Professional Documents
Culture Documents
CPS General en
CPS General en
- LOT 1 : TWO (02) GIS 220 / 60 kV – 3X 120 MVA AT INDUSTRIAL AREA OF SKIKDA
- LOT 2 : TWO (02) GIS 220 / 60 kV – 3X 120 MVA AT INDUSTRIAL AREA OF
ARZEW
PIECES IV – CAHIER 1
SPECIAL SPECIFICATIONS
GENERAL
1 - Subject
2 - Reference Document
3 - Consistency works
4 - General Conditions of Operation
5 - Extension of Benefits
PAGES 2
4.5 - Lighting - Heating - Air Conditioning
4.6 - Description of System On-line Monitoring of Transformers
4.7 - Fire Detection
4.8 - System Monitoring and Anti-Intrusion
CHAPTER 7 - TESTING
PAGES 3
GENERAL
PAGES 4
1. Object:
This special specification is intended to set the following conditions, which will be executed:
ENGINEERING, SUPPLIES, WORK, TRAINING, TEST AND COMMISSIONING OF THE
FOLLOWING ITEMS:
- LOT 1: TWO (02) GIS 220 / 60 kV – 3X 120 MVA AT INDUSTRIAL AREA OF SKIKDA
- LOT 2: TWO (02) GIS 220 / 60 kV – 3X 120 MVA AT INDUSTRIAL AREA OF ARZEW
2. Reference Document:
- Issue 1 - Studies and Civil Engineering Works - June 1993 Edition + Addendum
- Description of housing
- Description of premises
Topographic Survey
Single-line diagram 220 and 60 kV 220kV for reference
The bidder should make a proposal of layout drawing for the S/S, subject of this tender.
This particular specification includes only the articles and texts of the specifications above,
PAGES 5
3. CONSISTENCY OF ARTICLES
PAGES 6
15 outgoing cable cell client 60 kV FERTIAL, FERTALGE, METHANOL, AMO-ORASC,
DESYDRO, GP2Z, NAF/RAFF, SPM, GL4Z, HELIUM II, AMMONIAC, GL2Z, GP1Z,
L3Z
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, and 2
01 Coupling Cell
02 cells of bars Potential with Grounding
11 outgoing cable cell client 60 kV ADS, ENIP, POLY, GNLK (GNL-GPL), HELISON,
PTA, LAB, TOP, TRC, ENGI and PTE
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, 2
01 Coupling Cell
02 cells of bars Potential with Grounding
PAGES 7
A 60 kV S/S type “Shielded SF6" consisting of 2 busbar, In= 3000 A, Pcc= 3.5 GVA, Icc= 31.5 kA
with potential bar on each busbar and cells consisting the GIS
11 outgoing cable cell client 60 kV TOP, LAB, PTA, HELISON, ENIP, POLY, ADS, PTE,
ENGI, TRC, GNLK, and (GNL-GPL).
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, 2
01 Coupling Cell
02 cells of bars Potential with Grounding
4 - Terms of Operation:
The 220/60 kV GIS is remote controlled from the CRC. The equipment will be provided for remote
control, tele-measurement and tele-signaling from the different centers of control.
The equipment will be provided to local climatic conditions.
The operation and monitoring equipment will be electrically controlled remotely from the control room
and the various control centers and from local panels of local controls.
5 - Extension of Benefits:
5.1 The Manufacturer will at its expense:
The engineering, calculation notes, implementation plans (with updated after execution)
the work to implement the outdoor, indoor civil works, any body of work including all constraints
following the rules of art.
The manufacturing, the supply on site of all equipment and the whole steel ctructure, base of
equipment and various brackets.
The assembly of the whole electrical equipment, the control in factory, the acceptance test, the
commissioning, the warranty service of equipment supplied and various materials destinated for
the execution of contract as described in the conditions of “Piece I and II”.
The approval CTC.
The safety work
Nota : The manufacturer is required to submit a work in running order, including all accessories and
bodies clean, necessary for proper operation of the farm and for everything which is not specified as to
supply the master of the work. All power connections are sized for 1.2 of power transit
PAGES 8
CHAPTER 1
CIVIL-WORKS
PAGES 9
CHAPITRE 1 - CIVIL-ENGINEERING
1. PREAMBULE:
The purpose of this document is to describe the design, the technical specifications of implementation
and technical data, the conditions of realization of:
- LOT 1: TWO (02) GIS 220 / 60 kV – 3X 120 MVA AT INDUSTRIAL AREA OF SKIKDA
- LOT 2: TWO (02) GIS 220 / 60 kV – 3X 120 MVA AT INDUSTRIAL AREA OF ARZEW
The realization and installation is defined in the special plan of the client described in this document and
the plans and documents of the client given ot manufacturer.
The description which follows are not limited, the manufacturer should supply a full facilities and in
order of work.
The manufacturer under his full reponsability cannot claim, if during the normal execution of the
contract, he need to increase the quality or the quantity of his materials compared to his previous
engineering.
The study and calculation of civil engineering works will be done following Part 1 and 2 of tender of
construction of EHV substation Edition June 1993 and aslo the RPA version 2003.
The consistency of works includes mainly the civil works of buildings and outdoor civil works.
2 CONSISTENCY OF WORK OF CIVIL WOKS OF BUILDINGS:
The reponsability of manufacturer:
Industrial buildings: These buildings include a 220 kV building and 60 kV building with bridge
crane each and will be remote controlled (the control of bridge crane should be in wireless). The
bridge crane should lift the heavier equipment of each industrial building
The control building and premises with lightning conductor include the following:
Control room
Relay room
Auxiliary room
HF room
Battery room
Washroom facilities
Tea kitchen (first choice) and chamber passage
Store with wire counter display
Workshop
Office and meeting room equipped with furnitures and fixtures (1 st choice).
A space as workshop in each hall of GIS and to serve by the bridge crane.
The 220 and 60 kV industrial buildings, control building, local of generator, gatehouse and guard
house will be in durable.
The industrial and control building will be elevated 80 cm compared to the side of project.
The plat form of GIS buildings will be in armoured concrete.
The framing of buildings will be in armoured concrete
PAGES 10
The framing of the GIS building including the slab must not be connected to ground network and to
any other detached structure (firewall and other).
A total service space of 2.80 m minimum in height under-girder for all GIS building 220 and 60 kV
Foundation and slab of industrial buildings including the screed
Terrace inaccessible in armoured concrete in hollow building unit with sealing
Ceiling, suspended ceiling and raised floor
Facing with bricks, double partition with treatement of facing.
Encapsulation inside the building with recovery of skeletons
The tiled floor and faience on all heigh of walls for the battery room and toilets.
Provision of special products for screeds and other (paint anti dust and anti acid for battery room)
Supply and installation of special cements, shrinkage compensated or otherwise.
All trades Secondary Sanitary Plumbing, Lighting, Air Conditioning, Metallic carpentry, wood and
aluminum, Sanitation, Painting ordinary and special fitters (DENY) and glazing ... etc ...
Supply of heating system and air conditioner, Split ype in (n+1), confirmed by calculation ote.
For the industrial buildings of 220 and 60 kV GIS, the manufacturer should provide an air
conditioning in panel (n+1) (duplicate element)
Provide the pressurization for all premises: GIS Hall and the whole of all premises of control building.
The supply and installation of manifolds and down rainwater from the roof to the collector sewer.
PAGES 11
1.3.1 DETERMINATION OF PLATFORMS:
The leveling concerning mainly the execution of plate-form of S/S and road, the land should be
ridded vegetation before the operation of leveling.
The study of eart movement and development of earth for the preparation of the site of S/S and
its access, should allow justifying the solution to use for ease of execution and evacuation of
rainwater.
The number of plate-form tolerated by the client is two (02) if necessary at maximum with
justification of soil survey, with a possible max slope of 3 %. The same floor will be located on
a same plate-form.
The plan of grading and leveling are the responsibility of the Manufacturer and will be submitted
for the approval of client.
The platform is fitted over, after grading, by spreading gravel with a thickness of ten (10) cm,
bounded by a concrete curb.
The surface to grit is determined in function of ground network.
All embankment will have a protection in shotcrete with welded mesh, with cunette for rainwater
recovery
1.3.4 FOUNDATION:
The study of the foundations for base of equipment, device, anchor portal and buildings based on the
geotechnical report and the specifications of the client
In the case that the land type doesn’t require no special foundation, the foundations of buildings are
footings and concrete sleepers, and those portals and media anchors EHV switchgear, foundations of
concrete or sole individual isolated.
The dimension of foundation will be determinated in function of building load and the rate of
allowable work of soil.
To calculate the foundation, the safety factor of foundations shall be as follows:
Stability of overturning > 1.5
Stability of sliding> 1.2
Stability of toothing > 1.2
PAGES 12
The plans of foundations including the reinforcing steel must be properly and with the axial of
reference relative to the layout darwing and implantation drawing for a correct positioning of the
foundation.
The manufacturer will prepare a guide drawing of civil works in which will be collected at least the
following data:
Definition of levels of leveling.
Definition of anchor rod and size.
General implementation of civil works
Axes of their foundationive with their numbers and/or codes duly sides.
