OHS Baseline Risk Assessment - Catering Contract October 2021
OHS Baseline Risk Assessment - Catering Contract October 2021
Notes:
1. To be able to complete a baseline risk assessments you need to attend Hazard Identifica
2. All affected stakeholders should be involved in the development of a baseline risk assess
SHE department(including Occupational Hygienist and/or Occupational health practitione
3. The OHS risk assessment procedure 32-520 should be used as a reference when compl
4. This document shall be reviewed as per the requirements of the 32-520 procedure.
Here you have to list different types of activities that will be performed
1. List activity have different hazards and tasks linked to it.
Hazard number This is a number that has to be given to the hazards associated to the
to be numbered 1,2,3 etc. See example below
Hazar
A hazard is anything that is likely to lead to anList
event that will have an a
activity
nr
more than one risk.
Hazards are generally tangible and can be seen, heard, felt, measured
List specific activities to be
can be classified into the following categories:
performed taking into
consideration the equipment to
#
2
Erecting a scaffold 1
This is a number given to a risk that a hazard pose. One hazard can have mo
hazard was 1 then the risks should be numbered 1.1, 1.2 etc. See example b
Risk Nr
List the risks associated with the hazard and list them according to the
Associated risk
(Risk identification)
This is the risk type which could be Safety or Health. Safety when the c
Risk type health when the effects are on the persons health e.g. coughing
The exposed group represents people who are exposed to the risk eith
Exposed group/employees Hygiene it means exposure groups such as individual exposure or hom
Who is accountable for making sure the controls and monitors are:
- in place,
- implemented,
Risk Owner - regularly reviewed for effectiveness.
This can be a manager of a section or unit who has to ensure that all r
Utilise the consequence criteria tab to determine the impact the risk ha
Consequence
Likelihood
Utilise the likelihood tab to determine the impact the risk has or may ha
If the existing controls were not effective include additional controls tha
Additional Controls or Tasks Aimed at added to manage the risk. The hierarchy of controls shall be considere
improving Existing Controls
Consequence
This is to determine the consequences the risk pose. The consequenc
This is to determine the likelihood of the risk producing effects. The like
Likelihood
Monitoring Mechanisms
This is a measurement that is used to determine the success of contro
These are the dates for the implementation of the controls. Used if, for
Revised Target Date
Verification This means any type of verification or assessment done to check if obj
(i.e. Confirmation that the objectives have
been met)
Any comments that you wish to input as part of the Risk assessment.
Comments
ASELINE RISK ASSESSMENT TEMPLATE
ities that will be performed and consider the site or environment the activity will take place. The activity can
.
hazards associated to the activity. Each activity can have various hazards attached to it and therefore need
ow
or Health. Safety when the consequence of the risk has effect on the physical body of the person e.g. cut and
health e.g. coughing
are exposed to the risk either employees, visitors or members of the public. Also in terms of Occupational
s individual exposure or homogenous exposure group.
d duration the person/group is exposed to the hazard e.g. Exposed to noise for 3 hours daily. This will help to
kind of harm that the hazard can inflict to the person/group.
t.
who has to ensure that all required steps to reduce or eliminate the risk have been implemented.
and non-routine activity as required by OHSAS 18001. Routine activities are activities that are performed
cur due to unplanned circumstance e.g. a risk assessment for an emergency situation or work that is not part
isk pose.
d hazards identified.
e consequence rating and likelihood rating on the risk matrix to determine the priority rating. E.g. if the
he risk rating is III
clude additional controls that can minimise the impact of the risk. These are additional controls that should be
controls shall be considered.
risk pose. The consequence shall be determined using consequence rating tab.
k producing effects. The likelihood shall be determined using likelihood rating tab.
e consequence rating and likelihood rating on the risk matrix to determine the priority rating. E.g. if the
he risk rating is III
mine the success of controls in reducing the impact of the risk.
that have to be implemented to reduce or minimise it. Control owner is the person allocated the responsibility
Control owner has to give feedback to the Risk owner about the status and progress of the agreed controls.
of the controls
of the controls. Used if, for any reason, a Target Date is revised. Use the Comments field to explain.
ssment done to check if objectives of the controls and assessment are met.
