APPLIED PROJECT (CPL-5559)-CPMT-0015

2312 SPRING FIELD CRES

OAKVILLE L6J 7P8


WEEK 4

SUBMITTED TO: DIANA OLIVEIRIA

PROJECT TEAM MEMBERS

1. Baljeet singh C0697512


2. Jarmanjeet singh C0696897
3. M V Kishore C0696545
4. P Kartik C0696086
5. S Rahul Reddy C0694232

1
CPL-5559-CPMT-0015
Lincoln Cons. Group

TABLE OF CONTENTS

S.NO. LIST OF CONTENTS PAGE NO.

1 SCOPE MANAGEMENT PLAN 3-5

2 REQUIREMENT MANAGEMENT PLAN 5-6

3 TOOLS AND TECHNIQUES 6-7

4 PROJECT SCOPE STATEMENT 7-8

5 WORK BREAKDOWN STRUCTURE 8

2
CPL-5559-CPMT-0015
Lincoln Cons. Group

PROJECT SCOPE

COMPANY NAME: LINCON GROUP OF CONSTRUCTIONS

The project is to build a two-storey detached Single house where there is an existing building as
the budget of the owner is limited and cannot be made any exceptions on that the project must and
should be constructed in given time of 8 months the main constraint is budget, so we are planning the
project in a way that it is low cost and effective.

The site is a residential area and according to the zoning requirements of the area only 30% from
the lot area is permitted to be used as construction area, all the zoning requirements and demolition
permits will be acquired before the beginning of the construction and all the safety requirements are
followed during the construction.

Scope management plan includes the following.

➢ Plan scope management.


➢ Collect requirements.
➢ Create WBS.
➢ Verify scope statement.

ROLES AND RESPONSIBILITIES.

The project manager and client play the major role in our project as it DB delivery system and all the
team members are aware of the activities going on the site the following roles and responsibilities
defines each member activity.

Name Role Responsibility

➢ Make appropriate payments as per


agreements
Venkata kishore Sponsor ➢ Coordinate with project team when making
any changes.
➢ Be aware of what’s happening on site.

3
CPL-5559-CPMT-0015
Lincoln Cons. Group

Name Role Responsibilities

➢ Manage every day operating, utilization,


implementation and technical consultants acting
on purchasing assignments
➢ Report progress on comes from appropriate
persons to coordinate in management, maintain
Rahul Reddy Project manager and update project report, checkpoints and
monetary reportage to a high standard.
➢ Produce reports on every project at United
intervals, and whenever substantive actions square
measure needed.

Name Role Responsibilities

➢ Plan and monitor all the works distributed by the


employees.
➢ Places Request order to the owner about the
required material for construction.
➢ Organize the skillful employees once needed for a
Karthik pendyala Contractor style of work.
➢ Manage the transportation and disposal of
materials and waste if no alternative contract is
created for it.

4
CPL-5559-CPMT-0015
Lincoln Cons. Group

Name Role Responsibilities

➢ Assemble correct and well-organized estimates and


proposals in an exceedingly timely manner for
Stipulated worth, Design-Build and
Construction/Project Management formatted projects
Organize sub-contractor’s quotations, talk over to
Baljeet Estimator ensure quotes meet contract documents and issue
correct documented purchase orders.
➢ Maintain relationships with sub-contractors and
purchasers.

Name Role Responsibilities

➢ Must be present on site physically to inspect various


stages of construction and to make sure that everything
is going as per plan.
Jarmanjeet Engineer ➢ Field tests are to be done with utmost care to exactly find
the bearing capacity crushing strength, plasticity,
elasticity, porosity etc.
➢ Go through the designs and specifications all the time
and cross checking the current progress with the plan
and determining the progress of the project.

5
CPL-5559-CPMT-0015
Lincoln Cons. Group

REQUIREMENT MANAGEMENT PLAN

Requirement management arrange is employed during a project to stay the project trailing or updated
with all the necessities that are required by the owner and also the stakeholders. These are the
requirements that are to be the gift within the project. demand management arranges includes within
the analyzing, collecting, managing and dominant the necessities of the project.

In our project, our needs are classified as project needs and products needs. Of them Project needs
employee business, project management and delivery needs. Product needs includes technical and non-
technical, performance needs, security and material need etc.

Requirement management plan can be consisting of the following sections in detail:

➢ Identification: identifying and compiling all the project requirements of the stakeholders by
brainstorming, SWOT analysis.
➢ Analysis: each identified element should be investigated up to its root for its cause and this
should be done with project team.
➢ Prioritize: identified requirements will be prioritized according to the choice of client as of this
project budget is the first priority.
➢ Manage and control: we got the list of requirements for this project in a prioritized order in
order to track these we mostly use traceability matrix.

