Professional Documents
Culture Documents
Tablet Pressing Training Requirements
Tablet Pressing Training Requirements
Tablet Pressing Training Requirements
Operator Level 1
Operator Level 2
Employee Induction
Food Safety
PA-DOC-4.9.2 - Jewellery Policy
PA-SOP-4.9 Glass, Brittle Plastic & Other Similar Materials Breakage Procedure
PA-SOP-7.2 Personal Hygiene Procedure
PA-SOP-7.4 Cleanroom Gowning Procedure
PA-SOP-ALL-5.3.8 Allergen Spillage Procedure
PA-SOP-ALL-5.3.1 Allergen Control Program
PA-SOP-Pest Awareness Pest Control Awareness
PA-WI-MAN 6.1.3 - Work Instruction for the PTK - PR2000 I, II, III, IV
PA-MAN-WI-20 Manufacturing and Packaging Steps and Stands
PA-MAN-WI-21 Full Bag Weight
PA-MAN-WI-27 Tooling Reference number
SOP PA-SOP-MAN 6.1a - Production Process
PA-SOP-MAN-6.1m – Standard Operating Procedure for the Safe Operation of the
PTK PR-2000 Tablet Press Machine
PA-SOP-MAN-6.1n Reporting Damage to Equipment, Machinery and Fabrication
PA-SOP-MAN-6.1u Removal of Panels on All Machines
PA-SOP-MAN-6.1x Moving Machinery
PA-SOPMAN-6.1y – Standard Operating Procedure for the Safe Operation of the
PTK PR-3000 Tablet Press Machine
PA-SOP-MAN-6.1z - Standard Operating Procedure for the Operatives Tool Check
and Tool Box
PA-SOP-MAN-6.1.2 Manufacturing Clearance and Set Up Process
PA-SOP-MAN – Standard Operating Procedure for the use of Sieves within
Manufacturing (002)
PA-OJT-FORM 001 Allergen/Organic Production Dress Code
PA-OJT-FORM 002 - OJT - Manufacturing in Process Checks
PA-OJT-FORM 003 Waste Recording
PA-OJT-FORM 004 Manufacturing Tooling Set Up Check
PA-OJT-FORM 005 - OJT - PTK 2000 General Machine Training
PA-OJT-FORM 006 Alignment and Movement of Turret
PA-OJT-FORM 007 PTK Cleaning and Replacing Punches
PA-OJT-FORM 008 PTK Changeover
PA-OJT-FORM 009 Clearance and Set Up
PA-OJT-FORM 032 Basic Mechanical
PA-OJT-FORM 041 Packing Bulk Product
PA-OJT-FORM 043 Balance Checks
PA-OJT-FORM 052 PTK 3000 General Machine
Understanding Production Feedback Forms
PA-SOP-3.5.2.1 Goods in procedure
Team Leader Sign-off
Production Manager Sign-off
Acceptable Absence Level
Operator Level 3
RCA Training
Food Defence
PTK PR2000, PR3000 – Operation Manuals
The Pressing Machine’s in-depth analysis
The Auxiliary Equipment
The Machines’ Maintenance and Calibration
Root Cause Analysis
Shopfloor Data Capture
Continuous Improvement
5S Audit
Team Leader Sign-off
Production Manager Sign-off
Acceptable Absence Level
Operator Level 4
Operator Level 5
Team Leader
HACCP Training
Leadership Training
Six Sigma Leadership and Culture
Team Briefs and Daily Meetings
Communication and Visual Management
Manage CAPA Plan
Production Manager Sign-off
Senior Production Manager Sign-off
Operations Manager Sign-off
Acceptable Absence Level
Glossary:
Internal Training
Production Training
Quality Training
Engineering Training
Continuous Improvement
Formulation
Approval