Heavy and light roads, wells, cable tray, identification and numbers of all intersections and
details.
Data and runs of loads and solicitation on the foundations of the S/S identified by axes, and
codes that will be confirmed with calculations.
1.3.5 FENCE
The fence will be in reinforced concrete of 3.5 m in height stilted with concertina wire Φ600 of
diameter with detector wire with a treatement of the main frontage (see fascicule 1)
The fence will be carried out on the naturel land. It will be carried out from the opening of the site and
following the safety requirement.
The manufacturer should make the execution plan of fence and submit it to client for approval.
The gatehouse and the keeperhouse of S/S should be intergrated to the fence; without space separating
them from the fence.
If necessary, it will be included the study and realization of retaining walls in armoured concrete founded on
the solid soil.
These walls will be used to maintain the active earth pressure and will be provided a banister with body guard
between the different levels of plate-form.
An recovery pit of oil used of transformer or shunt, this pit is common to transformer ans shunt, the
sizing of the pit will be 1.5 of oil volume of predominant transformer.
This pit is constituted of a bottom, curtain wall and slab in unsurfaced exposed concrete
The bottom, curtain wall and slab will be tight. The bottom will be installed on a concrete dosed
250kg/m3.
The pipeline included in the walls of the pool must be placed before the pouring of concrete.
PAGES 13
This pit of retention tight should be covered with waterproofing protection and equipped with a
manhole and a sump wich will be used for the evacuation of oil.
This manhole will have a metallic galvanized trapdoor equipped with a lock and ladder in galvanized
steel putted up the curtain wall.
The manufacturer should make a study and propose the works of crossing and crossing of channel for the
crossing of the S/S cables
The cable tray should meet the following conditions:
The space occupied by the cables should not exceed 60 % maximum
Not inundable
Easy retractable cover
Bracket for the installation of cables
The crossing of cables by optical fiber should meet the characteristics of cables and the
recommendation of installation of cables supplier.
The power conncetions will be provided in different cable tray by Transformer connection.
For the cable trays which are located outside of the S/S, the manufacturer should study the line route
and their sizing taking into account all recommendation presented by the installations and in particular the
necessary relieving of handling material.
Provide the external lighting, external of fence and sides and also inside the S/S, (Industrial building
and control building and all annexe premises). The lighting will be studied to allow all intervention
during night without the need of empowerment means.
The external lighting should be studied and carried out to allow the good visibility and should take into
account the tele-monitoring system.
The external lighting and sides, also the near the substation of S/S on tower with double brackets, the
height of post light is 6 meter.
For the external drainage, it will be carried out by tubing tray in armoured concrete outside and along
the fence of S/S.
SANITATION NETWORK
PAGES 15
The manufacturer should carry out a sanitation network of rainwater and a sanitation network for
sewage.
DRIPPING
As far as possible, the spilling of all catching water will be in the public network, as well as the
authorization required was delivered.
If the public network does not exist, the manufacturer will make septic tank.and a well, which will be
installed far as possible from the works to don’t alter the characteristics of soil supporting the works.
The power supply in drinking water in the S/S and in housing will be carried out as:
- Either a conncection for distribution of water connected to public network: Hower, 2 tank of 3000 L in
galvanized steel; One for each building with the supply of supercharger and the whole equipments
and accessories necessary.
- Either from drilling: however, it will be provided a water tank of 10 m 3, a supercharger, lift-and-force
pump, piping, valve and other accessories (drinking water)
- Provide a special paint (non toxical) on the internal walls of water tank
All materials will be supplied by the manufacturer.
All formalities beside the official organization will be done by the manufacturer, in case of connection
of distribution or drilling
PAGES 16
- Deadline of supply of fence, gate house and guarding house: The end of works is fixed at 3 months
after the opening of site.
- The tele-monitoring and anti-intrusin system for all S/S
- Concerning the video monitoring; a port will be for the transmission of frame remotely.
- Installation of anti fire detection system with reporting the alarm to control room and guarding house
The manufacturer is supposed to have vist the location and had knowledge about its configuration,
conditions of access and all difficulties of execution which can occur during the works and cannot
claim for an additional for all visible or invisible works which he have to demolite or to move inside
the land of project to build and which are a n integrate part of his performance.
The study of civil works, steel structure and EHV equipment will be considered in seismic zone III.
The seismic factor will be 0.4 g (RPA 2003); using group 1 A of parasismic regulation in force.
In the calculation of works in armoured concrete, the manufacturer will use the soil study which is
submitted by the client for reference.
For all calculation, the Algerian regulations and equivalent will be used and written in French.
The convention with CTC will be the reponsability of manufacturer, All Civil works (building, transfor
pit, portal foundation, structure…etc.) will be submitted for approval of CTC.
NOTA:
The soil study and the topographic survey are given to client during the commercial stage as reference,
he should check them and complete or remake them if he judge that are complete; as result, the
manufacturer will have the full reponsability of all imponderable which can occur during works.
PAGES 17
Nota:
The use of ciment type and necessary aggregate for making the concrete will be recommended by
authorized laboratory.
1.11 OTHERS
- The architecture of buildings should be esthetic and adapted to environnement
- For buildings including the guarding house, the manufacturer will present an architecture file
(frontage, plan view and perspective). The choice will be done by the client according tto the samples
proposed.
- The arrangement of control building should allow a visibility of whole S/S
- Envisage the space inside GIS building for the extension of two (02) bay of one side including the
space outside for the conncetion until line head.
- The dimension of GIS building should respect the fact that the height of lift should be enough to move
the heaviest element and the most awkwardly shaped of GIS.
- The width of GIS building should integrate the necessary space to remove an element of GIS in
horizontal position and allow the move of filling and maintenance equipment.
-The industrial buildings including oremises and control building should take into account the reserve
equipped and the future extension inside and outside.
- The manufacturer should size the annex premises (control room, auxiliary room, HF room, etc…)
tanking into consideration a future extension of at least 4 bay.
- The diemsnion of all premises and their arrangement will be studied by the manufacturer and
presented to client for approval taking inti account the futur extension.
- The plan and dimension of premises will be submitted for the approval of client
- The block for client’s staff will be in cabin.
- The outdoor temperature change between -10 °C and + 55 °C, the ambient temperature in the hall of
GIS is 28 °C and in control building and annex premises 22 °C
- The GIS equipement should be elevated 40 cm compared to slab.
- For all equipment to provide in the opposite site, the manufacturer should be sure about the existence
of space in HF room of each S/S, if not, he will envisage a new HF room.
- The possible move of HV and MV line at site are the reponsability of client.
PAGES 18
PAGES 19
CHAPTER 2
STEEL STRUCTURE
PAGES 20
Chapter 2: Steel Structure.
Substation side:
Efforts will apply to those given by the calculation of the strained position.
PAGES 21
It is considered an overload of erection vertically applied to Busching (Value determined by the
manufacturer)
It is considered an overload of rime 2 kg / m on conductors and overhead ground wire with a wind of 18
centipièzes applying on conductors.
The frame is of type VIRENDEL galvanized, thickness of the galvanizing will 90microns minimum
(consider the salty atmosphere)
Method of sealing: anchors and bolts on platinum
Description of materials:
Voir Fascicule 2 Steel Structure
PAGES 22
CHAPTER 3:
HIGH VOLTAGE EQUIPMENT AND FACILITIES
PAGES 23
CHAPTER 3: HIGH VOLTAGE EQUIPMENT AND FACILITIES
PAGES 24
02 outgoing line cell (HASSI AMEUR and MARSAT)
03 outgoing cable cell: GIS Num 1 - ARZEW , clients: VAPOCRAQUEUR and GTL
01 outgoing cable cell equipped: Future GIS Num 3 - ARZEW
03 Transformers cells 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 Outgoing cable cell equipped Reserves 1&2
01 Coupling Cell
02 cells of bars Potential with Grounding
11 outgoing cable cell client 60 kV ADS, ENIP, POLY, GNLK (GNL-GPL), HELISON,
PTA, LAB, TOP, TRC, ENGI and PTE
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, 2
01 Coupling Cell
02 cells of bars Potential with Grounding
11 outgoing cable cell client 60 kV TOP, LAB, PTA, HELISON, ENIP, POLY, ADS, PTE,
ENGI, TRC, GNLK, and (GNL-GPL).
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, 2
01 Coupling Cell
02 cells of bars Potential with Grounding
PAGES 26
Characteristics of current reducers: CT
Core 1 2 3
Transformation ratio 600-1200 / 1A 600-1200 / 1A 600-1200 / 1A
Power at Secondary ( VA )
30 30 30
*Minimum
Accuracy class 0.2 5P20 5P20
Thermal resistance 31.5 kA 1sec 31.5 kA 1sec 31.5 kA 1 Sec
* Minimum values.
IEC reference standards.
The manufacturer must take into account the single line diagram for the characteristics of current
reducers (*). The rated burden and accuracy class of CTs will be justified by calculation notes and
subject to the approval of the client.
PAGES 27
OUTDOOR EQUIPMENT:
03 Lightning arresters equipped with rated voltage 245 kV and discharge class 3, equipped each with
discharge meter
01 AUX transformer, Ynzn11 and with minimum power 500 KVA, to conncet to the output 10.5 kV of
Transformer.
