DAFTAR UPAH TENAGA

NO TENAGA SAT UPAH


1 Mandor O.H 110,000.00
2 Kepala Tukang O.H 100,000.00
3 Kepala Tukang Besi O.H 100,000.00
4 Kepala Tukang Cat O.H 100,000.00
5 Kepala Tukang Pipa O.H 100,000.00
6 Tukang Batu O.H 90,000.00
7 Tukang Besi O.H 90,000.00
8 Tukang Besi Konstruksi O.H 90,000.00
9 Tukang Kayu O.H 90,000.00
10 Tukang Listrik O.H 90,000.00
11 Tukang Pipa O.H 90,000.00
12 Tukang Cat O.H 90,000.00
13 Pekerja O.H 85,000.00
14 Pekerja Tak Terampil O.H 85,000.00
DAFTAR HARGA MATERIAL

NO MATERIAL SATUAN HARGA


1 Accesorries 36,400.00 8,190.00
2 Accesorries Set 32,760.00
3 Air Tawar Liter 135
4 Allumunium Strip m 40,500.00
5 Ampelas lembar 5,040.00
6 Amplas Kayu lbr 5,040.00
7 Atap Sirap Lembar 18,090.00
8 Bak Cuci Stainless Steel + Accessories Buah 327,825.00
9 Bak Fiberglass buah 393,480.00
10 Balok Kayu Meranti m3 6,077,970.00
11 Bata Merah Buah 855
12 Bata Merah Uk.5 X 11 X 22 buah 855
13 Bata Ringan Tebal 10 cm Bh 10,800.00
14 Batu Bata buah 855
15 Batu Belah m3 173,925.00
16 Batu Kali Pecah 15/20 Cm m3 173,925.00
17 Batu Pecah m3 220,860.00
18 Batu Split Pecah Mesin 3/5 m3 220,860.00
19 Baut (Screw Driver) Buah 1,350.00
20 Besi Beton Kg 11,745.00
21 Besi Beton Polos Kg 11,745.00
22 Besi Beton Ulir Kg 12,195.00
23 Besi Hollow 40.40 Btg 188,100.00
24 Besi Plat Strip Kg 12,150.00
25 Besi Profil C kg 12,150.00
26 Besi Profil IWF kg 12,150.00
27 Besi Siku kg 10,890.00
28 Besi Strip Kg 12,150.00
29 Box panel PVC isi 4 MCB bh 347,940.00
30 C-75 , 0.6 Batang 89,865.00
31 C-75 , 0.8 Batang 93,015.00
32 Cat besi Kg 64,350.00
33 Cat Besi Dasar kg 64,350.00
34 Cat Dasar (Alkali) kg 27,855.00
35 Cat kayu kg 69,750.00
36 Cat Kayu Dasar Kg 69,750.00
37 Cat Kayu Dasar Setara Emco Kg 69,750.00
38 Cat Kayu Penutup 2 Kali Kg 69,750.00
39 Cat Kayu Penutup Setara Emco Kg 69,750.00
40 Cat Meni kg 48,825.00
41 Cat Meni Kayu Kg 34,785.00
42 Cat Tembok Galon 127,530.00
43 Cat Tembok Dasar Kg 27,855.00
Cat Tembok Exterior Setara Dulux Weathershield Galon 295,650.00
44 (2,5 Liter)
45 Cat Tembok Penutup (5 Kg) Galon 127,530.00
46 Dempul Kg 43,515.00
47 Dinding Keramik 20X20 Cm (Motif) m2 50,985.00
48 Dinding Keramik 20X20 Cm (Polos) m2 52,335.00
49 Dinding Keramik 20X25 Cm (Motif) m2 120,915.00
50 Dinding Keramik 20X25 Cm (Polos) m2 107,730.00
51 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M Batang 21,510.00
52 Dolken Kayu Gelam Ø 8-10/400 Cm Batang 21,510.00
53 Door Closer Buah 158,085.00
54 Door Holder Buah 24,390.00
55 Door Stopper Buah 24,390.00
56 Dynabolt Buah 11,610.00
57 Engsel Angin Kuningan 2" Stel 12,195.00
58 Engsel Hidrolis Pintu Alluminium Stel 239,535.00
59 Engsel Jendela Kupu-Kupu Kuningan 2.5" Stel 29,205.00
60 Engsel Pintu Kuningan 3" Stel 40,860.00
61 Fiting Plafon Buah 19,530.00
62 Fiting Plafond Ex. Broco Buah 19,530.00
63 Floor Drain + Accessories buah 16,920.00
64 Genteng Beton Buah 5,625.00
65 Genteng Bubungan Glazzur Buah 22,950.00
66 Genteng Karang Pilang Ex. Nglayur Buah 2,475.00
67 Genteng Keramik Glazzur ex. Kanmuri Buah 11,070.00
68 Genteng Kodok Ex. Nglayur Buah 2,835.00
69 Genteng Metal Lembar 120,240.00
70 Gypsum Board Tb. 9 Mm Lembar 86,985.00
71 Hollow 4/4 Zincromate Btg 32,760.00
72 Jaring Kawat Baja kg 11,250.00
73 Jendela Nako Daun 23,265.00
74 Kabel Nya 1 X 2,5 Ex. Supreme m' 4,455.00
75 Kabel Nym 2 X 2,5 Ex. Supreme m' 15,075.00
76 Kabel NYM 3 x 2,5 mm2 m 19,710.00
77 Kaca Polos Tebal 3 Mm m2 100,935.00
78 Kaca Rayban 5 Mm m2 116,280.00
79 Kaca Tebal 3 Mm buah 100,935.00
80 Kaca Tebal 5 Mm buah 112,500.00
81 Kaca Tebal 8 Mm buah 197,640.00
82 Kait Angin Buah 24,390.00
83 Kalsiboard Lembar 103,770.00
84 Kapi Buah 10,440.00
85 Kapur Pasang m3 108,135.00
86 Kaso Kruing (5X7) Cm m3 6,376,050.00
87 Kaso Kruing 5X7 m3 6,376,050.00
88 Kaso/Reng Kayu Kruing m3 6,955,695.00
89 Kawat Bendrat Roll 389,025.00
90 Kawat Berduri 50 M Roll 95,940.00
91 Kawat Beton Roll 389,025.00
92 Kayu Balok m3 5,230,755.00
93 Kayu Bekisting Meranti m3 5,230,755.00
94 Kayu Borneo Papan m3 7,293,555.00
95 Kayu Jati Balok m3 19,150,290.00
96 Kayu Jati Papan m3 19,150,290.00
97 Kayu Kamper Papan m3 10,433,520.00
98 Kayu Meranti 5/7 m3 5,166,270.00
99 Kayu Meranti Balok m3 6,077,970.00
100 Kayu Papan m3 6,376,050.00
101 Kayu Sengon 5/7 m3 2,856,645.00
102 Kayu Sengon Papan m3 2,856,645.00
103 Keramik Motif 20X20 Cm m2 50,985.00
104 Keramik Motif 30X30 Cm m2 49,995.00
105 Keramik Motif 40X40 Cm m2 50,490.00
106 Keramik Polos 20X20 Cm m2 52,335.00
107 Keramik Polos 30X30 Cm m2 46,665.00
108 Keramik Polos 40X40 Cm m2 49,815.00
109 Keramik Porselen Buah 1,305.00
110 Kerikil m3 220,860.00
111 Kerikil Beton m3 220,860.00
112 Kertas Gosok lembar 5,040.00
113 Kloset Duduk Setara Ina Komplit Buah 1,453,005.00
114 Kloset Jongkok Porselen Buah 174,375.00
115 Koral Beton m3 220,860.00
116 Kran Air Ex. Omco Buah 29,025.00
117 Kuas bh 11,790.00
118 Kuas cat bh 11,790.00
119 Kunci Slot Buah 22,500.00
120 Kunci Tanam Antik Buah 144,945.00
121 Kunci Tanam Biasa Buah 66,960.00
122 Kunci Tanam Biasa 2X Putar Buah 98,550.00
123 Kunci Tanam Kamar Mandi Buah 72,990.00
124 Lampu Down Light + Fitting Buah 105,030.00
125 Lampu Pijar 25 Watt Buah 10,350.00
126 Lampu Sl 18 Watt Buah 39,780.00
127 Lampu Sl 23 Watt Buah 46,260.00
128 Lampu Tl 1 x 18 Watt Set 185,895.00
129 Lampu Tl 1 x 36 Watt Set 290,295.00
130 Lem Kayu kg 29,070.00
131 List Gypsum m' 24,390.00
132 Marmer Tulungagung; 30 X 60 Cm m2 377,775.00
133 MCB 4 A bh 57,420.00
134 MCB 6 A bh 49,860.00
135 Meni Besi Kg 48,825.00
136 Minyak Bekisting liter 13,770.00
137 Minyak Cat Kayu Liter 22,050.00
138 Minyak Pelumas ltr 38,070.00
139 Mortar Utama 380 ( 40 kg ) Zak 25,200.00
140 Multipleks 9 Mm Lembar 156,960.00
141 Mur baut bh 1,215.00
142 Nok Genteng Beton Buah 7,785.00
143 Nok Genteng Metal Buah 28,890.00
144 Paku 4 s/d 7 cm kg 18,900.00
145 Paku Biasa kg 18,900.00
146 Paku Biasa 2" - 5" Kg 18,900.00
147 Paku payung bh 1,080.00
148 Paku Skrup Kg 24,390.00
149 Pasir Beton m3 231,885.00
150 Pasir Pasang m3 220,275.00
151 Pasir Urug m3 144,945.00
152 Pengencer Kg 26,685.00
153 Pintu Besi Lipat m2 581,220.00
154 Pipa Galvanis 1 1/2" (Medium B) Batang 450,045.00
155 Pipa Galvanis 1" (Medium B) Batang 293,895.00
156 Pipa Galvanis 1/2" (Medium B) Batang 155,205.00
157 Pipa Galvanis 3" (Medium B) Batang 1,055,655.00
158 Pipa Galvanis 3/4" (Medium B) Batang 191,655.00
159 Pipa Galvanis 4" (Medium B) Batang 1,527,570.00
160 Pipa Pralon 5/8 Batang 9,180.00
161 Pipa Pvc Aw Ø 1 1/2" Pjg 6 Meter Batang 136,080.00
162 Pipa Pvc Aw Ø 1" Pjg 6 Meter Batang 75,060.00
163 Pipa Pvc Aw Ø 1/2" Pjg 6 Meter Batang 49,410.00
164 Pipa Pvc Aw Ø 2 1/2" Batang 256,950.00
165 Pipa Pvc Aw Ø 2" Batang 201,690.00
166 Pipa Pvc Aw Ø 3" Batang 365,040.00
167 Pipa Pvc Aw Ø 3/4" Pjg 6 Meter Batang 59,940.00
168 Pipa Pvc Aw Ø 4" Batang 533,340.00
169 Pipa Pvc Class D Dia. 2" Batang 97,110.00
170 Pipa Pvc Class D Dia. 3" Batang 206,370.00
171 Pipa Pvc Class D Dia. 4" Batang 288,900.00
172 Plamir Kayu kg 32,940.00
173 Plamur Kayu Kg 32,940.00
174 Plamur Tembok Kg 14,625.00
175 Plywood 4 Mm Lembar 113,715.00
176 Plywood 4 Mm, Uk. 120 X 240 Cm Lembar 113,715.00
177 Plywood Tbl. 4 Mm Lembar 113,715.00
178 Plywood Uk. 4' X 8' X 4 Mm Lembar 113,715.00
179 Polycarbonate t. 8 mm m2 3,719,655.00
180 Profil Alluminium m 100,305.00
181 Profil Alluminium 3" m 88,695.00
182 Profil Alluminium 4" m 100,305.00
183 Rangka Metal Hollow 40.40.2 Mm Btg 32,760.00
184 Rel Pintu Dorong buah 383,625.00
185 Reng Batang 43,515.00
186 Reng Kruing (3X4) Cm m3 6,955,695.00
187 Reng Kruing 2X3 m3 6,955,695.00
188 Rol Cat bh 25,605.00
189 Rolling Door Aluminium Komplit m2 449,235.00
190 Rolling Door Besi Komplit m2 272,475.00
191 Roof Light Fiber Glass Lembar 60,795.00
192 Sabun Batangan Buah 3,555.00
193 Saklar Ex. Broco Buah 13,005.00
194 Saklar Ganda Ex. Broco Buah 18,000.00
195 Saklar Tunggal Ex. Broco Buah 13,005.00
196 Seal Tape roll 6,120.00
197 Sealant Tube 13,950.00
198 Semen Portland Zak 69,750.00
199 Semen Warna Kg 13,410.00
200 Seng Gel. Bjls 30 Lembar 71,055.00
201 Seng Gelombang Lembar 71,055.00
202 Seng Plat Lembar 45,675.00
203 Seng Plat 3" X 6" Bjls Lembar 45,675.00
204 Seng Plat 3" X 6" Bjls 28 Lembar 96,480.00
205 Sirtu m3 174,375.00
206 Skrup Fixer Buah 29,070.00
207 Soda Api Kg 16,830.00
208 Solar ltr 13,770.00
209 Spring Knip buah 38,430.00
210 Stop Kontak Ex. Broco Buah 15,975.00
211 T Doos Pvc Buah 4,635.00
212 Talang Jurai m' 40,590.00
213 Teakwood 4 Mm, Uk. 120 X 240 Cm Lembar 127,890.00
214 Teakwood Uk. 4' X 8' X 4 Mm lembar 127,890.00
215 Tepung Gypsum Kg 7,650.00
216 Terawang (Roster) buah 7,560.00
217 Tripleks 4 mm lembar 82,260.00
218 Ubin Granit 40X40 m2 290,610.00
219 Ubin Granit 60X60 m2 377,775.00
220 Urinoir set 1,639,800.00
221 Wastafel Setara Ina set 494,055.00
222 Water Drain + Asesories set 16,920.00
223 Wuwung Genteng Palentong Buah 15,120.00
224 Wuwung Karang Pilang Ex. Nglayur Buah 7,335.00
225 Wuwung Kodok Genteng Buah 14,940.00
226 Spandek TCT 0.45 MM m² 172,462.50
227 Angkur pengikat atap bh 8,694.00

228 Paving Stone Abu - Abu Tebal 6 Cm (Persegi m2 65,109.50


Panjang) K-175
Paving Stone Abu - Abu Tebal 6 Cm (Persegi
229 Panjang) K-200 m2 76,023.50

230 Paving Stone Abu - Abu Tebal 6 Cm (Persegi m2 106,501.24


Panjang) K-300
231 Kanstin Uk. 15.25.40 buah 27,606.00
232 Stopper/Uskup m2 96,514.00
233 Alumunium Composite m2 420,500.00
234 Hollow Besi Galvanis Uk 4 x 4 x 1 mm Btg 115,000.00
235 Braket Siku / spigot / stiffener Btg 60,000.00
236 Paku Skrup Kg 21,600.00
ASLI
9,100.00
36,400.00
150
45,000.00
5,600.00
5,600.00
20,100.00
364,250.00
437,200.00
6,753,300.00
950
950
12,000.00
950
193,250.00
193,250.00
245,400.00
245,400.00
1,500.00
13,050.00
13,050.00
13,550.00
209,000.00
13,500.00
13,500.00
13,500.00
12,100.00
13,500.00
386,600.00
99,850.00
103,350.00
71,500.00
71,500.00
30,950.00
77,500.00
77,500.00
77,500.00
77,500.00
77,500.00
54,250.00
38,650.00
141,700.00
30,950.00
328,500.00
141,700.00
48,350.00
56,650.00
58,150.00
134,350.00
119,700.00
23,900.00
23,900.00
175,650.00
27,100.00
27,100.00
12,900.00
13,550.00
266,150.00
32,450.00
45,400.00
21,700.00
21,700.00
18,800.00
6,250.00
25,500.00
2,750.00
12,300.00
3,150.00
133,600.00
96,650.00
36,400.00
12,500.00
25,850.00
4,950.00
16,750.00
21,900.00
112,150.00
129,200.00
112,150.00
125,000.00
219,600.00
27,100.00
115,300.00
11,600.00
120,150.00
7,084,500.00
7,084,500.00
7,728,550.00
432,250.00
106,600.00
432,250.00
5,811,950.00
5,811,950.00
8,103,950.00
21,278,100.00
21,278,100.00
11,592,800.00
5,740,300.00
6,753,300.00
7,084,500.00
3,174,050.00
3,174,050.00
56,650.00
55,550.00
56,100.00
58,150.00
51,850.00
55,350.00
1,450.00
245,400.00
245,400.00
5,600.00
1,614,450.00
193,750.00
245,400.00
32,250.00
13,100.00
13,100.00
25,000.00
161,050.00
74,400.00
109,500.00
81,100.00
116,700.00
11,500.00
44,200.00
51,400.00
206,550.00
322,550.00
32,300.00
27,100.00
419,750.00
63,800.00
55,400.00
54,250.00
15,300.00
24,500.00
42,300.00
28,000.00
174,400.00
1,350.00
8,650.00
32,100.00
21,000.00
21,000.00
21,000.00
1,200.00
27,100.00
257,650.00
244,750.00
161,050.00
29,650.00
645,800.00
500,050.00
326,550.00
172,450.00
1,172,950.00
212,950.00
1,697,300.00
10,200.00
151,200.00
83,400.00
54,900.00
285,500.00
224,100.00
405,600.00
66,600.00
592,600.00
107,900.00
229,300.00
321,000.00
36,600.00
36,600.00
16,250.00
126,350.00
126,350.00
126,350.00
126,350.00
4,132,950.00
111,450.00
98,550.00
111,450.00
36,400.00
426,250.00
48,350.00
7,728,550.00
7,728,550.00
28,450.00
499,150.00
302,750.00
67,550.00
3,950.00
14,450.00
20,000.00
14,450.00
6,800.00
15,500.00
77,500.00
14,900.00
78,950.00
78,950.00
50,750.00
50,750.00
107,200.00
193,750.00
32,300.00
18,700.00
15,300.00
42,700.00
17,750.00
5,150.00
45,100.00
142,100.00
142,100.00
8,500.00
8,400.00
91,400.00
322,900.00
419,750.00
1,822,000.00
548,950.00
18,800.00
16,800.00
8,150.00
16,600.00
191,625.00
9,660.00

60,850.00

71,050.00

99,533.87

25,800.00
90,200.00
DAFTAR BIAYA SEWA PERALATAN

NO MATERIAL SATUAN HARGA


1 Compressor Jam 224,642.53
2 Jack Hammer Jam 33,726.95
3 Sewa Alat Bantu Strouss Pile jam 10,650.00
4 Stamper Unit/hari 47,508.36
5 Stager  set 110,000.00
OVERHEAD/PROFIT = 0%
A PEKERJAAN PERSIAPAN
1 m' Pembuatan Pagar Sementara Seng
Gelombang Tinggi 2 M
Tenaga
Mandor 0.0200 O.H 110,000.00 2,200.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.4000 O.H 90,000.00 36,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 57,200.00
Bahan
Dolken Kayu Gelam Ø 8-10/400 Cm 1.2500 Batang 21,510.00 26,887.50
Semen Portland 0.0625 Zak 69,750.00 4,359.38
Seng Gelombang 1.2000 Lembar 71,055.00 85,266.00
Pasir Beton 0.0050 m3 231,885.00 1,159.43
Kerikil Beton 0.0090 m3 220,860.00 1,987.74
Kayu Meranti 5/7 0.0720 m3 5,166,270.00 371,971.44
Paku Biasa 2" - 5" 0.0600 Kg 18,900.00 1,134.00
Meni Besi 0.4500 Kg 48,825.00 21,971.25
Jumlah Bahan 514,736.73
Total ( Tenaga + Bahan) 571,936.73
Overhead 0.0000 0.00
H.S.P 571,936.73

2 1 m' Pembuatan Pagar Sementara Kawat Duri m'


Tinggi 1,8 M
Tenaga
Mandor 0.0200 O.H 110,000.00 2,200.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.3000 O.H 90,000.00 27,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 48,200.00
Bahan
Dolken Kayu Gelam Ø 8-10/400 Cm 1.0000 Batang 21,510.00 21,510.00
Semen Portland 0.0500 Zak 69,750.00 3,487.50
Kawat Berduri 50 M 0.5000 Roll 95,940.00 47,970.00
Pasir Beton 0.0050 m3 231,885.00 1,159.43
Koral Beton 0.0090 m3 220,860.00 1,987.74
Paku Biasa 2" - 5" 0.0600 Kg 18,900.00 1,134.00
Jumlah Bahan 77,248.67
Total ( Tenaga + Bahan) 125,448.67
Overhead 0.0000 0.00
H.S.P 125,448.67

1 m' Pengukuran Dan Pemasangan Bowplank m'


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 19,050.00
Bahan
Kayu Sengon Papan 0.0070 m3 2,856,645.00 19,996.52
Kayu Sengon 5/7 0.0120 m3 2,856,645.00 34,279.74
Paku Biasa 2" - 5" 0.0200 Kg 18,900.00 378.00
Jumlah Bahan 54,654.26
Total ( Tenaga + Bahan) 73,704.26
Overhead 0.0000 0.00
H.S.P 73,704.26

1 m2 Pekerjaan Pembuatan Kantor Sementara Dengan Lantai m2


Plesteran
Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.3000 O.H 100,000.00 30,000.00
Tukang Kayu 2.0000 O.H 90,000.00 180,000.00
Tukang Batu 1.0000 O.H 90,000.00 90,000.00
Pekerja 2.0000 O.H 85,000.00 170,000.00
Jumlah Tenaga 475,500.00
Bahan
Dolken Kayu Gelam Ø 8-10/400 Cm 1.2500 Batang 21,510.00 26,887.50
Kayu Meranti 5/7 0.1800 m3 5,166,270.00 929,928.60
Paku Biasa 2" - 5" 0.0800 Kg 18,900.00 1,512.00
Besi Plat Strip 1.1000 Kg 12,150.00 13,365.00
Semen Portland 0.8750 Zak 69,750.00 61,031.25
Pasir Pasang 0.1500 m3 220,275.00 33,041.25
Pasir Beton 0.1000 m3 231,885.00 23,188.50
Koral Beton 0.1500 m3 220,860.00 33,129.00
Bata Merah 30.0000 Buah 855.00 25,650.00
Seng Plat 0.2500 Lembar 45,675.00 11,418.75
Jendela Nako 0.2000 Daun 23,265.00 4,653.00
Kaca Polos Tebal 3 Mm 0.0800 m2 100,935.00 8,074.80
Kunci Tanam Biasa 0.1500 Buah 66,960.00 10,044.00
Plywood 4 Mm 0.0600 Lembar 113,715.00 6,822.90
Jumlah Bahan 1,188,746.55
Total ( Tenaga + Bahan) 1,664,246.55
Overhead 0.0000 0.00
H.S.P 1,664,246.55

1 m2 Pekerjaan Pembuatan Gudang Semen Dan


Peralatan m2

Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.2000 O.H 100,000.00 20,000.00
Tukang Kayu 2.0000 O.H 90,000.00 180,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 290,500.00
Bahan
Dolken Kayu Gelam Ø 8-10/400 Cm 1.7000 Batang 21,510.00 36,567.00
Kayu Meranti 5/7 0.2100 m3 5,166,270.00 1,084,916.70
Paku Biasa 2" - 5" 0.3000 Kg 18,900.00 5,670.00
Semen Portland 0.2625 Zak 69,750.00 18,309.38
Pasir Beton 0.0300 m3 231,885.00 6,956.55
Koral Beton 0.0500 m3 220,860.00 11,043.00
Seng Gelombang 1.5000 Lembar 71,055.00 106,582.50
Seng Plat 0.2500 Lembar 45,675.00 11,418.75
Jumlah Bahan 1,281,463.88
Total ( Tenaga + Bahan) 1,571,963.88
Overhead 0.0000 0.00
H.S.P 1,571,963.88

