HOUSE REPAIR

BUDGET: 50,000php
HOUSE DEMOLITION:
10,000- LABOR
House Materials:20,000

Days of Labor Labor payment


10/07/2021 4,500php

Snack 500
HOUSE MATERIALS
October 07, 2021
1439php
1 gal. cost saver red oxide 550php
1pc paint brush 4 95php
1-liter vulcaseal 505php
Palita 50php
Manoy ranol 100php
Gas 39php
Mama 100
October 08, 2021
3445php
5 pcs 10mm 875
5pcs 9mm 650
1kl pako (4) 90
1kl pako (3) 90
½ kl pako (1/2) 45
1/2 kl pako (2) 45
Gravel and sand 1,650
Total: 4,904
Snack 46
October 9, 2021
Hollow blocks 500
Gravel 1050
Utang ni mama 200