Project: ETAP Page: 1

Location: 16.0.0C Date: 05-12-2021

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: modul3 Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Line1 0.949 0.181 -0.949 -0.435 0.2 -253.5 100.0 100.0 0.03

T1 1.868 1.158 -1.859 -1.082 9.0 76.3 100.0 97.9 2.14

Cable1 1.541 0.747 -1.534 -0.745 7.2 1.9 97.9 97.4 0.42

Cable2 0.318 0.335 -0.318 -0.335 0.5 0.1 97.9 97.8 0.10

T5 0.949 0.435 -0.943 -0.401 5.6 33.6 100.0 98.2 1.79

T2 -0.777 -0.258 0.788 0.294 10.2 35.8 94.9 97.4 2.50

T3 -0.735 -0.412 0.746 0.451 11.0 38.5 94.2 97.4 3.23

Cable5 -0.655 -0.120 0.656 0.121 1.1 0.3 97.8 97.9 0.17

T4 0.973 0.456 -0.964 -0.406 8.3 49.6 97.8 95.2 2.52

T6 0.952 0.443 -0.947 -0.409 5.7 34.0 100.0 98.2 1.82

Cable3 -0.941 -0.401 0.943 0.401 2.6 0.7 97.9 98.2 0.25

Cable4 -0.944 -0.408 0.947 0.409 2.6 0.7 97.9 98.2 0.25

T7 1.229 0.688 -1.215 -0.603 14.2 85.0 97.9 94.3 3.63

78.1 102.8
Project: ETAP Page: 2

Location: 16.0.0C Date: 05-12-2021

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: LF
Filename: modul3 Config.: Normal

Equipment Cable and Overload Heater Losses Summary Report

% Voltage

Connected Load Cable /Overload Heater Losses


Terminal on % Vst
% Vd
ID Type ID Library kW kvar Bus Bus kV Load kV Operating Starting