1 m2 Pekerjaan Pembuatan Bedeng Kerja m2


Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.2000 O.H 100,000.00 20,000.00
Tukang Kayu 2.0000 O.H 90,000.00 180,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 290,500.00
Bahan
Dolken Kayu Gelam Ø 8-10/400 Cm 1.2500 Batang 21,510.00 26,887.50
Kayu Meranti 5/7 0.1860 m3 5,166,270.00 960,926.22
Paku Biasa 2" - 5" 0.3000 Kg 18,900.00 5,670.00
Semen Portland 0.4500 Zak 69,750.00 31,387.50
Pasir Beton 0.0300 m3 231,885.00 6,956.55
Koral Beton 0.0500 m3 220,860.00 11,043.00
Seng Gel. Bjls 30 1.5000 Lembar 71,055.00 106,582.50
Plywood Tbl. 4 Mm 1.3500 Lembar 113,715.00 153,515.25
Jumlah Bahan 1,302,968.52
Total ( Tenaga + Bahan) 1,593,468.52
Overhead 0.0000 0.00
H.S.P 1,593,468.52

1 m2 Pekerjaan Pembersihan Lapangan Dan Perataan m2


Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 14,000.00
Bahan
Jumlah Bahan 0.00
Total ( Tenaga + Bahan) 14,000.00
Overhead 0.0000 0.00
H.S.P 14,000.00

1 m2 Pekerjaan Pembuatan Jalan Sementara m2


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 85,550.00
Bahan
Batu Belah 0.1500 m3 173,925.00 26,088.75
Batu Pecah 0.0900 m3 220,860.00 19,877.40
Pasir Pasang 0.0100 m3 220,275.00 2,202.75
Jumlah Bahan 48,168.90
Total ( Tenaga + Bahan) 133,718.90
Overhead 0.0000 0.00
H.S.P 133,718.90

1 Unit Papan Nama Proyek Unit


Tenaga
Pekerja 0.6300 O.H 85,000.00 53,550.00
Tukang Kayu 1.0000 O.H 90,000.00 90,000.00
Tukang Cat 0.5000 O.H 90,000.00 45,000.00
Kepala Tukang 0.1000 O.H 100,000.00 10,000.00
Mandor 0.1000 O.H 110,000.00 11,000.00
Jumlah Tenaga 209,550.00
Bahan
Kayu Papan 0.0250 m3 6,376,050.00 159,401.25
Kayu Balok 0.0900 m3 5,230,755.00 470,767.95
Paku 4 s/d 7 cm 0.6000 kg 18,900.00 11,340.00
Cat Meni 0.7500 kg 48,825.00 36,618.75
Plamir Kayu 0.3000 kg 32,940.00 9,882.00
Amplas Kayu 2.0000 lbr 5,040.00 10,080.00
Kuas cat 0.2000 bh 11,790.00 2,358.00
Cat kayu 0.4000 kg 69,750.00 27,900.00
Semen Portland 0.6250 Zak 69,750.00 43,593.75
Pasir Beton 0.0600 m3 231,885.00 13,913.10
Batu Split Pecah Mesin 3/5 0.1000 m3 220,860.00 22,086.00
Jumlah Bahan 807,940.80
Total ( Tenaga + Bahan) 1,017,490.80
Overhead 0.0000 0.00
H.S.P 1,017,490.80
B PEKERJAAN BONGKARAN
1 m3 Pekerjaan Pembongkaran Beton (Manual) m3
Tenaga
Mandor 0.3330 O.H 110,000.00 36,630.00
Pekerja 6.6670 O.H 85,000.00 566,695.00
Jumlah Tenaga 603,325.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 603,325.00
Overhead 0.0000 0.00
H.S.P 603,325.00

1 m3 Pembongkaran Beton (Menggunakan Alat) m3


Tenaga
Pekerja 1.7858 O.H 85,000.00 151,793.00
Mandor 0.1489 O.H 110,000.00 16,379.00
Jumlah Tenaga 168,172.00
Alat
Compressor 1.0417 Jam 224,642.53 234,010.12
Jack Hammer 1.0417 Jam 33,726.95 35,133.36
Jumlah Bahan 269,143.49
Total ( Tenaga + Bahan) 437,315.49
Overhead 0.0000 0.00
H.S.P 437,315.49

1 m3 Pembongkaran Pasangan Batu Kali


m3
(Manual)
Tenaga
Mandor 0.2050 O.H 110,000.00 22,550.00
Pekerja 2.0480 O.H 85,000.00 174,080.00
Jumlah Tenaga 196,630.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 196,630.00
Overhead 0.0000 0.00
H.S.P 196,630.00

1 M3 Pembongkaran Pasangan Batu Kali


m3
(Menggunakan Alat)
Tenaga
Pekerja 1.3770 O.H 85,000.00 117,045.00
Mandor 0.1722 O.H 110,000.00 18,942.00
Jumlah Tenaga 135,987.00
Alat
Jack Hammer 1.2049 Jam 33,726.95 40,637.60
Jumlah Bahan 40,637.60
Total ( Tenaga + Bahan) 176,624.60
Overhead 0.0000 0.00
H.S.P 176,624.60

1 m3 Pekerjaan Pembongkaran Tembok Batu m3


Bata
Tenaga
Mandor 0.2500 O.H 110,000.00 27,500.00
Pekerja 5.0000 O.H 85,000.00 425,000.00
Jumlah Tenaga 452,500.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 452,500.00
Overhead 0.0000 0.00
H.S.P 452,500.00

1 m2 Pekerjaan Pembongkaran Penutup Atap


m2
Tidak Dipakai Kembali
Tenaga
Mandor 0.0375 O.H 110,000.00 4,125.00
Pekerja 0.0750 O.H 85,000.00 6,375.00
Jumlah Tenaga 10,500.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 10,500.00
Overhead 0.0000 0.00
H.S.P 10,500.00

1 m2 Pekerjaan Pembongkaran Penutup Atap


Dan Dipakai Kembali m2

Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,000.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 21,000.00
Overhead 0.0000 0.00
H.S.P 21,000.00

1 m2 Pembongkaran Paving m2
Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 18,100.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 18,100.00
Overhead 0.0000 0.00
H.S.P 18,100.00

C PEKERJAAN TANAH
1 m3 Pekerjaan Galian Tanah Biasa Sedalam 1
Meter m3

Tenaga
Mandor 0.0250 O.H 110,000.00 2,750.00
Pekerja 0.7500 O.H 85,000.00 63,750.00
Jumlah Tenaga 66,500.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 66,500.00
Overhead 0.0000 0.00
H.S.P 66,500.00

1 m3 Pekerjaan Galian Tanah Biasa Sedalam 2


Meter m3

Tenaga
Mandor 0.0450 O.H 110,000.00 4,950.00
Pekerja 0.9000 O.H 85,000.00 76,500.00
Jumlah Tenaga 81,450.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 81,450.00
Overhead 0.0000 0.00
H.S.P 81,450.00

1 m3 Pekerjaan Galian Tanah Biasa Sedalam 3 m3


Meter
Tenaga
Mandor 0.0670 O.H 110,000.00 7,370.00
Pekerja 1.0500 O.H 85,000.00 89,250.00
Jumlah Tenaga 96,620.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 96,620.00
Overhead 0.0000 0.00
H.S.P 96,620.00

1 m3 Pekerjaan Galian Tanah Keras Sedalam 1 m3


Meter
Tenaga
Mandor 0.0320 O.H 110,000.00 3,520.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 88,520.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 88,520.00
Overhead 0.0000 0.00
H.S.P 88,520.00

1 m3 Pekerjaan Galian Tanah Cadas Sedalam 1


Meter m3

Tenaga
Mandor 0.0600 O.H 110,000.00 6,600.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 134,100.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 134,100.00
Overhead 0.0000 0.00
H.S.P 134,100.00

1 m3 Pekerjaan Galian Tanah Lumpur Sedalam 1 m3


Meter
Tenaga
Mandor 0.0450 O.H 110,000.00 4,950.00
Pekerja 1.2000 O.H 85,000.00 102,000.00
Jumlah Tenaga 106,950.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 106,950.00
Overhead 0.0000 0.00
H.S.P 106,950.00

1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 20 cm Titik

Tenaga
Mandor 0.0200 O.H 110,000.00 2,200.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 36,200.00
Bahan
Sewa Alat Bantu Strouss Pile 0.4000 jam 10,650.00 4,260.00
Jumlah Bahan 4,260.00
Total ( Tenaga + Bahan) 40,460.00
Overhead 0.0000 0.00
H.S.P 40,460.00

1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 30 cm Titik

Tenaga
Mandor 0.0240 O.H 110,000.00 2,640.00
Pekerja 0.4800 O.H 85,000.00 40,800.00
Jumlah Tenaga 43,440.00
Bahan
Sewa Alat Bantu Strouss Pile 0.4000 jam 10,650.00 4,260.00
Jumlah Bahan 4,260.00
Total ( Tenaga + Bahan) 47,700.00
Overhead 0.0000 0.00
H.S.P 47,700.00

1 m2 Pekerjaan Pekerjaan Stripping Tebing m2


Setinggi 1 M
Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Pekerja 0.0500 O.H 85,000.00 4,250.00
Jumlah Tenaga 4,800.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 4,800.00
Overhead 0.0000 0.00
H.S.P 4,800.00

1 m3 Pekerjaan Pembuangan Hasil Galian Sejauh


30 M m3

Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Pekerja 0.3300 O.H 85,000.00 28,050.00
Jumlah Tenaga 29,150.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 29,150.00
Overhead 0.0000 0.00
H.S.P 29,150.00
1 m3 Pekerjaan Pengurugan Kembali Galian m3
Tanah Biasa Sedalam 1 M
Tenaga
Mandor 0.0084 O.H 110,000.00 924.00
Pekerja 0.2500 O.H 85,000.00 21,250.00
Jumlah Tenaga 22,174.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 22,174.00
Overhead 0.0000 0.00
H.S.P 22,174.00

1 m3 Pekerjaan Pengurugan Kembali Galian


Tanah Biasa Sedalam 2 M m3

Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 27,150.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 27,150.00
Overhead 0.0000 0.00
H.S.P 27,150.00

1 m3 Pekerjaan Pengurugan Kembali Galian m3


Tanah Biasa Sedalam 3 M
Tenaga
Mandor 0.0224 O.H 110,000.00 2,464.00
Pekerja 0.3500 O.H 85,000.00 29,750.00
Jumlah Tenaga 32,214.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 32,214.00
Overhead 0.0000 0.00
H.S.P 32,214.00

1 m3 Pekerjaan Pengurugan Kembali Galian


m3
Tanah Keras Sedalam 1 M
Tenaga
Mandor 0.0107 O.H 110,000.00 1,177.00
Pekerja 0.3334 O.H 85,000.00 28,339.00
Jumlah Tenaga 29,516.00
Bahan
Jumlah Bahan 0.00
Total ( Tenaga + Bahan) 29,516.00
Overhead 0.0000 0.00
H.S.P 29,516.00

1 m3 Pekerjaan Pengurugan Kembali Galian


Tanah Cadas Sedalam 1 M m3

Tenaga
Mandor 0.0200 O.H 110,000.00 2,200.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 44,700.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 44,700.00
Overhead 0.0000 0.00
H.S.P 44,700.00

1 m3 Pekerjaan Pengurugan Kembali Galian


Tanah Lumpur Sedalam 1 M m3

Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 35,650.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 35,650.00
Overhead 0.0000 0.00
H.S.P 35,650.00

1 m3 Pekerjaan Pemadatan Tanah Setiap 20 Cm m3


Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 48,000.00
Bahan

Jumlah Bahan 0.00


Total ( Tenaga + Bahan) 48,000.00
Overhead 0.0000 0.00
H.S.P 48,000.00

1 m3 Pekerjaan Pemadatan Tanah Dengan Alat m3


Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 48,000.00
Bahan
Stamper 0.0500 Unit/hari 47,508.36 2,375.42
Jumlah Bahan 2,375.42
Total ( Tenaga + Bahan) 50,375.42
Overhead 0.0000 0.00
H.S.P 50,375.42

1 m3 Pekerjaan Pengurugan Pasir Urug m3


Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 26,600.00
Bahan
Pasir Urug 1.2000 m3 144,945.00 173,934.00
Jumlah Bahan 173,934.00
Total ( Tenaga + Bahan) 200,534.00
Overhead 0.0000 0.00
H.S.P 200,534.00

1 m3 Pengurugan Sirtu Padat m3


Tenaga
Mandor 0.0250 O.H 110,000.00 2,750.00
Pekerja 0.2500 O.H 85,000.00 21,250.00
Jumlah Tenaga 24,000.00
Bahan
Sirtu 1.2000 m3 174,375.00 209,250.00
Jumlah Bahan 209,250.00
Total ( Tenaga + Bahan) 233,250.00
Overhead 0.0000 0.00
H.S.P 233,250.00

D PEKERJAAN PONDASI
1 m3 Pekerjaan Pasangan Pondasi Batu Belah
15/20 Cm, Campuran (1 Pc : 3 Pp) m3

Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Semen Portland 5.0500 Zak 69,750.00 352,237.50
Pasir Pasang 0.4850 m3 220,275.00 106,833.38
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Jumlah Bahan 667,780.88
Total ( Tenaga + Bahan) 878,530.88
Overhead 0.0000 0.00
H.S.P 878,530.88

1 m3 Pekerjaan Pasangan Pondasi Batu Belah


15/20 Cm, Campuran (1 Pc : 4 Pp) m3

Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Semen Portland 4.0750 Zak 69,750.00 284,231.25
Pasir Pasang 0.5200 m3 220,275.00 114,543.00
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Jumlah Bahan 607,484.25
Total ( Tenaga + Bahan) 818,234.25
Overhead 0.0000 0.00
H.S.P 818,234.25

1 m3 Pekerjaan Pasangan Pondasi Batu Belah


15/20 Cm, Campuran (1 Pc : 5 Pp) m3

Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Semen Portland 3.4000 Zak 69,750.00 237,150.00
Pasir Pasang 0.5440 m3 220,275.00 119,829.60
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Jumlah Bahan 565,689.60
Total ( Tenaga + Bahan) 776,439.60
Overhead 0.0000 0.00
H.S.P 776,439.60

1 m3 Pekerjaan Pasangan Pondasi Batu Belah m3


15/20 Cm, Campuran (1 Pc : 6 Pp)
Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Semen Portland 2.9250 Zak 69,750.00 204,018.75
Pasir Pasang 0.5610 m3 220,275.00 123,574.28
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Jumlah Bahan 536,303.03
Total ( Tenaga + Bahan) 747,053.03
Overhead 0.0000 0.00
H.S.P 747,053.03

1 m3 Pekerjaan Pasangan Pondasi Batu Belah m3


15/20 Cm, Campuran (1 Pc : 8 Pp)
Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Semen Portland 2.2750 Zak 69,750.00 158,681.25
Pasir Pasang 0.5840 m3 220,275.00 128,640.60
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Jumlah Bahan 496,031.85
Total ( Tenaga + Bahan) 706,781.85
Overhead 0.0000 0.00
H.S.P 706,781.85

1 m3 Pekerjaan Pasangan Pondasi Batu Belah


m3
15/20 Cm, Campuran (1 Pc : 3 Kp : 10 Pp)
Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Semen Portland 1.5250 Zak 69,750.00 106,368.75
Kapur Pasang 0.1470 m3 108,135.00 15,895.85
Pasir Pasang 0.4920 m3 220,275.00 108,375.30
Jumlah Bahan 439,349.90
Total ( Tenaga + Bahan) 650,099.90
Overhead 0.0000 0.00
H.S.P 650,099.90

1 m3 Pekerjaan Pasangan Pondasi Batu Belah m3


15/20 Cm, Campuran (1/4 Pc : 1 Kp : 4 Pp)
Tenaga
Mandor 0.0750 O.H 110,000.00 8,250.00
Kepala Tukang 0.0750 O.H 100,000.00 7,500.00
Tukang Batu 0.7500 O.H 90,000.00 67,500.00
Pekerja 1.5000 O.H 85,000.00 127,500.00
Jumlah Tenaga 210,750.00
Bahan
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Semen Portland 1.0250 Zak 69,750.00 71,493.75
Kapur Pasang 0.1310 m3 108,135.00 14,165.69
Pasir Pasang 0.5230 m3 220,275.00 115,203.83
Jumlah Bahan 409,573.26
Total ( Tenaga + Bahan) 620,323.26
Overhead 0.0000 0.00
H.S.P 620,323.26

1 m3 Pekerjaan Pemasangan Batu Kosong


m3
(Aanstamping)
Tenaga
Mandor 0.0390 O.H 110,000.00 4,290.00
Kepala Tukang 0.0390 O.H 100,000.00 3,900.00
Tukang Batu 0.3900 O.H 90,000.00 35,100.00
Pekerja 0.7800 O.H 85,000.00 66,300.00
Jumlah Tenaga 109,590.00
Bahan
Batu Kali Pecah 15/20 Cm 1.2000 m3 173,925.00 208,710.00
Pasir Pasang 0.4320 m3 220,275.00 95,158.80
Jumlah Bahan 303,868.80
Total ( Tenaga + Bahan) 413,458.80
Overhead 0.0000 0.00
H.S.P 413,458.80

E PEKERJAAN BETON
1 m3 Pekerjaan Lantai Kerja K-100 F’C = 7,4 Mpa
m3
Slump (3-6) Cm, W/C = 0,87
Tenaga
Mandor 0.0600 O.H 110,000.00 6,600.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 1.2000 O.H 85,000.00 102,000.00
Jumlah Tenaga 128,600.00
Bahan
Semen Portland 5.7500 Zak 69,750.00 401,062.50
Pasir Beton 0.6379 m3 231,885.00 147,919.44
Kerikil 0.7608 m3 220,860.00 168,030.29
Air Tawar 200.0000 Liter 135.00 27,000.00
Jumlah Bahan 744,012.23
Total ( Tenaga + Bahan) 872,612.23
Overhead 0.0000 0.00
H.S.P 872,612.23

Membuat 1 m3 Beton Mutu F’C = 7,4 Mpa (K m3


100), Slump (12+/-2) Cm, W/C = 0,87
Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 6.1750 Zak 69,750.00 430,706.25
Pasir Beton 0.6208 m3 231,885.00 143,954.21
Kerikil 0.7400 m3 220,860.00 163,436.40
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 767,121.86
Total ( Tenaga + Bahan) 944,051.86
Overhead 0.0000 0.00
H.S.P 944,051.86

Membuat 1 m3 Beton Mutu F’C = 9,8 Mpa (K


125), Slump (12+/-2) Cm, W/C = 0,78 m3

Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 6.9000 Zak 69,750.00 481,275.00
Pasir Beton 0.5915 m3 231,885.00 137,159.98
Kerikil 0.7497 m3 220,860.00 165,578.74
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 813,038.72
Total ( Tenaga + Bahan) 989,968.72
Overhead 0.0000 0.00
H.S.P 989,968.72

Membuat 1 m3 Beton Mutu F’C = 12,2 Mpa (K


150), Slump (12+/-2) Cm, W/C = 0,72 m3

Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 7.4750 Zak 69,750.00 521,381.25
Pasir Beton 0.5708 m3 231,885.00 132,359.96
Kerikil 0.7534 m3 220,860.00 166,395.92
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 849,162.13
Total ( Tenaga + Bahan) 1,026,092.13
Overhead 0.0000 0.00
H.S.P 1,026,092.13

Membuat 1 m3 Beton Mutu F’C = 14,5 Mpa (K


175), Slump (12+/-2) Cm, W/C = 0,66 m3

Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 8.1500 Zak 69,750.00 568,462.50
Pasir Beton 0.5428 m3 231,885.00 125,867.18
Kerikil 0.7623 m3 220,860.00 168,361.58
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 891,716.26
Total ( Tenaga + Bahan) 1,068,646.26
Overhead 0.0000 0.00
H.S.P 1,068,646.26

Membuat 1 m3 Beton Mutu F’C = 16,9 Mpa (K


m3
200), Slump (12+/-2) Cm, W/C = 0,61
Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 8.8000 Zak 69,750.00 613,800.00
Pasir Beton 0.5222 m3 231,885.00 121,090.35
Kerikil 0.7638 m3 220,860.00 168,692.87
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 932,608.22
Total ( Tenaga + Bahan) 1,109,538.22
Overhead 0.0000 0.00
H.S.P 1,109,538.22
Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K m3
225), Slump (12+/-2) Cm, W/C = 0,58
Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 9.2750 Zak 69,750.00 646,931.25
Pasir Beton 0.4986 m3 231,885.00 115,617.86
Kerikil 0.7755 m3 220,860.00 171,276.93
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 962,851.04
Total ( Tenaga + Bahan) 1,139,781.04
Overhead 0.0000 0.00
H.S.P 1,139,781.04

Membuat 1 m3 Beton Mutu F’C = 21,7 Mpa (K


m3
250), Slump (12+/-2) Cm, W/C = 0,56
Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 9.6000 Zak 69,750.00 669,600.00
Pasir Beton 0.4943 m3 231,885.00 114,620.76
Kerikil 0.7697 m3 220,860.00 169,995.94
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 983,241.70
Total ( Tenaga + Bahan) 1,160,171.70
Overhead 0.0000 0.00
H.S.P 1,160,171.70

Membuat 1 m3 Beton Mutu F’C = 24,0 Mpa (K m3


275), Slump (12+/-2) Cm, W/C = 0,53
Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 10.1500 Zak 69,750.00 707,962.50
Pasir Beton 0.4885 m3 231,885.00 113,275.82
Kerikil 0.7600 m3 220,860.00 167,853.60
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 1,018,116.92
Total ( Tenaga + Bahan) 1,195,046.92
Overhead 0.0000 0.00
H.S.P 1,195,046.92

Membuat 1 m3 Beton Mutu F’C = 26,4 Mpa (K


300), Slump (12+/-2) Cm, W/C = 0,52 m3

Tenaga
Mandor 0.0830 O.H 110,000.00 9,130.00
Kepala Tukang 0.0280 O.H 100,000.00 2,800.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 1.6500 O.H 85,000.00 140,250.00
Jumlah Tenaga 176,930.00
Bahan
Semen Portland 10.3250 Zak 69,750.00 720,168.75
Pasir Beton 0.4864 m3 231,885.00 112,788.86
Kerikil 0.7562 m3 220,860.00 167,014.33
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 1,028,996.95
Total ( Tenaga + Bahan) 1,205,926.95
Overhead 0.0000 0.00
H.S.P 1,205,926.95

Membuat 1 m3 Beton Mutu F’C = 28,8 Mpa (K


m3
325), Slump (12+/-2) Cm, W/C = 0,49
Tenaga
Mandor 0.1050 O.H 110,000.00 11,550.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 2.1000 O.H 85,000.00 178,500.00
Jumlah Tenaga 225,050.00
Bahan
Semen Portland 10.9750 Zak 69,750.00 765,506.25
Pasir Beton 0.4786 m3 231,885.00 110,980.16
Kerikil 0.7452 m3 220,860.00 164,584.87
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 1,070,096.28
Total ( Tenaga + Bahan) 1,295,146.28
Overhead 0.0000 0.00
H.S.P 1,295,146.28

Membuat 1 m3 Beton Mutu F’C = 31,2 Mpa (K m3


350), Slump (12+/-2) Cm, W/C = 0,48
Tenaga
Mandor 0.1050 O.H 110,000.00 11,550.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 2.1000 O.H 85,000.00 178,500.00
Jumlah Tenaga 225,050.00
Bahan
Semen Portland 11.2000 Zak 69,750.00 781,200.00
Pasir Beton 0.4764 m3 231,885.00 110,470.01
Kerikil 0.7408 m3 220,860.00 163,613.09
Air Tawar 215.0000 Liter 135.00 29,025.00
Jumlah Bahan 1,084,308.10
Total ( Tenaga + Bahan) 1,309,358.10
Overhead 0.0000 0.00
H.S.P 1,309,358.10

