Job/ Project: Taker Off: Element: Date: Sheet No: 1 S/D Sket Gambar
Job/ Project: Taker Off: Element: Date: Sheet No: 1 S/D Sket Gambar
TAKER OFF :
ELEMENT : PENANGKAP PETIR
DATE :
SHEET NO : 1 s/d ……………
1 SPLITZER (M1)
V = 29 BH X 2
= 58 M1
= 4.3 + 4.7 +
= 202.750 M1 X 16
V = 6.6 M1 X 4
V = 4.3 + 4.7 +
4.2 X 3
= 4.3 + 4.7 +
= 42.4 M1 X 9
V = 5.665 + 7.71 +
= 5.665 + 7.71 +
= 92.715
V = 3414.515 : 0.5
= 6829.03 BH
4 TEST TERMINAL BOX (UNIT)
V = 13 UNIT
5 HANDHOLE
V = 13 UNIT
B TERMINAL KONEKSI
V = 13 UNIT
JOB/ PROJECT :
TAKER OFF :
ELEMENT : PENANGKAP PETIR
DATE :
SHEET NO : 1 s/d ……………
NO ACTUAL CHECK/ PEKE
C CONDUKTOR
V = 13 UNIT
D COPER ROD
V = 18 M1 X 13
= 234 M1
6 DRAVING STUD
V = 13 UNIT
7 PIPA SPLITZER
V = 0.4 X 0.4 X
= 0.064 M3 X 13
= 0.832 M3
8 PIPA SPLITZER
V = 29 BH X 2
= 58 M1
NGKAP PETIR
SKET GAMBAR
A PENANGKAP PETIR
1 SPLITZER
2 KABEL KONDUCTOR KAWAT BC 35 MM
3 BRECKET KABEL
4 TEST TERMINAL BOX
5 HANDHOLE
A BAK KONTROL
B TERMINAL KONEKSI
C CONDUKTOR
D COPER ROD
6 DRAVING STUD
7 LAPISAN PASIR
8 PIPA SPLITZER
BH
BH
3.2 X 5 + 4.8 +
16 + 4.8 + 12.6
BH
7.75 X 8 + 5.78 X 3
62 + 17.34
NGKAP PETIR
SKET GAMBAR
A PENANGKAP PETIR
1 SPLITZER
2 KABEL KONDUCTOR KAWAT BC 35 MM
3 BRECKET KABEL
4 TEST TERMINAL BOX
5 HANDHOLE
A BAK KONTROL
B TERMINAL KONEKSI
C CONDUKTOR
D COPER ROD
6 DRAVING STUD
7 LAPISAN PASIR
8 PIPA SPLITZER
BH
0.4
UNIT
UNIT
35 MM UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
M1
UNIT
M3
M1
VOLUME SATUAN
29
2.00
58 M1
16
202.75
3244.00 M1
4
6.6
26.40 M1
9
42.4
51.40 M1
1
92.715
92.715 M1
3414.52 M1
1
6829.03
6829.03 BH
13
1.00
13 UNIT
13
1.00
13 UNIT
13
1.00
13 UNIT
M1
35 MM UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
M1
UNIT
user:
M3
M1
VOLUME SATUAN
13
1
13 UNIT
13
18.00
234.00 M1
13
1
13 UNIT
13
0.064
0.832 M3
29
2.00
58 M1
user: