Equipment Installation Package

AREA: F10N - WET PROCESS


MiCAP: 1451347
LID: V43
VMP: PSK_SUPRA_BULK
WS: 10-3PSK_SPRA5PL_STR_03
VMP REV: 3
TM REV.: TM-1_REV-A
DRAWING-NAME TITLE REV.-NO. DATE STATUS
x 1451347-CS-1 Coversheet 1 03/11/21 IFC
x 1451347-DMH-1 Drawing Modification History 1 03/11/21 IFC
x 1451347-TM-1 Tagging Matrix 1 03/11/21 IFC
x 1451347-EP-L3-1 Equipment Plan L3 1 03/11/21 IFC
x 1451347-EP-L2-1 Equipment Plan L2 1 03/11/21 IFC
x 1451347-MR-L3-1 Mechanical Routing Plan L3-1 1 03/11/21 IFC
x 1451347-MR-L3-2 Mechanical Routing Plan L3-2 1 03/11/21 IFC
x 1451347-MR-L2-1 Mechanical Routing Plan L2-1 1 03/11/21 IFC
x 1451347-MR-L2-2 Mechanical Routing Plan L2-2 1 03/11/21 IFC
x 1451347-ER-L3-1 Electrical Routing Plan L3 1 03/11/21 IFC
x 1451347-ER-L2-1 Electrical Routing Plan L2 1 03/11/21 IFC

Name: Date: Signature:

EQUIPMENT OWNER:

TI PC:

1451347
COVER SHEET
F10N
1451347
DRAWING MODIFICATION HISTORY
F10N
1451347
TAGGING MATRIX
F10N
GENERAL NOTES
A. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES' FOR
GENERAL NOTES THAT APPLY TO MICRON TOOL INSTALLATIONS.

B. ALL EQUIPMENT TO BE LOCATED WITHIN ±3mm TOLERANCE.

C. CONTRACTOR TO FURNISH AND INSTALL ALL ITEMS INCLUDED IN


THESE DRAWINGS IN ACCORDANCE WITH MICRON CONSTRUCTION
SPECIFICATIONS.

D. CONTRACTOR TO RELOCATE EXISTING SERVICES INTERFERING


WITH TOOL INSTALLATION i.e. HOUSE VACUUM, DATA CONDUIT,
ETC. COORDINATE ALL RELOCATIONS WITH TOOL OWNER AND
CONSTRUCTION COORDINATOR.

PSK_SUPRA_BULK - 1451347
V43 TOOL OUTLINE @ LEVEL 3
KEYED NOTES
1. TOOL DATUM.

2. RACK DATUM

2 2

2 2

KEY PLAN :

N 1451347
EQUIPMENT PLAN L2
F10N
GENERAL NOTES
A. REFER TO SINGAPORE STANDARD UTILITY DETAIL (SSUD)
'XNOTES' FOR GENERAL NOTES THAT APPLY TO MICRON
TOOL INSTALLATIONS.

B. ALL EQUIPMENT TO BE LOCATED WITHIN ±1mm TOLERANCE.

O
C. CONTRACTOR TO FURNISH AND INSTALL ALL ITEMS

A
2/1
11
INCLUDED IN THESE DRAWINGS IN ACCORDANCE WITH

M
MICRON CONSTRUCTION SPECIFICATIONS.

D. CONTRACTOR TO RELOCATE EXISTING SERVICES

MA
36.0 ENA
INT
0 [914NCE
.4] ACC
INTERFERING WITH TOOL INSTALLATION i.e. HOUSE VACUUM,

FRO ESS
M
THI ARE
S SURA EXT
FAC END
E
DATA CONDUIT, ETC. COORDINATE ALL RELOCATIONS WITH

S
TOOL OWNER AND CONSTRUCTION COORDINATOR.

1303 lbs [591 Kg] worst case


E. ARCHITECTURAL CONTRACTOR TO PROVIDE CUT-OUTS IN

Support Pad
2.43" Dia
RAISED FLOOR PANEL AS REQUIRED. COORDINATE WITH
OTHER TRADES TO ESTABLISH COMMON CUT-OUTS WHERE
POSSIBLE. COORDINATE SIZE AND LOCATION WITH
CONSTRUCTION COORDINATOR.