F PEKERJAAN BESI BETON


1 Kg Pekerjaan Pembesian Dengan Besi Polos Kg
Tenaga
Mandor 0.0004 O.H 110,000.00 44.00
Kepala Tukang 0.0007 O.H 100,000.00 70.00
Tukang Besi 0.0070 O.H 90,000.00 630.00
Pekerja 0.0070 O.H 85,000.00 595.00
Jumlah Tenaga 1,339.00
Bahan
Besi Beton Polos 1.0500 Kg 11,745.00 12,332.25
Kawat Beton 0.0006 Roll 389,025.00 233.42
Jumlah Bahan 12,565.67
Total ( Tenaga + Bahan) 13,904.67
Overhead 0.0000 0.00
H.S.P 13,904.67

1 Kg Pekerjaan Pembesian Dengan Besi Ulir Kg


Tenaga
Mandor 0.0004 O.H 110,000.00 44.00
Kepala Tukang 0.0007 O.H 100,000.00 70.00
Tukang Besi 0.0070 O.H 90,000.00 630.00
Pekerja 0.0070 O.H 85,000.00 595.00
Jumlah Tenaga 1,339.00
Bahan
Besi Beton Ulir 1.0500 Kg 12,195.00 12,804.75
Kawat Beton 0.0006 Roll 389,025.00 233.42
Jumlah Bahan 13,038.17
Total ( Tenaga + Bahan) 14,377.17
Overhead 0.0000 0.00
H.S.P 14,377.17
1 Kg Pekerjaan Pemasangan Wiremesh (Jaring Kawat Baja) Kg
Tenaga
Mandor 0.0010 O.H 110,000.00 110.00
Kepala Tukang 0.0020 O.H 100,000.00 200.00
Tukang Besi 0.0250 O.H 90,000.00 2,250.00
Pekerja 0.0250 O.H 85,000.00 2,125.00
Jumlah Tenaga 4,685.00
Bahan
Jaring Kawat Baja 1.0200 kg 11,250.00 11,475.00
Kawat Beton 0.0020 Roll 389,025.00 778.05
Jumlah Bahan 12,253.05
Total ( Tenaga + Bahan) 16,938.05
Overhead 0.0000 0.00
H.S.P 16,938.05

G PEKERJAAN BETON BERTULANG


1 m3 Membuat Pondasi Beton Bertulang (150 Kg
Besi+Bekisting) m3

Tenaga
Mandor 0.2650 O.H 110,000.00 29,150.00
Kepala Tukang 0.2620 O.H 100,000.00 26,200.00
Tukang Besi 1.0500 O.H 90,000.00 94,500.00
Tukang Kayu 1.3000 O.H 90,000.00 117,000.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 5.3000 O.H 85,000.00 450,500.00
Jumlah Tenaga 742,100.00
Bahan
Kayu Bekisting Meranti 0.2000 m3 5,230,755.00 1,046,151.00
Paku Biasa 2" - 5" 1.5000 Kg 18,900.00 28,350.00
Minyak Bekisting 0.4000 liter 13,770.00 5,508.00
Besi Beton Polos 157.5000 Kg 11,745.00 1,849,837.50
Kawat Beton 0.0900 Roll 389,025.00 35,012.25
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Jumlah Bahan 3,854,873.25
Total ( Tenaga + Bahan) 4,596,973.25
Overhead 0.0000 0.00
H.S.P 4,596,973.25

1 m3 Membuat Sloof Beton Bertulang (200 Kg


Besi+Bekisting) m3

Tenaga
Mandor 0.2830 O.H 110,000.00 31,130.00
Kepala Tukang 0.3230 O.H 100,000.00 32,300.00
Tukang Besi 1.4000 O.H 90,000.00 126,000.00
Tukang Kayu 1.5600 O.H 90,000.00 140,400.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 5.6500 O.H 85,000.00 480,250.00
Jumlah Tenaga 834,830.00
Bahan
Kayu Bekisting Meranti 0.2700 m3 5,230,755.00 1,412,303.85
Paku Biasa 2" - 5" 2.0000 Kg 18,900.00 37,800.00
Minyak Bekisting 0.6000 liter 13,770.00 8,262.00
Besi Beton Polos 210.0000 Kg 11,745.00 2,466,450.00
Kawat Beton 0.1200 Roll 389,025.00 46,683.00
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Jumlah Bahan 4,861,513.35
Total ( Tenaga + Bahan) 5,696,343.35
Overhead 0.0000 0.00
H.S.P 5,696,343.35

1 m3 Membuat Kolom Beton Bertulang (300 Kg m3


Besi+Bekisting)
Tenaga
Mandor 0.3530 O.H 110,000.00 38,830.00
Kepala Tukang 0.4030 O.H 100,000.00 40,300.00
Tukang Besi 2.1000 O.H 90,000.00 189,000.00
Tukang Kayu 1.6500 O.H 90,000.00 148,500.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 7.0500 O.H 85,000.00 599,250.00
Jumlah Tenaga 1,040,630.00
Bahan
Kayu Bekisting Meranti 0.4000 m3 5,230,755.00 2,092,302.00
Paku Biasa 2" - 5" 4.0000 Kg 18,900.00 75,600.00
Minyak Bekisting 2.0000 liter 13,770.00 27,540.00
Besi Beton Polos 315.0000 Kg 11,745.00 3,699,675.00
Kawat Beton 0.1800 Roll 389,025.00 70,024.50
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Kayu Meranti Balok 0.1500 m3 6,077,970.00 911,695.50
Multipleks 9 Mm 3.5000 Lembar 156,960.00 549,360.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 20.0000 Batang 21,510.00 430,200.00
Jumlah Bahan 8,746,411.50
Total ( Tenaga + Bahan) 9,787,041.50
Overhead 0.0000 0.00
H.S.P 9,787,041.50
1 m3 Membuat Balok Beton Bertulang (200 Kg m3
Besi+Bekisting)
Tenaga
Mandor 0.3180 O.H 110,000.00 34,980.00
Kepala Tukang 0.3330 O.H 100,000.00 33,300.00
Tukang Besi 1.4000 O.H 90,000.00 126,000.00
Tukang Kayu 1.6500 O.H 90,000.00 148,500.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 6.3500 O.H 85,000.00 539,750.00
Jumlah Tenaga 907,280.00
Bahan
Kayu Bekisting Meranti 0.3200 m3 5,230,755.00 1,673,841.60
Paku Biasa 2" - 5" 3.2000 Kg 18,900.00 60,480.00
Minyak Bekisting 1.6000 liter 13,770.00 22,032.00
Besi Beton Polos 210.0000 Kg 11,745.00 2,466,450.00
Kawat Beton 0.1200 Roll 389,025.00 46,683.00
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Kayu Meranti Balok 0.1400 m3 6,077,970.00 850,915.80
Multipleks 9 Mm 2.8000 Lembar 156,960.00 439,488.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 16.0000 Batang 21,510.00 344,160.00
Jumlah Bahan 6,794,064.90
Total ( Tenaga + Bahan) 7,701,344.90
Overhead 0.0000 0.00
H.S.P 7,701,344.90

1 m3 Membuat Plat Beton Bertulang (150 Kg m3


Besi+Bekisting)
Tenaga
Mandor 0.2650 O.H 110,000.00 29,150.00
Kepala Tukang 0.2650 O.H 100,000.00 26,500.00
Tukang Besi 1.0500 O.H 90,000.00 94,500.00
Tukang Kayu 1.3000 O.H 90,000.00 117,000.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 5.3000 O.H 85,000.00 450,500.00
Jumlah Tenaga 742,400.00
Bahan
Kayu Bekisting Meranti 0.3200 m3 5,230,755.00 1,673,841.60
Paku Biasa 2" - 5" 3.2000 Kg 18,900.00 60,480.00
Minyak Bekisting 1.6000 liter 13,770.00 22,032.00
Besi Beton Polos 157.5000 Kg 11,745.00 1,849,837.50
Kawat Beton 0.0900 Roll 389,025.00 35,012.25
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Kayu Meranti Balok 0.1200 m3 6,077,970.00 729,356.40
Multipleks 9 Mm 2.8000 Lembar 156,960.00 439,488.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 32.0000 Batang 21,510.00 688,320.00
Jumlah Bahan 6,388,382.25
Total ( Tenaga + Bahan) 7,130,782.25
Overhead 0.0000 0.00
H.S.P 7,130,782.25

1 m3 Membuat Dinding Beton Bertulang (150 Kg


Besi+Bekisting) m3

Tenaga
Mandor 0.2650 O.H 110,000.00 29,150.00
Kepala Tukang 0.2620 O.H 100,000.00 26,200.00
Tukang Besi 1.0500 O.H 90,000.00 94,500.00
Tukang Kayu 1.3000 O.H 90,000.00 117,000.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 5.3000 O.H 85,000.00 450,500.00
Jumlah Tenaga 742,100.00
Bahan
Kayu Bekisting Meranti 0.2400 m3 5,230,755.00 1,255,381.20
Paku Biasa 2" - 5" 3.2000 Kg 18,900.00 60,480.00
Minyak Bekisting 1.6000 liter 13,770.00 22,032.00
Besi Beton Polos 157.5000 Kg 11,745.00 1,849,837.50
Kawat Beton 0.0900 Roll 389,025.00 35,012.25
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Kayu Meranti Balok 0.1600 m3 6,077,970.00 972,475.20
Multipleks 9 Mm 2.8000 Lembar 156,960.00 439,488.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 24.0000 Batang 21,510.00 516,240.00
Jumlah Bahan 6,040,960.65
Total ( Tenaga + Bahan) 6,783,060.65
Overhead 0.0000 0.00
H.S.P 6,783,060.65

1 m3 Membuat Dinding Beton Bertulang (200 Kg


m3
Besi+Bekisting)
Tenaga
Mandor 0.2830 O.H 110,000.00 31,130.00
Kepala Tukang 0.3230 O.H 100,000.00 32,300.00
Tukang Besi 1.4000 O.H 90,000.00 126,000.00
Tukang Kayu 1.5600 O.H 90,000.00 140,400.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 5.6500 O.H 85,000.00 480,250.00
Jumlah Tenaga 834,830.00
Bahan
Kayu Bekisting Meranti 0.2500 m3 5,230,755.00 1,307,688.75
Paku Biasa 2" - 5" 3.0000 Kg 18,900.00 56,700.00
Minyak Bekisting 1.2000 liter 13,770.00 16,524.00
Besi Beton Polos 210.0000 Kg 11,745.00 2,466,450.00
Kawat Beton 0.1200 Roll 389,025.00 46,683.00
Semen Portland 8.4000 Zak 69,750.00 585,900.00
Pasir Beton 0.5400 m3 231,885.00 125,217.90
Kerikil 0.8100 m3 220,860.00 178,896.60
Kayu Meranti Balok 0.1050 m3 6,077,970.00 638,186.85
Multipleks 9 Mm 2.5000 Lembar 156,960.00 392,400.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 14.0000 Batang 21,510.00 301,140.00
Jumlah Bahan 6,115,787.10
Total ( Tenaga + Bahan) 6,950,617.10
Overhead 0.0000 0.00
H.S.P 6,950,617.10

1 m' Membuat Kolom Praktis Beton Bertulang


(11 X 11) Cm m'

Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0060 O.H 100,000.00 600.00
Tukang Besi 0.0200 O.H 90,000.00 1,800.00
Tukang Kayu 0.0200 O.H 90,000.00 1,800.00
Tukang Batu 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 11,430.00
Bahan
Kayu Bekisting Meranti 0.0020 m3 5,230,755.00 10,461.51
Paku Biasa 2" - 5" 0.0100 Kg 18,900.00 189.00
Besi Beton Polos 3.0000 Kg 11,745.00 35,235.00
Kawat Beton 0.0180 Roll 389,025.00 7,002.45
Semen Portland 0.1000 Zak 69,750.00 6,975.00
Pasir Beton 0.0060 m3 231,885.00 1,391.31
Kerikil 0.0090 m3 220,860.00 1,987.74
Jumlah Bahan 63,242.01
Total ( Tenaga + Bahan) 74,672.01
Overhead 0.0000 0.00
H.S.P 74,672.01

1 m' Membuat Ring Balok Beton Bertulang (10 X


m'
15) Cm
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.0330 O.H 90,000.00 2,970.00
Tukang Batu 0.0330 O.H 90,000.00 2,970.00
Tukang Besi 0.0330 O.H 90,000.00 2,970.00
Pekerja 0.2970 O.H 85,000.00 25,245.00
Jumlah Tenaga 36,805.00
Bahan
Kayu Bekisting Meranti 0.0030 m3 5,230,755.00 15,692.27
Paku Biasa 2" - 5" 0.0200 Kg 18,900.00 378.00
Besi Beton Polos 3.6000 Kg 11,745.00 42,282.00
Kawat Beton 0.0020 Roll 389,025.00 778.05
Semen Portland 0.1375 Zak 69,750.00 9,590.63
Pasir Beton 0.0090 m3 231,885.00 2,086.97
Kerikil 0.0150 m3 220,860.00 3,312.90
Jumlah Bahan 74,120.81
Total ( Tenaga + Bahan) 110,925.81
Overhead 0.0000 0.00
H.S.P 110,925.81

H PEKERJAAN BEKISTING
1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi m2
Tenaga
Mandor 0.0260 O.H 110,000.00 2,860.00
Kepala Tukang 0.0260 O.H 100,000.00 2,600.00
Tukang Kayu 0.2600 O.H 90,000.00 23,400.00
Pekerja 0.5200 O.H 85,000.00 44,200.00
Jumlah Tenaga 73,060.00
Bahan
Kayu Bekisting Meranti 0.0400 m3 5,230,755.00 209,230.20
Paku Biasa 2" - 5" 0.3000 Kg 18,900.00 5,670.00
Minyak Bekisting 0.1000 liter 13,770.00 1,377.00
Jumlah Bahan 216,277.20
Total ( Tenaga + Bahan) 289,337.20
Overhead 0.0000 0.00
H.S.P 289,337.20

1 m2 Pekerjaan Pasang Bekisting Untuk Sloof m2


Tenaga
Mandor 0.0260 O.H 110,000.00 2,860.00
Kepala Tukang 0.0260 O.H 100,000.00 2,600.00
Tukang Kayu 0.2600 O.H 90,000.00 23,400.00
Pekerja 0.5200 O.H 85,000.00 44,200.00
Jumlah Tenaga 73,060.00
Bahan
Kayu Bekisting Meranti 0.0450 m3 5,230,755.00 235,383.98
Paku Biasa 2" - 5" 0.3000 Kg 18,900.00 5,670.00
Minyak Bekisting 0.1000 liter 13,770.00 1,377.00
Jumlah Bahan 242,430.98
Total ( Tenaga + Bahan) 315,490.98
Overhead 0.0000 0.00
H.S.P 315,490.98

1 m2 Pekerjaan Pasang Bekisting Untuk Kolom m2


Tenaga
Mandor 0.0330 O.H 110,000.00 3,630.00
Kepala Tukang 0.0330 O.H 100,000.00 3,300.00
Tukang Kayu 0.3300 O.H 90,000.00 29,700.00
Pekerja 0.6600 O.H 85,000.00 56,100.00
Jumlah Tenaga 92,730.00
Bahan
Kayu Bekisting Meranti 0.0400 m3 5,230,755.00 209,230.20
Paku Biasa 2" - 5" 0.4000 Kg 18,900.00 7,560.00
Minyak Bekisting 0.2000 liter 13,770.00 2,754.00
Kayu Meranti Balok 0.0150 m3 6,077,970.00 91,169.55
Multipleks 9 Mm 0.3500 Lembar 156,960.00 54,936.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 2.0000 Batang 21,510.00 43,020.00
Jumlah Bahan 408,669.75
Total ( Tenaga + Bahan) 501,399.75
Overhead 0.0000 0.00
H.S.P 501,399.75

1 m2 Pekerjaan Pasang Bekisting Untuk Balok m2


Tenaga
Mandor 0.0330 O.H 110,000.00 3,630.00
Kepala Tukang 0.0330 O.H 100,000.00 3,300.00
Tukang Kayu 0.3300 O.H 90,000.00 29,700.00
Pekerja 0.6600 O.H 85,000.00 56,100.00
Jumlah Tenaga 92,730.00
Bahan
Kayu Bekisting Meranti 0.0400 m3 5,230,755.00 209,230.20
Paku Biasa 2" - 5" 0.4000 Kg 18,900.00 7,560.00
Minyak Bekisting 0.2000 liter 13,770.00 2,754.00
Balok Kayu Meranti 0.0180 m3 6,077,970.00 109,403.46
Multipleks 9 Mm 0.3500 Lembar 156,960.00 54,936.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 2.0000 Batang 21,510.00 43,020.00
Jumlah Bahan 426,903.66
Total ( Tenaga + Bahan) 519,633.66
Overhead 0.0000 0.00
H.S.P 519,633.66

1 m2 Pekerjaan Pasang Bekisting Untuk Lantai m2


Tenaga
Mandor 0.0330 O.H 110,000.00 3,630.00
Kepala Tukang 0.0330 O.H 100,000.00 3,300.00
Tukang Kayu 0.3300 O.H 90,000.00 29,700.00
Pekerja 0.6600 O.H 85,000.00 56,100.00
Jumlah Tenaga 92,730.00
Bahan
Kayu Bekisting Meranti 0.0400 m3 5,230,755.00 209,230.20
Paku Biasa 2" - 5" 0.4000 Kg 18,900.00 7,560.00
Minyak Bekisting 0.2000 liter 13,770.00 2,754.00
Balok Kayu Meranti 0.0150 m3 6,077,970.00 91,169.55
Multipleks 9 Mm 0.3500 Lembar 156,960.00 54,936.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 6.0000 Batang 21,510.00 129,060.00
Jumlah Bahan 494,709.75
Total ( Tenaga + Bahan) 587,439.75
Overhead 0.0000 0.00
H.S.P 587,439.75

1 m2 Pekerjaan Pasang Bekisting Untuk Dinding m2


Tenaga
Mandor 0.0330 O.H 110,000.00 3,630.00
Kepala Tukang 0.0330 O.H 100,000.00 3,300.00
Tukang Kayu 0.3300 O.H 90,000.00 29,700.00
Pekerja 0.6600 O.H 85,000.00 56,100.00
Jumlah Tenaga 92,730.00
Bahan
Kayu Bekisting Meranti 0.0300 m3 5,230,755.00 156,922.65
Paku Biasa 2" - 5" 0.4000 Kg 18,900.00 7,560.00
Minyak Bekisting 0.2000 liter 13,770.00 2,754.00
Balok Kayu Meranti 0.0200 m3 6,077,970.00 121,559.40
Multipleks 9 Mm 0.3500 Lembar 156,960.00 54,936.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 3.0000 Batang 21,510.00 64,530.00
Jumlah Bahan 408,262.05
Total ( Tenaga + Bahan) 500,992.05
Overhead 0.0000 0.00
H.S.P 500,992.05

1 m2 Pekerjaan Pasang Bekisting Untuk Tangga m2


Tenaga
Mandor 0.0330 O.H 110,000.00 3,630.00
Kepala Tukang 0.0330 O.H 100,000.00 3,300.00
Tukang Kayu 0.3300 O.H 90,000.00 29,700.00
Pekerja 0.6600 O.H 85,000.00 56,100.00
Jumlah Tenaga 92,730.00
Bahan
Kayu Bekisting Meranti 0.0300 m3 5,230,755.00 156,922.65
Paku Biasa 2" - 5" 0.4000 Kg 18,900.00 7,560.00
Minyak Bekisting 0.1500 liter 13,770.00 2,065.50
Balok Kayu Meranti 0.0150 m3 6,077,970.00 91,169.55
Multipleks 9 Mm 0.3500 Lembar 156,960.00 54,936.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 2.0000 Batang 21,510.00 43,020.00
Jumlah Bahan 355,673.70
Total ( Tenaga + Bahan) 448,403.70
Overhead 0.0000 0.00
H.S.P 448,403.70

1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi m2


(2 Kali Pakai)
Tenaga
Mandor 0.0130 O.H 110,000.00 1,430.00
Kepala Tukang 0.0130 O.H 100,000.00 1,300.00
Tukang Kayu 0.1300 O.H 90,000.00 11,700.00
Pekerja 0.2600 O.H 85,000.00 22,100.00
Jumlah Tenaga 36,530.00
Bahan
Kayu Bekisting Meranti 0.0200 m3 5,230,755.00 104,615.10
Paku Biasa 2" - 5" 0.1500 Kg 18,900.00 2,835.00
Minyak Bekisting 0.0500 liter 13,770.00 688.50
Jumlah Bahan 108,138.60
Total ( Tenaga + Bahan) 144,668.60
Overhead 0.0000 0.00
H.S.P 144,668.60

1 m2 Pekerjaan Pasang Bekisting Untuk Sloof (2


m2
Kali Pakai)
Tenaga
Mandor 0.0130 O.H 110,000.00 1,430.00
Kepala Tukang 0.0130 O.H 100,000.00 1,300.00
Tukang Kayu 0.1300 O.H 90,000.00 11,700.00
Pekerja 0.2600 O.H 85,000.00 22,100.00
Jumlah Tenaga 36,530.00
Bahan
Kayu Bekisting Meranti 0.0225 m3 5,230,755.00 117,691.99
Paku Biasa 2" - 5" 0.1500 Kg 18,900.00 2,835.00
Minyak Bekisting 0.0500 liter 13,770.00 688.50
Jumlah Bahan 121,215.49
Total ( Tenaga + Bahan) 157,745.49
Overhead 0.0000 0.00
H.S.P 157,745.49

1 m2 Pekerjaan Pasang Bekisting Untuk Kolom (2 m2


Kali Pakai)
Tenaga
Mandor 0.0165 O.H 110,000.00 1,815.00
Kepala Tukang 0.0165 O.H 100,000.00 1,650.00
Tukang Kayu 0.1650 O.H 90,000.00 14,850.00
Pekerja 0.3300 O.H 85,000.00 28,050.00
Jumlah Tenaga 46,365.00
Bahan
Kayu Bekisting Meranti 0.0200 m3 5,230,755.00 104,615.10
Paku Biasa 2" - 5" 0.2000 Kg 18,900.00 3,780.00
Minyak Bekisting 0.1000 liter 13,770.00 1,377.00
Kayu Meranti Balok 0.0075 m3 6,077,970.00 45,584.78
Multipleks 9 Mm 0.1750 Lembar 156,960.00 27,468.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1.0000 Batang 21,510.00 21,510.00
Jumlah Bahan 204,334.88
Total ( Tenaga + Bahan) 250,699.88
Overhead 0.0000 0.00
H.S.P 250,699.88

1 m2 Pekerjaan Pasang Bekisting Untuk Balok (2


Kali Pakai) m2

Tenaga
Mandor 0.0165 O.H 110,000.00 1,815.00
Kepala Tukang 0.0165 O.H 100,000.00 1,650.00
Tukang Kayu 0.1650 O.H 90,000.00 14,850.00
Pekerja 0.3300 O.H 85,000.00 28,050.00
Jumlah Tenaga 46,365.00
Bahan
Kayu Bekisting Meranti 0.0200 m3 5,230,755.00 104,615.10
Paku Biasa 2" - 5" 0.2000 Kg 18,900.00 3,780.00
Minyak Bekisting 0.1000 liter 13,770.00 1,377.00
Balok Kayu Meranti 0.0090 m3 6,077,970.00 54,701.73
Multipleks 9 Mm 0.1750 Lembar 156,960.00 27,468.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1.0000 Batang 21,510.00 21,510.00
Jumlah Bahan 213,451.83
Total ( Tenaga + Bahan) 259,816.83
Overhead 0.0000 0.00
H.S.P 259,816.83

