Client reference: e-mail from 1.

February 2021
Proposal No.: 2021_23037_Rev 1 Date: 7.2.2021

PROJECT:Service for GM Co

SCOPE: Welding Services for 2 pcs Aluminum Tanks


Client

GMCo Zeppelin Systems Gulf Co. Ltd.


Mr. Eng. Alaeddin Soror Heinz Wallmeyer
Dhahran Jubail expy, Dammam

Kingdom of Saudi Arabia

Mob. (+966) 546013800


Tel.: +966 509884096 e-mail: heinz.wallmeyer@zeppelin.com
Fax: web: www.zeppelin.com
E-mail: Eng.alaeddin@gmcoindustrial.com

Zeppelin Systems Gulf Co Ltd. Board of Directors: Bank details:


P.O. Box 1495, Al-Jubail 31951 Rochus Hofmann (Chairman) Saudi British Bank
Kingdom of Saudi Arabia Ralf Boschert IBAN SA45 4500 0000 0428 0448 4001
Tel.: +966 (0)13 8084181 Heinz Wallmeyer SWIFT-Code SABBSARI
Fax.: +966 (0)13 8084184
E-mail: zeppelingulf@zeppelin.com C. R. 2055009678
www.zeppelin-systems.com C.C. No. 160197
1. INTRODUCTION

Dear sirs,

many thanks for the inquiry package for the Service / Welding of 2 pcs Aluminum Tanks
in our Zeppelin Yard in Al Jubail – 3rd Support Industry.

Zeppelin Systems Gulf will quote in this quotation for the job according to the below
technical and commercial description.

The overall service is quoted under the conditions of


- Terms and Conditions for Assembly and Services

We are looking forward to working with you on this project and remain

Sincerely

Heinz Wallmeyer

1.1 DESCRIPTION OF PROJECT

GMCo would like Zeppelin to do the welding execution for 2 pcs Aluminum Tanks according
to the attached drawings.

Zeppelin is only responsible for the welding service.


1. Welding
2. Qualified welder with welder certificates
3. Welding machines TIC
4. Welding gas
5. Welding filler
6. NDT – RT test for the weld seams - 2% of weld seams
7. All needed grinding and cutting tools
8. PQR according European Norms, no API/ASME
9. Unloading of trucks – material supply

GMCo to supply/responsibility:
1. All needed raw material in plates, bended and all welding edges beveled
2. All bending, cutting and grinding services on the raw material plates related to the job
according to Zeppelin guidance
3. Supervision and assembly of any assories to the tanks
4. Material supply to Zeppelin free of charge
5. Any required pressure tests
6. Additional material for welding tests, appr. 2 square meter for each material thickness of
the tanks
7. Pick-up at Zeppelin yard and transportation to site
8. Any needed transportation saddles for the tanks
9. Material Certificate sfor the alminum plate material
10. Detailed design drawings of the entire tanks

Zeppelin Systems Gulf Co Ltd. Board of Directors: Bank details:


P.O. Box 1495, Al-Jubail 31951 Rochus Hofmann (Chairman) Saudi British Bank
Kingdom of Saudi Arabia Ralf Boschert IBAN SA45 4500 0000 0428 0448 4001
Tel.: +966 (0)13 8084181 Heinz Wallmeyer SWIFT-Code SABBSARI
Fax.: +966 (0)13 8084184
E-mail: zeppelingulf@zeppelin.com C. R. 2055009678
www.zeppelin-systems.com C.C. No. 160197
2. SCOPE OF SUPPLY

Welding Services for 2 pcs Aluminum Tanks

NOT included in Zeppelin scope is:

 any safety people like safety officer, permit receiver and so forth
 any waiting time in case we are waiting for material or any other services from
GMCo. Which is not under the responsibility of Zeppelin during the work
 any labratory tests, except RT film development
 any design drawings or as build drawings

Scope of work and responsibilities for Services / Assemblies / Commissioning

Realization Costs
Client
Zeppelin
Client
Zeppelin

No. Description

A IN GENERAL
1. Welder’s certificates x x
2. Tank design, structure, foundations, concrete work x x
3. Logistic scheduling of the complete assembly based on time schedule x x x x
4. Date management x x x x
5. Liability insurance x x
Realization Costs

Zeppelin

Client
Zeppelin

Client
No. Description

6. Installation insurance / Site insurance x x

B SAFETY
7. Safety coordinator x x
8. Safety expert x x
9. Safety officer x x
10. Permit Receiver x x
11. Safety equipment for our Zeppelin service, welder and assembly staff x x
12. Obligatory briefing on hazards and risks of our staff related to special safety instructions x x
13. First-aid facilities x x

C STAFF
14. Yard manager/supervisor for welding, assembly and infrastructure x x
15. Skilled welders as required x x
16. Skilled Silo welders as required (Tank/Silo welding only) x x
17. Skilled workers as required x x
18. Skilled Silo workers as required (Tank/Silo Installation only) n.a. n.a.
19. Skilled helpers as required x x
20. Visa for our staff n.a. n.a.
21. Incidental unexpected work/working time x x
22. Accomodation for our staff x x
23. Daily allowances for our staff x x
24. Food for our staff x x
25. Transfer from airport to hotel and back n.a. n.a.
26. Transfer from hotel to site and back n.a. n.a.
27. Flights to the main airport and return n.a. n.a.
28. Domestic flights between and n.a. n.a
29. Provision of washing facilities (sanitary installation) x x
Provision of (an) office container (air-conditioned) with work-related communication devices as
30. x x
telephone, fax and internet
31. Running expenses for communication x x
32. Provision of recreation room(s)/container(s) (air-conditioned) for the site personnel x x