01 Power transformer 220/63/10.5 kV- (120/120/40) MVA
01 three-pole connection switch at In = 2000 A under Un = 220 kV with three-pole electric control and
emergency manual control
06 End cable boxes in dry cable minimum section (2x1x800 mm² per phase).
01 Neutral switch 220 kV with local manual control
01 Neutral switch 60 kV with local manual control
01 Outdoor three-pole insulation switch AUX TR with local manual control
03 surge arresters of rated voltage 10.5 kV and discharge class 3 equipped with discharge meter
01 CT Tore Neutral Protection 220 kV
01 CT Tore Neutral Protection 60 kV
01 CT Tore Protection for earth leak AUX TR
01 CT Tore Neutral Protection of AUX TR
Conductors and connectors
* Minimum value.
- IEC reference standards.
The manufacturer must take into account the single line diagram for the characteristics of current
reducers (*). The rated burden and accuracy class of CTs will be justified by calculation notes and
subject to the approval of the client.
The cell allows the coupling of two busbars. Rated current of cell is In=4000 A
PAGES 28
It will be composed by the following equipment:
02 Three-pole busbar section isolator with local and remote electric control, manual emergency control
01 Three-pole circuit breaker with local and remote electric control, manual emergency control.
03 Unipolar current reducer with three (03) cores per pole
02 Three-pole earthing switch without making capacity with electric control and manual emergency
control
01 Local control cabinet
The station includes 02 Cells of this type; each one will be composed by the following elements:
03 Unipolar rapid earthing switches with making capacity and electric control and manual emergency
control
03 magnetic type and SF6 insulated Single pole voltage transformer for each bar with motorized
control insulation switch, and they are designed to support tests and to be replaced.
The characteristics of voltage reducers (VT) following the IEC 60044-2 Standards:
Core 1 2
Transformation ratio 220 kV /√3 /0.1 kV/√3 220 kV /√3 /0.1 kV/√3
PAGES 29
Power at the 50 VA minimum 50 VA minimum
secondary (VA)
Minimum (*)
Accuracy class 0.2 3P
Quality factor 1.5 Un / 30 sec 1.5 Un / 30 sec
- Minimum Value (*)
- Reference standards (IEC)
NOTA :
For the future extension, the manufacturer should envisage a buffer compartment with cut –off
switch motorized with rapid MALT for 220 kV GIS
The intermediate compartment is between the bubar switch and the circuit breaker of each cell
Envisage a system of localisation of default (arc detection) per compartment
3.3.1.6 Local control panel
It will be envisaged for each shielded cell a local control panel and it will include:
A bay unit manufactured by ……… and ………. Type with active synoptic integrated with the
electrical control equipment of different equipment of bay, the signalling is concerning the GIS, the
ICT, ICS, CCP, CCM and AC and DC auxiliary circuit breakers for the power supply of motors
and lighting and heating of bay equipments.
Automatic synchronization
Measurement of current and voltage
Signaling concerning the cell
Control of the cell
Locking
Control of synchronism
Monitoring unit of arc detection by optical fiber link for each compartment and each phase (use of
optical sensors)
It will be envisaged a synoptic of emergency control for each bay with manual synchro
It will be envisaged a commutator with key in three switch position local / remote / Maintenance
An ammeter on the "Phase 4" and a voltmeter with commutator
A Set of Relays-Verrines of signaling regarding the GIS.
Envisage also :
Key Local / remote locked in local position.
Commutator for live works with Three (03) Positions :
* Position 1: Normal Operation
* Position 2: Live works ( Cut set of tripping and reset and permutation of tripping in
Three phase Definitive Instantaneous tripping ).
PAGES 30
* Position 3: Free
Arc detection for each compartment
This panel will regroup all the circuits coming or going from the cell.
Nota: The power supply of motor of CB and DS will be 127 V DC
3.3.2 - 60 KV Level:
3.3.2.1 - 60 kV Busbar:
The busbars shall be designed to pass a current of 3000 A min, symmetrical short-circuit power
Pcc= 3.5 GVA, Icc = 31.5 kA.
The busbars will be mounted in isolated sheath SF6. The section of bars will be justified by
calculation note.
3.3.2.2 - Outgoing-line bay 60 kV line:
The rated current of cell is In= 1250 A, the shielded cell is composed of the following equipments:
02 Three-pole busbar section isolator with local and remote electric control and manual emergency
control on site
01 Single Three-pole circuit breaker with local and remote electric control and manual emergency control
on site.
03 Current transformer with three (03) Cores per Pole
02 Three-pole earthing switch without making capacity with electric control and manual emergency
control (CB frame)
01 Three-pole line isolator with local and remote electric control and manual emergency control on site
03 Unipolar rapid earthing switch with making capacity and electric control and manual emergency
control
03 Single-phase metal enclosed connection
03 Bushings SF6 / Air GIS side
01 Local control cabinet
OUTDOOR EQUIPMENT
03 wave trap for each connection
03 Connection box for each connection installed
03 Capacitive voltage transformer with 2 secondary windings ( Measurement and Protection )
03 surge arrester with rated voltage 60 kV and discharge class 3 equipped with discharge counter
Sd
Core 1 2 3
Transformation ratio 300-600/1A 300-600/1A 300-600/1A
Secondary power (VA)
30 30 30
Minimum (*)
Accuracy class 0.2 5P20 5P20
PAGES 31
Thermal resistance 31,5 kA 1sec 31,5 kA 1sec 31,5 kA 1 sec
* Minimum value
Reference standard CEI.
The manufacturer must take into account the single line diagram for the characteristics of current reducers (*).
The rated burden and accuracy class of CTs will be justified by calculation notes and subject to the approval
of the client.
Core 1 2 3
Transformation ratio 300-600/1A 300-600/1A 300-600/1A
Secondary power (VA)
30 30 30
Minimum (*)
Accuracy class 0.2 5P20 5P20
Thermal resistance 31,5 kA/ 1sec 31,5 kA/ 1sec 31,5 kA/ 1 sec
* Minimum value
Reference standard CEI.
The manufacturer must take into account the single line diagram for the characteristics of current reducers (*).
The rated burden and accuracy class of CTs will be justified by calculation notes and subject to the approval
of the client.
PAGES 32
3. 3. 2.4 – Transformer incoming line bay 220/63/10.5 kV:
The rated current of cell is In= 1600 A, the shielded cell is composed of the following equipments:
02 busbar section isolator with three-pole local and remote electric control and manual emergency control
on site
01 Three-pole circuit breaker with local and remote electric control and manual emergency control on site
03 Current transformer with three (03) cores per Pole
02 Three-pole earthing switch without making capacity with three-pole electric control and manual
emergency control (CB frame)
01 Three-pole line isolator with local and remote electric control and manual emergency control on site
03 Unipolar rapid earthing switch with making capacity and electric control and manual emergency
control
03 Inductive voltage transformer with 2 secondary (Measurement and Protection)
03 Insulation switch inductive VT with single-pole remote and local control with manual emergency
control
03 Single-phase metal enclosed connection.
03 cable end box, GIS side
Local control cabinet
OUTDOOR EQUIPMENT:
Cable connection 3 x (2x1x800 mm2)
* Minimum value
Reference standard CEI.
The manufacturer must take into account the single line diagram for the characteristics of current reducers (*).
The rated burden and accuracy class of CTs will be justified by calculation notes and subject to the approval
of the client.
02 Three-pole busbar section isolator with local and remote electric control, manual emergency control
PAGES 33
01 Three-pole circuit breaker with local and remote electric control and manual emergency control
03 single-pole current reducers with three (03) cores per pole
02 Three-pole earthing switch without making capacity with electric control and manual emergency
control
01 Local control cabinet
* Minimum value
Reference standard CEI.
The manufacturer must take into account the single line diagram for the characteristics of current reducers (*).
The rated burden and accuracy class of CTs will be justified by calculation notes and subject to the approval
of the client.
The station includes 02 cells of this type, each one will be composed with the following element:
03 Unipolar rapid earthing switch with making capacity and electric control and manual emergency
control
03 Magnetic type and SF6 insulated Single pole voltage transformer for each bar with motorized
control insulation switch, and they are designed to support tests and to be replaced.
The characteristics of voltage reducers (VT) following the IEC 60044-2 Standards:
Core 1 2
Transformation ratio 60 kV /√3 /0.1 kV/√3 60 kV / 0.1 kV/√3
Power at the 50 VA minimum 50 VA minimum
secondary (VA)
Minimum (*)
Accuracy class 0.2 3P
Quality factor 1.5 Un / 30 sec 1.5 Un / 30 sec
PAGES 34
* Minimum value
Reference standard CEI.
NOTA :
For the future extension, the manufacturer should envisage a buffer compartment with cut –off
switch motorized with rapid earthing for 60 kV GIS
The intermediate compartment is between the busbar switch and the circuit breaker of each cell
Envisage a system of localisation of default (arc detection) per compartment
Envisage also :
Key Local / remote locked in local position.
Commutator for live works with Three (03) Positions :
* Position 1: Normal Operation
* Position 2: Live works ( Cut set of tripping and reset and permutation of tripping in
Three phase Definitive Instantaneous tripping ).