1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (2


Kali Pakai) m2

Tenaga
Mandor 0.0165 O.H 110,000.00 1,815.00
Kepala Tukang 0.0165 O.H 100,000.00 1,650.00
Tukang Kayu 0.1650 O.H 90,000.00 14,850.00
Pekerja 0.3300 O.H 85,000.00 28,050.00
Jumlah Tenaga 46,365.00
Bahan
Kayu Bekisting Meranti 0.0200 m3 5,230,755.00 104,615.10
Paku Biasa 2" - 5" 0.2000 Kg 18,900.00 3,780.00
Minyak Bekisting 0.1000 liter 13,770.00 1,377.00
Balok Kayu Meranti 0.0075 m3 6,077,970.00 45,584.78
Multipleks 9 Mm 0.1750 Lembar 156,960.00 27,468.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 3.0000 Batang 21,510.00 64,530.00
Jumlah Bahan 247,354.88
Total ( Tenaga + Bahan) 293,719.88
Overhead 0.0000 0.00
H.S.P 293,719.88

1 m2 Pekerjaan Pasang Bekisting Untuk Dinding m2


(2 Kali Pakai)
Tenaga
Mandor 0.0165 O.H 110,000.00 1,815.00
Kepala Tukang 0.0165 O.H 100,000.00 1,650.00
Tukang Kayu 0.1650 O.H 90,000.00 14,850.00
Pekerja 0.3300 O.H 85,000.00 28,050.00
Jumlah Tenaga 46,365.00
Bahan
Kayu Bekisting Meranti 0.0150 m3 5,230,755.00 78,461.33
Paku Biasa 2" - 5" 0.2000 Kg 18,900.00 3,780.00
Minyak Bekisting 0.1000 liter 13,770.00 1,377.00
Balok Kayu Meranti 0.0100 m3 6,077,970.00 60,779.70
Multipleks 9 Mm 0.1750 Lembar 156,960.00 27,468.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1.5000 Batang 21,510.00 32,265.00
Jumlah Bahan 204,131.03
Total ( Tenaga + Bahan) 250,496.03
Overhead 0.0000 0.00
H.S.P 250,496.03

1 m2 Pekerjaan Pasang Bekisting Untuk Tangga


(2 Kali Pakai) m2

Tenaga
Mandor 0.0165 O.H 110,000.00 1,815.00
Kepala Tukang 0.0165 O.H 100,000.00 1,650.00
Tukang Kayu 0.1650 O.H 90,000.00 14,850.00
Pekerja 0.3300 O.H 85,000.00 28,050.00
Jumlah Tenaga 46,365.00
Bahan
Kayu Bekisting Meranti 0.0150 m3 5,230,755.00 78,461.33
Paku Biasa 2" - 5" 0.2000 Kg 18,900.00 3,780.00
Minyak Bekisting 0.0750 liter 13,770.00 1,032.75
Balok Kayu Meranti 0.0075 m3 6,077,970.00 45,584.78
Multipleks 9 Mm 0.1750 Lembar 156,960.00 27,468.00
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1.0000 Batang 21,510.00 21,510.00
Jumlah Bahan 177,836.85
Total ( Tenaga + Bahan) 224,201.85
Overhead 0.0000 0.00
H.S.P 224,201.85

1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi m2


(3 Kali Pakai)
Tenaga
Mandor 0.0087 O.H 110,000.00 957.00
Kepala Tukang 0.0087 O.H 100,000.00 870.00
Tukang Kayu 0.0867 O.H 90,000.00 7,803.00
Pekerja 0.1734 O.H 85,000.00 14,739.00
Jumlah Tenaga 24,369.00
Bahan
Kayu Bekisting Meranti 0.0134 m3 5,230,755.00 70,092.12
Paku Biasa 2" - 5" 0.1000 Kg 18,900.00 1,890.00
Minyak Bekisting 0.0334 liter 13,770.00 459.92
Jumlah Bahan 72,442.04
Total ( Tenaga + Bahan) 96,811.04
Overhead 0.0000 0.00
H.S.P 96,811.04

1 m2 Pekerjaan Pasang Bekisting Untuk Sloof (3 m2


Kali Pakai)
Tenaga
Mandor 0.0087 O.H 110,000.00 957.00
Kepala Tukang 0.0087 O.H 100,000.00 870.00
Tukang Kayu 0.0867 O.H 90,000.00 7,803.00
Pekerja 0.1734 O.H 85,000.00 14,739.00
Jumlah Tenaga 24,369.00
Bahan
Kayu Bekisting Meranti 0.0150 m3 5,230,755.00 78,461.33
Paku Biasa 2" - 5" 0.1000 Kg 18,900.00 1,890.00
Minyak Bekisting 0.0334 liter 13,770.00 459.92
Jumlah Bahan 80,811.24
Total ( Tenaga + Bahan) 105,180.24
Overhead 0.0000 0.00
H.S.P 105,180.24

1 m2 Pekerjaan Pasang Bekisting Untuk Kolom (3 m2


Kali Pakai)
Tenaga
Mandor 0.0110 O.H 110,000.00 1,210.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Kayu 0.1100 O.H 90,000.00 9,900.00
Pekerja 0.2200 O.H 85,000.00 18,700.00
Jumlah Tenaga 30,910.00
Bahan
Kayu Bekisting Meranti 0.0134 m3 5,230,755.00 70,092.12
Paku Biasa 2" - 5" 0.1334 Kg 18,900.00 2,521.26
Minyak Bekisting 0.0667 liter 13,770.00 918.46
Kayu Meranti Balok 0.0050 m3 6,077,970.00 30,389.85
Multipleks 9 Mm 0.1167 Lembar 156,960.00 18,317.23
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 0.6667 Batang 21,510.00 14,340.72
Jumlah Bahan 136,579.64
Total ( Tenaga + Bahan) 167,489.64
Overhead 0.0000 0.00
H.S.P 167,489.64

1 m2 Pekerjaan Pasang Bekisting Untuk Balok (3


Kali Pakai) m2

Tenaga
Mandor 0.0110 O.H 110,000.00 1,210.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Kayu 0.1100 O.H 90,000.00 9,900.00
Pekerja 0.2200 O.H 85,000.00 18,700.00
Jumlah Tenaga 30,910.00
Bahan
Kayu Bekisting Meranti 0.0134 m3 5,230,755.00 70,092.12
Paku Biasa 2" - 5" 0.1334 Kg 18,900.00 2,521.26
Minyak Bekisting 0.0667 liter 13,770.00 918.46
Balok Kayu Meranti 0.0060 m3 6,077,970.00 36,467.82
Multipleks 9 Mm 0.1167 Lembar 156,960.00 18,317.23
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 0.6667 Batang 21,510.00 14,340.72
Jumlah Bahan 142,657.61
Total ( Tenaga + Bahan) 173,567.61
Overhead 0.0000 0.00
H.S.P 173,567.61

1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (3 m2


Kali Pakai)
Tenaga
Mandor 0.0110 O.H 110,000.00 1,210.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Kayu 0.1100 O.H 90,000.00 9,900.00
Pekerja 0.2200 O.H 85,000.00 18,700.00
Jumlah Tenaga 30,910.00
Bahan
Kayu Bekisting Meranti 0.0134 m3 5,230,755.00 70,092.12
Paku Biasa 2" - 5" 0.1334 Kg 18,900.00 2,521.26
Minyak Bekisting 0.0667 liter 13,770.00 918.46
Balok Kayu Meranti 0.0050 m3 6,077,970.00 30,389.85
Multipleks 9 Mm 0.1167 Lembar 156,960.00 18,317.23
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 2.0000 Batang 21,510.00 43,020.00
Jumlah Bahan 165,258.92
Total ( Tenaga + Bahan) 196,168.92
Overhead 0.0000 0.00
H.S.P 196,168.92

1 m2 Pekerjaan Pasang Bekisting Untuk Dinding


(3 Kali Pakai) m2

Tenaga
Mandor 0.0110 O.H 110,000.00 1,210.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Kayu 0.1100 O.H 90,000.00 9,900.00
Pekerja 0.2200 O.H 85,000.00 18,700.00
Jumlah Tenaga 30,910.00
Bahan
Kayu Bekisting Meranti 0.0100 m3 5,230,755.00 52,307.55
Paku Biasa 2" - 5" 0.1334 Kg 18,900.00 2,521.26
Minyak Bekisting 0.0667 liter 13,770.00 918.46
Balok Kayu Meranti 0.0067 m3 6,077,970.00 40,722.40
Multipleks 9 Mm 0.1167 Lembar 156,960.00 18,317.23
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1.0000 Batang 21,510.00 21,510.00
Jumlah Bahan 136,296.90
Total ( Tenaga + Bahan) 167,206.90
Overhead 0.0000 0.00
H.S.P 167,206.90

1 m2 Pekerjaan Pasang Bekisting Untuk Tangga


m2
(3 Kali Pakai)
Tenaga
Mandor 0.0110 O.H 110,000.00 1,210.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Kayu 0.1100 O.H 90,000.00 9,900.00
Pekerja 0.2200 O.H 85,000.00 18,700.00
Jumlah Tenaga 30,910.00
Bahan
Kayu Bekisting Meranti 0.0100 m3 5,230,755.00 52,307.55
Paku Biasa 2" - 5" 0.1334 Kg 18,900.00 2,521.26
Minyak Bekisting 0.0500 liter 13,770.00 688.50
Balok Kayu Meranti 0.0050 m3 6,077,970.00 30,389.85
Multipleks 9 Mm 0.1167 Lembar 156,960.00 18,317.23
Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 0.6667 Batang 21,510.00 14,340.72
Jumlah Bahan 118,565.11
Total ( Tenaga + Bahan) 149,475.11
Overhead 0.0000 0.00
H.S.P 149,475.11

I PEKERJAAN DINDING
1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1 m2
Bata (1 Pc : 2 Ps)
Tenaga
Mandor 0.0300 O.H 110,000.00 3,300.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.6000 O.H 85,000.00 51,000.00
Jumlah Tenaga 74,300.00
Bahan
Semen Portland 1.0875 Zak 69,750.00 75,853.13
Pasir Pasang 0.0800 m3 220,275.00 17,622.00
Bata Merah Uk.5 X 11 X 22 140.0000 buah 855.00 119,700.00
Jumlah Bahan 213,175.13
Total ( Tenaga + Bahan) 287,475.13
Overhead 0.0000 0.00
H.S.P 287,475.13

1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1/2


m2
Bata (1 Pc : 2 Ps)
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Semen Portland 0.4738 Zak 69,750.00 33,047.55
Pasir Pasang 0.0380 m3 220,275.00 8,370.45
Bata Merah Uk.5 X 11 X 22 70.0000 buah 855.00 59,850.00
Jumlah Bahan 101,268.00
Total ( Tenaga + Bahan) 138,418.00
Overhead 0.0000 0.00
H.S.P 138,418.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1


Bata (1 Pc : 3 Ps) m2

Tenaga
Mandor 0.0300 O.H 110,000.00 3,300.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.6000 O.H 85,000.00 51,000.00
Jumlah Tenaga 74,300.00
Bahan
Semen Portland 0.8238 Zak 69,750.00 57,460.05
Pasir Pasang 0.0910 m3 220,275.00 20,045.03
Bata Merah Uk.5 X 11 X 22 140.0000 buah 855.00 119,700.00
Jumlah Bahan 197,205.08
Total ( Tenaga + Bahan) 271,505.08
Overhead 0.0000 0.00
H.S.P 271,505.08

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 3 Ps) m2

Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Semen Portland 0.3593 Zak 69,750.00 25,061.18
Pasir Pasang 0.0400 m3 220,275.00 8,811.00
Bata Merah Uk.5 X 11 X 22 70.0000 buah 855.00 59,850.00
Jumlah Bahan 93,722.18
Total ( Tenaga + Bahan) 130,872.18
Overhead 0.0000 0.00
H.S.P 130,872.18

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 4 Ps) m2

Tenaga
Mandor 0.0300 O.H 110,000.00 3,300.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.6000 O.H 85,000.00 51,000.00
Jumlah Tenaga 74,300.00
Bahan
Semen Portland 0.6638 Zak 69,750.00 46,300.05
Pasir Pasang 0.0930 m3 220,275.00 20,485.58
Bata Merah Uk.5 X 11 X 22 140.0000 buah 855.00 119,700.00
Jumlah Bahan 186,485.63
Total ( Tenaga + Bahan) 260,785.63
Overhead 0.0000 0.00
H.S.P 260,785.63

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 4 Ps) m2

Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Semen Portland 0.2875 Zak 69,750.00 20,053.13
Pasir Pasang 0.0430 m3 220,275.00 9,471.83
Bata Merah Uk.5 X 11 X 22 70.0000 buah 855.00 59,850.00
Jumlah Bahan 89,374.95
Total ( Tenaga + Bahan) 126,524.95
Overhead 0.0000 0.00
H.S.P 126,524.95

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 5 Ps) m2

Tenaga
Mandor 0.0300 O.H 110,000.00 3,300.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.6000 O.H 85,000.00 51,000.00
Jumlah Tenaga 74,300.00
Bahan
Semen Portland 0.5550 Zak 69,750.00 38,711.25
Pasir Pasang 0.1020 m3 220,275.00 22,468.05
Bata Merah Uk.5 X 11 X 22 140.0000 buah 855.00 119,700.00
Jumlah Bahan 180,879.30
Total ( Tenaga + Bahan) 255,179.30
Overhead 0.0000 0.00
H.S.P 255,179.30

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 5 Ps) m2

Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Semen Portland 0.2420 Zak 69,750.00 16,879.50
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Bata Merah Uk.5 X 11 X 22 70.0000 buah 855.00 59,850.00
Jumlah Bahan 86,641.88
Total ( Tenaga + Bahan) 123,791.88
Overhead 0.0000 0.00
H.S.P 123,791.88

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 6 Ps) m2

Tenaga
Mandor 0.0300 O.H 110,000.00 3,300.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.6000 O.H 85,000.00 51,000.00
Jumlah Tenaga 74,300.00
Bahan
Semen Portland 0.4625 Zak 69,750.00 32,259.38
Pasir Pasang 0.1220 m3 220,275.00 26,873.55
Bata Merah Uk.5 X 11 X 22 140.0000 buah 855.00 119,700.00
Jumlah Bahan 178,832.93
Total ( Tenaga + Bahan) 253,132.93
Overhead 0.0000 0.00
H.S.P 253,132.93

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 6 Ps) m2

Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Semen Portland 0.2080 Zak 69,750.00 14,508.00
Pasir Pasang 0.0490 m3 220,275.00 10,793.48
Bata Merah Uk.5 X 11 X 22 70.0000 buah 855.00 59,850.00
Jumlah Bahan 85,151.48
Total ( Tenaga + Bahan) 122,301.48
Overhead 0.0000 0.00
H.S.P 122,301.48

1 m2 Pekerjaan Pemasangan Dinding Terawang (Roster) Ukuran (12


m2
X 11 X 24) Cm, Campuran Spesi 1 Pc : 3 Pp
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Terawang (Roster) 30.0000 buah 7,560.00 226,800.00
Semen Portland 0.3500 Zak 69,750.00 24,412.50
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Jumlah Bahan 258,261.30
Total ( Tenaga + Bahan) 295,411.30
Overhead 0.0000 0.00
H.S.P 295,411.30
1 m2 Pekerjaan Pemasangan Dinding Terawang (Roster) Ukuran (12 m2
X 11 X 24) Cm, Campuran Spesi 1 Pc : 4 Pp
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Terawang (Roster) 30.0000 buah 7,560.00 226,800.00
Semen Portland 0.2750 Zak 69,750.00 19,181.25
Pasir Pasang 0.0350 m3 220,275.00 7,709.63
Jumlah Bahan 253,690.88
Total ( Tenaga + Bahan) 290,840.88
Overhead 0.0000 0.00
H.S.P 290,840.88

Pemasangan dinding bata ringan T = 10 cm m2


Tenaga
Mandor 0.0000 O.H 110,000.00 0.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 35,500.00
Bahan
Bata Ringan Tebal 10 cm 8.4000 Bh 10,800.00 90,720.00
Mortar Utama 380 ( 40 kg ) 0.0630 Zak 25,200.00 1,587.60
Jumlah Bahan 92,307.60
Total ( Tenaga + Bahan) 127,807.60
Overhead 0.0000 0.00
H.S.P 127,807.60

J PEKERJAAN PLESTERAN
1 m2 Pekerjaan Plesteran 1 Pc : 1 Ps Tebal 15 Mm m2
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.3876 Zak 69,750.00 27,035.10
Pasir Pasang 0.0160 m3 220,275.00 3,524.40
Jumlah Bahan 30,559.50
Total ( Tenaga + Bahan) 72,709.50
Overhead 0.0000 0.00
H.S.P 72,709.50

1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 15 Mm m2


Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.2556 Zak 69,750.00 17,828.10
Pasir Pasang 0.0200 m3 220,275.00 4,405.50
Jumlah Bahan 22,233.60
Total ( Tenaga + Bahan) 64,383.60
Overhead 0.0000 0.00
H.S.P 64,383.60

1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 15 Mm m2


Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.1944 Zak 69,750.00 13,559.40
Pasir Pasang 0.0230 m3 220,275.00 5,066.33
Jumlah Bahan 18,625.73
Total ( Tenaga + Bahan) 60,775.73
Overhead 0.0000 0.00
H.S.P 60,775.73

1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 15 Mm m2


Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.1560 Zak 69,750.00 10,881.00
Pasir Pasang 0.0240 m3 220,275.00 5,286.60
Jumlah Bahan 16,167.60
Total ( Tenaga + Bahan) 58,317.60
Overhead 0.0000 0.00
H.S.P 58,317.60

1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 15 Mm m2


Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.1296 Zak 69,750.00 9,039.60
Pasir Pasang 0.0260 m3 220,275.00 5,727.15
Jumlah Bahan 14,766.75
Total ( Tenaga + Bahan) 56,916.75
Overhead 0.0000 0.00
H.S.P 56,916.75

1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 15 Mm m2


Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.1104 Zak 69,750.00 7,700.40
Pasir Pasang 0.0270 m3 220,275.00 5,947.43
Jumlah Bahan 13,647.83
Total ( Tenaga + Bahan) 55,797.83
Overhead 0.0000 0.00
H.S.P 55,797.83

1 m2 Pekerjaan Plesteran 1Pc : ½Kp : 3Pp Tebal m2


15 Mm
Tenaga
Mandor 0.0180 O.H 110,000.00 1,980.00
Kepala Tukang 0.0120 O.H 100,000.00 1,200.00
Tukang Batu 0.1200 O.H 90,000.00 10,800.00
Pekerja 0.3600 O.H 85,000.00 30,600.00
Jumlah Tenaga 44,580.00
Bahan
Semen Portland 0.1440 Zak 69,750.00 10,044.00
Kapur Pasang 0.0030 m3 108,135.00 324.41
Pasir Pasang 0.0130 m3 220,275.00 2,863.58
Jumlah Bahan 13,231.98
Total ( Tenaga + Bahan) 57,811.98
Overhead 0.0000 0.00
H.S.P 57,811.98

1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 20 Mm m2


Tenaga
Mandor 0.0220 O.H 110,000.00 2,420.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 56,420.00
Bahan
Semen Portland 0.3408 Zak 69,750.00 23,770.80
Pasir Pasang 0.0270 m3 220,275.00 5,947.43
Jumlah Bahan 29,718.23
Total ( Tenaga + Bahan) 86,138.23
Overhead 0.0000 0.00
H.S.P 86,138.23

1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 20 Mm m2


Tenaga
Mandor 0.0220 O.H 110,000.00 2,420.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 56,420.00
Bahan
Semen Portland 0.2592 Zak 69,750.00 18,079.20
Pasir Pasang 0.0310 m3 220,275.00 6,828.53
Jumlah Bahan 24,907.73
Total ( Tenaga + Bahan) 81,327.73
Overhead 0.0000 0.00
H.S.P 81,327.73

1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 20 Mm m2


Tenaga
Mandor 0.0220 O.H 110,000.00 2,420.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 56,420.00
Bahan
Semen Portland 0.2080 Zak 69,750.00 14,508.00
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Jumlah Bahan 21,556.80
Total ( Tenaga + Bahan) 77,976.80
Overhead 0.0000 0.00
H.S.P 77,976.80

1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 20 Mm m2


Tenaga
Mandor 0.0220 O.H 110,000.00 2,420.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 56,420.00
Bahan
Semen Portland 0.1728 Zak 69,750.00 12,052.80
Pasir Pasang 0.0350 m3 220,275.00 7,709.63
Jumlah Bahan 19,762.43
Total ( Tenaga + Bahan) 76,182.43
Overhead 0.0000 0.00
H.S.P 76,182.43

1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 20 Mm m2


Tenaga
Mandor 0.0220 O.H 110,000.00 2,420.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Batu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 56,420.00
Bahan
Semen Portland 0.1472 Zak 69,750.00 10,267.20
Pasir Pasang 0.0360 m3 220,275.00 7,929.90
Jumlah Bahan 18,197.10
Total ( Tenaga + Bahan) 74,617.10
Overhead 0.0000 0.00
H.S.P 74,617.10

1 m2 Pekerjaan berapen 1SP : 5PP tebal 15 mm m2


Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0080 O.H 100,000.00 800.00
Tukang Batu 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,180.00
Bahan
Semen Portland 0.1296 Zak 69,750.00 9,039.60
Pasir Pasang 0.0260 m3 220,275.00 5,727.15
Jumlah Bahan 14,766.75
Total ( Tenaga + Bahan) 35,946.75
Overhead 0.0000 0.00
H.S.P 35,946.75

1 m' Pekerjaan Plesteran Skoning 1Pc : 3Ps Lebar m'


10 Cm
Tenaga
Mandor 0.0040 O.H 110,000.00 440.00
Kepala Tukang 0.0400 O.H 100,000.00 4,000.00
Tukang Batu 0.4000 O.H 90,000.00 36,000.00
Pekerja 0.0800 O.H 85,000.00 6,800.00
Jumlah Tenaga 47,240.00
Bahan
Semen Portland 0.0125 Zak 69,750.00 871.88
Pasir Pasang 0.0130 m3 220,275.00 2,863.58
Jumlah Bahan 3,735.45
Total ( Tenaga + Bahan) 50,975.45
Overhead 0.0000 0.00
H.S.P 50,975.45

1 m' Pekerjaan Benangan m'


Tenaga
Mandor 0.0040 O.H 110,000.00 440.00
Kepala Tukang 0.0400 O.H 100,000.00 4,000.00
Tukang Batu 0.0400 O.H 90,000.00 3,600.00
Pekerja 0.0800 O.H 85,000.00 6,800.00
Jumlah Tenaga 14,840.00
Bahan
Semen Portland 0.0125 Zak 69,750.00 871.88
Pasir Pasang 0.0130 m3 220,275.00 2,863.58
Jumlah Bahan 3,735.45
Total ( Tenaga + Bahan) 18,575.45
Overhead 0.0000 0.00
H.S.P 18,575.45

1 m2 Pekerjaan Plesteran Ciprat 1Pc:2Ps m2


Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 37,150.00
Bahan
Semen Portland 0.1080 Zak 69,750.00 7,533.00
Pasir Pasang 0.0060 m3 220,275.00 1,321.65
Jumlah Bahan 8,854.65
Total ( Tenaga + Bahan) 46,004.65
Overhead 0.0000 0.00
H.S.P 46,004.65

1 m2 Pekerjaan Finishing Siar Pasangan Batu m2


Bata Merah
Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0080 O.H 100,000.00 800.00
Tukang Batu 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,180.00
Bahan
Semen Portland 0.0777 Zak 69,750.00 5,419.58
Jumlah Bahan 5,419.58
Total ( Tenaga + Bahan) 26,599.58
Overhead 0.0000 0.00
H.S.P 26,599.58