F. ALL RAISED FLOOR TILES WITHIN 1M OF THE TOOL, THE


RAISED FLOOR PEDESTALS MUST BE SUPPORTED ON AND
ANCHORED TO THE CONCRETE SLAB.

G. ALL RAISED FLOOR TILES WITHIN 0.75M OF THE TOOL MUST


BE FASTENED TO THE RAISED FLOOR PEDESTALS. USE (4)
SCREWS, (1) IN EACH CORNER.

H. WHERE TOOLS ARE SUPPORTED ON THE RAISED FLOOR


TILES, AN ADDITIONAL RAISED FLOOR PEDESTAL MUST BE
PLACED DIRECTLY BELOW EACH FOOT THAT RESTS ON ANY
CUT TILE. ADDITIONAL RAISED FLOOR PEDESTALS MAY BE
REQUIRED AT EACH CORNER OF TILE THAT IS CUT,
DEPENDANT ON SIZE, COORDINATE WITH CONSTRUCTION
COORDINATOR.

I. CONFIRM EXACT SIZE AND LOCATION OF VIEW TILES, RAISED


FLOOR BOX, ETC. WITH TOOL OWNER AND CONSTRUCTION
COORDINATOR.

MAINTENANCE ACCESS AREA EXTENDS


36.00 [914.4] FROM THIS SURFACE

KEYED NOTES
1. FULL VIEW TILE .

2. POWER/DATA OUTLET..

3. 1/2 VIEW TILE.

4. TOOL DATUM
1 1 1 1 1 3 3 2
5. CUT TILES AS REQUIRED.

12/10/2021

SUPRAVP
4

1451347

STRIP
V43
LOAD PORT

5 3
PSK LOAD PORT

KEY PLAN :

N 1451347
EQUIPMENT PLAN L3
F10N
GENERAL NOTES:
A. SERVICE ROUTING SHOWN IS SUGGESTED. FINAL
ROUTING TO BE FIELD VERIFIED AND COORDINATED
WITH ALL OTHER TRADES AND CONSTRUCTION
COORDINATOR PRIOR TO INSTALLATION. REFER TO
EQUIPMENT TEMPLATE/DRAWINGS FOR FINAL
CONNECTION LOCATIONS.

O
A
2/1
11
B. ROUTING DRAWING TO BE READ IN CONJUNCTION

M
WITH VMP SCHEMATIC/PID PACKAGE.

C. REFER TO 'TAGGING' MATRIX FOR LPOC

MA
36.0 ENA
INT
0 [914NCE
ASSIGNMENTS.

.4] ACC
FRO ESS
M
THI ARE
S SURA EXT
FAC END
E S
D. CONTRACTOR TO RELOCATE EXISTING SERVICES
INTERFERING WITH TOOL INSTALLATION, (e.g. HOUSE

1303 lbs [591 Kg] worst case


VACUUM, DATA CONDUIT, ETC). COORDINATE ALL

Support Pad
2.43" Dia
RELOCATIONS WITH TOOL OWNER AND
CONSTRUCTION COORDINATOR.

E. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES',


'MNOTES' & 'ENOTES' FOR GENERAL NOTES
APPLICABLE TO TOOL INSTALLATIONS.

F. COMPONENTS INSTALLED BENEATH VIEW/ACCESS


TILES SHOULD BE INSTALLED IN A VISIBLE AND
ACCESSIBLE LOCATION.

G. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


ROUTED IN ACCORDANCE WITH SITE SPECIFICATIONS
AND SPACE MANAGEMENT GUIDELINES, (e.g. LINES
SHOULD RUN PERPENDICULAR TO COLUMN AND
AVOID BLOCKING POPOUTS WHEREVER POSSIBLE).

H. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE
SPECIFICATIONS.

