Standardized Work
Department: Die Maint revision
Position: All
Heating steels before and after Welding date: 11/7/2018

Task # Work Element Description Key Points Notes/ Diagrams


1

WIP Measurement/ Quality Check


Setting

Prepared By:

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562924427.xlsx date of last revision: 14Feb17
UNCONROLLED IF PRINTED

Checked By:

Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562924427.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: Die Maint revision
Position: ALL
Grinder Guard's date: 5/27/2020

Task # Work Element Description Key Points Notes/ Diagrams

This is for safety reasons to protect


you and you team members.

The tools and tool box


When hired on you are given tools are property of Topre
#1 needed to preform the job America please take
efficiently. care of the tools you
are given.

The grinders and


tools are your
The grinder you have been supplied responsibility to keep
#2 with is yours and yours only. inventory of and turn
in if broken or
damaged.

All angle grinders must have guards The guards are a


#3 to protect you and your team requirement and
members from injury's. cannot be taken off!

Random box checks


Please report any broken or
will be done to take
#4 missing guards to your team leader
inventory on your
or supervisor to be replaced.
tools.

This will insure all


Make sure to 5S your tools and box your tools are
#5 before going home. accounted for at the
end of the day.

Prepared By: Blake Sandlin


Checked By:
WIP Measurement/ Quality Check Safety
Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562924427.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: revision
Position: date:

Task # Work Element Description Key Points Notes/ Diagrams

Prepared By:

Checked By: Measurement/ Quality Check Safety


WIP Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562924427.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: Die Maint revision
date: 7-May-19
Position: All
Task # Work Element Description Key Points Notes/ Diagrams

Prepared By:
Checked By: Measurement/
WIP Setting Quality Check Safety

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562924427.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Measurement/
WIP Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562924427.xlsx date of last revision: 14Feb17