Kitchens MRs 30-12 Engineering - Purchasing Report
Kitchens MRs 30-12 Engineering - Purchasing Report
1 Jun-17 Unsatisfactory Dishwasher temperature Dish washer report Eng. Done In Process Banquet Purchasing , Eng. High
28/2/2017
27-9-2018
Broken Four hand wash basins 5836 Banquet
2 15-4-2018 2479 In Process RFQ.(1224) Purchasing , Eng. High
(Cristal Audit )
6 7/5/2018 Light bulb cover needs to be fixed 3940 RFQ.1520 Nobel house Engineering High
9/9/2018 2584
8
27-9-2018
under maintenance blast chiller
2479
Not Done Done banquet Engineering High
Egyptian night
11 26-12-2018 broken down fan of fridge no. 163 Medium
kitchen
17 20-10-2017 ROOF ISO 222000 Audit FF & E RFQ 205 Fruit room Purchasing , Eng. Medium
In room Dinning
20 20-10-2018 broken Hood 4255 Done Heliopolis Medium
21 2/11/2018 broken fridge door handle ( no. 121) RFQ.1316 Banquet kitchen Medium
22 26/12/2018 Broken roof / Fallen Paint 6612 Done MKOP kitchen Medium
The Corner broken cause of stuff hit it with trollies and Banquet
23 26/12/2018 Broken Wall corner we will try to provide a metal angle to cover the kitchen( Dry food Medium
corners as protection for it form hitting store )
24 8/12/2018 broken door of display fridge no. 83 1652 We ordered new doors covers RFQ.1823 le-Marchea Bar Medium
25 28-11-2018 broken floor Fridge no. 119 3863 Banquet kitchen Medium
27 27-8-2018 under maintenance hand wash basin 2248 In Process RFQ 963 le-Marche Purchasing , Eng. Low
27-9-2018 2479
28 7/5/2018 Broken light bulbs of hood 3940 RFQ.1520 Nobel house Engineering Low
15/12/2018 2656
31 15-4-2018 Ceiling of Dry store Cistal Audit Not done( Project ) In Process Purchasing , Eng. Project
Cristal Audit