How we know if we
Include: Include:
Indicate Yes or No.Yes if are succeeding.
Consequence
Who is accountable for making - Preventative Controls - Preventative Controls Used if, for any
Consequence
A hazard is anything that is likely to routine and No if non- Include comments on
Likelihood
Likelihood
sure the controls and monitors are: (controls implemented to eliminate hazards or (controls implemented to eliminate Person allocated the Where relevant, list the Once a date has reason, a
List specific activities to be performed lead to an event that will have an Who is exposed to the hazard i.e. The frequency and duration the routine These short-term RCE effectiveness. Pending,
A physical event occurs or could Safety or What causes the risk to come into - in place, What is the expected adverse reduce the likelihood of the risk occurring), hazards or reduce the likelihood of the responsibility for relevant legislative and or been agreed to, Target Date is
taking into consideration the equipment to adverse impact on achieving an # Employees, visitors, members of person/group is exposed to the changes to conditions Risk Control This may include i.e. In Progress, Date Done: By whom:
#
occur in relation to the hazard health effect? - implemented, impact on the objective? and risk occurring), and implementing the Eskom requirements that this can not be revised. Use
be used, the personnel involved in the task. objective. A hazard can pose more the public, etc. hazard e.g. Daily for 3 hrs. that could not be Effectiveness measurements, Complete
- regularly reviewed for - Reactive Controls - Reactive Controls agreed controls prescribe the control. changed the Comments
than one risk. reasonably anticipated inspections,
effectiveness. (controls implemented to reduce the (controls implemented to reduce the field to explain.
e.g. Emergencies supervision where
immediate impact of the risk occurring) immediate impact of the risk occurring)
necessary.
Disabling injury, Medical
Manual Handling of material Back injuries, muscle Lifting heavy unmanageable materials &
1 Incorrect lifting method 1 Safety Principal Contractor Daily ± 8 Hours Principal Contractor Yes treatment, Back injury, muscle Currently no existing control 4 4 I N
&equipment strain equipment can cause back injury
strain
LTI, Medical treatment,
Obstructed Access , inadequate Principal Contractor, Incompetent personnel,insufficient
Unauthorised access to site 2 On site Access Control 2 access control
Safety
employees,vistors
Daily ± 8 Hours
signages, Lack of supervision
Principal Contractor Yes Financial loss, Legal liability, Currently no existing control 4 4 I N
Theft
Extreme Temperatures, Floods, Principal Contractor, Medical treatment, Lost Time
Weather Conditions 3 Adverse Weather Conditions
3 heavy mist
Safety
employees,vistors
Daily ± 8 Hours Natural causes Principal Contractor Yes
Incident, Fatality
Currently no existing control 4 4 I N
Personnel are at risk of Principal Contractor, Unavailabily of warning signs during Medical treatment, Lost Time
Cleaning 4 Wet tile floors during cleaning activity.
4 slipping/falling
Safety
employees,vistors
Daily ± 8 Hours
mopping of floors
Principal Contractor Yes
Incident,First aid treatment
Currently no existing control 4 4 I N
Exposed wires; lose connections;
joints in cables; sharp edges (nip Electrocution, fatalities, falling
Use of Electrical Extensions points)o earth leakage fitted; earth equipment, lacerations, tripping,
Safety Principal Contractor Daily ± 8 Hours
Electrocution from exposed wires, loose
Principal Contractor Yes
Electrocution, fatality,electrical
Currently no existing control 5 4 I N
5 leakage not fitted by competent 5 fractures. connections, loose cover or no cover shock
Inappropriate size, layout, or
space in relation to the
workstation or work area due to Principal Contractor, Employee use a computer for long Medical treatment, Lost Time
Display Screen Equipment (DSE)
increasing size and reduced
Safety
employees,vistors
Daily ± 8 Hours
periods of time. Work equipment and
Principal Contractor Yes
Incident,First aid treatment
Currently no existing control 4 4 I N
Pregnant Workers mobility, dexterity, balance furniture such as the chair, suitable and
6 6 during pregnancy. comfortable for the employee.
