Indicative Action Plan On Climate Change - , 2009 - 2013 A) Climate Change Mitigation Strategies

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 10

INDICATIVE ACTION PLAN ON CLIMATE CHANGE

______________________,
2009 – 2013

A) CLIMATE CHANGE MITIGATION STRATEGIES

SECTOR MITIGATION SPECIFIC STRATEGIES/Activities Time frame Division/office Estimated


STRATEGY responsible/ lead budget
person required
Energy Supply Supply &  Identify the source of energy in  4th  MPDO 
distribution the locality qtr 2010 -lead
efficiency  Identify barangays without power  Brgy.
supply Officials
 Identify agencies to  Municip
support/assist for the provision of power al engineer office
equipment  NORSA
 Ensure regular Operation & MELCO
Maintenance (O&M) of power facilities
(transformer, wiring, generator)
Wind (for future    
study)
Bio energy (for    
future study)
Transport Biofuels (for future    
study)
Cycling  Conduct IEC activities (info drive  Firs  MHO – 
on the importance and advantages of t qtr. 2010 lead on IEC
cycling) onwards  MEO
 Construct/provide cycling lanes  Brgy.
within interior barangays Officials
 Encourage business sector on  SB
bicycle spare parts availability in the committee on
locality Trade and
Industry
Walking  Conduct IEC activities   
(advantage of walking)

SECTOR MITIGATION SPECIFIC STRATEGIES/Activities Time frame Division/office Estimated


STRATEGY responsible/ lead budget
person required
Buildings/ Efficient lighting &  Ensure energy efficient lighting in  4Q  Mun. 
Houses/ day lighting all public facilities esp. identified 2009 engg office / Fire
Hospital/ evacuation centers marshall / brgy
schools/  Ensure energy efficient lighting in officials
municipal hall/ all households  NORSA
Church/ Brgy.  Ensure conservation of electricity MELCO / brgy
halls in all public facilities and households officials
streetlights  Ensure regular Operation &
Maintenance of electric facilities
Efficient appliances  Conduct IEC activities (info drive)  4Q  Brgy 
 Conserve electricity through 2009 officials /
efficient use of appliances onwards NORSAMELCO /
 Provide proper disposal of schools
electronic waste  Muni
and brgy officials
Agriculture Improved crop  Selection of high value crop  1Q  MAO/ 
management varieties and request seedlings from DA 2010 agri technicians
Restoration of  Introduce intercropping, crop  4Q  MAO/ag 
degraded lands rotation, and plowing techniques 2009 ri technicians
 Conduct training on composting  Feb  MAO/ag 
2010 ri technicians
 Encourage use of organic  4Q  MAO/ag 
fertilizer/ pesticides 2009 ri technicians/
brgy officials
Improved rice  Training of farmers to improved   MAO/ 
cultivation rice cultivation techniques Agri technicians
techniques
Livestock & manure  Practice palay check activities   MAO 
management with integrated pest management
Improved energy  Mechanized land pre and post   MAO 
efficiency (tractors) activities like tractor, thresher, seeder.
Watershed  Select deep-rooted fruit bearing   MAO 
area/orchard high product suitable in the area
development
Forest Reforestation  Advocacy through Brgy.  nov  Liga ng 
(54has.) Assembly 2009 mga Brgy pres. /
 Passing of Brgy. Ordinance for onwards brgy officials
reforestation  Designa
 Coordinate with DA, DepEd, ted
NGO, LGU and other agencies. MENRO/MPDC
 Request seedlings from DENR/ 1Q 2010  MAO /
Forest Mgmt Bureau / CERD PGENRO
 Follow up of request
 Planting Upon release  MAO
 Monitoring and maintenance of  School /
planted seedlings SK
 SB,
Comm on Envi &
Nat Res. / CERD
Forest & mangrove  Advocacy through Barangay  Sa  Same 
management Assembly me as as reforestation
 Passing of Barangay Ordinance reforestatio
POs: san pedro, for forest and mangrove management n
mac arthur, pio del  Training of trainers for forest and
pilar, sto nino, mangrove management
kauswagan  Training on forest management 2Q 2010  Brgy
especially for SK, Brgy. Officials and (CERD) officials / CERD /
other organizations. PGENRO
Reduced  Advocacy thru Brgy. Assembly  Sa  Same 
deforestation  Passing of ordinance/ resolution me as as reforestation
to reduced deforestation, chainsaw reforestatio  SB,
registration n Comm on Envi &
 Strict implementation of Nat Res
ordinances  Au  MENRO
 Coordinate with PNP, DENR, g 2010 / brgy officials
PGENRO
 Monitoring of registered of  1Q  Brgy
chainsaw owners and its use 2010 officials / PNP
Waste Composting of  IEC on composting  Ple  MAO 
organic waste ase see with assistance
above of technical
Note: MRF is in- schedule on persons from DA
placed agriculture  MAO
 Training of Trainers on  1Q  Brgy.
composting (SK, BHWS, Brgy. Tanod, 2010 Officials/ SK
Brgy. Officials, etc.) onwards  MAO,
 Creation of communal compost RSI, Provincial
pit per barangay  No Sanitary
 Coordinate with DA, Rural vember Inspection
Sanitary Inspector 2009

