Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 17

“STC – PtMP project”

CPE Installation Report

Customer site Details:-


Path Name NAJRAN-NAJRAN IP10351

W.O ID I3616269335441
MINISTRY OF INTERIORPUBLIC
Customer Name
SECURITY
Contact Name ‫يعقوب‬

Contact Number 0562232005

Coordinates 17.5045 44.34337

BS ZNNA744

Sector/ POL C-H

Antenna Dia. 0.3

Antenna S/N A03051822008000443

Design RSL 54.7

Actual RSL (dbm)/SNR(db) -54.9/33.2

CPE AUID A 1155194

Civil work(pole/tower) 3m

Length of Cable 40m

Delivery note signed Yes

Implemented Team Faisal Khan

Installation Date(Day-Month-Year) 07-10-2021


Installation Quality Pictures:-

# Picture Content No Of PICs

1 Customer building 1
2 Tower / Pole ( close up / Far distant) 2
3 Line of Sight from [Top / Down] 2
4 ODU Cable Termination 5
5 IDU & PWR Cable Termination 5
6 IDU Install Location ( close up / Far distant) 2
7 Site Labels (Five Labels) 5
8 ODU Grounding Cable (Wall Side) 1
9 Serial Numbers (CPE / Antenna / IDU) 3
10 RSL/SNR Snapshot 1
11 Ping test Snapshot 1
12 Completion Report 1
13 Field Operation Acceptance Page (For STC Team Use)
14 Field Operation Clearance If Any (For 2nd Clearance Visit)

 Picture (1): Customer Site building:


 Picture (2): Customer Site building:
Picture (2.1): Tower / Pole (close up):-
Picture (2.2): Tower / Pole (Far distant):-

 Picture (3): Line Of Sight Pictures:


Picture (3.1): Line of Sight from [From Top Side]:-
Picture (3.2): Line of Sight from [From Down Side]:-

 Picture (4): Outdoor Cable Termination Pictures:


Picture (4.1): ODU Cable Termination:-
Picture (4.2): ODU Cable Termination:-

Picture (4.3): ODU Cable Termination:-

Picture (4.4): ODU Cable Termination:-


Picture (4.5): ODU Cable Termination:-

 Picture (5): Indoor Cable Termination Pictures:


Picture (5.1): IDU Cable Termination:-
Picture (5.2): IDU Cable Termination:-

Picture (5.3): IDU Cable Termination:-


Picture (5.4): IDU PWR Cable Termination:-

Picture (5.5): IDU PWR Source Location:-

 Picture (6): Indoor Unit Install Location:


Picture (6.1): IDU Install Location (Close up):-

Picture (6.2): IDU Install Location (Far Distant):-

 Picture (7): Site Labelling:


Picture (7.1): ODU CPE: - Picture (7.2): ODU Cable Start
-:End
-:Picture (7.3): ODU Cable End: - Picture (7.4): IDU Label

-:Picture (7.5): IDU PWR Label

 Picture (8): Outdoor Grounding Cable:


 Picture (9): Site Inventory:

Picture (9.1): CPE Serial Number:-

Picture (9.2): Antenna Serial Number:-


Picture (9.2): IDU Serial Number:-

 Picture (10): RSL/SNR Snapshot:


 Picture (11): Ping Test Snapshot:

 Picture (12): Completion Report:


 (13): Field Operation Acceptance:

# Field Operation Inspection List  x


1 External/Internal Wiring 
2 Proper Site Labelling 
3 Serial Numbers Verification for Equipment 
4 Power Source 
5 Proper Antenna Fixing and Grounding Check 
6 Ping Test 

Field Operation Site Acceptance  x


Accepted 

If rejected, please state your reasons below:


# Field Operation Rejection Reasons

1
2
3
4

 (14): Field Operation Clearance If Any:

Clearance PIC (1):-

Clearance PIC (2):-

Clearance PIC (3):-


Clearance PIC (4):-

You might also like