Professional Documents
Culture Documents
Ball Spring: Operating Standard E-3
Ball Spring: Operating Standard E-3
Supervisor
Level Trainee Prepared by
Operating Standard E-3 Verify
Inspect the ball and spring, make sure the ball does not have
1 Make sure punch's slot is right size
flat spots.
3 Hold punch with pliers Do not hold cutting edge to avoid damage No. 2
4 Turn punch until punch is locked Put free hand on punch and turn punch until you feel click.
5 Confirm punch is locked Try to turn punch. If punch moves, punch is not locked.
do not hold cutting edge
No. 3
No. 1
Heavy Duty (Bigger slot)
turn punch until
ball is in slot
No. 4 ؘ
Spring
Ball Parts N/A
Tools Pliers
PPE Bump Cap, Gloves, Safety Glasses, Ear Plugs, Safety Shoes, Sleeves,
1
6
THIS IS A CONTROLLED DOCUMENT. THIS DOCUMENT IS NOT TO BE COPIED. ONLY ORIGINALS STAMPED (in upper right corner) BY MANAGER ARE TO BE USED FOR PART PRODUCTION.
OS-2 of 2
Supervisor
Level Trainee Prepared by
Operating Standard E-3 Verify
1 Insert bar to small hole and press down ball If ball is tight, tap bar to loosen ball
3 keep holding down ball and pull out punch with pliers
Parts N/A
Tools Pliers, hammer, br
PPE Bump Cap, Gloves, Safety Glasses, Ear Plugs, Safety Shoes, Sleeves,
1
6
THIS IS A CONTROLLED DOCUMENT. THIS DOCUMENT IS NOT TO BE COPIED. ONLY ORIGINALS STAMPED (in upper right corner) BY MANAGER ARE TO BE USED FOR PART PRODUCTION.