JOB/ PROJECT :

TAKER OFF :
ELEMENT : PENANGKAP PETIR
DATE :
SHEET NO : 1 s/d ……………

NO ACTUAL CHECK/ PEKE

1 SPLITZER (M1)

V = 29 BH X 2
= 58 M1

2 KABEL KONDUCTOR K(M1)


V = 4.3 + 4.7 +
4.2 X 39 +

= 4.3 + 4.7 +

= 202.750 M1 X 16

V = 6.6 M1 X 4

V = 4.3 + 4.7 +
4.2 X 3

= 4.3 + 4.7 +

= 42.4 M1 X 9

V = 5.665 + 7.71 +

= 5.665 + 7.71 +

= 92.715

3 BRECKET KABEL (BH)

V = 3414.515 : 0.5

= 6829.03 BH
4 TEST TERMINAL BOX (UNIT)

V = 13 UNIT

5 HANDHOLE

A BAK KONTROL uk. 0,4 x 0,4 x 0,4

V = 13 UNIT

B TERMINAL KONEKSI

V = 13 UNIT

JOB/ PROJECT :
TAKER OFF :
ELEMENT : PENANGKAP PETIR
DATE :
SHEET NO : 1 s/d ……………
NO ACTUAL CHECK/ PEKE

C CONDUKTOR

V = 13 UNIT

D COPER ROD

V = 18 M1 X 13

= 234 M1

6 DRAVING STUD

V = 13 UNIT

7 PIPA SPLITZER

V = 0.4 X 0.4 X

= 0.064 M3 X 13

= 0.832 M3
8 PIPA SPLITZER

V = 29 BH X 2
= 58 M1
NGKAP PETIR

SKET GAMBAR

A PENANGKAP PETIR
1 SPLITZER
2 KABEL KONDUCTOR KAWAT BC 35 MM
3 BRECKET KABEL
4 TEST TERMINAL BOX
5 HANDHOLE
A BAK KONTROL
B TERMINAL KONEKSI
C CONDUKTOR
D COPER ROD
6 DRAVING STUD
7 LAPISAN PASIR
8 PIPA SPLITZER

ACTUAL CHECK/ PEKERJAAN


3.2 X 5 + 4.8 +
4.5 + 4.65

16 + 4.8 + 163.8 4.5 + 4.65

BH

BH

3.2 X 5 + 4.8 +

16 + 4.8 + 12.6

BH

7.75 X 8 + 5.78 X 3

62 + 17.34
NGKAP PETIR

SKET GAMBAR

A PENANGKAP PETIR
1 SPLITZER
2 KABEL KONDUCTOR KAWAT BC 35 MM
3 BRECKET KABEL
4 TEST TERMINAL BOX
5 HANDHOLE
A BAK KONTROL
B TERMINAL KONEKSI
C CONDUKTOR
D COPER ROD
6 DRAVING STUD
7 LAPISAN PASIR
8 PIPA SPLITZER

ACTUAL CHECK/ PEKERJAAN

BH

0.4

UNIT
UNIT
35 MM UNIT
UNIT
UNIT

UNIT
UNIT
UNIT
M1
UNIT
M3
M1

VOLUME SATUAN

29
2.00
58 M1
16
202.75
3244.00 M1

4
6.6
26.40 M1

9
42.4
51.40 M1

1
92.715
92.715 M1
3414.52 M1

1
6829.03
6829.03 BH
13
1.00
13 UNIT

13
1.00
13 UNIT

13
1.00
13 UNIT

M1
35 MM UNIT
UNIT
UNIT

UNIT
UNIT
UNIT
M1
UNIT
user:
M3
M1

VOLUME SATUAN

13
1
13 UNIT

13
18.00
234.00 M1

13
1
13 UNIT

13
0.064
0.832 M3
29
2.00
58 M1
user: