Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

ROUGHTERRAINCRANE

TR-250M-5
TADANOTR.25OM.5
HYDRAULICROUGHTERRAINCRANE
TOTALRATEDLOADIN KILOGRAMS
THISDOCUMENT
SHOULDBE READIN CONJUNCTION
WITHTHEA.M.L.
1. oUTRIccERS ExrExpEp{o.sm;- 35s"
FULLY
c
X'
B ( m \)
9.5m 16.5m23.5m 30.5m
E 50
D
25
8.0m
450 5o
13.0m
25 450
2.5 25.0 19.0 12.5 83" 3.0 2.1 1.6 2.0 1,2 0.9
3.0 25.0 19.0 12,5 7.0 76" 3.0 2,1 1.6 2,0 1.2 0.9
3.5 25.0 19.0 12,5 7,0 72 3.0 2.1 1.6 1.75 1 . 1 0.8
4.0 23.0 19.0 12,5 7.0 70 2,8 2,1 1,6 1.65 1.05 0.9
4.5 21.2 18.0 12,5 7,0 65" 2.35 1.8 1 . 5 1.4 0,95 0.79
5.0 19.4 16.7 12.5 7,0 60" 2.0 1.55 1.35 1.2 0.9 0.75
5.5 17.9 15.6 11.75 7.0 550 1.45 1.35 1.2 1.05 0.85 0.74
6.0 16.3 14.6 11,1 7.0 500 1.05 1 . 0 0.95 0.85 0.75 0,7
6.5 15.1 13.9 10.5 7,0 450 0.75 0.7 0.7 0.6 0.55 0.55
7.0 '13,7 13,0 10.0 7,0 400 0.55 0,5 0.4 0.4
8.0 10.55 9.0 7,0 350 0.38 0.35
9.0 8.65 8,2 6.3 A = Boom Length
10.0 7.05 7.3 5.8 B = Working Radius
11.0 5.85 6.4 5.3 C = Jib Length
12,0 4.95 5.5 4.9 D = Jib Offset
E = Boom Angle
13,0 4,2 4.75 4.5
14.0 3.6 4.1 4.15
15.0 3.6 3.9
16.0 3.15 3,45
17.0 2,9 3.05
18.0 2.45 2.7
19.0 2.15 2,45
20.0 1.9 2,2
21,0 1 . 7 1.95
22.0 1.75
24.0 1,4
26.0 1.15
29.0 0.95
PRECAUTIONS
TOBETAKEN
WHEN
THEOUTRIGGERS
AREEXTENDED:
'l
. Thetotalratedloadsshovi'n
aretorhe casewhentheoutiggers aresethorizontally
onfirmground.
Thevalues abovetheboldlinesarebasedonlhe
cranestrengthwhllethosebelow arebased
onthecranest-bitity.
2. Totalratedloadsbelovboldlineedonotexceed75%oftipping load,
3' Thau€ights ofslingsandhooks (mainwindrhook:260kg,intermediate
hook:170kg,
auiliarywinc.h:
o0kg)areincludedinthetolalraledloadssho,vn,
4, Thetohlratedloadisbased ontheadualwo*ing mdiusinc.ludingthedeflection
oftheboom.
Thechartbelovir
shovistheshndadnumber ofpartlin€sforeadrboomlength.Theloadperlineshouldnots(ceed3,ahr themainwinchand3.0tfor
theauxiliarv
winch,
BOOIILENGTH 9.5m 16.5m 23.5m 30.5m JIB I SINGLETOP
NO.OFPARTLINES I 6 4 4 1
6. Asa ru|e.,
free{alloperation beperformed
should onlywhenlowering
thehookalone.lf a hoisted
loadmustbelowered
byfree-fall
operation,
theload
mustbekeptbelow1/5hofthetotalratedloadandsuddenbraking
operations
mustbeavoided.
7. Thetotalrabdloadforthesingle topshallbethevalueobtained bysubtrading 200kgfromlhetotalratedloadoftheboomandmustnoto(ceed3.0t.
8. Thehoistingperformancetorhe 'OveIsides'range rvilldifferaccording
tothe-extendedwidthoftheoutriggers.
operationsshould beperfomed in
ac@dance withtheperformanc€ corespondingtotheextended widlh.Also,althoughthe prforiiances
hoisting iorthe.overfronfand"overreal
rangesare€quivalenl
tolhoaeofthe 'oulriggers
fullyexl8nded' condition,
thefrontandrearrang*ianglea)willdifferaccordinglo thewidthtovihichthe
oumggers areextendedinthelettandriahtdireciions.
9. Specialweather caution:
RefertoOperaiors Manual.
10. Refer
lo CraneManual.
TADANOTR.25OM.5
HYDRAULICROUGHTERRAINCRANE
TOTALRATEDLOADIN KILOGRAMS
THISDOCUMENT
SHOULDBE READIN CONJUNCTION
WITHTHEA.M.L.
?. luTRtccERSMlD