* Position 3: Free
Arc detection for each compartment
This panel will regroup all the circuits coming or going from the cell.
Nota:
PAGES 35
The power supply of all motors of CB and DS will be 127 V DC.
PAGES 36
3.4. High Voltage Connection:
NOTA: The whole performance of supply, works, tests are the reposability of manufacturer
PAGES 37
3.5.3 Reinforced insulation:
The facilities and equipments will be planned with reinforced insulation of 31 mm / kV.
Diagram:
The symbol of bodies will be represented on each compartment of 220 and 60 kV sub-station for easy
identification.
3.6.4 - Earthing system:
The achievement of different grounding to perform in the station must meet the requirements of international
standards and specifications of client.
The general earthing network will be composed of a loop circuit network. The network will be realized and
buried about 1 m deep and formed of bare copper cable of 200 mm ² minimum section.
The real section will be determined according to zero sequence current. The earthing network must be
arranged to form loop circuits connected without interruption of conductors, to frames, foundationes rails and
various foundationes. The transversal mesh are connected at their ends, at main looping by appropriate
connectors of clamping bolt type, Visible and easily removable, welds are excluded.
No connection will be buried.
All high and medium voltage switchgear, both outdoor and indoor, frames and railings, transformer tanks,
cables, panels and LV cabinets, rectifiers, and all the cabinets, light devices and outlet, the secondary circuits
of instrument transformers, etc. ... Will be connected to earthing system properly.
The manufacturer should:
PAGES 38
CHAPTER 4 :
LOW VOLTAGE
PAGES 39
Chapter 4 : Low Voltage Specifications
1 – MAIN PROTECTION:
It will be ensured by a digital three-pole longitudinal differential protection which adopts a connection
with optical fiber or in copper.
It will be manufactured by ……… Type ……… and must necessarily be approved by the customer.
- Overcurrent Protection
- Distance protection
- Tripping logic.
- Tele-activities Functions
- Measure of I, U, P, Q, F.
- Control of synchronism.
- Location of default.
- Disturbography
- Thermal overload.
- State recorder
PAGES 40
The protection will be equipped with a test box which will include (voltages, currents, polarities,
tripping), it will be manufactured by ABB and Type RTXP 18 or 24
NOTA:
Envisage a differential protection in opposite S/S (including transportation, installation, setting,
communication and integration to CCN of opposite S/S).
It will be ensured by a digital three-pole longitudinal differential protection which adopts a connection
with optical fiber manufactured by ……… Type ………
- Overcurrent Protection
- Tripping logic.
- Tele-activities Functions
- Measure of I, U, P, Q, F.
- Control of synchronism.
- Location of default.
- Disturbography
- Thermal overload.
- State recorder
The protection will be equipped with a test box manufactured by ABB and Type RTXP 18/24 which
will include (Currents, polarities, tripping),
3- EMERGENCY PROTECTION
This protection will be independent and will be destinated for the protection of line against inadmissible
overloads and will be ensured by a digital overcurrent relay at constant time with thermal and
complementary overload.
The protection will be equipped with a test box manufactured by ABB and Type RTXP 18 or 24 which
will include (voltages, currents, polarities, tripping),
Position 2: Test (this position prevents the emission into the other bays and can receive PDD from other
bay)
It will be digital type, manufactured by ……… Type ………. it will be submitted to the client for
approval.
The protection should be provided with a three position switch:
Position 1: Normal operation
Position 2: Test (this position prevents the emission into the other bays and can receive PDD from other
bay)
Position 3: HS (Out of service)
The protection will be equipped with a test box manufactured by ABB and Type RTXP 18/24
2 - OVERCURRENT:
It will be provided a digital overcurrent protection and will be manufactured by ……….. Type ………..
It will be ensured by a digital three-pole longitudinal differential protection which adopts a connection
with optical fiber or in copper.
It will be manufactured by ……… Type ……… and must necessarily be approved by the customer.
- Overcurrent Protection
- Distance protection
- Tripping logic.
- Tele-activities Functions
- Measure of I, U, P, Q, F.
- Control of synchronism.
- Location of default.
- Disturbography
- Thermal overload.
- State recorder
The protection will be equipped with a test box which will include (voltages, currents, polarities,
tripping), it will be manufactured by ABB and Type RTXP 18 or 24
NOTA:
Envisage a differential protection in opposite S/S (including transportation, installation, setting,
communication and integration to CCN of opposite S/S).
It will be ensured by a digital three-pole longitudinal differential protection which adopts a connection
with optical fiber manufactured by ……… Type ………
- Overcurrent Protection
- Tripping logic.
PAGES 43
- Tele-activities Functions
- Measure of I, U, P, Q, F.
- Control of synchronism.
- Location of default.
- Disturbography
- Thermal overload.
- State recorder
The protection will be equipped with a test box manufactured by ABB and Type RTXP 18/24 which
will include (Currents, polarities, tripping),
This protection will be independent and will be destinated for the protection of line against inadmissible
overloads and will be ensured by a digital overcurrent relay at constant time with thermal and
complementary overload.
The protection will be equipped with a test box manufactured by ABB and Type RTXP 18 or 24 which
will include (voltages, currents, polarities, tripping),
Position 2: Test (this position prevents the emission into the other bays and can receive PDD from other
bay)
PAGES 44
4. 2.2.3 – TRANSFORMERS INCOMING PROTECTION 220 / 60 KV
PROTECTION CIRCUIT BREAKER FAILURE: Manufactured by ………….and Type …………….
This protection against the failure of the CB should be digital, decentralized type, operating when the
operation of one or other of the protections after adjustable delay and that the CB refuse to open.
It starts by the whole of protections, its action is after control of the closing position of CB by using a
current criteria.
It causes the parallel triggering of coupling and all outgoings which are switched to the same bar.
4. 2. 2. 4 – COUPLING PROTECTION 60 KV
1 - PROTECTION BACK UP (CB failure):
It will be digital type, manufactured by ……… Type ………. it will be submitted to the client for
approval.
The protection should be provided with a three position switch:
Position 1: Normal operation
Position 2: Test (this position prevents the emission into the other bays and can receive PDD from other
bay)
Position 3: HS (Out of service)
The protection will be equipped with a test box manufactured by ABB and Type RTXP 18/24
2 - OVERCURRENT:
It will be provided a digital overcurrent protection and will be manufactured by ……….. Type ………..
All automatisation: bistable or positions of switching DS and auxiliaries of tripping, etc... of the
protection of bar will be independent from the failure of the CB.. A monitoring of the equilibrium of
each bus bar is necessary to inform the operator about a bad position of bistable during the opening of
secondary of CT or any form of adaptation of transformation ration of CT.
PAGES 45
In the S/S with 2 bus bar, the coupling bay includes one CT with 2 secondary windings to power
supply the protection of each bar.
Envisage the test boxes.
PAGES 46
4. 2. 4 - CABINET OF PROTECTIONS AND RELAYING
The equipment of protection and relaying will be modular plug-in type in racks 19 inch.
These racks will be mounted in ouble doors separated cabinets with adequate degree of protection and
accepted by the customer.
The painting of cabinets will be preceded by a common type of treatment, degreasing, pull-in rinsing
and topcoat paint in epoxy paint, color to be determined.
The cabinets will be wired, the wiring to the protection being made from one or more connectors.
The cabinets will be connected to a terminal block outwards using cables.
The terminal will be in insensitive and inaccessible materials to heat and not hydroscopic.
The model will submitted for approvel of client.
All equipment and wiring will be perfectly marked.
The cabinet of relaying and protections will be installed (and connected) in the relaying buildings.
The forced ventilation in the panels should be confirmed by the manufacturer by calculation note.
The color code should be respected by function (Current circuits, voltage, polarity…)
The panels are a rotating part with access from the front, installed, adjoining to the wall in realting
buildings. The test boxes associated to protections.
The degree of protection will be IP 510.
NOTA :
The energy meters will measure both directions of energy (emission- receive) without touching the
wiring.
Measurement Carried out at the bay and CCN (U, I, P,Q ,F, harmonics…)
Active and reactive power sensor fucntion integrated into the CCN
Features recordings of active and reactive power integrated in the CCN with the possibility of storage
for sufficient capacity.
PAGES 47
4 . 2 . 5 . 2 – Coupling busbar 400 kV
Measuring of frequency and voltage by busbar performed at the bay unit and CCN.
Functions voltage and frequency sensors by bars.
Features recordings of frequency and voltage of each bar with means of archiving.
For the whole sub-station: for the recording of the frequency with fast and slow running. The function
will be integrated into the fault recorder.
4 . 2 . 5 . 3 – Transformers incoming 220/63/10.5 KV
Two digital energy meters.The recording of active and reactive power will be provided at the SCS
It will be scheduled two multifunction energy meters (transmission, reception, active and reactive) and it's
static multifunction type, manufactured by …………, type …………..., class 0.5, EHV side.
Measured carried out at bay unit and CCN (U, I, P, Q, F, harmonics ...)
Features of active and reactive power sensors integrated into the CCN.
Features of recording of active and reactive power integrated in the CCN with the possibility of storage
for a sufficient capacity.
Nota: The energy meters should measure the both direction of energy (transmission – reception) without
touch the wiring.