1 m2 Pekerjaan Finishing Siar Pasangan Dinding


Conblock Ekspose m2

Tenaga
Mandor 0.0040 O.H 110,000.00 440.00
Kepala Tukang 0.0040 O.H 100,000.00 400.00
Tukang Batu 0.0350 O.H 90,000.00 3,150.00
Pekerja 0.0700 O.H 85,000.00 5,950.00
Jumlah Tenaga 9,940.00
Bahan
Semen Portland 0.0400 Zak 69,750.00 2,790.00
Jumlah Bahan 2,790.00
Total ( Tenaga + Bahan) 12,730.00
Overhead 0.0000 0.00
H.S.P 12,730.00

1 m2 Pekerjaan Finishing Siar Pasangan Batu Kali


m2
Adukan 1 Pc : 2 Ps
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Batu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 42,150.00
Bahan
Semen Portland 0.1585 Zak 69,750.00 11,055.38
Pasir Pasang 0.0120 m3 220,275.00 2,643.30
Jumlah Bahan 13,698.68
Total ( Tenaga + Bahan) 55,848.68
Overhead 0.0000 0.00
H.S.P 55,848.68

1 m2 Pekerjaan Acian m2
Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 28,100.00
Bahan
Semen Portland 0.0813 Zak 69,750.00 5,670.68
Jumlah Bahan 5,670.68
Total ( Tenaga + Bahan) 33,770.68
Overhead 0.0000 0.00
H.S.P 33,770.68

K PENUTUP LANTAI
1 m2 Pekerjaan Pasang Lantai Granit Ukuran
60X60 Cm m2

Tenaga
Mandor 0.0120 O.H 110,000.00 1,320.00
Kepala Tukang 0.0120 O.H 100,000.00 1,200.00
Tukang Batu 0.1200 O.H 90,000.00 10,800.00
Pekerja 0.2400 O.H 85,000.00 20,400.00
Jumlah Tenaga 33,720.00
Bahan
Ubin Granit 60X60 1.0500 m2 377,775.00 396,663.75
Semen Portland 0.2400 Zak 69,750.00 16,740.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Semen Warna 1.5000 Kg 13,410.00 20,115.00
Jumlah Bahan 443,431.13
Total ( Tenaga + Bahan) 477,151.13
Overhead 0.0000 0.00
H.S.P 477,151.13

1 m2 Pekerjaan Pasang Lantai Granit Ukuran


m2
40X40 Cm
Tenaga
Mandor 0.0130 O.H 110,000.00 1,430.00
Kepala Tukang 0.0130 O.H 100,000.00 1,300.00
Tukang Batu 0.1250 O.H 90,000.00 11,250.00
Pekerja 0.2500 O.H 85,000.00 21,250.00
Jumlah Tenaga 35,230.00
Bahan
Ubin Granit 40X40 1.0608 m2 290,610.00 308,279.09
Semen Portland 0.2450 Zak 69,750.00 17,088.75
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Semen Warna 1.3000 Kg 13,410.00 17,433.00
Jumlah Bahan 352,713.21
Total ( Tenaga + Bahan) 387,943.21
Overhead 0.0000 0.00
H.S.P 387,943.21

1 m2 Pekerjaan Pasangan Lantai Keramik Polos m2


Uk.40X40 Cm
Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Semen Portland 0.2450 Zak 69,750.00 17,088.75
Semen Warna 1.3000 Kg 13,410.00 17,433.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Keramik Polos 40X40 Cm 1.0608 m2 49,815.00 52,843.75
Jumlah Bahan 97,277.88
Total ( Tenaga + Bahan) 195,627.88
Overhead 0.0000 0.00
H.S.P 195,627.88

1 m2 Pekerjaan Pasangan Lantai Keramik Polos


m2
Uk.30X30 Cm
Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Semen Portland 0.2500 Zak 69,750.00 17,437.50
Semen Warna 1.5000 Kg 13,410.00 20,115.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Keramik Polos 30X30 Cm 1.0683 m2 46,665.00 49,852.22
Jumlah Bahan 97,317.09
Total ( Tenaga + Bahan) 195,667.09
Overhead 0.0000 0.00
H.S.P 195,667.09

1 m2 Pekerjaan Pasangan Lantai Keramik Polos m2


Uk.20X20 Cm
Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Keramik Polos 20X20 Cm 1.0600 m2 52,335.00 55,475.10
Semen Portland 0.2600 Zak 69,750.00 18,135.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Semen Warna 1.6200 Kg 13,410.00 21,724.20
Jumlah Bahan 105,246.68
Total ( Tenaga + Bahan) 203,596.68
Overhead 0.0000 0.00
H.S.P 203,596.68

1 m2 Pekerjaan Pasangan Lantai Keramik Motif


Uk.40X40 Cm m2

Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Semen Portland 0.2450 Zak 69,750.00 17,088.75
Semen Warna 1.3000 Kg 13,410.00 17,433.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Keramik Motif 40X40 Cm 1.0608 m2 50,490.00 53,559.79
Jumlah Bahan 97,993.92
Total ( Tenaga + Bahan) 196,343.92
Overhead 0.0000 0.00
H.S.P 196,343.92

1 m2 Pekerjaan Pasangan Lantai Keramik Motif


m2
Uk. 30X30 Cm
Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Semen Portland 0.2500 Zak 69,750.00 17,437.50
Semen Warna 1.5000 Kg 13,410.00 20,115.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Keramik Motif 30X30 Cm 1.0683 m2 49,995.00 53,409.66
Jumlah Bahan 100,874.53
Total ( Tenaga + Bahan) 199,224.53
Overhead 0.0000 0.00
H.S.P 199,224.53

1 m2 Pekerjaan Pasangan Lantai Keramik Motif m2


Uk. 20X20 Cm
Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Keramik Motif 20X20 Cm 1.0600 m2 50,985.00 54,044.10
Semen Portland 0.2600 Zak 69,750.00 18,135.00
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Semen Warna 1.6200 Kg 13,410.00 21,724.20
Jumlah Bahan 103,815.68
Total ( Tenaga + Bahan) 202,165.68
Overhead 0.0000 0.00
H.S.P 202,165.68

1 m2 Pekerjaan Pasangan Lantai Marmer Ex.


Tulungagung m2

Tenaga
Mandor 0.0350 O.H 110,000.00 3,850.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Batu 0.3500 O.H 90,000.00 31,500.00
Pekerja 0.7000 O.H 85,000.00 59,500.00
Jumlah Tenaga 98,350.00
Bahan
Semen Portland 0.2048 Zak 69,750.00 14,284.80
Semen Warna 0.6500 Kg 13,410.00 8,716.50
Pasir Pasang 0.0450 m3 220,275.00 9,912.38
Marmer Tulungagung; 30 X 60 Cm 1.0600 m2 377,775.00 400,441.50
Jumlah Bahan 433,355.18
Total ( Tenaga + Bahan) 531,705.18
Overhead 0.0000 0.00
H.S.P 531,705.18

L PENUTUP DINDING
1 m2 Pekerjaan Pasangan Dinding Keramik Polos m2
Uk.20X25 Cm
Tenaga
Mandor 0.0450 O.H 110,000.00 4,950.00
Kepala Tukang 0.0450 O.H 100,000.00 4,500.00
Tukang Batu 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.9000 O.H 85,000.00 76,500.00
Jumlah Tenaga 126,450.00
Bahan
Semen Portland 0.2325 Zak 69,750.00 16,216.88
Semen Warna 1.9400 Kg 13,410.00 26,015.40
Pasir Pasang 0.0180 m3 220,275.00 3,964.95
Dinding Keramik 20X25 Cm (Polos) 1.0500 m2 107,730.00 113,116.50
Jumlah Bahan 159,313.73
Total ( Tenaga + Bahan) 285,763.73
Overhead 0.0000 0.00
H.S.P 285,763.73

1 m2 Pekerjaan Pasangan Dinding Keramik Polos m2


Uk.20X20 Cm
Tenaga
Mandor 0.0450 O.H 110,000.00 4,950.00
Kepala Tukang 0.0450 O.H 100,000.00 4,500.00
Tukang Batu 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.9000 O.H 85,000.00 76,500.00
Jumlah Tenaga 126,450.00
Bahan
Semen Portland 0.2325 Zak 69,750.00 16,216.88
Semen Warna 1.9400 Kg 13,410.00 26,015.40
Pasir Pasang 0.0180 m3 220,275.00 3,964.95
Dinding Keramik 20X20 Cm (Polos) 1.0500 m2 52,335.00 54,951.75
Jumlah Bahan 101,148.98
Total ( Tenaga + Bahan) 227,598.98
Overhead 0.0000 0.00
H.S.P 227,598.98

1 m2 Pekerjaan Pasangan Dinding Keramik Motif


Uk.20X25 Cm m2

Tenaga
Mandor 0.0450 O.H 110,000.00 4,950.00
Kepala Tukang 0.0450 O.H 100,000.00 4,500.00
Tukang Batu 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.9000 O.H 85,000.00 76,500.00
Jumlah Tenaga 126,450.00
Bahan
Semen Portland 0.2325 Zak 69,750.00 16,216.88
Semen Warna 1.9400 Kg 13,410.00 26,015.40
Pasir Pasang 0.0180 m3 220,275.00 3,964.95
Dinding Keramik 20X25 Cm (Motif) 1.0500 m2 120,915.00 126,960.75
Jumlah Bahan 173,157.98
Total ( Tenaga + Bahan) 299,607.98
Overhead 0.0000 0.00
H.S.P 299,607.98

1 m2 Pekerjaan Pasangan Dinding Keramik Motif


Uk.20X20 Cm m2

Tenaga
Mandor 0.0450 O.H 110,000.00 4,950.00
Kepala Tukang 0.0450 O.H 100,000.00 4,500.00
Tukang Batu 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.9000 O.H 85,000.00 76,500.00
Jumlah Tenaga 126,450.00
Bahan
Semen Portland 0.2325 Zak 69,750.00 16,216.88
Semen Warna 1.9400 Kg 13,410.00 26,015.40
Pasir Pasang 0.0180 m3 220,275.00 3,964.95
Dinding Keramik 20X20 Cm (Motif) 1.0500 m2 50,985.00 53,534.25
Jumlah Bahan 99,731.48
Total ( Tenaga + Bahan) 226,181.48
Overhead 0.0000 0.00
H.S.P 226,181.48

M PEKERJAAN KUSEN PINTU JENDELA KAYU


1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Jati m3
Tenaga
Mandor 0.3500 O.H 110,000.00 38,500.00
Kepala Tukang 2.1000 O.H 100,000.00 210,000.00
Tukang Kayu 21.0000 O.H 90,000.00 1,890,000.00
Pekerja 7.0000 O.H 85,000.00 595,000.00
Jumlah Tenaga 2,733,500.00
Bahan
Kayu Jati Balok 1.1000 m3 19,150,290.00 21,065,319.00
Paku Biasa 1.2500 kg 18,900.00 23,625.00
Lem Kayu 1.0000 kg 29,070.00 29,070.00
Jumlah Bahan 21,118,014.00
Total ( Tenaga + Bahan) 23,851,514.00
Overhead 0.0000 0.00
H.S.P 23,851,514.00

1 m2 Pekerjaan Pasang Pintu Klamp Kayu Jati m2


Tenaga
Mandor 0.0180 O.H 110,000.00 1,980.00
Kepala Tukang 0.1050 O.H 100,000.00 10,500.00
Tukang Kayu 1.0500 O.H 90,000.00 94,500.00
Pekerja 0.3500 O.H 85,000.00 29,750.00
Jumlah Tenaga 136,730.00
Bahan
Kayu Jati Papan 0.0400 m3 19,150,290.00 766,011.60
Paku Biasa 0.0500 kg 18,900.00 945.00
Jumlah Bahan 766,956.60
Total ( Tenaga + Bahan) 903,686.60
Overhead 0.0000 0.00
H.S.P 903,686.60

1 m2 Pekerjaan Pasang Daun Pintu Panil Kayu Jati m2


Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.3000 O.H 100,000.00 30,000.00
Tukang Kayu 3.0000 O.H 90,000.00 270,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 390,500.00
Bahan
Kayu Jati Papan 0.0400 m3 19,150,290.00 766,011.60
Lem Kayu 0.5000 kg 29,070.00 14,535.00
Jumlah Bahan 780,546.60
Total ( Tenaga + Bahan) 1,171,046.60
Overhead 0.0000 0.00
H.S.P 1,171,046.60

1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Jati m2


Tenaga
Mandor 0.0400 O.H 110,000.00 4,400.00
Kepala Tukang 0.2400 O.H 100,000.00 24,000.00
Tukang Kayu 2.4000 O.H 90,000.00 216,000.00
Pekerja 0.8000 O.H 85,000.00 68,000.00
Jumlah Tenaga 312,400.00
Bahan
Kayu Jati Papan 0.0240 m3 19,150,290.00 459,606.96
Lem Kayu 0.3000 kg 29,070.00 8,721.00
Jumlah Bahan 468,327.96
Total ( Tenaga + Bahan) 780,727.96
Overhead 0.0000 0.00
H.S.P 780,727.96

1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Jati m2


Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.3000 O.H 100,000.00 30,000.00
Tukang Kayu 3.0000 O.H 90,000.00 270,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 390,500.00
Bahan
Kayu Jati Papan 0.0640 m3 19,150,290.00 1,225,618.56
Lem Kayu 0.5000 kg 29,070.00 14,535.00
Jumlah Bahan 1,240,153.56
Total ( Tenaga + Bahan) 1,630,653.56
Overhead 0.0000 0.00
H.S.P 1,630,653.56

1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kayu Jati m2

Tenaga
Mandor 0.0400 O.H 110,000.00 4,400.00
Kepala Tukang 0.2400 O.H 100,000.00 24,000.00
Tukang Kayu 2.4000 O.H 90,000.00 216,000.00
Pekerja 0.8000 O.H 85,000.00 68,000.00
Jumlah Tenaga 312,400.00
Bahan
Plywood Uk. 4' X 8' X 4 Mm 1.0000 Lembar 113,715.00 113,715.00
Kayu Jati Papan 0.0256 m3 19,150,290.00 490,247.42
Paku Biasa 0.0300 kg 18,900.00 567.00
Lem Kayu 0.5000 kg 29,070.00 14,535.00
Jumlah Bahan 619,064.42
Total ( Tenaga + Bahan) 931,464.42
Overhead 0.0000 0.00
H.S.P 931,464.42

1 m2 Pekerjaan Pasang Pintu Teakwood


Rangkap, Rangka Kayu Jati m2

Tenaga
Mandor 0.0400 O.H 110,000.00 4,400.00
Kepala Tukang 0.2400 O.H 100,000.00 24,000.00
Tukang Kayu 2.4000 O.H 90,000.00 216,000.00
Pekerja 0.8000 O.H 85,000.00 68,000.00
Jumlah Tenaga 312,400.00
Bahan
Teakwood Uk. 4' X 8' X 4 Mm 1.0000 lembar 127,890.00 127,890.00
Kayu Jati Papan 0.0250 m3 19,150,290.00 478,757.25
Paku Biasa 0.0300 kg 18,900.00 567.00
Lem Kayu 0.3000 kg 29,070.00 8,721.00
Jumlah Bahan 615,935.25
Total ( Tenaga + Bahan) 928,335.25
Overhead 0.0000 0.00
H.S.P 928,335.25

1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu m2


Kamper
Tenaga
Mandor 0.0400 O.H 110,000.00 4,400.00
Kepala Tukang 0.2400 O.H 100,000.00 24,000.00
Tukang Kayu 2.4000 O.H 90,000.00 216,000.00
Pekerja 0.8000 O.H 85,000.00 68,000.00
Jumlah Tenaga 312,400.00
Bahan
Teakwood Uk. 4' X 8' X 4 Mm 1.0000 lembar 127,890.00 127,890.00
Kayu Kamper Papan 0.0250 m3 10,433,520.00 260,838.00
Paku Biasa 0.0300 kg 18,900.00 567.00
Lem Kayu 0.3000 kg 29,070.00 8,721.00
Jumlah Bahan 398,016.00
Total ( Tenaga + Bahan) 710,416.00
Overhead 0.0000 0.00
H.S.P 710,416.00

1 m2 Pekerjaan Pasang Pintu Tripleks Rangkap, m2


Rangka Kayu Kamper
Tenaga
Mandor 0.0400 O.H 110,000.00 4,400.00
Kepala Tukang 0.2400 O.H 100,000.00 24,000.00
Tukang Kayu 2.4000 O.H 90,000.00 216,000.00
Pekerja 0.8000 O.H 85,000.00 68,000.00
Jumlah Tenaga 312,400.00
Bahan
Tripleks 4 mm 1.0000 lembar 82,260.00 82,260.00
Kayu Kamper Papan 0.0250 m3 10,433,520.00 260,838.00
Paku Biasa 0.0300 kg 18,900.00 567.00
Lem Kayu 0.3000 kg 29,070.00 8,721.00
Jumlah Bahan 352,386.00
Total ( Tenaga + Bahan) 664,786.00
Overhead 0.0000 0.00
H.S.P 664,786.00

N KUDA-KUDA DAN RANGKA ATAP


1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Jati
m3
Bentang 6 m
Tenaga
Mandor 0.2000 O.H 110,000.00 22,000.00
Kepala Tukang 1.2000 O.H 100,000.00 120,000.00
Tukang Kayu 12.0000 O.H 90,000.00 1,080,000.00
Pekerja 4.0000 O.H 85,000.00 340,000.00
Jumlah Tenaga 1,562,000.00
Bahan
Kayu Jati Balok 1.1000 m3 19,150,290.00 21,065,319.00
Besi Plat Strip 15.0000 Kg 12,150.00 182,250.00
Paku Biasa 5.6000 kg 18,900.00 105,840.00
Jumlah Bahan 21,353,409.00
Total ( Tenaga + Bahan) 22,915,409.00
Overhead 0.0000 0.00
H.S.P 22,915,409.00

1 m3 Pekerjaan Pemasangan Gording Kayu Jati m3


Tenaga
Mandor 0.3350 O.H 110,000.00 36,850.00
Kepala Tukang 2.0100 O.H 100,000.00 201,000.00
Tukang Kayu 20.1000 O.H 90,000.00 1,809,000.00
Pekerja 6.7000 O.H 85,000.00 569,500.00
Jumlah Tenaga 2,616,350.00
Bahan
Kayu Jati Balok 1.1000 m3 19,150,290.00 21,065,319.00
Besi Plat Strip 15.0000 Kg 12,150.00 182,250.00
Paku Biasa 3.0000 kg 18,900.00 56,700.00
Jumlah Bahan 21,304,269.00
Total ( Tenaga + Bahan) 23,920,619.00
Overhead 0.0000 0.00
H.S.P 23,920,619.00

1 m2 Pekerjaan Pasang Rangka Atap Genteng Kodok m2


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 19,050.00
Bahan
Kaso/Reng Kayu Kruing 0.0120 m3 6,955,695.00 83,468.34
Paku Biasa 0.1500 kg 18,900.00 2,835.00
Jumlah Bahan 86,303.34
Total ( Tenaga + Bahan) 105,353.34
Overhead 0.0000 0.00
H.S.P 105,353.34

1 m2 Pekerjaan Pasang Rangka Atap Genteng Keramik m2


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 19,050.00
Bahan
Kaso Kruing 5X7 0.0140 m3 6,376,050.00 89,264.70
Reng Kruing 2X3 0.0036 m3 6,955,695.00 25,040.50
Paku Biasa 0.2500 kg 18,900.00 4,725.00
Jumlah Bahan 119,030.20
Total ( Tenaga + Bahan) 138,080.20
Overhead 0.0000 0.00
H.S.P 138,080.20

1 m2 Pekerjaan Pasang Rangka Atap Genteng Beton m2


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 19,050.00
Bahan
Kaso Kruing (5X7) Cm 0.0140 m3 6,376,050.00 89,264.70
Reng Kruing (3X4) Cm 0.0057 m3 6,955,695.00 39,647.46
Paku Biasa 0.2500 kg 18,900.00 4,725.00
Jumlah Bahan 133,637.16
Total ( Tenaga + Bahan) 152,687.16
Overhead 0.0000 0.00
H.S.P 152,687.16

O LISTPLANK
1 m' Pekerjaan Pasang Listplank Kayu Jati 3/20 m'
Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 29,050.00
Bahan
Kayu Jati Papan 0.0108 m3 19,150,290.00 206,823.13
Paku Biasa 0.1000 kg 18,900.00 1,890.00
Jumlah Bahan 208,713.13
Total ( Tenaga + Bahan) 237,763.13
Overhead 0.0000 0.00
H.S.P 237,763.13

1 m' Pekerjaan Pasang Listplank Kayu Jati 3/30 m'


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 29,050.00
Bahan
Kayu Jati Papan 0.0110 m3 19,150,290.00 210,653.19
Paku Biasa 0.0500 kg 18,900.00 945.00
Jumlah Bahan 211,598.19
Total ( Tenaga + Bahan) 240,648.19
Overhead 0.0000 0.00
H.S.P 240,648.19

P PARTISI KAYU
1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka
Kayu Jati m2

Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0450 O.H 100,000.00 4,500.00
Tukang Kayu 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 58,630.00
Bahan
Kayu Jati Balok 0.0280 m3 19,150,290.00 536,208.12
Teakwood 4 Mm, Uk. 120 X 240 Cm 0.8600 Lembar 127,890.00 109,985.40
Paku Biasa 0.1500 kg 18,900.00 2,835.00
Lem Kayu 0.5600 kg 29,070.00 16,279.20
Jumlah Bahan 665,307.72
Total ( Tenaga + Bahan) 723,937.72
Overhead 0.0000 0.00
H.S.P 723,937.72

1 m2 Pekerjaan Pasang Dinding Pemisah


m2
Plywood Rangkap Rangka Kayu Jati
Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Kepala Tukang 0.0600 O.H 100,000.00 6,000.00
Tukang Kayu 0.6000 O.H 90,000.00 54,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 78,100.00
Bahan
Kayu Jati Balok 0.0280 m3 19,150,290.00 536,208.12
Plywood 4 Mm, Uk. 120 X 240 Cm 0.8600 Lembar 113,715.00 97,794.90
Paku Biasa 0.1500 kg 18,900.00 2,835.00
Lem Kayu 0.5600 kg 29,070.00 16,279.20
Jumlah Bahan 653,117.22
Total ( Tenaga + Bahan) 731,217.22
Overhead 0.0000 0.00
H.S.P 731,217.22

Q PENUTUP ATAP DAN LANGIT-LANGIT

1 m2 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. Nglayur m2


Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0075 O.H 100,000.00 750.00
Tukang Kayu 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,130.00
Bahan
Genteng Karang Pilang Ex. Nglayur 25.0000 Buah 2,475.00 61,875.00
Jumlah Bahan 61,875.00
Total ( Tenaga + Bahan) 83,005.00
Overhead 0.0000 0.00
H.S.P 83,005.00

1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. m2


Nglayur
Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0080 O.H 100,000.00 800.00
Tukang Kayu 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,180.00
Bahan
Genteng Kodok Ex. Nglayur 25.0000 Buah 2,835.00 70,875.00
Jumlah Bahan 70,875.00
Total ( Tenaga + Bahan) 92,055.00
Overhead 0.0000 0.00
H.S.P 92,055.00

1 m2 Pekerjaan Pasang Atap Genteng Keramik


Glazzur m2

Tenaga
Mandor 0.0800 O.H 110,000.00 8,800.00
Kepala Tukang 0.0800 O.H 100,000.00 8,000.00
Tukang Kayu 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 36,300.00
Bahan
Genteng Keramik Glazzur ex. Kanmuri 14.5000 Buah 11,070.00 160,515.00
Jumlah Bahan 160,515.00
Total ( Tenaga + Bahan) 196,815.00
Overhead 0.0000 0.00
H.S.P 196,815.00