INITIATING CHANGE:

In this state of affairs, there's a desire of handling the changes within the project. Al the stakeholders
should agree to the changes to be created to any of the scope, quality, schedule, and budget. The
changes in style and plans shouldn't have an effect on the triple constraints of the project.

TRACEABILITY MATRIX:

The requirement traceability matrix is employed for tracing however, the wants meet the deliverables of
the project. demand management set up should embody a traceability matrix to form certain that
everyone the specifications and options satisfy the wants as per the set up of the project.

6
CPL-5559-CPMT-0015
Lincoln Cons. Group

TOOLS USED FOR COLLECTING REQUIREMENTS

1. INTERVIEWING: For gathering ideas and requirements in design and what needs to be
completed for the project, the stakeholders are interviewed by the project manager. The
project manager prepares a note of all project requirements. This process is done by phone
calls, emails and meetings.
2. FOCUS GROUP: The project manager creates a list of stakeholder’s involvement with their
interest. The entire requirement is taken into consideration and a list is made with the priority
based on the requirements.
3. FACILITATED WORKSHOP: The project team and stakeholders are gathered to check the plan,
design and drawing if any changes is made in them , all members will share their ideas with own
prospective. This process is made where the need to be change in budget, scope, quality and
schedule.
4. BRAIN STORMING: The project manager and the stakeholders are held a meeting and they will
be look for new technique and ideas or process that will be used and implemented and any of
the new material and product which can be used for construction and this will be helpful for
identifying new requirements.
5. DELPHI TECHNIQUE: The individual request will be send to all stakeholders by the project
manager regarding their requirements. The stakeholders check out their requirements from the
list and send back to the project manager individually. The project manager gathers all their
requirements and assigned them in order and do not make any changes to owner requirements.
6. DOCUMENT ANALYSIS: With the help of previous construction documents a requirement list is
made for the construction which is helpful for project proposal, agreements, and generating
business plan which are the sources for preparing latest ideas and requirement based analysing
technique and previous documents.

PROJECT SCOPE STATEMENT:

SCOPE VERIFICATION

The clients interest is the main priority in our project so all the design requirements and planning should
be done according to the requirement of the sponsor/client without ignoring the zoning codes and
requirements.

The project manager then finalizes the scope of the project and then the stake holders verify the
project scope and approve the project to the next level that is documentation and approval process.

SCOPE CONTROL

Scope control is the final process in the plan scope management in this process the team members who
are present on the site play a major role in this process as the plans are finalized the building process

7
CPL-5559-CPMT-0015
Lincoln Cons. Group

should be done according to the approved plans and no changes should be made before informing to
the stake holders. This section of the scope management plan also details the change process for
making changes to the scope baseline.

SCOPE BASELINE

Scope baseline is the part of the project management plan and acts as the reference point through the
project life. It has several components. These include project scope document, the WBS itself and the
WBS dictionary.

The base plan where all the project progress, it includes all the documents during the approval stage and
planning stage.

SCOPE STATEMENT:

Existing building should be demolished clear the site according to the client’s
preference a new plan will be made and the contract will also be done by the
Scope description
same DB firm. All the work should be done within the stipulated timeframe and
within the budget

➢ Demolition the existing building and site clearance


➢ Soil testing and planning
Project ➢ Constructing the building as per plan
deliverables ➢ Final finishing and landscaping
➢ Economic situation would not change dramatically.
➢ The construction achieved in a reasonable, sustainable and affordable
way to meet the project schedule.
Assumptions ➢ Resources will be located on time and within budget.

➢ Budget: The project has to be managed in a way that it does not


exceed the prescribed budget as decides in the construction document.
Constrains ➢ Time: The project must be complete within the period specified in the
contract.

WORK BREAKDOWN STRUCTURE

8
CPL-5559-CPMT-0015
Lincoln Cons. Group

Two Storey
Residendial House

Signup the Sub- Super -


Demolition Design Services Finishing
Project Structure Structure

Acquiring Removal of Check


Getting Permit for Getting
Project Hazardous Reuirement Foundation Excavation Columns Slabs Beams Hvac Electrical Plumbing Outside Inside
Permits demolition Permins
Team Material s

Making Install water


Hire heavy Removal of Placing Laying of Laying of Cleaning
Boundary shuttering shuttering Form work drainage Painting
Machinary Debris Formwork ducts wires paint spots
Layout system

Install Install
Removal of Reinforcem Reinforcem Reinforcem cooling
Reinforcing electical toilets,sinks, plastering
sand ent ent ent system
Panel cabinet

Concreting Concrete Concrete Concrete heating


Pouring Pouring Pouring system

Removal of Removal of
form work form work

9