Professional Documents
Culture Documents
Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work
Department: revision
Position: date:
Prepared By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925735.xlsx date of last revision: 14Feb17
UNCONROLLED IF PRINTED
Checked By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925735.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
Checked By:
WIP Measurement/ Quality Check Safety
Setting
Approved By: # details revision date Name
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925735.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925735.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: Die Maintenance revision
Position: Technician
Moving Full Oil Drums date: 18-Sep-17
If the drum is full do not attempt to move it by Follow steps 4~7 to make sure
3 hand. it is moved correctly.
When moving full oil drums the oil drum trucks are
5 the correct way to move them.
See pic. 3
Pic 3 Pic 4
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925735.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925735.xlsx date of last revision: 14Feb17