1 m2 Pekerjaan Pasang Atap Genteng Beton m2


Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 28,100.00
Bahan
Genteng Beton 11.0000 Buah 5,625.00 61,875.00
Paku Biasa 0.0300 kg 18,900.00 567.00
Jumlah Bahan 62,442.00
Total ( Tenaga + Bahan) 90,542.00
Overhead 0.0000 0.00
H.S.P 90,542.00

1 m2 Pekerjaan Pasang Atap Genteng Metal m2


Tenaga
Mandor 0.0010 O.H 110,000.00 110.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 27,110.00
Bahan
Genteng Metal 1.0200 Lembar 120,240.00 122,644.80
Paku Biasa 0.2000 kg 18,900.00 3,780.00
Jumlah Bahan 126,424.80
Total ( Tenaga + Bahan) 153,534.80
Overhead 0.0000 0.00
H.S.P 153,534.80

1 m2 Pasang Atap Sirap Kayu m2


Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0250 O.H 100,000.00 2,500.00
Tukang Kayu 0.2500 O.H 90,000.00 22,500.00
Pekerja 0.1660 O.H 85,000.00 14,110.00
Jumlah Tenaga 39,990.00
Bahan
Atap Sirap 30.0000 Lembar 18,090.00 542,700.00
Paku Biasa 0.2000 kg 18,900.00 3,780.00
Jumlah Bahan 546,480.00
Total ( Tenaga + Bahan) 586,470.00
Overhead 0.0000 0.00
H.S.P 586,470.00

1 m2 Pasang Atap Seng Gelombang m2


Tenaga
Mandor 0.0060 O.H 110,000.00 660.00
Kepala Tukang 0.0060 O.H 100,000.00 600.00
Tukang Kayu 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.1200 O.H 85,000.00 10,200.00
Jumlah Tenaga 16,860.00
Bahan
Seng Gelombang 0.7000 Lembar 71,055.00 49,738.50
Paku Biasa 0.0200 kg 18,900.00 378.00
Jumlah Bahan 50,116.50
Total ( Tenaga + Bahan) 66,976.50
Overhead 0.0000 0.00
H.S.P 66,976.50

1 m2 Pasang Atap Galvalume m2


Tenaga
Kepala Tukang Besi 0.0080 O.H 100,000.00 800.00
Tukang Besi 0.0800 O.H 90,000.00 7,200.00
Pekerja 0.0800 O.H 85,000.00 6,800.00
Jumlah Tenaga 14,800.00
Bahan
Spandek TCT 0.45 MM 0.7000 m² 172,462.50 120,723.75
Angkur pengikat atap 0.0200 bh 8,694.00 173.88
Jumlah Bahan 120,897.63
Total ( Tenaga + Bahan) 135,697.63
Overhead 0.0000 0.00
H.S.P 135,697.63

1 m2 Pekerjaan Pasang Atap Roof Light Fiber Glass m2 63,300.00


Tenaga
Mandor 0.0070 O.H 110,000.00 770.00
Kepala Tukang 0.0070 O.H 100,000.00 700.00
Tukang Kayu 0.0670 O.H 90,000.00 6,030.00
Pekerja 0.1400 O.H 85,000.00 11,900.00
Jumlah Tenaga 19,400.00
Bahan
Roof Light Fiber Glass 0.6000 Lembar 60,795.00 36,477.00
Paku Biasa 0.0500 kg 18,900.00 945.00
Jumlah Bahan 37,422.00
Total ( Tenaga + Bahan) 56,822.00
Overhead 0.0000 0.00
H.S.P 56,822.00

1 m' Pekerjaan Pasang Wuwung Genteng Palentong m'


Tenaga
Mandor 0.0020 O.H 110,000.00 220.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 54,220.00
Bahan
Semen Portland 0.2000 Zak 69,750.00 13,950.00
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Wuwung Genteng Palentong 5.0000 Buah 15,120.00 75,600.00
Jumlah Bahan 96,598.80
Total ( Tenaga + Bahan) 150,818.80
Overhead 0.0000 0.00
H.S.P 150,818.80

1 m' Pekerjaan Pasang Wuwung Genteng Kodok m'


Tenaga
Mandor 0.0020 O.H 110,000.00 220.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 54,220.00
Bahan
Semen Portland 0.2000 Zak 69,750.00 13,950.00
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Wuwung Kodok Genteng 5.0000 Buah 14,940.00 74,700.00
Jumlah Bahan 95,698.80
Total ( Tenaga + Bahan) 149,918.80
Overhead 0.0000 0.00
H.S.P 149,918.80

1 m' Pekerjaan Pasang Wuwung Genteng Karang m'


Pilang Ex. Nglayur
Tenaga
Mandor 0.0020 O.H 110,000.00 220.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 54,220.00
Bahan
Semen Portland 0.2000 Zak 69,750.00 13,950.00
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Wuwung Karang Pilang Ex. Nglayur 5.0000 Buah 7,335.00 36,675.00
Jumlah Bahan 57,673.80
Total ( Tenaga + Bahan) 111,893.80
Overhead 0.0000 0.00
H.S.P 111,893.80
1 m' Pekerjaan Pasang Bubungan Genteng m'
Keramik/ Glazzur
Tenaga
Mandor 0.0020 O.H 110,000.00 220.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 54,220.00
Bahan
Semen Portland 0.2000 Zak 69,750.00 13,950.00
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Genteng Bubungan Glazzur 5.0000 Buah 22,950.00 114,750.00
Jumlah Bahan 135,748.80
Total ( Tenaga + Bahan) 189,968.80
Overhead 0.0000 0.00
H.S.P 189,968.80

1 m' Pekerjaan Pasang Nok Genteng Beton m'


Tenaga
Mandor 0.0200 O.H 110,000.00 2,200.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 56,200.00
Bahan
Nok Genteng Beton 3.5000 Buah 7,785.00 27,247.50
Paku Biasa 0.0500 kg 18,900.00 945.00
Semen Portland 0.2700 Zak 69,750.00 18,832.50
Pasir Pasang 0.0320 m3 220,275.00 7,048.80
Semen Warna 1.0000 Kg 13,410.00 13,410.00
Jumlah Bahan 67,483.80
Total ( Tenaga + Bahan) 123,683.80
Overhead 0.0000 0.00
H.S.P 123,683.80

1 m' Pemasangan Nok Genteng Metal m'


Tenaga
Mandor 0.0130 O.H 110,000.00 1,430.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Kayu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.2500 O.H 85,000.00 21,250.00
Jumlah Tenaga 37,680.00
Bahan
Nok Genteng Metal 1.1000 Buah 28,890.00 31,779.00
Paku Biasa 0.0500 kg 18,900.00 945.00
Jumlah Bahan 32,724.00
Total ( Tenaga + Bahan) 70,404.00
Overhead 0.0000 0.00
H.S.P 70,404.00

1 m' Pasang Nok Sirap m2


Tenaga
Mandor 0.0060 O.H 110,000.00 660.00
Kepala Tukang 0.0250 O.H 100,000.00 2,500.00
Tukang Kayu 0.2500 O.H 90,000.00 22,500.00
Pekerja 0.1250 O.H 85,000.00 10,625.00
Jumlah Tenaga 36,285.00
Bahan
Seng Plat 3" X 6" Bjls 28 0.4000 Lembar 96,480.00 38,592.00
Paku Biasa 0.1000 kg 18,900.00 1,890.00
Jumlah Bahan 40,482.00
Total ( Tenaga + Bahan) 76,767.00
Overhead 0.0000 0.00
H.S.P 76,767.00

1 m' Pasang Nok Atap Seng m2


Tenaga
Mandor 0.0060 O.H 110,000.00 660.00
Kepala Tukang 0.0070 O.H 100,000.00 700.00
Tukang Kayu 0.0700 O.H 90,000.00 6,300.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 20,410.00
Bahan
Seng Plat 3" X 6" Bjls 28 0.3000 Lembar 96,480.00 28,944.00
Paku Biasa 0.0400 kg 18,900.00 756.00
Jumlah Bahan 29,700.00
Total ( Tenaga + Bahan) 50,110.00
Overhead 0.0000 0.00
H.S.P 50,110.00

1 m2 Pekerjaan Langit - Langit Gypsum Board,


(120X240) Tebal 9 Mm m2

Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Kayu 0.0500 O.H 90,000.00 4,500.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 14,050.00
Bahan
Gypsum Board Tb. 9 Mm 0.3640 Lembar 86,985.00 31,662.54
Paku Skrup 0.1100 Kg 24,390.00 2,682.90
Jumlah Bahan 34,345.44
Total ( Tenaga + Bahan) 48,395.44
Overhead 0.0000 0.00
H.S.P 48,395.44

1 m' Pekerjaan List Langit - Langit Gypsum m'


Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0060 O.H 100,000.00 600.00
Tukang Kayu 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 11,430.00
Bahan
List Gypsum 1.0500 m' 24,390.00 25,609.50
Tepung Gypsum 0.1500 Kg 7,650.00 1,147.50
Jumlah Bahan 26,757.00
Total ( Tenaga + Bahan) 38,187.00
Overhead 0.0000 0.00
H.S.P 38,187.00

R SANITASI
Pekerjaan Pemasangan 1 Buah Kloset Duduk Buah
Tenaga
Mandor 0.1600 O.H 110,000.00 17,600.00
Kepala Tukang 0.0010 O.H 100,000.00 100.00
Tukang Batu 1.1000 O.H 90,000.00 99,000.00
Pekerja 3.3000 O.H 85,000.00 280,500.00
Jumlah Tenaga 397,200.00
Bahan
Kloset Duduk Setara Ina Komplit 1.0000 Buah 1,453,005.00 1,453,005.00
Peralatan (6% Dari Harga Bahan) 0.0600 Set 1,453,005.00 87,180.30
Jumlah Bahan 1,540,185.30
Total ( Tenaga + Bahan) 1,937,385.30
Overhead 0.0000 0.00
H.S.P 1,937,385.30

Pekerjaan Pemasangan 1 Buah Kloset Jongkok


Porselen Buah

Tenaga
Mandor 0.1600 O.H 110,000.00 17,600.00
Kepala Tukang 1.5000 O.H 100,000.00 150,000.00
Tukang Batu 1.5000 O.H 90,000.00 135,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 387,600.00
Bahan
Kloset Jongkok Porselen 1.0000 Buah 174,375.00 174,375.00
Semen Portland 0.1500 Zak 69,750.00 10,462.50
Pasir Pasang 0.0100 m3 220,275.00 2,202.75
Jumlah Bahan 187,040.25
Total ( Tenaga + Bahan) 574,640.25
Overhead 0.0000 0.00
H.S.P 574,640.25

Pekerjaan Pemasangan 1 Buah Urinoir Buah


Tenaga
Mandor 0.1000 O.H 110,000.00 11,000.00
Kepala Tukang 0.1000 O.H 100,000.00 10,000.00
Tukang Batu 1.0000 O.H 90,000.00 90,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 196,000.00
Bahan
Urinoir 1.0000 set 1,639,800.00 1,639,800.00
Semen Portland 0.1500 Zak 69,750.00 10,462.50
Pasir Pasang 0.0100 m3 220,275.00 2,202.75
Peralatan (30% Dari Harga Bahan) 0.3000 set 1,639,800.00 491,940.00
Jumlah Bahan 2,144,405.25
Total ( Tenaga + Bahan) 2,340,405.25
Overhead 0.0000 0.00
H.S.P 2,340,405.25

Pekerjaan Pemasangan 1 Buah Wastafel Buah


Tenaga
Mandor 0.1000 O.H 110,000.00 11,000.00
Kepala Tukang Pipa 0.1500 O.H 100,000.00 15,000.00
Tukang Pipa 1.4500 O.H 90,000.00 130,500.00
Pekerja 1.2000 O.H 85,000.00 102,000.00
Jumlah Tenaga 258,500.00
Bahan
Wastafel Setara Ina 1.0000 set 494,055.00 494,055.00
Semen Portland 0.1500 Zak 69,750.00 10,462.50
Pasir Pasang 0.0100 m3 220,275.00 2,202.75
Peralatan (12% Dari Harga Bahan) 0.1200 set 494,055.00 59,286.60
Jumlah Bahan 566,006.85
Total ( Tenaga + Bahan) 824,506.85
Overhead 0.0000 0.00
H.S.P 824,506.85

Pekerjaan Pemasangan 1 Buah Bak Mandi Buah


Fiberglass
Tenaga
Mandor 0.1100 O.H 110,000.00 12,100.00
Kepala Tukang 0.5400 O.H 100,000.00 54,000.00
Tukang Batu 2.7000 O.H 90,000.00 243,000.00
Pekerja 1.8000 O.H 85,000.00 153,000.00
Jumlah Tenaga 462,100.00
Bahan
Bak Fiberglass 1.0000 buah 393,480.00 393,480.00
Peralatan (12% Dari Harga Bahan) 0.1200 set 393,480.00 47,217.60
Jumlah Bahan 440,697.60
Total ( Tenaga + Bahan) 902,797.60
Overhead 0.0000 0.00
H.S.P 902,797.60

Pekerjaan Pemasangan 1 Buah Bak Mandi Batu Buah


Bata Volume 0.3 m3
Tenaga
Mandor 0.3000 O.H 110,000.00 33,000.00
Kepala Tukang 0.3000 O.H 100,000.00 30,000.00
Tukang Batu 3.0000 O.H 90,000.00 270,000.00
Pekerja 6.0000 O.H 85,000.00 510,000.00
Jumlah Tenaga 843,000.00
Bahan
Batu Bata 150.0000 buah 855.00 128,250.00
Semen Portland 3.0000 Zak 69,750.00 209,250.00
Pasir Pasang 0.3000 m3 220,275.00 66,082.50
Keramik Porselen 360.0000 Buah 1,305.00 469,800.00
Semen Warna 6.0000 Kg 13,410.00 80,460.00
Jumlah Bahan 953,842.50
Total ( Tenaga + Bahan) 1,796,842.50
Overhead 0.0000 0.00
H.S.P 1,796,842.50

Pekerjaan Pemasangan 1 Buah Bak Cuci Piring


Buah
Stainless Steel Dan Accessories
Tenaga
Mandor 0.0150 O.H 110,000.00 1,650.00
Kepala Tukang 0.0300 O.H 100,000.00 3,000.00
Tukang Batu 0.3000 O.H 90,000.00 27,000.00
Pekerja 0.0300 O.H 85,000.00 2,550.00
Jumlah Tenaga 34,200.00
Bahan
Bak Cuci Stainless Steel + Accessories 1.0000 Buah 327,825.00 327,825.00
Water Drain + Asesories 1.0000 set 16,920.00 16,920.00
Jumlah Bahan 344,745.00
Total ( Tenaga + Bahan) 378,945.00
Overhead 0.0000 0.00
H.S.P 378,945.00

Pekerjaan Pemasangan 1 Buah Floor Drain Buah


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 11,400.00
Bahan
Floor Drain + Accessories 1.0000 buah 16,920.00 16,920.00
Jumlah Bahan 16,920.00
Total ( Tenaga + Bahan) 28,320.00
Overhead 0.0000 0.00
H.S.P 28,320.00

Pekerjaan Pemasangan 1 Buah Bak Kontrol Buah


Pasangan Batu Bata Uk 30 X 30 Cm, Tinggi 35 Cm
Tenaga
Mandor 0.0110 O.H 110,000.00 1,210.00
Kepala Tukang 0.0720 O.H 100,000.00 7,200.00
Tukang Batu 0.7200 O.H 90,000.00 64,800.00
Pekerja 2.1600 O.H 85,000.00 183,600.00
Jumlah Tenaga 256,810.00
Bahan
Batu Bata 40.0000 buah 855.00 34,200.00
Semen Portland 1.1000 Zak 69,750.00 76,725.00
Pasir Pasang 0.0700 m3 220,275.00 15,419.25
Kerikil Beton 0.0700 m3 220,860.00 15,460.20
Besi Beton 1.6000 Kg 11,745.00 18,792.00
Pasir Beton 0.0600 m3 231,885.00 13,913.10
Jumlah Bahan 174,509.55
Total ( Tenaga + Bahan) 431,319.55
Overhead 0.0000 0.00
H.S.P 431,319.55

Pekerjaan Pemasangan 1 Buah Bak Kontrol


Buah
Pasangan Batu Bata Uk. 45 X 45 Cm, Tinggi 50 Cm
Tenaga
Mandor 0.0160 O.H 110,000.00 1,760.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Batu 1.1500 O.H 90,000.00 103,500.00
Pekerja 3.2000 O.H 85,000.00 272,000.00
Jumlah Tenaga 378,360.00
Bahan
Batu Bata 70.0000 buah 855.00 59,850.00
Semen Portland 1.9250 Zak 69,750.00 134,268.75
Pasir Pasang 0.1300 m3 220,275.00 28,635.75
Kerikil Beton 0.0200 m3 220,860.00 4,417.20
Besi Beton 2.6000 Kg 11,745.00 30,537.00
Pasir Beton 0.0900 m3 231,885.00 20,869.65
Jumlah Bahan 278,578.35
Total ( Tenaga + Bahan) 656,938.35
Overhead 0.0000 0.00
H.S.P 656,938.35

Pekerjaan Pemasangan 1 Buah Bak Kontrol Buah


Pasangan Batu Bata Uk. 60 X 60 Cm, Tinggi 65 Cm
Tenaga
Mandor 0.0160 O.H 110,000.00 1,760.00
Kepala Tukang 0.0110 O.H 100,000.00 1,100.00
Tukang Batu 1.1500 O.H 90,000.00 103,500.00
Pekerja 3.2000 O.H 85,000.00 272,000.00
Jumlah Tenaga 378,360.00
Bahan
Batu Bata 123.0000 buah 855.00 105,165.00
Semen Portland 2.8500 Zak 69,750.00 198,787.50
Pasir Pasang 0.1840 m3 220,275.00 40,530.60
Kerikil Beton 0.0330 m3 220,860.00 7,288.38
Besi Beton 4.8500 Kg 11,745.00 56,963.25
Pasir Beton 0.1200 m3 231,885.00 27,826.20
Jumlah Bahan 436,560.93
Total ( Tenaga + Bahan) 814,920.93
Overhead 0.0000 0.00
H.S.P 814,920.93

1 m' Pekerjaan Pasang Pipa Galvanis Diameter m'


1/2"
Tenaga
Mandor 0.0270 O.H 110,000.00 2,970.00
Kepala Tukang Pipa 0.0090 O.H 100,000.00 900.00
Tukang Pipa 0.0900 O.H 90,000.00 8,100.00
Pekerja 0.0540 O.H 85,000.00 4,590.00
Jumlah Tenaga 16,560.00
Bahan
Pipa Galvanis 1/2" (Medium B) 0.2000 Batang 155,205.00 31,041.00
Perlengkapan 0.0584 Set 155,205.00 9,063.97
Jumlah Bahan 40,104.97
Total ( Tenaga + Bahan) 56,664.97
Overhead 0.0000 0.00
H.S.P 56,664.97

1 m' Pekerjaan Pasang Pipa Galvanis Diameter m'


3/4"
Tenaga
Mandor 0.0270 O.H 110,000.00 2,970.00
Kepala Tukang Pipa 0.0090 O.H 100,000.00 900.00
Tukang Pipa 0.0900 O.H 90,000.00 8,100.00
Pekerja 0.0540 O.H 85,000.00 4,590.00
Jumlah Tenaga 16,560.00
Bahan
Pipa Galvanis 3/4" (Medium B) 0.2000 Batang 191,655.00 38,331.00
Perlengkapan 0.0584 Set 191,655.00 11,192.65
Jumlah Bahan 49,523.65
Total ( Tenaga + Bahan) 66,083.65
Overhead 0.0000 0.00
H.S.P 66,083.65

1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1" m'


Tenaga
Mandor 0.0270 O.H 110,000.00 2,970.00
Kepala Tukang Pipa 0.0090 O.H 100,000.00 900.00
Tukang Pipa 0.0900 O.H 90,000.00 8,100.00
Pekerja 0.0540 O.H 85,000.00 4,590.00
Jumlah Tenaga 16,560.00
Bahan
Pipa Galvanis 1" (Medium B) 0.2000 Batang 293,895.00 58,779.00
Perlengkapan 0.0584 Set 293,895.00 17,163.47
Jumlah Bahan 75,942.47
Total ( Tenaga + Bahan) 92,502.47
Overhead 0.0000 0.00
H.S.P 92,502.47

1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1 1/2" m'


Tenaga
Mandor 0.0054 O.H 110,000.00 594.00
Kepala Tukang Pipa 0.0180 O.H 100,000.00 1,800.00
Tukang Pipa 0.1800 O.H 90,000.00 16,200.00
Pekerja 0.1080 O.H 85,000.00 9,180.00
Jumlah Tenaga 27,774.00
Bahan
Pipa Galvanis 1 1/2" (Medium B) 0.2000 Batang 450,045.00 90,009.00
Perlengkapan 0.0584 Set 450,045.00 26,282.63
Jumlah Bahan 116,291.63
Total ( Tenaga + Bahan) 144,065.63
Overhead 0.0000 0.00
H.S.P 144,065.63

1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3" m'


Tenaga
Mandor 0.0054 O.H 110,000.00 594.00
Kepala Tukang Pipa 0.0180 O.H 100,000.00 1,800.00
Tukang Pipa 0.1800 O.H 90,000.00 16,200.00
Pekerja 0.1080 O.H 85,000.00 9,180.00
Jumlah Tenaga 27,774.00
Bahan
Pipa Galvanis 3" (Medium B) 0.2000 Batang 1,055,655.00 211,131.00
Perlengkapan 0.0584 Set 1,055,655.00 61,650.25
Jumlah Bahan 272,781.25
Total ( Tenaga + Bahan) 300,555.25
Overhead 0.0000 0.00
H.S.P 300,555.25

1 m' Pekerjaan Pasang Pipa Galvanis Diameter 4" m'


Tenaga
Mandor 0.0068 O.H 110,000.00 748.00
Kepala Tukang Pipa 0.0225 O.H 100,000.00 2,250.00
Tukang Pipa 0.2250 O.H 90,000.00 20,250.00
Pekerja 0.1350 O.H 85,000.00 11,475.00
Jumlah Tenaga 34,723.00
Bahan
Pipa Galvanis 4" (Medium B) 0.2000 Batang 1,527,570.00 305,514.00
Perlengkapan 0.0584 Set 1,527,570.00 89,210.09
Jumlah Bahan 394,724.09
Total ( Tenaga + Bahan) 429,447.09
Overhead 0.0000 0.00
H.S.P 429,447.09

Pekerjaan Pemasangan 1 Buah Kran Air Ø 3/4"


Buah
Atau 1/2"
Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang Pipa 0.0100 O.H 100,000.00 1,000.00
Tukang Pipa 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 11,400.00
Bahan
Kran Air Ex. Omco 1.0000 Buah 29,025.00 29,025.00
Seal Tape 1.0000 roll 6,120.00 6,120.00
Jumlah Bahan 35,145.00
Total ( Tenaga + Bahan) 46,545.00
Overhead 0.0000 0.00
H.S.P 46,545.00

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1/2" m'


Tenaga
Mandor 0.0018 O.H 110,000.00 198.00
Kepala Tukang Pipa 0.0060 O.H 100,000.00 600.00
Tukang Pipa 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0360 O.H 85,000.00 3,060.00
Jumlah Tenaga 9,258.00
Bahan
Pipa Pvc Aw Ø 1/2" Pjg 6 Meter 0.2000 Batang 49,410.00 9,882.00
Perlengkapan 0.0584 Set 49,410.00 2,885.54
Jumlah Bahan 12,767.54
Total ( Tenaga + Bahan) 22,025.54
Overhead 0.0000 0.00
H.S.P 22,025.54

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3/4" m'


