN. EQUIPPED WITH A TRAP EVERY
3.15

3.15

3.15

3.15
FIXTURE AND EQUIPMENT REQUIRING CONNECTIONS OF THE DRAINAGE SYSTEM.

3. SET EACH TRAP AS CLOSE AS POSSIBLE TO THE FIXTURE SERVED AND RENDER LEVEL
WITH RESPECT TO THEIR WATER SEAL. A VICINITY MAP
OTHER :
PROPERTY LINE PROPERTY LINE
1 2 NTS

4. PIPES SHALL BE INSTALLED AS INDICATED, ANY RELOCATION REQUIRED FOR PROPER


EXECUTION OF OTHER TRADES SHALL BE PRIOR APPROVAL OF ARCHITECT AND 2.90 3.45 3.10 2.90 3.45 3.10
ENGINEER.
9.60 9.60
2. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH,
AND ELEVATION.

3. ALL FIXTURES SHALL BE VENTED, UNLESS OTHERWISE INDICATED.

4. AIR CHAMBER : ALL INDIVIDUAL BRANCHES TO FIXTURES OR GROUP OF FIXTURE SAND T I D LOO OO
/ OR EQUIPMENT SHALL BE PROVIDED WITH CHAMBER OF CAPPED VERTICAL PIPE
EXTENSION OF DIMENSIONS AS IN DETAIL. P PLUMBING LAYOUT PLAN P DOWNSPOUT PLAN
8 3 SCALE 1:1 M
8 4 SCALE 1:1 M

CERTIFICATION
I HEREBY CERTIFY THAT THERE BE NO ARTESIAN WELL WITHIN THE RADIUS OF 25MTS. AWAY
FROM THE PROPOSED SEPTIC TANK LOCATION.

REGISTERED MASTER PLUMBER

P EPA ED BY : EG NO : P O ECT TITLE: OWNE : S EET CONTENT: T IS D AWING IS ISSUED O : S EET NO :


P ESENTATION BUILDING PE MIT
DATE: AS S OWN ESTIMATE AB ICATION
OWNE S APP OVED CONST UCTION
TIN NO : A P OPOSED 3 STO EY ESIDENTIAL BUILDING ELI ABALO AB A ANO BIDDING AS BUILT P
MASTE PLUMBE CLIENT
PT NO : T ESE D AWINGS AS INST UMENT O SE VICE A E T E P OPE TY AND
INST UMENTS O T E A C ITECT IT S ALL NE UNLAW UL O ANY
89
PE SON WIT OUT T E W ITTEN CONSENT O SAID DOCUMENTS TO
ADD ESS : DATE: LOCATION: C U AN BULACAO TALISAY CITY CEBU ADD ESS: C U AN BULACAO TALISAY CITY CEBU DUPLICATE O COPY SAID DOCUMENTS A 2 SEC 33 4 PD