Professional Documents
Culture Documents
Cafe Amore Chapter 6
Cafe Amore Chapter 6
TECHNICAL STUDY
A. Product Description
Café Amoré will offer variety of hot and cold coffee with unique delicious taste
and aroma so captivating that will let the customer-patrons promise for a constant
comeback. Other offers of the business are other refreshments -- baked goods, pastries
and desserts where customers can choose according to their liked flavors.
B. Menu
41
42
43
44
45
C. Facilities and Equipment
The proponents who are dealing with a coffee business, should have the
finest, durable, and quality tested vending machines, and other cooking/baking equipment
that are convenient and user-friendly. All facilities and equipment should also be hazard-
customer-patrons.
On the other hand, all of the future-to-use facilities and equipment should have
Café Amoré as a coffee shop will also provide the finest experience of customer-
patrons with its offer -- both freedom and privacy to its loyal customers as it has areas
D. Labor Requirements
among employees and employer-owner/manager. This business will just have six (5)
employees including the manager to run the initial operation. High class training and
proper orientation will be done to all hired employees to ensure quality service. All
employees are required to have their Philhealth and SSS with the necessary deductions
46
E. Waste Disposal
surrounding/environment.
utility personnel who regulates proper waste disposal, and with the other employees, they
will conduct daily maintenance in cleanliness. There will garbage bins or receptacles for
management will ensure that garbage will be collected by the municipal garbage trucks
Café Amoré with the help of their utility personnel who regulates proper waste
disposal, and with the other employees cooperating, will see to it daily maintenance of
Amoré will never use plastic utensils that greatly affect the environment.
F. Utilities
The proposed project is definitely in need of power and water utilities in which
the former will be supplied by the Zamboanga del Sur Electric Cooperative II
(ZAMSURECO) and the latter by the local water system of the municipality of Buug.
Telecommunications should also be used as one necessity of the business which will be
powered by the three (3) major cell phone signal providers - the Globe, Smart and Sun
Cellular. The plan to have Internet connection will be run by the PLDT-Fibr’. In case of
47
power failure and water scarcity, generator and big water tank should be respectively
G. Drainage
that construction meet the standards. The drainage system shall be filled with pipes to
avoid future leakage and shall be connected to drainage system of the place for water
waste to easily run through. Every now and then, the management should check and
48