Recycling & waste  Training of Trainers  No  MPDC - 


minimization  Continues IEC on recycling/ v. 2009 lead
segregation committee  Brgy.
 Organize waste recycling/ Continuous Officials/ MHO
segregation committee  School
 Conduct recycled waste exhibit
per barangay

B) CLIMATE CHANGE ADAPTATION STRATEGIES

Sector Accommodate Key activities Time Frame Responsible Estimated


Strategies Unit/ Lead Budget
Person required
Water (by Rain water harvesting  Paglagay ng alulod sa bahay tulad ng  Nov. 2009  Per household 
municipal/family biniyak na kawayan ( Installation of onwards
ang approach) Water Storage and indigenous rain water collector e.g.
conservation bamboo)
technology  Pagbili/paglagay ng lalagyan (Purchasing
and installation of water collector e.g.
drum)

Water Natural rainfall Proper maintenance of water ways e.g.  Co  Brgy. Officials
(Municipal down management regular cleaning of estuaries (bukana ng ntinuous School
to individual) tubig o dagat), proper disposal of garbage.  LGU Rural
Sanitary
Inspectors
Water Safe water  Identification of barangays with  De  Brgy 
no potable water c 2009 officials/ MPDC/
 Identify appropriate places where MEO/MHO/PSI/
to place the jetmatic pumps. (at least 20  De RSI
meters away from septic tank) c. 2009
 Putting up of shallow wells
(jetmatic pumps) per barangay
 Request/ resolution requesting  Oct
jetmatic units 2010
 Ensure appropriate design of
septic tank.  Jan
 Identification of sites appropriate 2010
for construction of shallow wells.
 Ensure appropriate design of
jetmatic pump.
 Properly regulated ang paggawa
ng septic tank/jetmatic pump.

Water Desalination Ask assistance from the LGU August 2010  MPDC, 
MHO, RSI
 SB
committee on
health
Eco-tourism Diverse tourism  Strict implementation of municipal and  Continuous  Brgy. Officials 
(municipal attractions and barangay ordinances on preservation/  PNP
coverage) revenues protection of fish sanctuary.  Municipal
officials
 Strong political will  MENRO
 CERD
Infrastructure/ Strict  Strict implementation of municipal and Continuous  MPDC – Engr. 
Settlement/ implementation of barangay ordinances related to Villanueva
Costal Zones easement/setback easement/ setback concerns  MEO
(Municipal wide) (for easement w/o  Strong political will  Brgy. Officials
house/  PNP
development)  Municipal
officials

Agriculture Use of drought/flood  Request drought resistant corn   MAO, 


(Family resistant crops  Request for water resistant rice Agri Tech
approach thru  Request for arrow root (sago)
assistance from seedlings
DA) Cropping pattern  Request short period maturity   MAO, 
adjustment crops from DA and BPI (Bureau of plant Agri Tech
Adjust of planting industry) to be available on planting
dates and crop period.
variety  Planting of gabi and palawan
Improved land  Compulsory tree planting/ mangrove   Brgy officials/ 
management planting per household schools/ SK/
(erosion control  Passing and strict implementation of an MENRO/CERD
through ordinance banning the cutting of trees. Pos
mangrove/Tree  Advocacy (information drive)  Same as
planting mangrove/forest
mitigation

Energy Supply Energy efficiency  IEC activities (Brgy. Assembly)   Same 


 Brgy. Resolution requesting as energy
residents to divert the use of fluorescent mitigation
bulbs to CFLs.
 Identification of site for the proper
disposal of non-functional electric bulb.
Renewable energy  identify funding agency/donor for  1Q  MPDC 
sources (solar) – San solar power 2010
Antonio, San Pedro,  Formulate project proposal for
Mac Arthur, solar energy
Kauswagan)  Prepare resolution to support
funding or donation for solar power.
 Identification of barangay recipients MPDC/brgy officials
for solar power.