F SYSTEM- AND SILO INSTALLATION


Free access to the fabrication and assembly place as well as intermediate storage area and
33. x x
installation place for the trucks and cranes* )
34. Provision of cranes with cross beam and fork-lift trucks in adequate size x x
)
35. Transport of tools from the storage area or assembly place respectively to installation area* n.a. n.a. n.a. n.a.
36. Transport of silos from assembly area to installation place* ) n.a. n.a. n.a. n.a.
37. Installation of silos n.a. n.a. n.a. n.a.
38. Assembly of silo access elements (railings, walkways etc.) n.a. n.a. n.a. n.a.
39. Delivery and installation of piping and fittings n.a. n.a. n.a. n.a.
40. Cleaning of silos after installation including provision and disposal of detergent 1) n.a. n.a. n.a. n.a.
Realization Costs

Zeppelin

Client
Zeppelin

Client
No. Description

41. Final acceptance of silos n.a. n.a. n.a. n.a.


42. Professional mechanical 1:1 installation of the system until readiness of operation n.a. n.a. n.a. n.a.
43. Professional electrical 1:1 installation of the system until readiness of operation n.a. n.a. n.a. n.a.
44. Pneumatic installation from manifold near by the supplied equipment, max 10 meters n.a. n.a. n.a. n.a.
45. Cabletrays in galvanized steel n.a. n.a. n.a. n.a.
46. Cables from Cabinet to equipment n.a. n.a. n.a. n.a.
47. Power Supply to Zeppelin Main Cabinet (including cable, cable tray etc.)/Zeppelin generator x x
48. Any suspension material and its installation needed to fix the cable trays n.a. n.a. n.a. n.a.
49. Professional adjustment of the machines and systems n.a. n.a. n.a. n.a.
50. Sealing of all openings in the roof, walls and any installation openings n.a. n.a. n.a. n.a.
51. Issue of acceptance report x x x x

*) lifting over pipe bridges is excluded, if not explicitly agreed


1)
Quantity, size and quality as well as location will be defined by Zeppelin during detail engineering
2)
located directly at the work area
3)
if required

3. CONDITIONS OF SUPPLY

3.1. PRICE

Qty. Description Total Prices

Welding of 2 pcs aluminum tanks as described above

2 Welding of aluminum Tanks Dia: 4.050 mm,


Height: 6.000 mm – Material 3003 / Al-Mn 1 Cu

Including all of the above mentioned services and


manpower

Total SAR 262.000,--


Revised 7.2.2021 SAR 250.000,--

Standby Charges / Waiting Time:

Zeppelin Gulf service technicians (Supervisor/welder/fitter) SAR 1.270,--/guy/day

Remarks:

For the work 10 hours working time per day (dayshift) was considered
3.2. PRICE ADJUSTMENT

The price is fixed and not adjustable, yet payments effected 12 months upon issue date of
order will be revised to maintain the economic and financial balance of the contract
according to procedures specified in item 3. Adjustments of "Annex 2 - General Conditions
of Sales”.

3.3. TAXES

Any local taxes and any fees are not considered in the quotation

3.4. DELIVERY TIME

Delivery time will appr. 5-6 weeks because of the actual Corona issues and limited welders
availability because of the borders are closed.

3.5. PLACE OF DELIVERY

EXW – ex works Zeppelin manufacturing yard – Jubail KSA (Incoterms 2020)

3.6. PAYMENT CONDITIONS

A) 50% Down payment upon receipt of raw material

B) 30% After having finished the first Tank, declaration of readiness for pick-up from
Zeppelin

C) 20% Final Payment after issue of final inspection protocol, latest three (3) months
after ex works delivery of 2nd tank

Payment terms: all payments within 30 days after date of invoice.

3.7. EXCLUSIONS

please compare above list of responsibilities


any not specifically mentioned services in this quotation are excluded from the service

any taxes or local fees which may will be charges by the government

3.8. GUARANTEE

Equipment supplied by ZEPPELIN are guaranteed against manufacture failures for a period of
12 months beginning with the installation’s take-over date or 18 months upon delivery date,
whichever occurs firstly. This warranty excludes all parts damaged due to mishandling or force
majeure.
3.9 LIMITATION of LIABILITY

The Supplier shall in no case be liable for loss of production, loss of profit, loss of use, loss
of contracts or any other consequential or indirect loss whatsoever.

The Supplier is liable and insured for personal injury or death and damage to Buyers`
property as far as caused by him.

The total liability of the Supplier out of or in connection with the Contract for damages and
losses which are not covered by the insurance policies shall not exceed 20% of the contract
price.

The above limitation of liability is not applicable in case of wilful misconduct, gross
negligence of the Supplier or persons employed by the Supplier, personal injury, damage to
purchaser`s property and/or infringement of third parties’ intellectual property rights.

3.10 OTHER COMERCIAL CONDITIONS

The above quotation is based on our terms and conditions of


- Orgalime S 2000S for Supervision
- Terms and Conditions for Assembly and Services

3.11 VALIDITY

This quotation is none binding

We are looking forward to keep working with you and if you have any questions on the
assembly, commissioning and start-up then please contact us for clarification.
We are at service to you any time.

Sincerely

Heinz Wallmeyer Frank Wunder


Managing Director Senior Service Manager
Zeppelin Systems Gulf Co. Ltd.

Attachments