Tenaga
Mandor 0.0018 O.H 110,000.00 198.00
Kepala Tukang Pipa 0.0060 O.H 100,000.00 600.00
Tukang Pipa 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0360 O.H 85,000.00 3,060.00
Jumlah Tenaga 9,258.00
Bahan
Pipa Pvc Aw Ø 3/4" Pjg 6 Meter 0.2000 Batang 59,940.00 11,988.00
Perlengkapan 0.0584 Set 59,940.00 3,500.50
Jumlah Bahan 15,488.50
Total ( Tenaga + Bahan) 24,746.50
Overhead 0.0000 0.00
H.S.P 24,746.50

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1" m'


Tenaga
Mandor 0.0018 O.H 110,000.00 198.00
Kepala Tukang Pipa 0.0060 O.H 100,000.00 600.00
Tukang Pipa 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0360 O.H 85,000.00 3,060.00
Jumlah Tenaga 9,258.00
Bahan
Pipa Pvc Aw Ø 1" Pjg 6 Meter 0.2000 Batang 75,060.00 15,012.00
Perlengkapan 0.0584 Set 75,060.00 4,383.50
Jumlah Bahan 19,395.50
Total ( Tenaga + Bahan) 28,653.50
Overhead 0.0000 0.00
H.S.P 28,653.50

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1 1/2" m'


Tenaga
Mandor 0.0018 O.H 110,000.00 198.00
Kepala Tukang Pipa 0.0060 O.H 100,000.00 600.00
Tukang Pipa 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0360 O.H 85,000.00 3,060.00
Jumlah Tenaga 9,258.00
Bahan
Pipa Pvc Aw Ø 1 1/2" Pjg 6 Meter 0.2000 Batang 136,080.00 27,216.00
Perlengkapan 0.0584 Set 136,080.00 7,947.07
Jumlah Bahan 35,163.07
Total ( Tenaga + Bahan) 44,421.07
Overhead 0.0000 0.00
H.S.P 44,421.07

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 2" m'


Tenaga
Mandor 0.0027 O.H 110,000.00 297.00
Kepala Tukang Pipa 0.0090 O.H 100,000.00 900.00
Tukang Pipa 0.0900 O.H 90,000.00 8,100.00
Pekerja 0.0540 O.H 85,000.00 4,590.00
Jumlah Tenaga 13,887.00
Bahan
Pipa Pvc Aw Ø 2" 0.2000 Batang 201,690.00 40,338.00
Perlengkapan 0.0584 Set 201,690.00 11,778.70
Jumlah Bahan 52,116.70
Total ( Tenaga + Bahan) 66,003.70
Overhead 0.0000 0.00
H.S.P 66,003.70

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 2 1/2" m'


Tenaga
Mandor 0.0018 O.H 110,000.00 198.00
Kepala Tukang Pipa 0.0060 O.H 100,000.00 600.00
Tukang Pipa 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0360 O.H 85,000.00 3,060.00
Jumlah Tenaga 9,258.00
Bahan
Pipa Pvc Aw Ø 2 1/2" 0.2000 Batang 256,950.00 51,390.00
Perlengkapan 0.0584 Set 256,950.00 15,005.88
Jumlah Bahan 66,395.88
Total ( Tenaga + Bahan) 75,653.88
Overhead 0.0000 0.00
H.S.P 75,653.88

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3" m'


Tenaga
Mandor 0.0041 O.H 110,000.00 451.00
Kepala Tukang Pipa 0.0135 O.H 100,000.00 1,350.00
Tukang Pipa 0.1350 O.H 90,000.00 12,150.00
Pekerja 0.0810 O.H 85,000.00 6,885.00
Jumlah Tenaga 20,836.00
Bahan
Pipa Pvc Aw Ø 3" 0.2000 Batang 365,040.00 73,008.00
Perlengkapan 0.0584 Set 365,040.00 21,318.34
Jumlah Bahan 94,326.34
Total ( Tenaga + Bahan) 115,162.34
Overhead 0.0000 0.00
H.S.P 115,162.34

1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 4" m'


Tenaga
Mandor 0.0041 O.H 110,000.00 451.00
Kepala Tukang Pipa 0.0135 O.H 100,000.00 1,350.00
Tukang Pipa 0.1350 O.H 90,000.00 12,150.00
Pekerja 0.0810 O.H 85,000.00 6,885.00
Jumlah Tenaga 20,836.00
Bahan
Pipa Pvc Aw Ø 4" 0.2000 Batang 533,340.00 106,668.00
Perlengkapan 0.0584 Set 533,340.00 31,147.06
Jumlah Bahan 137,815.06
Total ( Tenaga + Bahan) 158,651.06
Overhead 0.0000 0.00
H.S.P 158,651.06

1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 2" m'


Tenaga
Mandor 0.0027 O.H 110,000.00 297.00
Kepala Tukang Pipa 0.0090 O.H 100,000.00 900.00
Tukang Pipa 0.0900 O.H 90,000.00 8,100.00
Pekerja 0.0540 O.H 85,000.00 4,590.00
Jumlah Tenaga 13,887.00
Bahan
Pipa Pvc Class D Dia. 2" 0.2000 Batang 97,110.00 19,422.00
Perlengkapan 0.0584 Set 97,110.00 5,671.22
Jumlah Bahan 25,093.22
Total ( Tenaga + Bahan) 38,980.22
Overhead 0.0000 0.00
H.S.P 38,980.22

1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 3" m'


Tenaga
Mandor 0.0041 O.H 110,000.00 451.00
Kepala Tukang Pipa 0.0135 O.H 100,000.00 1,350.00
Tukang Pipa 0.1350 O.H 90,000.00 12,150.00
Pekerja 0.0810 O.H 85,000.00 6,885.00
Jumlah Tenaga 20,836.00
Bahan
Pipa Pvc Class D Dia. 3" 0.2000 Batang 206,370.00 41,274.00
Perlengkapan 0.0584 Set 206,370.00 12,052.01
Jumlah Bahan 53,326.01
Total ( Tenaga + Bahan) 74,162.01
Overhead 0.0000 0.00
H.S.P 74,162.01

1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 4" m'


Tenaga
Mandor 0.0041 O.H 110,000.00 451.00
Kepala Tukang Pipa 0.0135 O.H 100,000.00 1,350.00
Tukang Pipa 0.1350 O.H 90,000.00 12,150.00
Pekerja 0.0810 O.H 85,000.00 6,885.00
Jumlah Tenaga 20,836.00
Bahan
Pipa Pvc Class D Dia. 4" 0.2000 Batang 288,900.00 57,780.00
Perlengkapan 0.0584 Set 288,900.00 16,871.76
Jumlah Bahan 74,651.76
Total ( Tenaga + Bahan) 95,487.76
Overhead 0.0000 0.00
H.S.P 95,487.76

S PEKERJAAN BESI DAN ALLUMUNIUM


1 Kg Pemasangan Besi Profil IWF Kg
Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0060 O.H 100,000.00 600.00
Tukang Besi 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 11,430.00
Bahan
Besi Profil IWF 1.1500 kg 12,150.00 13,972.50
Jumlah Bahan 13,972.50
Total ( Tenaga + Bahan) 25,402.50
Overhead 0.0000 0.00
H.S.P 25,402.50

1 Kg Pemasangan Besi Siku Kg


Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0060 O.H 100,000.00 600.00
Tukang Besi 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 11,430.00
Bahan
Besi Siku 1.1500 kg 10,890.00 12,523.50
Jumlah Bahan 12,523.50
Total ( Tenaga + Bahan) 23,953.50
Overhead 0.0000 0.00
H.S.P 23,953.50

1 Kg Pemasangan Besi Profil C Kg


Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0060 O.H 100,000.00 600.00
Tukang Besi 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 11,430.00
Bahan
Besi Profil C 1.1500 kg 12,150.00 13,972.50
Jumlah Bahan 13,972.50
Total ( Tenaga + Bahan) 25,402.50
Overhead 0.0000 0.00
H.S.P 25,402.50

100 Kg Pekerjaan Perakitan Besi Profil Kg


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0010 O.H 100,000.00 100.00
Tukang Besi 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 18,150.00
Bahan
Solar 1.0000 ltr 13,770.00 13,770.00
Minyak Pelumas 0.1000 ltr 38,070.00 3,807.00
Jumlah Bahan 17,577.00
Total ( Tenaga + Bahan) 35,727.00
Overhead 0.0000 0.00
H.S.P 35,727.00

1 m2 Pemasangan Rangka Besi Hollow 1.40.40.2


Mm, Modul 60.120 Dinding Partisi Penutup m2
Kalsiboard

Tenaga
Mandor 0.0130 O.H 110,000.00 1,430.00
Kepala Tukang 0.0250 O.H 100,000.00 2,500.00
Tukang Besi 0.2500 O.H 90,000.00 22,500.00
Pekerja 0.2500 O.H 85,000.00 21,250.00
Jumlah Tenaga 47,680.00
Bahan
Rangka Metal Hollow 40.40.2 Mm 0.8750 Btg 32,760.00 28,665.00
Kalsiboard 0.8600 Lembar 103,770.00 89,242.20
Accesorries 0.2500 Set 32,760.00 8,190.00
Jumlah Bahan 126,097.20
Total ( Tenaga + Bahan) 173,777.20
Overhead 0.0000 0.00
H.S.P 173,777.20

1 m' Pekerjaan Kusen Alluminium 4" m'


Tenaga
Mandor 0.0021 O.H 110,000.00 231.00
Kepala Tukang 0.0043 O.H 100,000.00 430.00
Tukang Kayu 0.0430 O.H 90,000.00 3,870.00
Pekerja 0.0430 O.H 85,000.00 3,655.00
Jumlah Tenaga 8,186.00
Bahan
Profil Alluminium 4" 1.1000 m 100,305.00 110,335.50
Skrup Fixer 0.0080 Buah 29,070.00 232.56
Sealant 0.0600 Tube 13,950.00 837.00
Jumlah Bahan 111,405.06
Total ( Tenaga + Bahan) 119,591.06
Overhead 0.0000 0.00
H.S.P 119,591.06

1 m' Pekerjaan Kusen Alluminium 3" m'


Tenaga
Mandor 0.0021 O.H 110,000.00 231.00
Kepala Tukang 0.0043 O.H 100,000.00 430.00
Tukang Kayu 0.0430 O.H 90,000.00 3,870.00
Pekerja 0.0430 O.H 85,000.00 3,655.00
Jumlah Tenaga 8,186.00
Bahan
Profil Alluminium 3" 1.1000 m 88,695.00 97,564.50
Skrup Fixer 0.0080 Buah 29,070.00 232.56
Sealant 0.0600 Tube 13,950.00 837.00
Jumlah Bahan 98,634.06
Total ( Tenaga + Bahan) 106,820.06
Overhead 0.0000 0.00
H.S.P 106,820.06

1 m2 Pasang Rangka Atap Galvalume Untuk m2


Genteng Asbes/Spandex
Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Besi 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 64,000.00
Bahan
C-75 , 0.8 0.2480 Batang 93,015.00 23,067.72
C-75 , 0.6 0.3720 Batang 89,865.00 33,429.78
Baut (Screw Driver) 28.0000 Buah 1,350.00 37,800.00
Dynabolt 1.6000 Buah 11,610.00 18,576.00
Reng 0.6000 Batang 43,515.00 26,109.00
Talang Jurai 0.1240 m' 40,590.00 5,033.16
Jumlah Bahan 144,015.66
Total ( Tenaga + Bahan) 208,015.66
Overhead 0.0000 0.00
H.S.P 208,015.66

1 m2 Pasang Rangka Atap Galvalume Untuk


Genteng Biasa/Metal m2

Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Besi 0.4500 O.H 90,000.00 40,500.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 64,000.00
Bahan
C-75 , 0.8 0.2480 Batang 93,015.00 23,067.72
C-75 , 0.6 0.3720 Batang 89,865.00 33,429.78
Baut (Screw Driver) 38.0000 Buah 1,350.00 51,300.00
Dynabolt 1.6000 Buah 11,610.00 18,576.00
Reng 0.9000 Batang 43,515.00 39,163.50
Talang Jurai 0.1240 m' 40,590.00 5,033.16
Jumlah Bahan 170,570.16
Total ( Tenaga + Bahan) 234,570.16
Overhead 0.0000 0.00
H.S.P 234,570.16

1 m2 Pasang Rangka Langit-Langit Hollow


m2
40.40.2, Modul 60.60
Tenaga
Mandor 0.0180 O.H 110,000.00 1,980.00
Kepala Tukang 0.0350 O.H 100,000.00 3,500.00
Tukang Besi 0.3500 O.H 90,000.00 31,500.00
Pekerja Tak Terampil 0.3500 O.H 85,000.00 29,750.00
Jumlah Tenaga 66,730.00
Bahan
Hollow 4/4 Zincromate 0.1038 Btg 32,760.00 3,400.49
Accesorries 0.2500 set 32,760.00 8,190.00
Jumlah Bahan 11,590.49
Total ( Tenaga + Bahan) 78,320.49
Overhead 0.0000 0.00
H.S.P 78,320.49

1 m2 Pekerjaan Pasang Pintu / Jendela Kaca Rangka Alluminium m2

Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0090 O.H 100,000.00 900.00
Tukang Kayu 0.0850 O.H 90,000.00 7,650.00
Pekerja 0.0850 O.H 85,000.00 7,225.00
Jumlah Tenaga 16,325.00
Bahan
Profil Alluminium 4.4000 m 100,305.00 441,342.00
Kaca Rayban 5 Mm 1.1000 m2 116,280.00 127,908.00
Sealant 0.2700 Tube 13,950.00 3,766.50
Jumlah Bahan 573,016.50
Total ( Tenaga + Bahan) 589,341.50
Overhead 0.0000 0.00
H.S.P 589,341.50

1 m2 Pekerjaan Pemasangan Pintu Alluminium


m2
Strip Lebar 8 Cm
Tenaga
Mandor 0.0042 O.H 110,000.00 462.00
Kepala Tukang 0.0085 O.H 100,000.00 850.00
Tukang Kayu 0.0850 O.H 90,000.00 7,650.00
Pekerja 0.0850 O.H 85,000.00 7,225.00
Jumlah Tenaga 16,187.00
Bahan
Profil Alluminium 4.4000 m 100,305.00 441,342.00
Allumunium Strip 14.6000 m 40,500.00 591,300.00
Jumlah Bahan 1,032,642.00
Total ( Tenaga + Bahan) 1,048,829.00
Overhead 0.0000 0.00
H.S.P 1,048,829.00

1 m2 Pekerjaan Pemasangan Rolling Door Besi m2


Tenaga
Mandor 0.0600 O.H 110,000.00 6,600.00
Kepala Tukang 0.1200 O.H 100,000.00 12,000.00
Tukang Besi 1.2000 O.H 90,000.00 108,000.00
Pekerja 1.2000 O.H 85,000.00 102,000.00
Jumlah Tenaga 228,600.00
Bahan
Rolling Door Besi Komplit 1.0000 m2 272,475.00 272,475.00
Jumlah Bahan 272,475.00
Total ( Tenaga + Bahan) 501,075.00
Overhead 0.0000 0.00
H.S.P 501,075.00

1 m2 Pekerjaan Pemasangan Rolling Door m2


Alumunium
Tenaga
Mandor 0.0500 O.H 110,000.00 5,500.00
Kepala Tukang 0.1000 O.H 100,000.00 10,000.00
Tukang Besi 1.0000 O.H 90,000.00 90,000.00
Pekerja 1.0000 O.H 85,000.00 85,000.00
Jumlah Tenaga 190,500.00
Bahan
Rolling Door Aluminium Komplit 1.0000 m2 449,235.00 449,235.00
Jumlah Bahan 449,235.00
Total ( Tenaga + Bahan) 639,735.00
Overhead 0.0000 0.00
H.S.P 639,735.00

1 m2 Pekerjaan Pemasangan Pintu Besi Lipat m2


Tenaga
Mandor 0.0220 O.H 110,000.00 2,420.00
Kepala Tukang 0.0440 O.H 100,000.00 4,400.00
Tukang Besi 0.4400 O.H 90,000.00 39,600.00
Pekerja 0.4400 O.H 85,000.00 37,400.00
Jumlah Tenaga 83,820.00
Bahan
Pintu Besi Lipat 1.0000 m2 581,220.00 581,220.00
Jumlah Bahan 581,220.00
Total ( Tenaga + Bahan) 665,040.00
Overhead 0.0000 0.00
H.S.P 665,040.00

1 m' Pekerjaan Pasang Talang Datar/Jurai Seng


m'
Bjls 28 Lebar 90
Tenaga
Mandor 0.0010 O.H 110,000.00 110.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 37,110.00
Bahan
Seng Plat 3" X 6" Bjls 28 1.0500 Lembar 96,480.00 101,304.00
Paku Biasa 0.0150 kg 18,900.00 283.50
Kayu Borneo Papan 0.0190 m3 7,293,555.00 138,577.55
Jumlah Bahan 240,165.05
Total ( Tenaga + Bahan) 277,275.05
Overhead 0.0000 0.00
H.S.P 277,275.05

1 m' Pekerjaan Pasang Talang 1/2 Lingkaran D-15 m'


Cm Seng Bjls 30 Lebar 45 Cm
Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0300 O.H 100,000.00 3,000.00
Tukang Kayu 0.3000 O.H 90,000.00 27,000.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 43,630.00
Bahan
Seng Plat 3" X 6" Bjls 1.0500 Lembar 45,675.00 47,958.75
Paku Biasa 0.0100 kg 18,900.00 189.00
Besi Strip 0.5000 Kg 12,150.00 6,075.00
Jumlah Bahan 54,222.75
Total ( Tenaga + Bahan) 97,852.75
Overhead 0.0000 0.00
H.S.P 97,852.75

1 m' Railing Tangga Besi Hollow m'


Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0080 O.H 100,000.00 800.00
Tukang Besi 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,180.00
Bahan
Besi Hollow 40.40 1.0345 Btg 188,100.00 194,589.45
Mur baut 6.0000 bh 1,215.00 7,290.00
Cat besi 1.0000 Kg 64,350.00 64,350.00
Jumlah Bahan 266,229.45
Total ( Tenaga + Bahan) 287,409.45
Overhead 0.0000 0.00
H.S.P 287,409.45

1 m2 Kanopi rangka besi hollow & Penutup atap


Polycarbonate m2

Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Kepala Tukang 0.0080 O.H 100,000.00 800.00
Tukang Besi 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 21,180.00
Bahan
Besi Hollow 40.40 1.7242 Btg 188,100.00 324,322.02
Polycarbonate t. 8 mm 0.0404 m2 3,719,655.00 150,274.06
Paku payung 6.0000 bh 1,080.00 6,480.00
Jumlah Bahan 481,076.08
Total ( Tenaga + Bahan) 502,256.08
Overhead 0.0000 0.00
H.S.P 502,256.08

1 m2 Pembuatan & Pemasangan Pagar Besi m2


Hollow
Tenaga
Mandor 0.0520 O.H 110,000.00 5,720.00
Kepala Tukang Besi 0.1050 O.H 100,000.00 10,500.00
Tukang Besi Konstruksi 1.0500 O.H 90,000.00 94,500.00
Pekerja 1.0500 O.H 85,000.00 89,250.00
Jumlah Tenaga 199,970.00
Bahan
Besi Hollow 40.40 1.7242 Btg 188,100.00 324,322.02
Kawat Bendrat 0.0020 Roll 389,025.00 778.05
Jumlah Bahan 325,100.07
Total ( Tenaga + Bahan) 525,070.07
Overhead 0.0000 0.00
H.S.P 525,070.07

T PEKERJAAN KUNCI ENGSEL DAN KACA


Pekerjaan Pemasangan 1 Buah Kunci Tanam
Antik Buah

Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0600 O.H 100,000.00 6,000.00
Tukang Kayu 0.6000 O.H 90,000.00 54,000.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 65,430.00
Bahan
Kunci Tanam Antik 1.0000 Buah 144,945.00 144,945.00
Jumlah Bahan 144,945.00
Total ( Tenaga + Bahan) 210,375.00
Overhead 0.0000 0.00
H.S.P 210,375.00

Pekerjaan Pemasangan 1 Buah Kunci Tanam Buah


Biasa
Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Kayu 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 51,400.00
Bahan
Kunci Tanam Biasa 2X Putar 1.0000 Buah 98,550.00 98,550.00
Jumlah Bahan 98,550.00
Total ( Tenaga + Bahan) 149,950.00
Overhead 0.0000 0.00
H.S.P 149,950.00

Pekerjaan Pemasangan 1 Buah Kunci Tanam Buah


Kamar Mandi
Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Kayu 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.0050 O.H 85,000.00 425.00
Jumlah Tenaga 50,755.00
Bahan
Kunci Tanam Kamar Mandi 1.0000 Buah 72,990.00 72,990.00
Jumlah Bahan 72,990.00
Total ( Tenaga + Bahan) 123,745.00
Overhead 0.0000 0.00
H.S.P 123,745.00

Pekerjaan Pemasangan 1 Buah Engsel Pintu Buah


Tenaga
Mandor 0.0008 O.H 110,000.00 88.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Kayu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.0150 O.H 85,000.00 1,275.00
Jumlah Tenaga 16,363.00
Bahan
Engsel Pintu Kuningan 3" 1.0000 Stel 40,860.00 40,860.00
Jumlah Bahan 40,860.00
Total ( Tenaga + Bahan) 57,223.00
Overhead 0.0000 0.00
H.S.P 57,223.00

Pekerjaan Pemasangan 1 Buah Engsel Jendela


Kupu-Kupu Buah

Tenaga
Mandor 0.0005 O.H 110,000.00 55.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 10,905.00
Bahan
Engsel Jendela Kupu-Kupu Kuningan 2.5" 1.0000 Stel 29,205.00 29,205.00
Jumlah Bahan 29,205.00
Total ( Tenaga + Bahan) 40,110.00
Overhead 0.0000 0.00
H.S.P 40,110.00

Pekerjaan Pemasangan 1 Buah Engsel Angin Buah


Tenaga
Mandor 0.0005 O.H 110,000.00 55.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 28,555.00
Bahan
Engsel Angin Kuningan 2" 1.0000 Stel 12,195.00 12,195.00
Jumlah Bahan 12,195.00
Total ( Tenaga + Bahan) 40,750.00
Overhead 0.0000 0.00
H.S.P 40,750.00

Pekerjaan Pemasangan 1 Buah Engsel Hidrolis Buah


Pintu Almunium
Tenaga
Kepala Tukang 0.0130 O.H 100,000.00 1,300.00
Tukang Kayu 0.1250 O.H 90,000.00 11,250.00
Jumlah Tenaga 12,550.00
Bahan
Engsel Hidrolis Pintu Alluminium 1.0000 Stel 239,535.00 239,535.00
Jumlah Bahan 239,535.00
Total ( Tenaga + Bahan) 252,085.00
Overhead 0.0000 0.00
H.S.P 252,085.00

Pekerjaan Pemasangan Spring Knip Stel


Tenaga
Mandor 0.0005 O.H 110,000.00 55.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.1000 O.H 85,000.00 8,500.00
Jumlah Tenaga 28,555.00
Bahan
Spring Knip 1.0000 buah 38,430.00 38,430.00
Jumlah Bahan 38,430.00
Total ( Tenaga + Bahan) 66,985.00
Overhead 0.0000 0.00
H.S.P 66,985.00

Pemasangan 1 Buah Kait Angin Buah


Tenaga
Mandor 0.0005 O.H 110,000.00 55.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.1400 O.H 90,000.00 12,600.00
Pekerja 0.0800 O.H 85,000.00 6,800.00
Jumlah Tenaga 21,455.00
Bahan
Kait Angin 1.0000 Buah 24,390.00 24,390.00
Jumlah Bahan 24,390.00
Total ( Tenaga + Bahan) 45,845.00
Overhead 0.0000 0.00
H.S.P 45,845.00

