MONTHLY PLANNED MAINTENANCE WORKLIST –Engine

機艙部門 月計劃保養工作項目清單

Vessel Name: SAKIZAYA LEADER Month/Year: MAR/2018


No. DESCRIPTION OF WORK PLANNED 計劃保養工作項目
1 M/E T/C AIR FILTER TO BE RENEWED
2 M/E SCAV SPACE TO BE CLEANED AND CHECKED
3 M/E PISTON RING TO BE CHECKED
4 M/E SCAV BOX DRAIN TANK TO BE CLEANED
5 ACC A/C AIR FILTER TO BE CLEANED
6 ACCUMULATOR TO BE CHECKED
7 BOILER BURNER NOZZLE TO BE CLEANED
8 BOILER SUPPLY PUMP SUCTION STRAINER TO BE CLEANED
9 G/E INLET ENGINE FO FILTER TO BE CLEANED
10 G/E L O BY PASS FILTER TO BE CLEANED
11 G/E T/C AIR FILTER TO BE RENEWED
12 ENGINE ROOM ALL FAN MOTOR BELT TO BE CHECKED
13 M/E AIR CLEAN TANK TO BE CLEANED
14 INCINERATOR BURNER NOZZLE TO BE CLEANED
15 LO .FO PURIFIER SUCTION FILTER TO BE CLEANED
The Work Items of the Monthly Planned Maintenance Worklist - Engine is basically in reference to the document
OR
WSR-OT-10. 月計劃保養工作項目清單應根據 WSR-OT-10 計劃,整理出每月計劃保養工作項目

Chief Engineer: ZHURONGQING

1st Engineer: SUN ZHEN LIANG


Page ( 1 / 1 )