MAINTENANCE ACCESS AREA EXTENDS


36.00 [914.4] FROM THIS SURFACE

DN50 GE 0-8-2

12/10/2021

SUPRAVP
1451347
ISO100 EV

STRIP
V43
PSK
ISO100 EV ISO100 EV - JJMP

ISO100 EV - JJMP

ISO100 EV
ISO100 EV - JJMP
DN50 GE 0-8-2

KEY PLAN :

N 1451347
MECHANICAL ROUTING PLAN L3-1
F10N
GENERAL NOTES:
A. SERVICE ROUTING SHOWN IS SUGGESTED. FINAL
ROUTING TO BE FIELD VERIFIED AND COORDINATED
WITH ALL OTHER TRADES AND CONSTRUCTION
COORDINATOR PRIOR TO INSTALLATION. REFER TO
EQUIPMENT TEMPLATE/DRAWINGS FOR FINAL
CONNECTION LOCATIONS.

B. ROUTING DRAWING TO BE READ IN CONJUNCTION

O
A
WITH VMP SCHEMATIC/PID PACKAGE.

2/1
11

M
C. REFER TO 'TAGGING' MATRIX FOR LPOC
ASSIGNMENTS.

MA
36.0 ENA
INT
0 [914NCE
.4] ACC
FRO ESS
M
THI ARE
D. CONTRACTOR TO RELOCATE EXISTING SERVICES

S SURA EXT
FAC END
E S
INTERFERING WITH TOOL INSTALLATION, (e.g. HOUSE
VACUUM, DATA CONDUIT, ETC). COORDINATE ALL
RELOCATIONS WITH TOOL OWNER AND

1303 lbs [591 Kg] worst case


Support Pad
2.43" Dia
CONSTRUCTION COORDINATOR.

E. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES',


'MNOTES' & 'ENOTES' FOR GENERAL NOTES
TOP to BOTTOM: APPLICABLE TO TOOL INSTALLATIONS.
1/2" PCWR
1/2" PCWS F. COMPONENTS INSTALLED BENEATH VIEW/ACCESS
1/2" PCWR TILES SHOULD BE INSTALLED IN A VISIBLE AND
1/2" PCWS ACCESSIBLE LOCATION.
1/2" PCWR
1/2" PCWS G. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE
1/2" PCWR ROUTED IN ACCORDANCE WITH SITE SPECIFICATIONS
1/2" PCWS AND SPACE MANAGEMENT GUIDELINES, (e.g. LINES
1/2" PCWS
SHOULD RUN PERPENDICULAR TO COLUMN AND
1/2" PCWR
AVOID BLOCKING POPOUTS WHEREVER POSSIBLE).

H. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE
SPECIFICATIONS.

TOP to BOTTOM: KEYED NOTES:


1/2" PCWR
TOP to BOTTOM: 1/2" PCWS 1. LOCATE VALVES AND INSTRUMENTS UNDER VIEWTILE. FOR
3/8" O2 1/2" PCWR VALVES AND INSTRUMENTS NOT SHOWN FOR CLARITY, SEE
1/2" HPN2 1/2" PCWS MECHANICAL P&ID FOR COMPONENTS.
3/8" H2(3.8%)/N2
3/8" He MAINTENANCE ACCESS AREA EXTENDS
36.00 [914.4] FROM THIS SURFACE

1 1 1 1 1 1

LEFT to RIGHT
1/4" HPN2 0-9-4
TOP to BOTTOM:
1/4" O2 0-9-3
1/4" HPN2 0-9-5 0-11-7 1/2" PCWS PM#2
1/4" H2(3.8%)/N2 0-9-15 1/2" PCWS PM#1 0-11-1 0-11-8 1/2" PCWR PM#2
1/4" He 0-9-12 1/2" PCWR PM#1 0-11-2 TOP to BOTTOM:
1/4" HPN2 0-9-7 0-11-5 1/2" PCWS PM#2
1/2" CDA
1/4" O2 0-9-6 0-11-6 1/2" PCWR PM#2
1/2" PV
1/4" HPN2 0-9-8
1/4" H2(3.8%)/N2 0-9-16 1/2" PCWR PM#1 0-11-4
1/4" He 0-9-13 1/2" PCWS PM#1 0-11-3