Y'
B(m)\
9.5m 16.5m23.5m30.5m D
E
c
5o
8.0m
25 45" 5o
13.0m
250 450
2.5 25.0 19.0 12.5 830 3.0 2.1 1.6 2.0 1,2 0.8
3,0 25.0 19.0 12.5 76" 3.0 2,1 1 . 6 2.0 1.2 0.8
3.5 25.0 19.0 12.5 7.0 72 3.0 2.1 1 . 6 1.75 1 , 1 0.8
4.0 23.0 19.0 12.5 7,0 700 2,9 2,1 1 . 6 1.65 1.05 0.8
4.5 21.2 18.0 12.5 7,0 65" 2.0 1 . 8 1 . 5 1.4 0.95 0.78
5.0 18.4 16.7 12.5 7,0 6 0 0 ' 1.3 1 . 1 5 1 . 1 1.0 0.9 0.75
5.5 15.4 15.0 11.75 7.0 550 0.8 0.75 0.75 0.65 0.6 0.5
6.0 13.0 12.6 11,1 7.0 500 0.5 0.45 0.45 0.4 0.35 0.3
6.5 11,2 10.9 10.5 7,0
7,0 9.5 9.4 10.0 7.0 A = Boom Length
B = Working Radius
8.0 7.3 8.0 7.0 C = Jib Length
9.0 5.85 6.5 6.3 D = Jib Offset
10.0 4,75 5.4 5.6 E = Boom Angle
11.0 3.9 4.55 4.8
12.0 3.3 3.85 4.15
13.0 2.75 3.3 3.55
14.0 2,3 2.85 3.1
15.0 2.45 2,7
16.0 2,1 2.35
17,0 1.9 2.1
18.0 1.55 1 . 9
19.0 1.35 1 . 6
20.0 1.15 1 , 4
2',1.0 0.95 1.2
22,0 1.05
24.0 0.75
26.0 0.5
PRECAUTIONS TOBETAKENW}IENTHEOUTRTGGERS AREEXTET{DED:
1' Thetotalratedloadsshown arcforhe casewhentheoubigge|s onfirmground.
aresethorizontally Thevaluesabove
theboldlin€sarebas€d
0nthecrane strengti
whileftosebelow arcbased
onhe crane stabilily.
2, Totalratedloadsbelow boldlinesdonotexceed
75%oftipping
load.
3. Tietwights ofslings
andhooks (mainwinchhook:
260kg,
intermediate
hook170kg,auxiliary
winch:
60kg)areindudedinthetotalraGdloads
snown.
4. Thetotalratedloadis basedontheactualworking
radiusincluding
thedeflection
oftheboom.
5. Thechaibelow
shorr{s
he standard ofpadlinesbr eadlboom
number Theloadperlineshould
length. notexceed
3.2tforfte mainwinch
and
3.0tfortheauxiliarv
win ch.
BOOMLENGTH 9.5m 16.5m 23.5m 30.5m JIB' SINGLE TOP
NO.OFPARTLINES 8 6 4 4 1
6. Asa rule,trce-hlloperation shouldbeperfomed onlywhenlo\asringthehookalone. Ita hoigted
loadmustbelov,/ered
byfree-fall
operation,
tre
loadmustbekeptbelow 1/5tof$e htalratedloadandsudden braiing
opeBtions mustbeavoided.
7. Th-e tohlratedloadforthesingletopshallbethevalueobtained bysubtading200kg fromfrebtalrabdloadoftheboom andmustnotexceed
3.0t.
8. Thehoisting performanceforhe "Over
sides"rangewilldifferacording
b theextended widthoftheoufiggers.
Operations shouldbeperfurmed
inaccordancewihtheperfotmance corBspondingtofie 6)dended width.Also,although performances
thehoisting for$e "Over tronfand'Over
reafranges areequivalent
tohoseofthebutriggers fullye{ended'ondition,
thefronlandrearrangjes(angle
a)willdifferaccording
totre
width
towhich theoutriggersareextended
inhe leftandrightdirections.
9. Special \teather
caution:
Reter toODeratorsManual.
1 0 . RefurtoCrane Manual,
TADANOTR.25OM.5
HYDRAULICROUGHTERRAINCRANE
TOTALRATEDLOADIN KILOGRAMS
THISDOGUMENT
SHOULDBE READIN CONJUNCTION
WITHTHEA.M.L.