Nota:
- Provide a system of tele-metering with two modems (transmission and reception), computer with
working station, printer (last version and hight technology)
- Provide a PC for telemetering system for EHV S/S
4 .2 .6.1: It will be provided a redundant and duplicated SCS (two (02) central units installed in
different rack and different panel) for the whole 220/60 kV S/S for the control, signaling, measurement
and recording. It will be manufactured by ………, type …………..
The optical fiber connection will be planned between the command control system and the bay units IN
WYE.
The optical fiber connection will be planned between the command control system and the digital
protection IN WYE.
The Manufacturer will be responsible for the provision of all equipment (industrial computers adequate,
Printers, accessories, modems, converter fiber/copper, software, etc..).
All controls, measures and fault or operating signaling of equipment necessary for the operation will be
developed according to the tele information sheet type attached to this document. For addresses of
station as well as address ranges for (measurement, control, signaling,). The client will provide the
information.
PAGES 48
With all the elements provided by the client, the manufacturer will present the complete tele information
sheets for the concerned station with the addresses for proper operation.
The refund and the processing of information will be carried out at the controller station and local
levels.
The printers must use normal paper. The digital command control system must be in accordance with
standard protocol IEC recently.
The Manufacturer will be responsible for all equipment including all the items for rational exploitation.
The communication system must be opened protocol according to IEC 61850. This equipment will
allow the monitoring and the remote control of the station (for remote control of all circuit breakers and
electrical disconnecting switch of all bays).
Complete, redundant and split system, including 2 industrial computer with auxiliary memory integrated
to the system + software including licences and updating + printers + 02 screens 21 inch + big screen 42
inch and accessories + keyboard, UPS (DC and AC) and computer for engineering EHV S/S, tele-
metering system indepenedant from the CCN with computer, modem and printers.
In addition to the resources necessary to the normal operation of the station, it will be provided:
A key for the passage of the whole operating station from local to operation in remote or vice versa. A
key by unit at relaying cabinets for the passage of the unit from local to remote or vice versa.
Provide a system of synchronization by GPS for all equipment with computer and setting and all items.
Expect also a display zone for the station installed in the control room.
Each board for telecommunication will be equipped: RS232 output and other optical fiber
Provide the supervision of auxiliary services (measurement of current, voltage) and also the control of
the two circuit breakers incoming AUX TR must be provided at the digital command control system of
HV S/S.
It will set a second channel alarms (signaling led of emergency or verrine) for each bay also the TG.
The computer of CCN will be Industrial computer with auxiliary storage integrated in the system.
The CCN system must have 2 central processing units with 3 outputs (3 boards) of communication
separated towards the upper center (2 for the CRC and one for the CNC) and each communication board
will have 2 output port ( a RS232/485 port and an optical fiber output).
In CCN system, envisage a computer for engineering.
The computer, dot-matrix printers, and equipment must be of recent technology.
The manufacturer will give to Client the specifications for approval and any order will be done on the
basis of this approval.
Two printers, one to the stream (dot-matrix) and the other color connected directly to the LAN.
The general unit must not be incorporated into the CCN cabinet, for that, provide a TG cabinet with TG
unit separated.
The communication protocol will be 61580 in local and 101 for telecontrol.
NOTA: The bidder should submit in his offer the detailed architecture of the digital SCS, and all
technical characteristics of equipments + Industrial computers.
PAGES 49
4 .2 .6 .2 BAY UNITS :
It is planned a bay unit at each bay 220 and 60 kV.
It will be manufactured by …………., type ……….. with double connection with the command
control with the following functions:
Control, lock, synchro check, measurement, pole misalignment, signaling, record of status with an
integrated active synoptic.
Provide also:
- Key of transfer with luminous signaling
- Local/remote key locked in local position..
- TST key with two positions.
Position 1: normal operation
Position 2: live working (Interlocking cut and reclosing and permutation of tripping to instantaneous
definitive three-phase tripping).
For the lock: it is envisaged a Soft and hard lock for the control of equipment.
For earthing switches of bar predict electromecanic or mechanic lock.
4 .2 .6.3 GENERALITY SUBSTATION: GENERAL UNIT
It shall be provided monitoring units of auxiliary services and alarm processing for all equipment; it will
be manufactured by ……….., type …………
It will be provided a system of alarms patch.
It is also planned at general unit:
Clocks for the duration function of intervention with In Service/Out of Service Commutator.
The function of travel time, a QUART table for telephones, lighting, return of alarms, duration of
response, intercom, door call and a general alarm.
It will set a fire detection system for the whole substation, the detection must be done at various local
and central cabinet will be located in the guard room and the information is transmitted to the control
command and higher levels. It will set an intrusion prevention system.
4 . 2 .6 . 4 PRINCIPLES OF COMMUNICATION AND TELECONTROL:
It is expected modems, computers and software suitable for the following functions (station and
controller station):
Tele control, tele signaling, telemetry, Telemetering, tele disturbography, telesettings (protection,
recorder, etc. ....)
It will set a desktop with minimum requirements are:
Latest Pentium, monitor, printer and a laptop for setting of protections.
The MANUFACTURER must ensure the compatibility of the modem with dialup line and their various
software of installed equipment.
4 . 2 .6 . 5 PRINCIPLES OF SIGNALING
The signaling and events will be treated at the digital command control and oscillo-disturbography.
State logger:
PAGES 50
Function integrated in the bay unit and the digital command control system, give all signaling of S/S
which will be recorded in the detail.
These signaling should be restored in abbreviated language on the list of event and alam.
The restore of these signaling is dated by day, hour, minute and second.
The whole signaling should be represented in signaling sheet which represent the data bank of S/S.
Return of alarm:
The alarms programmed urgent in the command control system concerning the operation of S/S will be
returned in the worker villa durinh the no working time on a verrine “Fault S/S”
This return of alarm is completed at the general unit by a timer ensuring the role of intervention period,
which at the end of time out, will generate a general alarm.
This return will include:
The return of telephone call PTT and HF in the worker and passage villa.
The door telephone ensuring telephone connection between a visitor and operating agent and possible
automatic opening of door from the S/S and housing.
All this system is power supplied by auxiliary service 48 Vdc.
4 . 2 . 6 . 6 DISTURBOGRAPHY:
The analogic quantities of current, voltage and frequency. The restitution and the treatment of the
disturbography will be at the control room of substation and in the controller station via a modem for
teledisturbography.
It will be provided a modem for connection. The Manufacturer will be responsible for the supply of all
equipment (computers adequate, printers, accessories, modems on telephone link or CPL, converter
fiber/copper, software, licences and updating, etc. ... ...)
The record of frequence with slow and rapid run will be in same time.
The oscillo-disturbography will make the continuous record function.
The manufacturer will be responsible about all the facilities including all subjects for rational
exploitation.
The substation being teleindicated, telemetered and remote controlled from a superior station, all the
teleindication, telemetry and remote controls will be developed and brought to the HF terminal block
according to teleinformation sheet.
The diagrams will be etablished according to the client habits and IEC standards.
PAGES 51
4. 2. 9 – AUXILIARY SERVICES:
The installation of auxiliary services will conform to client plan. All battery capacities, rectifiers
gauges, AUX TR and GENERATOR proposed must be justified by calculation notes prepared by the
MANUFACTURER and subject to client approval.
An electric and mechanical locking will prohibit the parallelization of the transformers of the
auxiliary services. It will be envisaged an automatic system of permutation on alternating voltage
presence at the time of the permutation of one AUX TR with the other AUX TR.
A box for the power supply of the oil treatment device will be installed near each transformer.
The arrangement of the auxiliary services AC and DC must be according to the plan of customer
including measurement and the protection. The power supply for each outgoing of antenna.
CHARACTERISTICS :
Type................................................. Stationary
Manufacturer.............................................
Elements............................................. Lead
Capacity............................................. 500 AH Minimum
Rated voltage ....................................127 V
Floating voltage................................. V/element
Number of elements................................ 58
Equalizing charge voltage............... 2.3 V per element
Aptitude for the overload............................. 10 %
Exceptional charge voltage.............
Rated voltage at the terminals of at
the end of 8 hours (after a breakdown) ………….110.2 V.
4.2.9.3 - 48 V BATTERIES:
A 48 kV battery will be envisaged for an operation in floating with the charger.
The second charger will be provided for emergency.
PAGES 52
CHARACTERISTICS :
Type.................................................
Manufacturer...............................................
Elements.................................................. Lead
Capacity............................................ 250 AH Minimum
Rated voltage ..................................... 48 V
Floating voltage..................................... V
Equalizing charge voltage...................... V (arround 2,24 V per element)
Number of elements.................................... 24
Aptitude for the overload.............................. 10 %
Exceptional charge voltage……………………..
Rated voltage at the terminals of battery after a breakdown of 8 hours ……45.6 V
4.2.9.4 - MAINTENANCE:
A complete set of tools and its accessories for maintenance will be provided for each type of
battery.
POWER SUPPLY:
The chargers 127 V and 48 V will be power supplied with three-phase 220 - 380 V the limit of
variation of the supply voltage lying between 0.9 and 1.1 Un, the frequency being able to vary
from 47 and 52 HZ, the continuous output voltage will not have to vary more or less than 1%.
