SECTION - 1
INDEX
6.0 Spares
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
This specification defines the general philosophy and technical criteria of instruments for
ABADAN Gas turbine Power Plant.
The supplier shall take precautions in the selection of materials and equipment against
deterioration due to the effects of temperature and dust. Particular attention must be paid to
the selection and protection of electronic components, instrumentation and temperature and
humidity sensitive equipment.
Evaluation of the existing climatologically factors yield the following design meteorological
conditions, which shall be accounted for in the supplier’s design, construction, planning and
operations. Unless otherwise noted, the following shall be used for maximum and minimum
design values.
1) Manufacturer's name
2) Manufacturer's model and serial number
3) Instrument range
4) Pressure rating
5) Contact rating (if any)
6) Enclosure classification
7) Tag number (KKS system shall be used)
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
3.2 Language
For detailed technical specifications please refer to the instrument data sheets, section 2,
attachment A.
The vendor shall submit quality assurance plan along with bid. The Engineer shall have the
right to inspect design material, and workmanship, and to report there on at any time during
the progress of design and/or fabrication.
All instruments specified in this Section shall be calibrated by the Vendor using his standard
calibration procedures, which he shall submit to the Engineer for his review prior to the
performance of it.
The Vendor shall submit the records of all calibrations at the time of delivery of the
equipment specified.
The Vendor shall provide equipment, instruments, tools and personnel, and shall bear all
expenses incidental to the foregoing tests, including replacement of damaged parts and
material.
The tests shall be performed as specified in item 1.8 of scope of work / supply. (Section 2)
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
6.0 SPARES
The supply of spare parts as necessary and recommended by the supplier for Three (5) years
reliable trouble-free operation & maintenance of the equipment shall be under the scope of
this specification.
The spares shall be interchangeable with the parts for which they are intended for
replacement.
The supplier shall assess the service expectancy period for spares under normal operating
conditions after which replacement will be necessary.
Spares which may be required during various test, trials and commissioning shall be
arranged separately and shall be supplied along with the main equipment, so that
commissioning is not disturbed due to lack of these spares. If any item is not listed but
found necessary during commissioning the supplier shall arrange the same immediately
without any extra prices unless agreed by purchaser.
The supplier shall indicate a list of special tools & tackle, which may be required for
maintenance, overhaul, and replacement of the main equipment to be supplied under this
specification.
The supplier shall also indicate essential test gadget (such as portable field calibrator for
transmitters), which may be required for test/calibration of the equipment at site.
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
SECTION - 2
INDEX
1.0 General
1.9 Warranty
1.10 Attachments
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
SCOPE OF WORK / SUPPLY
1.0 GENERAL
This material description covers the minimum requirements for design, manufacturing,
testing and delivery of: Instruments as per selected type and materials indicated for
ABADAN Gas Turbine Power Plant.
The scope of work shall include but shall not be limited to the followings:
- All required shop test calibration using all test devices / facilities arranged in house
- Warranty as specified
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
1.3 Documents to be provided
- Data sheet (attachment A supplier portion filled in) 3 Attached to the bid
- Spare parts list recommended for 5 years operation & 3
maintenance (Attachment B filled in)
- Spare parts list recommended for commissioning and start up 3
(Attachment C filled in)
- Special tools & tackle list as per Attachment D filled in
3
- Technical deviations from specification as per Attachment E
filled in
3
- List of users for instrument offered
3
- Quality assurance plan
3
"B" DOCUMENTS FOR REVIEW AND/OR APPROVAL
- Certified assembly drawings and dimension drawings 1 3 15 calendar days after
- Calculation sheets 3 P.O.
- Installation instructions 1 3
"C" FINAL DOCUMENTS
Documents as above in addition to:
T= Transparencies
C= Copies
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
Unless stated otherwise in the material description or specification, all dimensions and
weights shall be in the (S.I) metric system of units. English sizes shall be used and shown
on all drawings, specifications etc. for the following items:
The following European drawing sizes A1, A3, A4 and A0 can be used.
All drawings shall have at their right-bottom corner the Client label.
A4 size forms or drawings must have a client label cover sheet.
A. Scope
B. Contents
In general, supplier as identified by check box shall use the following structure.
•1 General description
•2 Design/Operating conditions and controls
•3 Preparing for initial start-up commissioning
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
Required Not Required
•1 Routing maintenance
•2 Special maintenance
•3 Performance checks
C. Binding Details
All pages of O & M manuals shall be in the contractual language and shall be A4
standard size.
All drawings larger than A4 size shall be folded and inserted in individual A4 size
transparent plastic pockets.
The supplier shall provide required quantity of sets complete with facing sheet. The
manuals should not be side punched and bound in books or hard covers, since they
will be incorporated in plant operations and maintenance books.
11
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
This will include as per above 1a), b), c), tests list,
procedure and record forms.
- Place of testing
- Starting date
12
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
Note: When this block is checked off by Client/Engineer supplier may provide his
standard in house testing/inspection documents as proof that hardware design,
manufacture and testing meets the intent of this description and attachment A "data
sheets" and instrument technical specification.
In case of deviation Supplier is obliged to provide with the offer a complete list of
the deviations, independently from and in addition to any other documentation
provided with the offer.
B. In case of P.O. award, the Supplier's Quality Control department will be required to
maintain a job file for Client/Engineer review at all times. This file will contain all
relevant documentation for the purchase components.
C. The Supplier shall indicate shipping weights (metric tons) shipping volumes (cubic
meters) and storage requirements.
Packing shall be suitable for overseas shipment.
13
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
Supplier shall provide the following inspection requirements as a minimum for any boxes
checked off by Client/Engineer.
Visual
Functional
1.9 Warranty
14
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
ATTACHMENT A
15
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
ATTACHMENT B
RECOMMENDED SPARE PARTS FOR 5 YEARS OPERATION & MAINTENANCE
NOTE:
- Supplier shall itemize and quote the quantities of essential spare parts.
- Supplier shall give for each item the identification part number, the quantity, the
description and the unit price.
16
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
ATTACHMENT C
RECOMMENDED SPARE PARTS FOR COMMISSIONING & START UP
NOTE:
- Supplier shall itemize and quote the quantities of essential spare parts for commissioning
and start up. If any part is not mentioned but found necessary during commissioning and
start up the supplier shall arrange immediately without extra price unless agreed by
purchaser.
- Supplier shall give for each item the identification part number, the quantity, the
description and the unit price.
17
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
ATTACHMENT D
RECOMMENDED SPECIAL TOOLS & TACKLE
NOTE:
- Supplier shall itemize and quote the quantities of essential tools & tackle.
- Supplier shall give for each item the identification part number, the quantity, the
description and the unit price.
ATTACHMENT E
18
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT
ABADAN GAS TURBINE POWER PLANT
TECHNICAL SPECIFICATION MONENCO IRAN
TECHNICAL DEVIATION FROM SPECIFICATION
NOTE:
- Supplier shall list out any deviation from technical specification & explain reasons for
non-conformance.
19
D:\ABADAN\ATAEI\I&C\SPEC.I&C\_INST.SPC\ms\FMT