3. OUTRIGGER
c 8.0m 13.0m
\, 9.5m 16,5m23.5m30.5m D
B (m)\ E 5o 25 45" 5o 25 450
2.5 25.0 19.0 12,5 83" 3.0 2.1 1.6 2,0 1.2 0.8
3.0 25.0 19.0 12.5 760 3.0 2,1 1,6 2,0 1.2 0.8
3.5 20.5 19.0 12.5 7,0 720 2,2 1.8 1.6 1.75 1 , 1 0.8
4.0 16.0 15.7 12.5 7.0 700 1 . 9 1.5 1.35 1.4 1.05 0.8
4.5 12,8 12.6 12.5 7.0 650 1.0 0.9 0.8 0.9 0.65 0.55
5.0 10.7 10.5 11.0 7,0 60" 0.5 0.45 0.4 0.4 0.35 0.3
5.5 9.05 8.8 9.4 7,0
6.0 7,7 7.6 8.2 7.0 A = Boom Length
B = Working Radius
6.5 6.6 6.5 7,25 7,0 C = Jib Length
7,0 5.8 5.6 6.4 6.5 D = Jib Offset
8.0 4.4 5.05 5.3 E = Boom Angle
9.0 3.4 4.05 4.35
10.0 2.7 3.3 3.65
11.0 2.15 2.7s'.3.05
12.0 1.7 2.3 2,6
13.0 1.3 1.9 2,2
14.0 1.0 1.6 1.85
15.0 1.35 1.55
16.0 1 . 1 1.3
17,0 0.9 1.05
19.0 0,7 0.9
19.0
20.0
0.5 0.7 I'm, |*:tit'Illilf.i:l
|'il,:lff'
lAnglea"l 25
I
15
0.55 | | 5 |

PRECAUTIONS TOBETAKENWHENTHEOUTRIGGERSARE EXTENDED:


l. Thetotalratedloadsshown arobrlhe casewhenhe outriggersaresethorizontally
onfirmground.
Thevalues abovehe boldlinesare
basedonhe cranestrength whilethosebelowarebasedon-0recran€shbility.
2. Totalrat€dloadsbelow
boldlinesdonotexceedZ5%oftippingload.
3' Theweighbofslingsandhooks(mainwinchhook260kg, inbrmediatehook170kg,auxiliary
winch:
60kg)areincluded
inthetohlrated
loads shown.
4. Thetotalratedloadis basedontheactualworking
radiusincluding
thedeflection
of theboom.
5. Thechartb€lowshowsthestandard ofpartlinesforeachboomlengh.Theloadperlineshould
number notexceed
3.a br themain
winch
and3.0tforthe
theauxilisrv
windl.
winch.
BOOM LEI{GTH 9.5m 16.5m 23.5m 30.5m JIB/ SII{GLETOP
NO.OFPARTLINES I 6 4 4 1
Asa rule,free-fall
operation
shouldbeperformed onlywhenlowering thehookalone,lf a hoisted
loadmustbelowered
byfree-fall
operation,theloadmustbekeptbelow1/5t'of thetotalratedloadandsuddenbrakingoperations mustbeavoided.
7. Thetotalratedloadbr he singletopshallbethevalueobtained bysubfacting 200kg fromh6 tohlratedloadoftheboomandmustnot
exceed 3.0t.
8. The- hoistingperformance
forhe "oversides"rangewilldifferaccording
totheextended widthoffre outriggers.
Operations
shouldbe
performed inaccordance
withhe perfurmance coresponding tohe extended widfr.Also,altrough performances
fte h-oisting forfre
"overfont'and"overreafranges areequivalent
b hoseoihe "outriggers fullyextended" condiion,thefont'ahd (angle
rearranges a)
willdifferaccording
tohe widthtowhichtheoutriggers
areextendeo inttreteftancrigtrtdireclions.
9. Special weaftercaution:
RefertoODeratorsManual,
10. Refer toCrane Manual.

