Kitchens MRs 30-12 Engineering - Purchasing Report
Kitchens MRs 30-12 Engineering - Purchasing Report
Kitchens MRs 30-12 Engineering - Purchasing Report
1 Jun-17 Unsatisfactory Dishwasher temperature Dish washer report Eng. Done In Process ( During 4 Days ) Banquet Purchasing , Eng. High
28/2/2017
27-9-2018 Broken Four hand wash basins 5836 Banquet
2 15-4-2018
2479 In Process RFQ.(1224) Purchasing , Eng. High
(Cristal Audit )
31-8-2017 The Only not working basin is the Chocolate Room Hand Wash basin and
3 27-9-2018 Broken hand wash basin 138 In Process it needs Some Spare Parts (RFQ.900 & RFQ963) pastry Purchasing , Eng. High
2479
6 7/5/2018 Light bulb cover needs to be fixed 3940 RFQ.1520 Nobel house Engineering High
9/9/2018 2584
8 27-9-2018 under maintenance blast chiller 2479 Not Done Done " Under Test " also need the Fryon in RFQ 1829 banquet Engineering High
The old material cant simply changed the cost of changing the material
9 15-4-2018 Rusty meat mincer of all parts will be so expensive butcher Engineering High
Cristal Audit
Egyptian night
11 26-12-2018 broken down fan of fridge no. 163 In Process kitchen Medium
12 8/10/2018 Broken two light bulbs cover ( above chocolate 3946 RFQ.1505 pastry Medium
17-12-2018 machine, in front of oven) 479
13 8/10/2018 Broken light bulbs cover 3944 Done Vegetable room Medium
Damaged door Gasket
Double order with RFQ
14 15-4-2018 1- Under counter fridge units located in Dabka Cistal Audit 774 & This order was RFQ 1830 Dabka kitchen Purchasing , Eng. Medium
2427
Cristal Audit kitchen ( number 54 ) delivered on 26/11/2018
17 20-10-2017 ROOF ISO 222000 Audit FF & E In Process Fruit room Purchasing , Eng. Medium
In room Dinning
20 20-10-2018 broken Hood 4255 Done Heliopolis Medium
21 2/11/2018 broken fridge door handle ( no. 121) RFQ.1316 Banquet kitchen Medium
22 26/12/2018 Broken roof / Fallen Paint 6612 After 3 Days MKOP kitchen Medium
The Corner broken cause of stuff hit it with trollies and we will try to Banquet
23 26/12/2018 Broken Wall corner provide a metal angle to cover the corners as protection for it form kitchen( Dry food Medium
hitting store )
24 8/12/2018 broken door of display fridge no. 83 1652 We ordered new doors covers RFQ.1823 le-Marchea Bar Medium
25 28-11-2018 broken floor Fridge no. 119 3863 next Sunday Banquet kitchen Medium
27-8-2018 2248
27 27-9-2018 under maintenance hand wash basin 2479 In Process RFQ 963 le-Marche Purchasing , Eng. Low
7/5/2018 3940
28 15/12/2018 Broken light bulbs of hood 2656 RFQ.1520 Nobel house Engineering Low
30 17/12/2018 Broken light bulbs freezer no. 15 470 Done pastry Low
31 15-4-2018 Ceiling of Dry store Cistal Audit Not done( Project ) In Process Purchasing , Eng. Project
Cristal Audit