HENKEL Calculation
HENKEL Calculation
7 Hrs
Mixing Time 3 Hrs Three Batches Mixing Time
Shifting to filling vessel 2 Hrs Shifting to filling vessel
Filling ( depend upon Packing ) 4 Hrs Approximate Filling ( depend upon Packing )
Total 11 Hrs Total
Utilities use for above batch Utilities use for above batch
Agitator motor 5.5 KW X 7Hrs = 38.5 Kw/h x 0.14 SR 5.39 Agitator motor 5.5 KW X 7Hrs = 38.5
( Collied vessel 3 Hrs + Filling vessel 4 Hrs ) ( Collied vessel 3 Hrs + Filling vessel 4 Hrs )
Filling Pump 4.0 Kw X 4 Hrs =16 Kw/h x 0.14 SR 2.24 Filling Pump 4.0 Kw X 4 Hrs =16
Cooling of product during Mixing 66 Cooling of product during Mixing
Nitrogen 7 Nitrogen
Bucket filter and other consumable items Per batch 300 Bucket filter and other consumable items Per batch
Packaging material (Depends upon packing ) Packaging material (Depends upon packing )
Total days require to produced T-1 & T-221 + 106 =327 days / Year 27.25 days/Mont
Vessel Use Collied vessel
Capacity 3.5 MT
317 Days 106
After mixing it will be shifted in other Tank
2 Hrs
7 Hrs
Per batch
1
4
Product P-1
Requirement 1913 MT/Y Vessel Use REACTOR ER # 2
Batch Size 3.5 MT Capacity 5.0 MT
Numbers of Batches 547 Days 274
Basis 2 batches per day
12 Hrs
Mixing Time 6 Hrs Two Batches
Filling ( depend upon Packing ) 4 Hrs
AR -1 AR -2 AR -3 AR -4 ER -1
DAYS 22 Days 330 556 164 88 220
264 Per year 3,960 6,672 1,056 1,056 2,640
24 Days 360 607 178.5 96 240
288 Per year 4,320 7,284 2,142 1,152 2,880
27 Days 405 683 200.8 108 270
324 Per year 4,860 8,196 2,410 1,296 3,240
327
* The UPR production depends upon the requirement of Scott Barder
The average 1.25 batch per day .
ONS
25 working days
27 working days
30 working days
2 x 12,000 24,000
2X Check With Henkel
15,000
20,000
40,000
55,000
35,000
avoid any ignition & pollution 60,000
70,000
Check With Henkel
225,000
664,000
1 is 1913 MT/Y
AR -1 AR -2 AR -3 AR -4
Product Category UPR UPR AlKYD AlKYD
Available days / Year 320 320 320 320
Available Hours 24 7,680 7,680 7,680 7,680
Production Hours 7,680 7,680 7,680 7,680
Batch Time - Hrs 19 19 21 20
Output Per Batch 12.564 21.709 6.46 4.079
# of Batches / Year 404.21 404.21 365.71 384.00
Annual Production 5,079 8,775 2,363 1,566
Variable Charges:
Electricity -Kwh. 2,105 2,812 474 463
Nitrogen 45 69 17 17
Diesel- liters 43 43 43 43
18 12 2
8.2 3.60 2.06 Material Charge
98.50%
8.077 3.500 2.040
8.077
99.50%
40 692 475
2 0 0
2.69 water Litre
1000
REACTOR ER # 2 SS 321 (EMULSION ) 1800 Dx 3000 L x 5 TH
MOTOR OF REACTOR HEYNAU-KOPP VARIABLE K-25
VERTICAL COLUMN SS 321 273 D X1695 L
CONDENSER SS 304 43 D x 2495 L X 74 TUBES
SEPERATOR SS 304 450 D X 750 L
COLLIED VESEL LAMPID COIL SS 304 1760 D X 2620 L X 5 TH
MOTOR OF VESSEL GEARED MOTOR BAUER G 83-20/D5A4-429
MONOMER VESSEL SS0 304 1800 D x 2850 L X 4 TH
MOTOR OF MONOMER GEARED MOTOR BAUER
HOLDING VESSEL # 2 JACKET TYPE 2200 D X 3400 L
MOTOR OF HOLDING VESSEL G-82-20 /D5A4-429
CATALYST TANKS SS 304 500 DX 650 L X 2 TH
FILTER BUCKET SS 304
7.63 CU M 5 MT HAGEMANN 1986
9 -17.5 KW
20 SQ M
100 LITRE
3800 LITRES.
5.5 KW 40 RPM
6600 LITRE
5.5 KW 340 RPM
10 CU M
11 KW 34.5/ 1760 RPM 2000153
100 LITRES
1 Nos
Production for Abahsain Scott Bader JV
Listing of Additional Capex requirement