Professional Documents
Culture Documents
MC # I s.2017
MC # I s.2017
MC#^I s.2017
MEMORANDUM CIRCULAR
In view of the increased authority provided under MC No.55 s.2017 vested to NIA
Officials particularly the Field Managers (RIO's/DEPT OFFICES/PMO's/IMO's) who are
to conduct contract procurement under outsourcing scheme of Consultancy Services in
undertaking Detailed Engineering Design (DED) of Storage/Reservoir Dams [Reservoir
Irrigation Projects and the Appurtenant Structures /Facilities) and the approval of
same including the review of DED plans / drawings and reports, it is imperative that the
NIA Central and Field Offices Managers, and Dam Design Engineers [including the
hired Design Consultants/Firms/Entities) shall for uniformity adopt and maintain
common or standard process, procedure and requirements for the preparation,
undertaking and conduct review of DED's with the corresponding
documentations/reports prior to approval by the concerned Authorized Official or
Head of Office.
The herein attached Standard Process and Procedure shall serve as the Agency's
handy tool, reference and template for both the new practicing and experienced Dam
Design Engineers & Consultants in facilitating the preparation, conduct/ review and
approval of the project's DED documents.
Therefore, all concerned Managers and RIO/PMO/IMO Chief Design Engineers are
obliged to observe compliance with the said Standard Process and Procedure to
ensure completeness of details, information/requirements which are of vital
importance and a valuable reference in the conduct of Dam Integrity , Safety
Inspection and Evaluation.
o o
This Memorandum Circular shall take effect immediately and shall remain in force unless
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
SECTION! PURPOSE/OBJECTIVE
This dDCument intends to provide the Agency a standard guidance
on process and procedure and also uniform template common for
all the nev\/ly practicing and experienced Dam Design
Engineers/Staff including the hired Individual Design Consultants
and Consulting Firms and concerned NIA officials both at the
Central and Field Offices who are mandated and duly authorized to
prepare, review and approve Detailed Engineering Designs
(DED's) Plans and Drawings including Documentations/ Reports of
Storage /Reservoir Dams.
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 2 of 18
o o
r
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Pages of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
3.1.3.1. Determine & delineate existing irrigated, rain fed and new
area for inclusion under the project.
3.1.3.2. Verify/validate and confirm the delineated/identified
Potential Irrigable /Service Area and or Design Irrigable
Area as reflected on the General Irrigation & Drainage
Layout/Network and as identified on land classification map,
soil map and land use Map.
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 4 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
the infrastructure.
3.1.5.1. Regional geofogy, Geofogic map of the project area. Seismic Map &
Geohazard map of the PhiUppines & the focality
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 5 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 6 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 7 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 8 of 18
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 9 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 10 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 11 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
benchmarks.
3.3.2.6. Seismic monitoring apparatus (Strong motion seismograph)
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 12 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 13 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
4.6.2.4. SURVEY
1. General Layout of Project area reflecting the delineated design irrigable
area, focation of the Dam & reservoir area and any existing facilities
(ie. roads & public infra facilities)
2. Topographic map of the dam site and the whole reservoir area and
reservoir rims / flanks reflecting the contour lines w/ corresponding
elevations up to the estimated maximum tevel to be submerged by the
reservoir water surface, Dam axis. Spillway center line. Outlet works
conduit center line alignment. Include to reflect the focations ( in Grid
and or Geographic Coordinates System) , Designations or
Identifications and Elevations of the Horizontal and Vertical Survey
Control Points and Bench Marks
4.6.2.5. GEOLOGY
1. Geofogic Map of the dam site and reservoir area reflecting focations and
designations of the Test Pits, borrow areas of embankment and quarry
sites of boulders/ cobbtes /rock fragments & concrete aggregate
materials. Prepare tabulations of materials with corresponding
Classifications, identified source and estimated quantities.
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 14 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
2. Geofogic Profile/ Cross- Section of dam axis reflecting the focations &
designations of Drill holes/ Boreholes with the corresponding fog of
borehotes or the factual description of the foundation materials. Must
indicate also the focation of center lines of the Spillway & Outtet Works
Conduit and other specially provided appurtenances (ie.Tunnels,
Galteries and emergency outtet works/ Facilities)
3. Geofogic Profite/Sections along Spillway line and Outtet Works Conduit
line reftecting focations and designations of Borehotes/Drill botes and
the corresponding fog of borehotes or factual information & outline of
the structure.
4. Drilling & Grouting Plan and Profite & Section and details of any other
foundation treatment measures.
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 15 of 18
o o
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
1. INTRODUCTION
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 16 of 18
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
1.1. Scope
1.2. Design devetopment
1.3. Principal features
2. PROJECT AREA
2.1. Location
2.2. Access
2.3. Topography
2.4. Geofogy/Seismicity
2.5. Hydrofogy and Ffood Studies
2.6. Sedimentation
2.7. Construction materials.
4. SPILLWAY
4.1. Spillway channels width & wall height & freeboard
4.2. Spillway control weir, crest profite, Steel gates & lifting or hoisting
mechanism & hydraulic performance
4.3. Energy dissipator
4.4. Structural design
4.5. Inspection access, pedestrian & equipment footbridge / bridge
4.6. Physical and Numerical Modeling Considerations/report/results (if
rendered and undertaken as required)
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 17 of 18
DSD-CWDS-ENGINEERING STANDARDS NO.002-12-2017
5. OUTLET WORKS
5.1. Overall layout of Diversion (Tunnel or Cut & Cover Section) &
or irrigation outlet conduit, irrigation intake, gate chamber,
emergency & or sediment flushing outlets
5.2. Ffow Control & Regulating Valves and guard & regulating steel gates
5.3. Hydraulics & structural design
5.4. Inspection, monitoring. Repair or replacement & maintenance
access provisions (i.e. Adits & Galleries)
5.5. Physical and Numerical Modeling Considerations/report/results (if
rendered and undertaken as required)
6. CONSTRUCTION CONSIDERATION
6.1. Proposed Construction sequence/Schedute
6.2. Proposed Key Staff, Manpower & Equipments Utilization
6.3. Diversion & care of river Scheme
7. APPENDICES
7.1. APPENDIX -A-GEOLOGY
7.2. APPENDIX -B- HYDROLOGY
7.3. APPENDIX -C- SEDIMENTATION
7.4. APPENDIX-D -DAM STABILITY
7.5. APPENDIX-E -SEEPAGE
7.6. APPENDIX-F-ELECTRICAL / ELECTRONICS& MECHANICAL
FACILITIES
8. REFERENCES & BIBLIOGRAPHY
9. FIGURES
10. TABLES
NIA Standard Process and Procedure for The Preparation And Undertaking/ Review of Detailed Engineering Design (DED) Of
Storage/Reservoir Dams
Page 18 of 18