12/10/2021

SUPRAVP
1

1451347

STRIP
TOP to BOTTOM:

V43
1/2" PCWS (TM) 0-11-13

PSK
1/2" PCWR (TM) 0-11-14

LEFT to RIGHT
1/4" He 0-9-14
1/4" H2 (3.8%)/N2 0-9-17
1/4" HPN2 0-9-11
1/4" O2 0-9-9
1/4" HPN2 0-9-10

TOP to BOTTOM:
1/2" CDA 0-9-1
1/2" PV 0-9-2

KEY PLAN : TOP to BOTTOM: TOP to BOTTOM:


1/2" PCWS PM#2 0-11-11 0-11-9 1/2" PCWS PM#2
1/2" PCWR PM#2 0-11-12 0-11-10 1/2" PCWR PM#2

N 1451347
MECHANICAL ROUTING PLAN L3-2
F10N
GENERAL NOTES:
A. SERVICE ROUTING SHOWN IS SUGGESTED. FINAL
ROUTING TO BE FIELD VERIFIED AND COORDINATED
WITH ALL OTHER TRADES AND CONSTRUCTION
COORDINATOR PRIOR TO INSTALLATION. REFER TO
EQUIPMENT TEMPLATE/DRAWINGS FOR FINAL
CONNECTION LOCATIONS.

B. ROUTING DRAWING TO BE READ IN CONJUNCTION


WITH VMP SCHEMATIC/PID PACKAGE.

C. REFER TO 'TAGGING' MATRIX FOR LPOC


ASSIGNMENTS.

D. CONTRACTOR TO RELOCATE EXISTING SERVICES


INTERFERING WITH TOOL INSTALLATION, (e.g. HOUSE
VACUUM, DATA CONDUIT, ETC). COORDINATE ALL
RELOCATIONS WITH TOOL OWNER AND
CONSTRUCTION COORDINATOR.

E. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES',


'MNOTES' & 'ENOTES' FOR GENERAL NOTES
APPLICABLE TO TOOL INSTALLATIONS.

F. COMPONENTS INSTALLED BENEATH VIEW/ACCESS


TILES SHOULD BE INSTALLED IN A VISIBLE AND
ACCESSIBLE LOCATION.
DN100 - GE - GS
G. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE
ROUTED IN ACCORDANCE WITH SITE SPECIFICATIONS
DN100 - AE - SSC AND SPACE MANAGEMENT GUIDELINES, (e.g. LINES
DN100 - GE - GS ISO100 - EV SHOULD RUN PERPENDICULAR TO COLUMN AND
AVOID BLOCKING POPOUTS WHEREVER POSSIBLE).

H. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE
SPECIFICATIONS.

ISO100 - EV-JJMP

P3-8-1 NW40 AE
DN100 - GE - GS

P2-8-1 NW40 AE
ISO100 - EV

ISO100 - EV-JJMP

P1-8-1 NW40 AE

ISO100 - EV-JJMP

ISO100 - EV

PSK_SUPRA_BULK - 1451347
V43 TOOL OUTLINE @ LEVEL 3

KEY PLAN :

N 1451347
MECHANICAL ROUTING PLAN L2 - 1
F10N
GENERAL NOTES:
TOP to BOTTOM: A. SERVICE ROUTING SHOWN IS SUGGESTED. FINAL
1/2" PCWR ROUTING TO BE FIELD VERIFIED AND COORDINATED
1/2" PCWS WITH ALL OTHER TRADES AND CONSTRUCTION
1/2" PCWR COORDINATOR PRIOR TO INSTALLATION. REFER TO
1/2" PCWS EQUIPMENT TEMPLATE/DRAWINGS FOR FINAL
1/2" PCWR CONNECTION LOCATIONS.
1/2" PCWS
1/2" PCWR B. ROUTING DRAWING TO BE READ IN CONJUNCTION
1/2" PCWS WITH VMP SCHEMATIC/PID PACKAGE.
1/2" PCWS
1/2" PCWR
C. REFER TO 'TAGGING' MATRIX FOR LPOC
ASSIGNMENTS.
TOP to BOTTOM:
3/8" O2 D. CONTRACTOR TO RELOCATE EXISTING SERVICES
1/2" HPN2 INTERFERING WITH TOOL INSTALLATION, (e.g. HOUSE
3/8" H2(3.8%)/N2 LEFT to RIGHT:
VACUUM, DATA CONDUIT, ETC). COORDINATE ALL
3/8" He 2" PCWR
RELOCATIONS WITH TOOL OWNER AND
2" PCWS
TOP to BOTTOM: 1/2" UN2 CONSTRUCTION COORDINATOR.
1/2" PCWR
1/2" PCWS E. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES',
1/2" PCWR 'MNOTES' & 'ENOTES' FOR GENERAL NOTES
1/2" PCWS APPLICABLE TO TOOL INSTALLATIONS.