PRESENTATION:
The chargers will be presented in the form of cabinets
4.2.9.6- CHARACTERISTICS :
127 V CHARGERS:
Number.................................................
Type....................................................
Manufactured..................................................
PAGES 53
Rated current.......................................100 A minimum
Supply voltage...........................220/380 Vca. +/- 10 %
Frequency................................................. 50Hz
Automatic limiting device of current against the short-circuit........ will be provided
Maximum ripple ratio.............................. 0.1 %
Degree of protection....................................IP 41
48 V CHARGERS
Number...............................................
Type.................................................
Manufactured.................................................
Rated current.............................. 60 A, minimum
Supply voltage.................... .220/380 Vca .+/- 10 %
Frequency............................................50 HZ
Automatic limiting device of current gainst the short-circuit......will be provided
Maximum ripple ratio............................ 0.1 %
Degree of protection..................................IP41
PAGES 54
4 . 2 .9 .7 - EMERGENCY POWER UNIT:
It is envisaged an alternative emergency power unit of 100 kVA minimal, three-phase with outputs 380-
220 V.
GENERATOR:
Manufacturer…………………….………………
Type of motor……………..………………
Cycle of operation …………………..
Maximum speed of operation ………… 1500 rpm
Power …………………………………. 100 kVA minimum
Type of cooling …………………….
Lubricant …………………………………….
Quantity of oil in the case ……………….KG
Type of filter …………………………………. cartridge oil
Type of fuel filter ……………………….
Type of air filter ………………………………
Oil pressure in KG/CM ………………….. kg / cm2
Weight of the motor with electrical equipment …Kg
ALTERNATOR:
Marque ……………………………….
Type ……………………………………
Minimum power output ……………. 100 kVA
Efficiency ………………………………
Speed tour / mn …………………….. rpm
Insulation class ………………………..
Connection ………………………………. 380/220 V
Type of protection ………………………….
Temperature rise …………………………………Auto-ventilated
Type of voltage regulation ……………… Automatic
Overload …………………………………….. 10 % every 12 hours
Weight..................................................... ……… kg
ACCESSORIES:
Electrical filling pump
Fuel tank of 400 liters for 8 hours
Shutters (air input/ air output)
Accessories of assembly
PAGES 55
4 . 3 - EQUIPMENT
4 . 3 . 1 - GENERAL:
All the measuring instrument, indicators, recorders and meters must be in conformity with the
specifications of the customer - Booklet 4.
All the small equipment connecting terminals, wiring connectors, changeover switches, pushbuttons,
pilot lamp, unit interruptor, relay, etc… must be subjected to the approval of the customer.
NB:
The choice of the sections will be checked by calculations.
Each end of conductor outside of cabinets will be provided with a reference mark of identification
in accordance with the specifications of item 508 of Booklet 4.
The terminal boards of arrival of the cabinets will be marked like their terminals.
The wiring connected there will be marked at the input and the output.
PAGES 56
4 . 4 . 2 - WIRING OF COMMAND OF CONTROL OF MEASUREMENT AND PROTECTION
The MANUFACTURER must make the study of connection that will be established in the whole of the
work
The establishment of the measuring circuits, signalling order and various power supply resulting from
the diagrams of installation.
SPECIFICATIONS
The low voltage cables will be isolated with the thermoplastic materials at 1000 V of rated voltage, the
dielectric rigidity having to be in conformity with standards IEC.
The cables posed in raceway on consoles, will be all of continuous screen coppers type.
The screen will be grounded at each end of the cable using a braid welded on the screen.
The cables posed in the ground will have in more a mechanical protection. The minimal sections of
conductors will be:
For the signalling circuits ................................................: 1, 5 mm²
For the control circuits and polarities....................................................: 2, 5 mm²
After checking that the max voltage drop is compatible with a good performance of equipment
For the secondary circuits of VT ... 6 mm² with voltage drop lower than 0.1 %
For the secondary circuits of CT …….. 6 mm²
After checking that in case of max current of defect, the total load of the wiring and of the equipment
does not exceed the rated burden of CT.
4 . 4 . 3 - LV CIRCUIT BREAKERS:
The low tension circuit breakers and those of the auxiliaries which are of detachable type, will be
equipped with two contacts of signaling on defect and O/C.
Provide air conditioner Split type (n+1) for the whole premises of control building, store, workshope,
generator, except for battery room provide an air separating jar anti-explosive which the number will be
cobfirmed by calculation note.
For the GIS provide panels with air conditioning (n+1).
The manufacturer should provide pressurization of all premises: The GIS halls and the whole premises
of control building.
NOTA :
The whole of the equipment proposed in the contract must have the approval of the
customer. In case of refusal. The customer reserves the right for the choice of Change of
the equipment without any financial incidence.
PAGES 57
4. 6. DESCRIPTION OF THE SYSTEM OF MONITORING ON-LINE OF TRANSFORMERS
The monitoring system will be manufactured by…………, type……….. It’s envisaged for all transformers.
The system analyzes and interprets the data collected of a transformer to determine its state in real-time and to
detect the latent defects.
PAGES 58
Position sensor of tap changer
Sensor of the differential temperature of tap changer
4. 6. 4-Software:
The principal interface for the system must be ensured by software installed on the computer.
The remote users can work as an on-line mode to visualize the data and the results of the models in
real-time, by communicating in continuous way with the system via networks or Internet. In
autonomous mode, the users can consult the data and results stored which are stored in the Access
database, this information can also be exported in Excel spreadsheet for additional analyzes and
reports.
The software must allow the remote configuration of models and set point of alarms, the protection
thanks to a password, the display of summary lists of alarms and events, and filing to amount of two
years of the data.
4. 6. 5- COMMUNICATION:
The system should allow the following access methods:
• Direct access by a RS 232/485 port.
• Access by line commutated to an optional modem by means of a phone line or a mobile
phone network.
• Connection of communication using of the protocols in conformity with the standards of
industry and via gateway in order to transmit the information to SCADA or remote DCS
systems.
Access via Internet connection and a router/firewall to a server of computer or PLC on Internet
PAGES 59
CHAPTER 5
REMOTE MONITORING AND ANTI INTRUSION
PAGES 60
CHAPTER 5
SYSTEM OF REMOTE MONITORING AND ANTI INTRUSION
It will be envisaged a system of remote monitoring and anti intrusion for the whole stations
5.1 Purpose:
The security system is for:
- The monitoring of the outer perimeter of sites and access roads.
- Detection and signaling of any attempted intrusion by detection cable which is bonded to the
surveillance video.
- Event logging into a computer.
- The introduction of barbed wire concertina.
- The signaling of the incident by optical and acoustic signals.
- This specification is intended to establish conditions that will be the design, supply, works and the
installation of anti-intrusion systems and video for the video surveillance concerned.
Nota: What follows is a minimum requirement; the MANUFACTURER shall clearly indicate any
change or proposal made in order to have a functional and efficient system.
5.2 TECHNICAL PROFILE:
The security system must be centralized management type. It must be able to detect any time, preventing any
malicious attempt all over the perimeter of the institution.
The operations will be regrouped and managed from the same control center.
The supplier offers the appropriate transmission medium.
The system of protection, detection and monitoring will consist of the following elementary systems:
2.1 defensive network of sharp barbed wire (Concertina) placed in top of the fence:
- The barbed-wire type concertina inert (with detector wire) in stainless steel and high strength with the
inability to cut with ordinary tools.
- The coils will be folded with 04 turns per meter.
- The diameter of the turns is about 700 mm.
- The spikes sharp as razors are set at regular intervals.
- The blade bit barbed wire is equipped with high strength steel stitch to make the assembling clips between
the turns.
PAGES 61
- A terminal (Computer) constructed with interactive graphic standard software initialized with the site
information defining the surveillance zones, the positions and the status of camera operation.
This system must be organized in such manner so that any intrusion is immediately checked automatically;
this recognition must make possible the remove of doubt.
In the case of a release of alarm, the zone concerned would be immediately encircled by cameras with the
appearance of images of the area of intrusion in full screen.
It must be installed judiciously on the perimeter so that the whole of the fence is covered.
This equipment will have to be fixed on mates being able to resist the loads of the latter and to resist the
wind power without vibration for the rotary cameras.
2.3.1 Camera:
The video surveillance cameras should help to make very high quality take. They must be equipped with an
automatic circuit making its operation simpler and more efficient:
- All cameras are color type Day / Night
- Sensor 1/4 '' ccd
- Control of sensitivity and gain control (CAG)
- The sensitivity of the cameras must be 0.02 lux or more with AGC
- The horizontal resolution is 480 lines or more.
- The operating temperature is from - 20 °C to 60 °C
- Lights balance
- Correction of range and border
- Selection of synchronization.
- Back lighting Compensation
- The scope of lens is variable according to the distances and angles to cover.
- The cases of fixed cameras and domes will have a degree of protection IP 66.
- The glass should be thick, resistant to shock.
- The fasteners are in stainless steel.
- The rotation angle is 360°
- These cameras will ensure a good vision of day and night with maximum reliability.
- The case must be sealed and covered with the latest industrial progress to ensure full protection for
cameras and associated circuitry.