Brgy officials
Creation of  Conduct IEC activities (Barangay   Brgy 
marshland/wetlands assembly) officials/school
as buffer against  Enforcement of law on the protection
sea level rise and of marshland and wetlands in  PNP/MENR
flooding. coordination with PGENRO, DENR and O/brgy tanods
PNP.
Health Improved sanitation  Impose the strict implementation of the   MHO/P 
solid waste management plan SI/RSI/BDH
 IEC activities (Training of trainers) Chief/SB on
 Pass a brgy resolution relative to envi/PNP
sanitation  Brgy
 Construction of MRF per barangay officials
 Solid waste segregation implementation
 Integrate liquid waste management in the  MPDC/
SWAMP. Brgy. officials
 MPDC
 SB on
environment i
Disease surveillance  Organize a disease surveillance   MHO 
and control and control teams in Brgys. and
municipality.
 Call meetings for the
dissemination of duties and functions
 Advocacy on disease prevention
and control per barangay.
 Conduct regular immunization
sessions.
 Monitoring and recording of
prevalence of diseases.
 Reporting and follow-up for
interventions
Heat – health action  Organize the heat health   MHO 
plan committee (Barangay/Municipal)
 Call meetings for the
identification of the committee and its
functions and duties.
 Integrate heat-health issues on
the health action plan.
 Identify heat health-related
problems.
Health Emergency medical  Re-organized emergency  Co  MHO – 
(municipal down services medical service team ntinuous lead
to Barangay)  Identification of duties and  MSWD
functions  SB on
 Training and advocacy health
 Provision of emergency medical  Red
supplies and equipment Cross –
 Provision of motorboat for Catarman
emergency use  PHO

 LGU

Seawalls and storm  Expansion and improvement of existing   Brgy 


Infrastructure/ surge barriers seawalls officials/MPDC
Settlement/  Request funding from local and national
Costal Zones agencies for additional construction of
seawalls
 Ensure appropriate design of seawalls/
breakwater.
 Identify funding agencies
 Identify areas for dike construction. . Mac
Arthur, Poblacion, Sto. Nino, San
Antonio, Pio del Pilar, Kauswagan.
Protection of  Strict enforcement of law against illegal   PNP/ME 
existing natural extraction of corals and illegal fishing NRO/Bantay
barriers (corals, Dagat/brgy
mangrove and rock  Coordinate with Biri-Larosa as to the officials
formations) implementation of Bantay-dagat  Mayor/M
enforcement (cost sharing of resources) ENRO/SB on
 Coordination with PNP. PGENRO and Environment
BFAR (Bureau of Fish and .  MENRO
 Strict implementation of the ordinance
prohibiting vandalism on the rock  PNP/
formation. Tourism Officer/
brgy officials
(Progress)
Relocation  Identify & prioritize the HH to be  1Q  PDMU/ 
relocated 2010 Designated
 Identify safe area for relocation MDCC/ MPDC/
per brgy / consult thru concerned PNP/brgy
agencies / refer to hazard map by PDMU officials/ brgy
& request tanod/MSWD
 Request financial assistance
from LGUs/NGAs/funding donors
(local/intl) for rehabilitation
 Resolution for the financial
assistance Mayor/MPDC
 Identify private land suitable for
relocation site Brgy officials
 Identify willing private land
owners
Evacuation  For short term, identify  4Q  Mayor, 
evacuation centers 2009 brgy captains /
 Evacuation center for animals MDCC
 Ensure complete facilities in the reloc  4Q  Mayor,
center (safe water/health /toilet / 2010 MEO
kitchen/generator/
 Continuous IEC on proper evacuation
 Ensure safe route to evacuation center  Co  MDCC /
ntinuous PDMU/BDCC
 Brgy
 4Q officials/MEO
2009
Early warning  Installation of early warning   
system system such as rain gauge, and sea level
measurement using indigenous material
Note: This was not e.g. bamboo with calibrations
identified during the
planning but we
think this is crucial
that should be
considered in your
plan.

You might also like