Professional Documents
Culture Documents
Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work: Task # Work Element Description Key Points Notes/ Diagrams
Standardized Work
Department: revision
Position: date:
Prepared By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926548.xlsx date of last revision: 14Feb17
UNCONROLLED IF PRINTED
Checked By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926548.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
Checked By:
WIP Measurement/ Quality Check Safety
Setting
Approved By: # details revision date Name
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926548.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926548.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: Die Maintenance revision
Position: Tool Maker
Safe Operating Procedures for Spotting Dies date: 27-Jun-19
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926548.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
First Check the T bolts to make shure they are up The T bolts should be changed
to date. every year.
When setting punches, the only person allowed The other person or persons
3 inside the die or press is the person operating the should remain ouside of the
pendant. Pic 4 machine during operation.