The video surveillance system is a good combination of static and dynamic cameras.
2.3.1.1 The dynamic color camera (Dome) from established brand, will ensure the coverage of fixed
cameras installed to protect the perimeter of the site, as well as the possible shadowing of intruder inside
the site, they will be located in sensitive areas and should be putted in location in order to allow the view
of the whole electrical installations.
In case of alarm, the dynamic cameras should move automatically to the location of the incident.
PAGES 62
The images focused at the control station must allow with a minimum errors to detect the cause of the
outbreak and the intrusion
2.3.1.2 The fast camera Day / Night will be arranged on the fence walls of site to cover totally the
external perimeter of site.
The system shall allow a cyclical representation of all takes of cameras to have a snapshot with the
visualization of the location of the incident in case of alarm. The image of the area of intrusion must be
displayed in full screen.
The protection of elements of the monitoring network against outdoor atmospheric stress is essential
for the lifespan of the system.
2.3.1.3 Lens for cameras: The lens must be equipped for the control of iris and zoom motor control
and focusing.
The mechanic and automation must be studied for intensive use of these focusing functions and iris
control.
These objectives should be the same brand as the camera brand or equivalent.
The dialogue between the operator and the system uses a computer in which will be installed software
that can increase the effectiveness of interventions.
The presentation of images is mainly in response to an alarm for outdoor surveillance.
PAGES 63
A suitable office furniture (ergonomic) and good quality, will be provided for an easy and comfortable
operation of the system.
The video signal transmission will be done by the most appropriate way according to the site to
protect. It follows that the transmission of image must be protected against electromagnetic
interference.
In case of using cable (coaxial or optical fiber), the latter should be chosen so that the installation
operation and environmental conditions do not alter their mechanical and electrical properties.
The function of transmitting images to a remote control center must be integrated into the proposed
system. The system must allow consultation remotely through IP and / or GSM.
All computers must be the last generation and established brand with flat-panel display TFT 21'' to
manage video and screens 17'' for the management system of anti intrusion.
The entire system must be connected to the backup system that will allow the operation of the entire
system (camera + video control + anti intrusion device) even in case of accidental or deliberated
outage of power supply.
It will provide an UPS – 2 kVA which will be sized for an operating time of (01) hour
All external intervention on the elements of the facility, likely to neutralize the surveillance and alarm
equipments shall result the immediate and automatic triggering of an audible and light alarm
The operating system must be secured by access levels.
PAGES 64
The system must provide a facility and ease of operation for the operator whether in management or
programming of various modules and functions with a minimum of equipment.
All these functions will be performed in a friendly software environment.
The system of video surveillance and anti intrusion must be expandable and scalable by a
simple adding of a module or update of software.
The system must allow remote access through IP and / or GSM.
The equipment and the technical materials used in all systems will be tropicalized type and their
fences are non-flammable, among others they must meet the following criteria:
- Compliance with international standards in force.
- Performance and Reliability
- Operating safety
- Modular principle and possibility of extension.
- Protection against noise or interference due to the natural environment (Strong wind, dust, heavy
rainfall, large variations of temperature ... etc) and electrical installations nearby.
- Easy mounting (with connectors)
- False alarm rate very low.
Previously performed by the bidder, they must be punctuated by a performance record including plans
which should include:
- Equipment and materials used.
- The detailed configuration envisaged for the implementation of the system.
- The electrical connection circuits.
- The exact definitions of surveillance zones.
- The Location of centralized console and control station.
- Technical documentation
- A raceway plan.
- The electrical wiring diagrams of functional relationship to achieve between different equipment
- The detailed schedules of audits, engineering and supply.
- The detailed schedules of implementation and commissioning
PAGES 65
For the technical choice of system to be put in place, the supplier proposes consultation with relevant
departments of the client:
- The overall design of the system.
- The choice of materials and appropriate equipment.
- Site selection
The Supplier shall make the audits of various sites to equip for the exact definition of equipment
needs.
All audits must be conducted in a short period.
5.10 DOCUMENTATION
The supplier must provide all documentation needed for maintenance and operation of equipment in
French and 4 copies, including:
- The overall architecture of the system
- The overview of the installation,
- Layout plan of electric cables of all equipment,
- Wiring diagrams,
- Note of commissioning of all modules
- A maintenance manual of system,
NOTE: it is asked to provide the documentation on CD ROM and workbooks. (Provide two (2) CD
ROM).
PAGES 66
5.11 THE TRAINING OF PERSONNEL
Training for 20 person/days will be planned for the personnel operating the system and will allow them
to do the exploitation of monitoring system, maintenance and maintenance of monitoring and anti
intrusion equipments.
The supplier undertakes to make available for staff an education materials for the smooth running of
training and the courses will be taught in French and their documentation will be delivered in French.
The training program offered by the manufacturer will be submitted for approval from CLIENT who
undertakes to amend or supplement if necessary.
Out of warranty period, the Supplier undertakes to take in charge, upon request of CLIENT,
maintenance of remote monitoring and anti-intrusion equipment. This provision will give rise to a
contract which will be between the two parties.
PAGES 67
CAHIER 6
TELECOMMUNICATIONS AND TELECONTROL
PAGES 68
CAHIER 6:
Specifications of Telecommunication and Tele-control
6.1 GENERALITES:
All equipments and works of installation of telephony and telecontrol will be conforming to the
specifications and IEC, CCITT standards.
6. 2- Scope:
The MANUFACTURER will be reponsible about the necessary engineering and after engineering works,
the supply and the erection for the complete realization of equipments of telephony and tele-control and
in running order, including the material necessary foir the installation, the fixing and connections to the
S/S and commander S/S of CRC and DISPATCHING
11 outgoing cable cell client 60 kV: ADS, ENIP, POLY, GNLK (GNL-GPL), HELISON,
PTA, LAB, TOP, TRC, ENGI and PTE
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, 2
01 Coupling Cell
02 cells of bars Potential with Grounding
PAGES 70
A 220 kV S/S type “Shielded SF6" consisting of 2 busbar, In= 4000 A, Pcc= 12 GVA, Icc= 31.5 kA
with potential bar on each busbar and cells consisting the GIS
11 outgoing cable cell client 60 kV TOP, LAB, PTA, HELISON, ENIP, POLY, ADS, PTE,
ENGI, TRC, GNLK, and (GNL-GPL).
03 incoming cells transformers 220/63/10.5 kV, 3*(120/120/40) MVA - TR 1,2 & 3
02 outgoing cable cell Equipped Reserves 1, 2
01 Coupling Cell
02 cells of bars Potential with Grounding
The 220/60 kV S/S will be tele-controlled from the CRC.The manufacturer will provide the
communication to CRC, CNC and CNC-R, The protocol of communication standard IEC 870.5.101
PROFIL ABB.
Nota: The possible decommissioning, deinstallation and the packaging of existant BLU at the
opposite S/S during the replacing, the manufacturer will envisage the supply, the transportation
of new BLU, will install it and put into service.
The manufacturer should provide the whole of telecom equipments at the opposite S/S:
Transportation, erection, installation, setting, integration, the test and commissioning.
The parametry of S/S at the CRC is not the reponsability of the manufacturer.
The RTU equipment must operate on two supports: powerline and optical fiber. There should be
facilities at both ends.
The manufacturer will make his case for the communication of its equipment with existing
equipment at CRC, CNC and CNC-R
Envisage two switching filters (or balun) for the connexion of the “phase 0’
The autoswitch will be digital type and approved, with redundancy of CPU, power supply and network
of connection. It must fit or adapt without difficulty in the network of existing client.
For its programming and maintenance, it shall be provided a laptop computer (microphone, visu,
keyboard, and printer) with software of programming and maintenance as well as modems adequate for
fiber connection and powerline with adjustable speed (50 - 9600 baud) for telemanagement.
The BLU equipment will be for mixed use (voice and signals) working in the entire range 40 - 500
KHZ.
The teleprotection equipment will be 04 orders type.
The connection and coupling device will be two types. One phase-ground and the other phase- phase.
A lenght of coaxial cable 75 ohms between HF room and each phase equipped with wave trap.
A HF dispatcher located in HF Room reflects the exact configuration and complete telecommunications
equipment in addition a set with strips as reserve.
PAGES 72
MULTIPLEXER EQUIPMENT
The manufacturer should provide optical board for the opposite S/S and ensure the adaptation of PCM
supplied with the existing PCM type BX06 or BX10 or other following the opposite S/S (supply of the
whole material and software to ensure the telecontrol)
PCM Equipment: The Manufacturer should provide PCM Equipment which can be connected to
SDH equipment and can be reconized by the same station of management of SDH equipment
PAGES 73
10 Interfaces E1
50 Interfaces RS232
20 Interfaces RS485
20 (2x4) Wire E&M
NOTA: The bidder should include in his offer the detailed diagram of its installation of telecom
equipment and a proposal of integration of his system to the existing system.
The power supply of equipment in 48 dc is supplied by the distribution box 48 dc installed in the HF
room and which is composed of:
- Ammeter indicator on shunt
- Voltmeter indicator
- A bar of switching Earthing more than 48 V
- Bipolar outgoing protected by CB 6 A
- The positive pole is to the ground of S/S
- The positive and negative 48 kV arriving on wall box “Distribution box” in the HF room.