F. COMPONENTS INSTALLED BENEATH VIEW/ACCESS


TILES SHOULD BE INSTALLED IN A VISIBLE AND
ACCESSIBLE LOCATION.

G. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


ROUTED IN ACCORDANCE WITH SITE SPECIFICATIONS
AND SPACE MANAGEMENT GUIDELINES, (e.g. LINES
SHOULD RUN PERPENDICULAR TO COLUMN AND
AVOID BLOCKING POPOUTS WHEREVER POSSIBLE).

H. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE
SPECIFICATIONS.

KEYED NOTES:
1/2" CDA
1. LOCATE VALVES AND INSTRUMENTS UNDER VIEWTILE.
1/2" PV 1 FOR VALVES AND INSTRUMENTS NOT SHOWN FOR
CLARITY, SEE MECHANICAL P&ID FOR COMPONENTS.

TOP to BOTTOM:
P3-11-2 3/8" PCWR
1 P3-11-1 3/8" PCWS
P3-9-1 1/4" UN2
P2-11-2 3/8" PCWR
P2-11-1 3/8" PCWS
P2-9-1 1/4" UN2
P1-11-2 3/8" PCWR
PSK_SUPRA_BULK - 1451347 P1-11-1 3/8" PCWS
V43 TOOL OUTLINE @ LEVEL 3
P1-9-1 1/4" UN2

KEY PLAN :

N 1451347
MECHANICAL ROUTING PLAN L2 - 2
F10N
GENERAL NOTES
A. SERVICE ROUTING SHOWN IS SUGGESTED. FINAL ROUTING
TO BE FIELD VERIFIED AND COORDINATION WITH ALL OTHER
TRADES AND CONSTRUCTION COORDINATOR PRIOR TO
INSTALLATION. REFER TO EQUIPMENT TEMPLATE/DRAWINGS
FOR FINAL CONNECTION LOCATIONS.

O
A
2/1
11
B. ROUTING DRAWING TO BE READ IN CONJUNCTION WITH VMP

M
SCHEMATIC/PID PACKAGE.

C. REFER TO TAGGING MATRIX FOR LPOC ASSIGNMENTS.

MA
36.0 ENA
INT
0 [914NCE
.4] ACC
WHERE DISCREPANCIES EXIST BETWEEN THE TAGGING

FRO ESS
M
THI ARE
S SUR
A EXT
FAC END
E
MATRIX AND THE ROUTING PLAN, THE TAGGING MATRIX

S
SHALL TAKE PRECEDENCE. COORDINATE WITH
CONSTRUCTION COORDINATOR.

1303 lbs [591 Kg] worst case


Support Pad
2.43" Dia
D. CONTRACTOR TO RELOCATE EXISITNG SERVICES
INTERFERING WITH TOOL INSTALLATION, (eg. HOUSE
VACUUM, DATA CONDUIT, ETC). COORDINATE ALL
RELOCATIONS WITH TOOL OWNER AND CONSTRUCTION
COORDINATOR.

E. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES',


'MNOTES' & 'ENOTES' FOR GENERAL NOTES APPLICABLE TO
TOOL INDTALLATIONS.

F. COMPONENTS INSTALLED BENEATH VIEW ACCESS TILES


SHOULD BE INSTALLED IN A VISIBLE AND ACCESSIBLE
LOCATION.