4
TADANOTR.25OM.5
HYDRAULIGROUGHTERRAINCRANE
TOTALRATEDLOADIN KILOGRAMS
THISDOCUMENT
SHOULDBE READIN CONJUNCTION
WITHTHEA.M.L.
4: WITHOUTOUTRIGGERS
STATIONARY CREEP (travellins
at 1.6km/hor less)
B 9.5mBoom 16.5mBoom 23.5mBoom 9.5mBoom 16.5m Boom 23.5mBoom
(m) Over 360' Over Over Over Over Over
Front Front 360. Front 360' Front 360' Front 360" Front 360"
3.0 14.0 9.0 9.0 7.3 10.5 7.0 7,5 5.1
3.5 14.0 7.6 9.0 7.3 6.5 4.5 10.5 6.2 7,5 5.1 5.5 3,2
4.0 12.5 6.3 9.0 5.85 6.5 4.5 9.5 5.3 7.5 4.9 5.5 3,2
4.5 10.9 5.2 9.0 4.75 6.5 4.5 8,7 4.4 7.5 3.95 5.5 3,2
5.0 9.55 4,3 8,2 4.0 6.5 4,3 8.0 3.6 7.0 3.3 5.5 3,2
5.5 8.3 3.6 7,4 3.3 6.1 3.7 6.9 3.0 6,2 2,7 5.15 3.1
6.0 7.2 3.0 6.6 2,8 5.65 3,2 5.9 2,5 5.5 2,3 4.8 2,7
6.5 6.25 2,5 5.9 2.35 5,25 2,75 5.1 2,1 4.9 1.9 4,45 2,3
7.0 5.2 2,0 5.25 1.95 4.85 2,4 4.3 1 . 7 4.35 1 . 6 4.15 2,0
8.0 4.1 1.4 4.1 1.8 3.4 1 , 1 3.5 1 . 5
9.0 3.25 0.95 3.5 1.4 2.7 0.7 2.95 1 . 1
10.0 2,6 0.6 3.0 1.05 2.15 2,45 0.8
11.0 2,1 2.55 0.75 1.7 2.05 0.6
12,0 1.7 2,2 1.35 1,7
13.0 1.35 1.85 1,1 1,45
14.0 1.0 1.55 0.8 1.2
15.0 1.3 1.0
16.0 1.05 0.85
17,0 0.85 0.7
18.0 0.65 0.55
19.0 0.5
B : WORKING (m)
RADIUS

NOTE: Stationary
loadcapacities
do notexceed75o/o of tippingload.Pickandcarry1.6kmlhor lessload
capacities
do notexceed662/30/o
of tippingload.
PRECAUTIONS
TOBETAKEN
WHEN
THEOUTRIGGERS
ARENOTMOUNTED:
1. Thetotalratedloadsshownareforthecasewhenthecraneis sethorizontally onfirmground, with
theairpressureofthetyresbeingattheprescribed pressureandwiththespringlockbeingapplied
completely.
Thevaluesabovetheboldlinesarebasedonthetyrestrength whilethosebeloware
basedonthecranestability.Thefoundation,
working conditions,
etc,shouldbetakeninto
consideration
adequatelywhenusingthecraneforactualwork.(Tyreairpressure: 8.0k9/cmz).
2. Theweights oftheslingsarehooksareincludedin thetotalratedloadsshown,
3. Thetotalratedloadsarebasedontheactualworking radiiintowhichareincludedthedeflection
of
theboomandthetyres.
4. Thechartbelowshowsthestandard numberof partlinesforeachboomlength. Theloadperline
shouldnotexceed 3.2tforthemainwinchand3.0tfortheauxiliarv winch.
. BOOMLENGTH 9.5m 16.5m 23.5m JIB' SINGLE
TOP OVERFRONT
NO.OFPARTLITIES I 6 4 1
5. Thetotalratedloadforthesingletopshallbethevalueobtained
bysubtracting
200k9fromthetotal
ratedloadoftheboomandmustnotexceed 3.01. APPROX.2DEG.
6. Free-fall shouldnotbeperformed
operations without
outriggers.
7. Booms andjibsshould
over30.5min length notbeusedwithoutoutriggers, \ -
------- /
8. "Overfront"craneoperations
shouldbeperformed withtheboombeinginsidea2 area(1' eachto
WORKINGAREADIAGRAM
'OVERFRONT'
ffii" r*ing
brake
shourd
beappried,
tne
naoshourd
bekept
as WITHOUTOUTRIGGERS
"*lYJilliJffillillh:T:l;"
closetothegroundaspossible theground
butnottouching andthespeedshould bekeptat
OPERATION
WITHIN
SHOULDBEPERFORMED
INFRONT
2 DEGREES OF
1.6km/horless.Inparticular,
anyabruptsteering, orbraking
starting mustbeavoided, cHASS|S.
10. Craneoperationsshouldnotbeperformedwhencreepingwhilehoisting
a load.
11. Specialweather
caution:
Refer Manual.
toOperators
12. RefertoCraneManual.
-

TADANOTR.25OM.5HYDRAULICROUGHTERRAINCRANE
WORKING RADIUS- LIFTINGHEIGHT

B3

E
.ll
30 {
=
G)
-
25 tr
k'r_?: G)
-
{
20 .-r

3
Y

ffi

lo 15 20 25

W0RKING
RADIUS
(m)
NOTES:
1' The deflectionof the boom is not incorporatedin the figureabove.

2' The figureabove is for the case when the outriggersare fully extended(360")

You might also like