Pemasangan 1 Buah Door Closer Buah


Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Kayu 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.0500 O.H 85,000.00 4,250.00
Jumlah Tenaga 54,580.00
Bahan
Door Closer 1.0000 Buah 158,085.00 158,085.00
Jumlah Bahan 158,085.00
Total ( Tenaga + Bahan) 212,665.00
Overhead 0.0000 0.00
H.S.P 212,665.00

Pemasangan 1 Buah Kunci Slot Buah


Tenaga
Mandor 0.0010 O.H 110,000.00 110.00
Kepala Tukang 0.0200 O.H 100,000.00 2,000.00
Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.0200 O.H 85,000.00 1,700.00
Jumlah Tenaga 21,810.00
Bahan
Kunci Slot 1.0000 Buah 22,500.00 22,500.00
Jumlah Bahan 22,500.00
Total ( Tenaga + Bahan) 44,310.00
Overhead 0.0000 0.00
H.S.P 44,310.00

Pemasangan 1 Buah Door Holder Buah


Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Kayu 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.0500 O.H 85,000.00 4,250.00
Jumlah Tenaga 54,580.00
Bahan
Door Holder 1.0000 Buah 24,390.00 24,390.00
Jumlah Bahan 24,390.00
Total ( Tenaga + Bahan) 78,970.00
Overhead 0.0000 0.00
H.S.P 78,970.00

Pemasangan 1 Buah Door Stopper Buah


Tenaga
Mandor 0.0050 O.H 110,000.00 550.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 11,400.00
Bahan
Door Stopper 1.0000 Buah 24,390.00 24,390.00
Jumlah Bahan 24,390.00
Total ( Tenaga + Bahan) 35,790.00
Overhead 0.0000 0.00
H.S.P 35,790.00

Pekerjaan Pemasangan 1 Buah Rel Pintu Dorong Buah


Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang 0.0600 O.H 100,000.00 6,000.00
Tukang Kayu 0.6000 O.H 90,000.00 54,000.00
Pekerja 0.0600 O.H 85,000.00 5,100.00
Jumlah Tenaga 65,430.00
Bahan
Rel Pintu Dorong 1.0000 buah 383,625.00 383,625.00
Jumlah Bahan 383,625.00
Total ( Tenaga + Bahan) 449,055.00
Overhead 0.0000 0.00
H.S.P 449,055.00
Pemasangan 1 m2 Kaca Tebal 3 Mm m2
Tenaga
Mandor 0.0008 O.H 110,000.00 88.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Kayu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.0150 O.H 85,000.00 1,275.00
Jumlah Tenaga 16,363.00
Bahan
Kaca Tebal 3 Mm 1.1000 buah 100,935.00 111,028.50
Sealant 0.1667 Tube 13,950.00 2,325.47
Jumlah Bahan 113,353.97
Total ( Tenaga + Bahan) 129,716.97
Overhead 0.0000 0.00
H.S.P 129,716.97

Pemasangan 1 m2 Kaca Tebal 5 Mm m2


Tenaga
Mandor 0.0008 O.H 110,000.00 88.00
Kepala Tukang 0.0150 O.H 100,000.00 1,500.00
Tukang Kayu 0.1500 O.H 90,000.00 13,500.00
Pekerja 0.0150 O.H 85,000.00 1,275.00
Jumlah Tenaga 16,363.00
Bahan
Kaca Tebal 5 Mm 1.1000 buah 112,500.00 123,750.00
Sealant 0.1667 Tube 13,950.00 2,325.47
Jumlah Bahan 126,075.47
Total ( Tenaga + Bahan) 142,438.47
Overhead 0.0000 0.00
H.S.P 142,438.47

Pemasangan 1 m2 Kaca Tebal 8 Mm m2


Tenaga
Mandor 0.0009 O.H 110,000.00 99.00
Kepala Tukang 0.0170 O.H 100,000.00 1,700.00
Tukang Kayu 0.1700 O.H 90,000.00 15,300.00
Pekerja 0.0170 O.H 85,000.00 1,445.00
Jumlah Tenaga 18,544.00
Bahan
Kaca Tebal 8 Mm 1.1000 buah 197,640.00 217,404.00
Sealant 0.2334 Tube 13,950.00 3,255.93
Jumlah Bahan 220,659.93
Total ( Tenaga + Bahan) 239,203.93
Overhead 0.0000 0.00
H.S.P 239,203.93
U PENGECATAN
1 m2 Pekerjaan Mengerok Cat Lama Permukaan m2
Kayu Secara Manual
Tenaga
Mandor 0.0080 O.H 110,000.00 880.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 13,630.00
Bahan
Sabun Batangan 0.0500 Buah 3,555.00 177.75
Jumlah Bahan 177.75
Total ( Tenaga + Bahan) 13,807.75
Overhead 0.0000 0.00
H.S.P 13,807.75

1 m2 Pekerjaan Mendempul Dan Menggosok


m2
Kayu
Tenaga
Mandor 0.0025 O.H 110,000.00 275.00
Kepala Tukang Cat 0.0040 O.H 100,000.00 400.00
Tukang Cat 0.0400 O.H 90,000.00 3,600.00
Pekerja 0.0400 O.H 85,000.00 3,400.00
Jumlah Tenaga 7,675.00
Bahan
Dempul 0.0800 Kg 43,515.00 3,481.20
Minyak Cat Kayu 0.0200 Liter 22,050.00 441.00
Jumlah Bahan 3,922.20
Total ( Tenaga + Bahan) 11,597.20
Overhead 0.0000 0.00
H.S.P 11,597.20

1 m2 Pekerjaan Pengecatan Bidang Kayu Lama m2


Tenaga
Mandor 0.0025 O.H 110,000.00 275.00
Kepala Tukang Cat 0.0075 O.H 100,000.00 750.00
Tukang Cat 0.0750 O.H 90,000.00 6,750.00
Pekerja 0.0700 O.H 85,000.00 5,950.00
Jumlah Tenaga 13,725.00
Bahan
Plamur Kayu 0.1500 Kg 32,940.00 4,941.00
Cat Kayu Dasar Setara Emco 0.1700 Kg 69,750.00 11,857.50
Cat Kayu Penutup Setara Emco 0.1700 Kg 69,750.00 11,857.50
Jumlah Bahan 28,656.00
Total ( Tenaga + Bahan) 42,381.00
Overhead 0.0000 0.00
H.S.P 42,381.00
1 m2 Pekerjaan Pengecatan Bidang Kayu Baru (1
Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat m2
Penutup

Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang Cat 0.0060 O.H 100,000.00 600.00
Tukang Cat 0.0090 O.H 90,000.00 810.00
Pekerja 0.0700 O.H 85,000.00 5,950.00
Jumlah Tenaga 7,690.00
Bahan
Cat Meni Kayu 0.2000 Kg 34,785.00 6,957.00
Plamur Kayu 0.1500 Kg 32,940.00 4,941.00
Kuas 0.0100 bh 11,790.00 117.90
Pengencer 0.0300 Kg 26,685.00 800.55
Ampelas 0.2000 lembar 5,040.00 1,008.00
Cat Kayu Dasar 0.1700 Kg 69,750.00 11,857.50
Cat Kayu Penutup 2 Kali 0.2600 Kg 69,750.00 18,135.00
Jumlah Bahan 43,816.95
Total ( Tenaga + Bahan) 43,934.85
Overhead 0.0000 0.00
H.S.P 43,934.85

1 m2 Pekerjaan Mengikis/Mengerok Permukaan


Cat Tembok Lama m2

Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Pekerja 0.1500 O.H 85,000.00 12,750.00
Jumlah Tenaga 13,080.00
Bahan
Soda Api 0.0500 Kg 16,830.00 841.50
Jumlah Bahan 841.50
Total ( Tenaga + Bahan) 13,921.50
Overhead 0.0000 0.00
H.S.P 13,921.50

1 m2 Pekerjaan Mengapur Dinding Tembok Baru


Sampai Baik 3 Kali m2

Tenaga
Mandor 0.0100 O.H 110,000.00 1,100.00
Kepala Tukang 0.0010 O.H 100,000.00 100.00
Tukang Cat 0.0070 O.H 90,000.00 630.00
Pekerja 0.0390 O.H 85,000.00 3,315.00
Jumlah Tenaga 5,145.00
Bahan
Kapur Pasang 0.0010 m3 108,135.00 108.14
Jumlah Bahan 108.14
Total ( Tenaga + Bahan) 5,253.14
Overhead 0.0000 0.00
H.S.P 5,253.14

1 m2 Pekerjaan Pengecatan Tembok Baru 1 Lapis


Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup m2
Interior

Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang Cat 0.0063 O.H 100,000.00 630.00
Tukang Cat 0.0630 O.H 90,000.00 5,670.00
Pekerja 0.0200 O.H 85,000.00 1,700.00
Jumlah Tenaga 8,330.00
Bahan
Plamur Tembok 0.1000 Kg 14,625.00 1,462.50
Cat Tembok Dasar 0.1000 Kg 27,855.00 2,785.50
Cat Tembok Penutup (5 Kg) 0.0520 Galon 127,530.00 6,631.56
Jumlah Bahan 10,879.56
Total ( Tenaga + Bahan) 19,209.56
Overhead 0.0000 0.00
H.S.P 19,209.56

1 m2 Pekerjaan Pengecatan Tembok Lama 1


Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat m2
Penutup Interior

Tenaga
Mandor 0.0030 O.H 110,000.00 330.00
Kepala Tukang Cat 0.0042 O.H 100,000.00 420.00
Tukang Cat 0.0420 O.H 90,000.00 3,780.00
Pekerja 0.0280 O.H 85,000.00 2,380.00
Jumlah Tenaga 6,910.00
Bahan
Cat Tembok Dasar 0.1200 Kg 27,855.00 3,342.60
Cat Tembok 0.0360 Galon 127,530.00 4,591.08
Jumlah Bahan 7,933.68
Total ( Tenaga + Bahan) 14,843.68
Overhead 0.0000 0.00
H.S.P 14,843.68

1 M2 Pengecatan Tembok Exterior m2


Tenaga
Pekerja 0.2000 O.H 85,000.00 17,000.00
Tukang Cat 0.3000 O.H 90,000.00 27,000.00
Jumlah Tenaga 44,000.00
Bahan
Cat Tembok Exterior Setara Dulux Weathershield 0.0400 Galon 295,650.00 11,826.00
(2,5 Liter)
Cat Dasar (Alkali) 0.1600 kg 27,855.00 4,456.80
Ampelas 0.5000 lembar 5,040.00 2,520.00
Rol Cat 0.0100 bh 25,605.00 256.05
Jumlah Bahan 19,058.85
Total ( Tenaga + Bahan) 63,058.85
Overhead 0.0000 0.00
H.S.P 63,058.85

1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi m2

Tenaga
Mandor 0.0025 O.H 110,000.00 275.00
Kepala Tukang Cat 0.0200 O.H 100,000.00 2,000.00
Tukang Cat 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.0200 O.H 85,000.00 1,700.00
Jumlah Tenaga 21,975.00
Bahan
Meni Besi 0.1000 Kg 48,825.00 4,882.50
Kuas Cat 0.0100 bh 11,790.00 117.90
Jumlah Bahan 5,000.40
Total ( Tenaga + Bahan) 26,975.40
Overhead 0.0000 0.00
H.S.P 26,975.40

1 m2 Pekerjaan Pengecatan Permukaan Baja


Galvanis Secara Semprot Dengan Sistem 3 Lapis m2
Cat Mutakhir

Tenaga
Mandor 0.2000 O.H 110,000.00 22,000.00
Kepala Tukang Cat 0.2000 O.H 100,000.00 20,000.00
Tukang Cat 0.7000 O.H 90,000.00 63,000.00
Pekerja 0.4000 O.H 85,000.00 34,000.00
Jumlah Tenaga 139,000.00
Bahan
Cat Besi Dasar 0.3000 kg 64,350.00 19,305.00
Jumlah Bahan 19,305.00
Total ( Tenaga + Bahan) 158,305.00
Overhead 0.0000 0.00
H.S.P 158,305.00

1 m2 Pekerjaan Pengecatan Plafond m2


Tenaga
Mandor 0.0040 O.H 110,000.00 440.00
Kepala Tukang Cat 0.0060 O.H 100,000.00 600.00
Tukang Cat 0.0600 O.H 90,000.00 5,400.00
Pekerja 0.0800 O.H 85,000.00 6,800.00
Jumlah Tenaga 13,240.00
Bahan
Kapi 0.0500 Buah 10,440.00 522.00
Plamur Tembok 0.1000 Kg 14,625.00 1,462.50
Cat Tembok 0.0480 Galon 127,530.00 6,121.44
Kertas Gosok 0.5000 lembar 5,040.00 2,520.00
Kuas Cat 0.0100 bh 11,790.00 117.90
Jumlah Bahan 10,743.84
Total ( Tenaga + Bahan) 23,983.84
Overhead 0.0000 0.00
H.S.P 23,983.84

V INSTALASI LISTRIK
Pemasangan 1 Titik Stop Kontak Titik
Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.0500 O.H 85,000.00 4,250.00
Jumlah Tenaga 49,750.00
Bahan
Kabel Nya 1 X 2,5 Ex. Supreme 15.0000 m' 4,455.00 66,825.00
Pipa Pralon 5/8 0.2000 Batang 9,180.00 1,836.00
Stop Kontak Ex. Broco 1.0000 Buah 15,975.00 15,975.00
T Doos Pvc 1.0000 Buah 4,635.00 4,635.00
Jumlah Bahan 89,271.00
Total ( Tenaga + Bahan) 139,021.00
Overhead 0.0000 0.00
H.S.P 139,021.00

Pemasangan 1 Titik Lampu (Menggunakan Kabel Titik


Nya)
Tenaga
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Listrik 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 75,500.00
Bahan
Kabel Nya 1 X 2,5 Ex. Supreme 15.0000 m' 4,455.00 66,825.00
Pipa Pralon 5/8 1.0000 Batang 9,180.00 9,180.00
Saklar Ex. Broco 1.0000 Buah 13,005.00 13,005.00
Fiting Plafond Ex. Broco 1.0000 Buah 19,530.00 19,530.00
T Doos Pvc 1.0000 Buah 4,635.00 4,635.00
Jumlah Bahan 113,175.00
Total ( Tenaga + Bahan) 188,675.00
Overhead 0.0000 0.00
H.S.P 188,675.00
Pemasangan 1 Titik Lampu (Menggunakan Kabel Titik
Nym)
Tenaga
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Listrik 0.5000 O.H 90,000.00 45,000.00
Pekerja 0.3000 O.H 85,000.00 25,500.00
Jumlah Tenaga 75,500.00
Bahan
Saklar Ex. Broco 1.0000 Buah 13,005.00 13,005.00
Kabel Nym 2 X 2,5 Ex. Supreme 7.5000 m' 15,075.00 113,062.50
Pipa Pralon 5/8 1.0000 Batang 9,180.00 9,180.00
T Doos Pvc 1.0000 Buah 4,635.00 4,635.00
Fiting Plafon 1.0000 Buah 19,530.00 19,530.00
Jumlah Bahan 159,412.50
Total ( Tenaga + Bahan) 234,912.50
Overhead 0.0000 0.00
H.S.P 234,912.50

Pekerjaan Pemasangan Saklar Tunggal Per Titik Titik


Tenaga
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Listrik 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.0010 O.H 85,000.00 85.00
Jumlah Tenaga 23,085.00
Bahan
Saklar Tunggal Ex. Broco 1.0000 Buah 13,005.00 13,005.00
Jumlah Bahan 13,005.00
Total ( Tenaga + Bahan) 36,090.00
Overhead 0.0000 0.00
H.S.P 36,090.00

Pekerjaan Pemasangan Saklar Ganda Per Titik Titik


Tenaga
Kepala Tukang 0.0500 O.H 100,000.00 5,000.00
Tukang Listrik 0.2000 O.H 90,000.00 18,000.00
Pekerja 0.0010 O.H 85,000.00 85.00
Jumlah Tenaga 23,085.00
Bahan
Saklar Ganda Ex. Broco 1.0000 Buah 18,000.00 18,000.00
Jumlah Bahan 18,000.00
Total ( Tenaga + Bahan) 41,085.00
Overhead 0.0000 0.00
H.S.P 41,085.00

1 Unit Pemasangan Lampu 1 x 18 Watt (Lengkap) Buah


Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 3,150.00
Bahan
Lampu Tl 1 x 18 Watt 1.0000 Set 185,895.00 185,895.00
Jumlah Bahan 185,895.00
Total ( Tenaga + Bahan) 189,045.00
Overhead 0.0000 0.00
H.S.P 189,045.00

1 Unit Pemasangan Lampu 1 x 36 Watt (Lengkap) Buah


Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 3,150.00
Bahan
Lampu Tl 1 x 36 Watt 1.0000 Set 290,295.00 290,295.00
Jumlah Bahan 290,295.00
Total ( Tenaga + Bahan) 293,445.00
Overhead 0.0000 0.00
H.S.P 293,445.00

1 Buah Pemasangan Lampu Sl 18 Watt Buah


Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 3,150.00
Bahan
Lampu Sl 18 Watt 1.0000 Buah 39,780.00 39,780.00
Jumlah Bahan 39,780.00
Total ( Tenaga + Bahan) 42,930.00
Overhead 0.0000 0.00
H.S.P 42,930.00

1 Buah Pemasangan Lampu Sl 23 Watt Buah


Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 3,150.00
Bahan
Lampu Sl 23 Watt 1.0000 Buah 46,260.00 46,260.00
Jumlah Bahan 46,260.00
Total ( Tenaga + Bahan) 49,410.00
Overhead 0.0000 0.00
H.S.P 49,410.00

1 Buah Pemasangan Lampu Pijar 25 Watt Buah


Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 3,150.00
Bahan
Lampu Pijar 25 Watt 1.0000 Buah 10,350.00 10,350.00
Jumlah Bahan 10,350.00
Total ( Tenaga + Bahan) 13,500.00
Overhead 0.0000 0.00
H.S.P 13,500.00

1 Buah Pemasangan Lampu Down Light + Fitting Buah


Tenaga
Kepala Tukang 0.0050 O.H 100,000.00 500.00
Tukang Listrik 0.0200 O.H 90,000.00 1,800.00
Pekerja 0.0100 O.H 85,000.00 850.00
Jumlah Tenaga 3,150.00
Bahan
Lampu Down Light + Fitting 1.0000 Buah 105,030.00 105,030.00
Jumlah Bahan 105,030.00
Total ( Tenaga + Bahan) 108,180.00
Overhead 0.0000 0.00
H.S.P 108,180.00

1 Titik Pemasangan Box Panel Titik


Tenaga
Kepala Tukang 1.0000 O.H 100,000.00 100,000.00
Tukang Listrik 1.0000 O.H 90,000.00 90,000.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 232,500.00
Bahan
Box panel PVC isi 4 MCB 1.0000 bh 347,940.00 347,940.00
MCB 6 A 2.0000 bh 49,860.00 99,720.00
MCB 4 A 2.0000 bh 57,420.00 114,840.00
Kabel NYM 3 x 2,5 mm2 6.0000 m 19,710.00 118,260.00
Jumlah Bahan 680,760.00
Total ( Tenaga + Bahan) 913,260.00
Overhead 0.0000 0.00
H.S.P 913,260.00

W PAVING & PERKERASAN JALAN


1 m2 Pekerjaan Pemasangan Paving Stone Tebal Titik
6 Cm Abu - Abu Persegi Panjang (K-175)
Tenaga
Mandor 0.0125 O.H 110,000.00 1,375.00
Kepala Tukang 0.0125 O.H 100,000.00 1,250.00
Tukang Batu 0.2500 O.H 90,000.00 22,500.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 67,625.00
Bahan
Paving Stone Abu - Abu Tebal 6 Cm (Persegi
Panjang) K-175 1.0000 m2 65,109.50 65,109.50

Jumlah Bahan 65,109.50


Total ( Tenaga + Bahan) 132,734.50
Overhead 0.0000 0.00
H.S.P 132,734.50

1 m2 Pekerjaan Pemasangan Paving Stone Tebal Titik


6 Cm Abu - Abu Persegi Panjang (K-200)
Tenaga
Mandor 0.0125 O.H 110,000.00 1,375.00
Kepala Tukang 0.0125 O.H 100,000.00 1,250.00
Tukang Batu 0.2500 O.H 90,000.00 22,500.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 67,625.00
Bahan
Paving Stone Abu - Abu Tebal 6 Cm (Persegi
1.0000 m2 76,023.50 76,023.50
Panjang) K-200
Jumlah Bahan 76,023.50
Total ( Tenaga + Bahan) 143,648.50
Overhead 0.0000 0.00
H.S.P 143,648.50

1 m2 Pekerjaan Pemasangan Paving Stone Tebal


6 Cm Abu - Abu Persegi Panjang (K-300) Titik

Tenaga
Mandor 0.0125 O.H 110,000.00 1,375.00
Kepala Tukang 0.0125 O.H 100,000.00 1,250.00
Tukang Batu 0.2500 O.H 90,000.00 22,500.00
Pekerja 0.5000 O.H 85,000.00 42,500.00
Jumlah Tenaga 67,625.00
Bahan
Paving Stone Abu - Abu Tebal 6 Cm (Persegi
Panjang) K-300 1.0000 m2 106,501.24 106,501.24

Jumlah Bahan 106,501.24


Total ( Tenaga + Bahan) 174,126.24
Overhead 0.0000 0.00
H.S.P 174,126.24

1 m' Pekerjaan Pemasangan Kanstin Uk. 15.25.40 (K-300) Titik


Tenaga
Mandor 0.0010 O.H 110,000.00 110.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 27,110.00
Bahan
Semen Portland 0.4500 Zak 69,750.00 31,387.50
Pasir Pasang 0.0010 m3 220,275.00 220.28
Kanstin Uk. 15.25.40 2.5000 buah 27,606.00 69,015.00
Jumlah Bahan 100,622.78
Total ( Tenaga + Bahan) 127,732.78
Overhead 0.0000 0.00
H.S.P 127,732.78

1 m' Pekerjaan Pemasangan Stopper/ Uskup (K-300) Titik


Tenaga
Mandor 0.0010 O.H 110,000.00 110.00
Kepala Tukang 0.0100 O.H 100,000.00 1,000.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.2000 O.H 85,000.00 17,000.00
Jumlah Tenaga 27,110.00
Bahan
Semen Portland 0.4500 Zak 69,750.00 31,387.50
Pasir Pasang 0.0010 m3 220,275.00 220.28
Stopper/Uskup 0.1670 m2 96,514.00 16,117.84
Jumlah Bahan 47,725.61
Total ( Tenaga + Bahan) 74,835.61
Overhead 0.0000 0.00
H.S.P 74,835.61

V ACCESSORIES
1 m2 Pekerjaan Pemasangan / Covering ACP (Aluminium Composite
Panel) m2

Tenaga
Mandor 0.0070 O.H 110,000.00 770.00
Kepala Tukang 0.0700 O.H 100,000.00 7,000.00
Tukang Besi 0.7000 O.H 90,000.00 63,000.00
Pekerja 0.3900 O.H 85,000.00 33,150.00
Jumlah Tenaga 103,920.00
Bahan
Alumunium Composite 1.1000 m2 420,500.00 462,550.00
Hollow Besi Galvanis Uk 4 x 4 x 1 mm 0.8000 Btg 115,000.00 92,000.00
Braket Siku / spigot / stiffener 0.2670 Btg 60,000.00 16,020.00
Skrup Fixer 0.0800 Buah 29,070.00 2,325.60
Paku Skrup 0.1100 Kg 21,600.00 2,376.00
Sealant 0.2500 Tube 13,950.00 3,487.50
Jumlah Bahan 570,570.00
Alat
Stager  0.0200 set 110,000.00 2,200.00
Jumlah Bahan 2,200.00
Total ( Tenaga + Bahan) 674,490.00
Overhead 0.0000 0.00
H.S.P 674,490.00