Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work
Department: revision
Position: date:
Prepared By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925276.xlsx date of last revision: 14Feb17
UNCONROLLED IF PRINTED
Checked By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925276.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: Die Maintenance revision
Grinding small parts with Angle Grinder date: 6/12/2018
Position: All
Task # Work Element Description Key Points Notes/ Diagrams
Foam inserted
safety glasses or
Wear the appropriate PPE
1 face shields,
for grinding.
gloves, sleeves,
etc.
Make sure
grinding area is
free from
2 Prepare the grinding area.
flammables and
other potential fire
hazards.
When grinding
with an angle
grinder do not
hold small parts in
Clamp and secure small
3 your hand while
parts in vise before grinding.
grinding. The
grinder could
kick/slip off
causing injury.
Check grinding
wheel for cracks.
Inspect grinder and grinding
4 Make sure the
wheel for any defects.
wheel is secured
to the grinder.
Secure grinder
with 2 hands
before grinding.
Having two hands
on the grinder will
5 Begin grinding small parts.
allow you to keep
your hands
behind the
grinder guard and
out of harms way.
Prepared By: J.Holmes 6/12/2018
Checked By: C.Jones
WIP Measurement/ Quality Check Safety
Setting
Approved By: # details revision date Name
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925276.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925276.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
Checked By: Measurement/
WIP Setting Quality Check Safety
Approved By: # details revision date Name
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925276.xlsx date of last revision: 14Feb17