G. ALL MECHANICAL/ ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE SPECIFICATIONS
AND SPACE MANAGEMENT GUIDELINES (e.g. LINES SHOULD
RUN PREPENDICULAR TO COLUMN AND AVOID BLOCKING
POPOUTS WHEREVER POSSIBLE.

H. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE SPECIFICATIONS.

KEYED NOTES:
MAINTENANCE ACCESS AREA EXTENDS

1. DATA/POWER RECEPTACLES TO BE PER SSUD E024. VERIFY


36.00 [914.4] FROM THIS SURFACE

12/10/2021

SUPRAVP
LOCATION AND EXACT ORIENTATION WITH TOOL OWNER VIA
CONSTRUCTION COORDINATOR

1451347
2. HALF VIEWTILE FOR ELEC/DATA PORT. COORDINATE EXACT
LOCATION AND ORIENTATION WITH TOOL OWNER VIA

STRIP
CONSTRUCTION COORDINATOR.

V43
PSK
1 2

01 02 03

25mm CONDUIT (CONTROL)

150mm x 150mm CABLE TRUNKING FOR POWER


04 CABLES

100mm x 100mm CABLE TRUNKING FOR CONTROL


CABLES

150mm x 50mm DIVIDED TRAY FOR POWER &


CONTROL CABLES

KEY PLAN :

N 1451347
ELECTRICAL ROUTING PLAN L3
F10N
GENERAL NOTES
A. SERVICE ROUTING SHOWN IS SUGGESTED. FINAL ROUTING
TO BE FIELD VERIFIED AND COORDINATION WITH ALL OTHER
TRADES AND CONSTRUCTION COORDINATOR PRIOR TO
INSTALLATION. REFER TO EQUIPMENT TEMPLATE/DRAWINGS
FOR FINAL CONNECTION LOCATIONS.

B. ROUTING DRAWING TO BE READ IN CONJUNCTION WITH VMP


SCHEMATIC/PID PACKAGE.

C. REFER TO TAGGING MATRIX FOR LPOC ASSIGNMENTS.


WHERE DISCREPANCIES EXIST BETWEEN THE TAGGING
MATRIX AND THE ROUTING PLAN, THE TAGGING MATRIX
SHALL TAKE PRECEDENCE. COORDINATE WITH
CONSTRUCTION COORDINATOR.

D. CONTRACTOR TO RELOCATE EXISITNG SERVICES


INTERFERING WITH TOOL INSTALLATION, (eg. HOUSE
VACUUM, DATA CONDUIT, ETC). COORDINATE ALL
PSK_SUPRA_BULK - 1451347 RELOCATIONS WITH TOOL OWNER AND CONSTRUCTION
V43 TOOL OUTLINE @ LEVEL 3 COORDINATOR.

E. REFER TO STANDARD UTILITY DETAIL (SSUD) 'XNOTES',


150mm x 150mm CABLE TRUNKING FOR POWER 'MNOTES' & 'ENOTES' FOR GENERAL NOTES APPLICABLE TO
CABLES TOOL INDTALLATIONS.

F. COMPONENTS INSTALLED BENEATH VIEW ACCESS TILES


25mm CONDUIT (CONTROL) SHOULD BE INSTALLED IN A VISIBLE AND ACCESSIBLE
LOCATION.

G. ALL MECHANICAL/ ELECTRICAL SERVICES SHALL BE


SUPPORTED IN ACCORDANCE WITH SITE SPECIFICATIONS
AND SPACE MANAGEMENT GUIDELINES (e.g. LINES SHOULD
RUN PREPENDICULAR TO COLUMN AND AVOID BLOCKING
POPOUTS WHEREVER POSSIBLE.

3-6-1 H. ALL MECHANICAL/ELECTRICAL SERVICES SHALL BE


P1-6-1
SUPPORTED IN ACCORDANCE WITH SITE SPECIFICATIONS.
3-6-2

P2-6-1

P3-6-1 100mm x 100mm CABLE TRUNKING FOR CONTROL


CABLES

KEY PLAN :

N 1451347
ELECTRICAL ROUTING PLAN L2
F10N