Pregnant women are more likely Principal Contractor, No control measures in place for lone Medical treatment, Lost Time
to need urgent medical attention.
Safety
employees,vistors
Daily ± 8 Hours working? Such as panic alarms, buddy Principal Contractor Yes
Incident,First aid treatment
Currently no existing control 4 4 I N
7 Lone working 7 systems
Improper training on the use of
Use of Hazardous Chemical Skin rash or allergy/dermatitis; Medical treatment, Lost Time
Skin/eye contact with cement Health Principal Contractor Daily ± 8 Hours hazardous chemical substances, poor Principal Contractor Yes Currently no existing control 4 4 I N
Substances 8 8 cement splashed in eye.
communication, inadequate use of PPE
Incident,First aid treatment
When
detergants/chemicals
are improperly stored
Human factor i.e. ignorance
Improper storage and there is a risk of food
Employees, Contractors of food handlers and Contracting Currently there are no existing
15 handling of cleaning 15 mix up with chemicals Health Daily ± 8 Hours Catering Manager N 4 4 I N
& Visitors cooks/chefs, lack of illnesses/diseases controls.
detergents/chemicals and spillage of
awareness.
chemicals which can
lead to slips, trips and
falls.
Use of unsterilized kitchen Employees, Contractors Contracting Currently there are no existing
17 17 Cross contamination Health Daily ± 8 Hours Lack of controls Catering Manager N 4 4 I N
utensils & Visitors illnesses/diseases controls.
19
Health
Employees, visitor, Defective air-conditioning Respiratory irritation. Currently there are no existing
Fumes R 19 Mould, Dampness and Daily for 8 hrs Facilities Manager N 4 4 I N
Safety
Contractors Employee system . No ventilation. Damage building controls.
Failure to follow
Health,
manufacture's Damage to property,
Safety & Employees, Contractors Currently there are no existing
20 Use of gas stoves 20 Gas leakage, explosion Daily ± 8 Hours specification/guidline, failure Catering Manager N injury, may also lead to 4 4 I N
Property & Visitors controls.
to follow right instruction and fatalities in case of fire
Damage
procedures
3 3I III
6 III II I I I
Consequences
4 4 Ti IV
5 III II II I I
5 5N
5
6
Consequence criteria
Description
Lost Time Injury. Irreversible health effects/occupational disease with permanent consequence
Fully effective F
Partially effective P
Ineffective I
Totally ineffective Ti
None N
CONTROL EFFECTIVENESS GUIDE
Guide
Nothing more to be done except review and monitor the existing controls.
Controls are well designed for the risk, are largely preventative and
address the root causes and Management believes that they are effective
and reliable at all times. Reactive controls only support preventative
controls.
Most controls are designed correctly and are in place and effective. Some
more work to be done to improve operating effectiveness or Management
has doubts about operational effectiveness and reliability.
While the design of controls may be largely correct in that they treat most
of the root causes of the risk, they are not currently very effective. There
may be an over-reliance on reactive controls.
OR
Significant
Some of the control gaps.
controls Either
do not seem controls do not
correctly treat root
designed causes
in that they or
dothey
not
do not operate at all effectively. Controls, if they exist are
treat root causes, those that are correctly designed are operating just reactive.
effectively.
Virtually no credible control. Management has no confidence that any
degree of control is being achieved due to poor control design and/or very
limited operational effectiveness.
Risk matrix
6 III II I
5 III II II
Consequences
4 IV III II
3 IV III II
2 IV IV III
1 IV IV III
1 2 3
Likelihood
Priority Risk ranking Action required
Immediate action
I Very high
required
Strong mandatory
II High
action required
Action required,
III Medium possibly at
administrative level
Minor or no action
IV Low
required
rix
I I
I I
I I
II I
II II
III III
4 5
elihood