It’s envisaged many outgoing (bipolar) as the equipments to power supply more than three (03)
outgoing of reserve.
Should be from approved technology, simple maintenance and with characteristics according to CCIR,
CCITT, IEC standards.
- The BLU should have the possibility to provide at least 2 channels (data and digital or analogic voice)
- The principle of operation is being used by the technic of carrier current on energy line (CPL)
- The connection between 2 S/S is constituted by transmission equipments Sender/Receiver with many
channels LF and working in the HF band as single side system.
- They are connected to energy line through a system called coupling composed of:
- Coaxial cable (BLU connection/Connection box)
- Connection box and drainage coil
- A capacitive PT or capacitor of coupling
- A wave trap which the resonance frequency is adjustable on site
- It’s envisaged a BLU connection
6.7.1 CHARACTERISTICS
PAGES 74
Frequency range HF: Between 40 kHz and 500 kHz
Frequency band HF: 2 joining bands of 4 kHz
Frequency band LF: from 300 Hz to 3600 Hz decomposed in:
Voice band; 300 to 2000 Hz
Supra voice band: 2100 to 3600 Hz
Speed: Adjustable until 9600 bauds
The call is made in supra voice channel, in starting of band and out of band. It’s blocked in reception
in all supra phonic band.
a) VOICE BAND
Use for telephone connection
Present circuits of 02 wires or 04 wires
Can be connected to auto switch of transit (2 or 4 wires)
Possibility to connect a telephone set of operation ofr maintenance
- Impedance: 600 Ohms in 2 wires or 4 wires
- Levels: 2 wires: 0 dbm at sending and 7 dbm at reception
4 wires: 3.5 dbm at sending and reception
- Supra voice: - 14 dbm at the sending and reception
These levels are given as reference and should be adjustable around their average values.
b) HF BANDE
- Carrier frequency HF: between 40 kHz and 500 kHz
- HF band: (2x4) kHz jointed
- Impedance 75 Ohm Asymetric
- Power: 80 W
5.7.2 OPERATION
At the control station or at controlled station, the BLU equipment should present all following
possibilities of connection:
a) On line inter-automatic with an auto-switch called “transit” by the wires called:
PAGES 75
E Calling (cde) SENDING
R Calling (cde) RECEPTION
M Control pass 2/4 wires
T.C) Busy
O.C)
b) On line of consumer (Telephone set line) by the L1-L2. A plug of connection to an operation
telephone set is envisaged on the equipment
5.7.3 POWER SUPPLY: The BLU are power supplied from the distribution panel 48 V.
Tele-activities equipments:
The equipment of etele-activities is detonated to transmit signals (4 orders) for an exchange of rapid,
reliable and sure between the protection system installed at each end of HV lines.
Multiplexer:
The system to provide for each work should be a full transmission system and it can also serve as basic
system of the hierarchical upper levels.
It allows:
- The transmission of data, telephone channel and image
- The conncetion direct of customer set.
- The transmission of external alarm signaling.
PAGES 76
- Connection of far customer from distant autoswitch
- Power supply of module
- Digital connection at N x 64 Kbit/s, 2 Mbit/s minimum
- System of centralized management (remote management) for the whole MUX
The design and the operation of this type of equipment should be conforming to IUT-T standard and
also to all relative standards to system SDH, STM 4
Provide Patch panels, Accessories and computer of setting of Mux.
Auto-Switch
These auto switches should meet the following special operating criteria:
- The auto-switch should have a redundant central unit and dedoubled power supply.
- Ensure a double traffic
- Switch between all HF stations of operation network.
- Local within same site
- Fast and sure etablishment of communication
- Reduced maintenance
- Small overall
- Modular design
- Temporary switching and without blockage
- Transmission support: CPL, optical fiber, hertizian and radio beam
- Normalized dial tone
The main functions required for these equipments are:
- Routing and diversion of calls.
- Code translation
- Absorption of code
- Signaling of the impossibility of routing to the upstream station.
- Transfert
- Conference
- Goup of set
- Beam of big distance line or inter auto
- Take without sending
- Autotest, Fault loop, tele-maintenance and tele-monitoring (IHM)
- Meter of observation of traffic
- Switching of dialing plan, dialing of maintenance for the cheking of the state of line inter auto.
PAGES 77
It should be done through a pre wired system (Patchs panels) and that for each equipment of end.
It is used as boxes of bursting, of protection of welding and of local distribution of fiber.
Connector technology:
The patch cable should meet the patch panels.
It’s the reponsability of manufacturer any possible decommissioning, deinstallation and packing of
existing BLU at the opposite substation during the replace, the manufacturer has the reponsability to
PAGES 78
supply, transport the new BLU, installation, commissioning, communication and warranty of
communication.
The manufacturer should provide al telecom equipment to opposite site: transport, assembly,
installation, parametry, integration, test, commissioning, communication and warranty of
communication.
The manufacture should provide for the opposite site 220 and 60 kV all optical and electrical boards
and the necessary extension on the SDH and PCM equipment manufactured by HUAWEI and provide
the integration of SDH node in management system HUWAEI.
6.5 MAINTENANCE:
For the whole supply, it will be proposed for each equipment a lot of parts and spares as necessary for
the operation and maintenance of equipment.
Measurement and adjustments points should appear on the front before the blocks for various controls,
such as: supply voltage, level and type of signals, etc. ...).
Detailed explicit documentation with diagrams in French must accompany each equipment.
The distribution of telephony and the provision required will the responsability of the
MANUFACTURER.
The manufacturer should provide seal telephone set at each transformer room and also normal telephone
set at each premise of building (EHV) except for battery room.
PAGES 79
6.8 - TELECONTROL EQUIPMENT:
6 .8. 1 - PURPOSE:
The Telecontrol equipment must ensure the operating distance.
These equipments are equipped with input/output modules with capacity needed to the amount
of information to transmit and a modem for transmission on dedicated line whose transmission
speed is adjustable between 50 and 9600 baud.
The transmission support is generally a dedicated line (powerline on energy line CPL) and
optical fiber
A ) PC to PA :
Monitoring signals of efficiency operation of equipment.
Closing or opening order of circuit breakers and disconnecting switches.
Orders "increase and decrease" the transformer adjuster.
Load shedding order
B ) PA to PC
Changes of states of circuit breakers and disconnecting switches. (TSD)
The alarm of substation (TSS)
The measures of active and reactive powers, voltages and currents.
Postions of adjusters.
PAGES 80
6.8.4 - Wiring:
The wiring between the different cabinets will be by flexible telephone cable and channeled
through the dispatcher, or sometimes all of the information, which is the element of breaking
and mixing of all the wiring.
This dispatcher reflects the exact configuration and entire of telecommunication equipment.
The connectors of cabinets will be provided wired.
6. 8 .5. 2 .1 - SIGNALING:
During an outbreak of alarms or events, it is reported to the staff by flashing of general
indicators correspondents following console followed by an audible alarm that can be
continuous or implusional:
Immediate (onset and / or Disappearance)
Deferred (has the appearance and / or disappearance)
Changes of fugitive states (DR) of certain organs should be underground.
All signals are dated on the printers.
A station or unit in local causes the audible alarm, and the printing of information relating to
the station or unit in local
PAGES 81
6. 8 .4. 2 .3 - TELEMETRY:
The values of TM are periodically transmitted to the center and for in case of exceeding
thresholds.
There are two thresholds (Upper and Lower). State changes in relation to thresholds are
printed, dated and visualized on screens.
An automatic and periodic statement shall be.
SPECIAL PROVISIONS:
The manufacturer shall provide the Protocol used in its Telecontrol equipment and also to cooperate for
the adaptation of its protocol to the equipment of other manufacturer.
The Telecontrol equipment shall be wired in such a way to allow a extension by addition.
The Telecontrol equipment of the PC should be wired and pre-configured in such a way that they can be
extended only by adding modules
NOTE: All equipments provided under the contract must have the approval of the customer in case
of refusal. The client reserves the right to change the equipment without financial implication
PAGES 82
CHAPITRE 7
TESTS
PAGES 83
Chapitre 7 - Tests
All tests of 220 and 60 kV equipment will meet the IEC standard and carried out with the presencc of client.
For 220/60 kV S/S, the manufacturer will carry out the controls and routine test following the planning above:
Unit testing on all high-gradient insulators 1.5 kV eff / mm locally at spare part stage following IEC
publications 270. (Cones are not in that category).
PAGES 84
7.2.3 Other tests on the cell
. Control of compliance of assembly following the diagram
. Checking the sealing of assembly junctions between subset
. Operation of relays, monitoring devices and all auxiliary circuits with rated voltages, minimum
and maximum.
. Measurement of resistance of main circuit on the 3 phases
. Dielectric tests in 50 Hz at 2 kV of all wiring compared to ground during 60 s.
. Dielectric tests
appliance of 420 kV 50 Hz during 60 s between live part and ground
appliance of 3 shocks (+) and 3 shocks (-) wave 1.2 / 50 µs at 1050 kV between live
part and ground
. Dielectrique test will be carried at minimum operating pressure of SF6 .
PAGES 85