Murugan Paramasivam. BE,MBA.

, Contact: 9865597711
Electrical Engineer, Notifymurugan@gmail.com
(With Valid C- License, BOE, EA&EM Certificate) Tamilnadu, India.
Total years of Experience: 15.00 Years

PROFILE SUMMARY

Engineering Professional with Total 14.00 years of lead role experience in Electrical, Project Management, Pre
Commissioning, Testing & Commissioning,Operation & Maintenance, Energy Performance Management. I Strongly
believe & Interested in Continuous Research & Study the latest Technical Upgradation in Electrical Engineering and
implement innovative ideas in all aspects of organisation needs to achieve Continuous Performance improvement
in effective Operations, Maintenance, Energy Management, Projects Implementation, Safety & Environment.

WORK EXPERIENCE:

A) Vedanta Resources Ltd., Mumbai; Total year of service : 7 Years 3 Months


Plant : Talwadi Sabo Power Limited (TSPL) – Punjab, India.
Role & Responsiblities:-
Position: Associate Manager – 3 X 660MW – Electrical systems - Erection, Testing, Commissioning, O&M.

B) Power Engineering Services., Neyveli; Total year of service : 5 Years 1 Months


Plant : Neyveli Lignite Corporation – Tamilnadu, India .
Role & Responsiblities:-
Position: Manager – Electrical systems - Erection, Testing, Commissioning, O&M.

C) SS Power Tech., Salem; Total year of service : 2 Years 2 Months


Plant : Neyveli Lignite Corporation – Tamilnadu, India .
Role & Responsiblities:-
Position: Manager – Electrical systems - Erection, Testing, Commissioning, O&M.

POST GRAGUATE & ENGINEERING EDUCATION:

A) Master of Business Administration in General Management fromAnnamalai University, India.(2009 – 2011).


B) Bachelor of Engineering in Electrical & Electronics fromAnnamalai University, India.(2003 – 2007);
First Class with Distinction OGPA : 85.58%.

WORK EXPERIENCE IN ELECTRICAL ENGINEERING:-ERECTION, TESTING AND COMMISSIONING:

 Erection, Testing &Commissioning of Generators& Accessories up to 660MW, 776.5MVA, 22KV, 3000 RPM
Hydrogen/Water cooled, ABB Unitrol 5000 Static Excitation System.
 Erection, Testing & Commissioning of Generating Transformer& Accessories up to 3X270MVA, 22KV/420KV,
OFAF type.
 Erection, Testing & Commissioning of 400KV AIS Switchyard with One and half scheme, “I” Type configuration
with 4 CT Protection configuration, having 17 bays.
 Erection, Testing & Commissioning of Transmission Line Feeder & Switchyard Protection relays, Bay Control Unit
(BCU) & SCADA Schemes for 400 KV.
 Erection, Testing & Commissioning of Electrical Protection system & Relay configuration in Generation,
Transmission and Distribution functions.
 Erection, Testing & Commissioning of E-SCADA systems &Transmission Line PLCC systems.
 Erection, Testing & Commissioning of 400KV SF6 Circuit Breakers.
 Erection, Testing & Commissioning of Variable Frequency Drives (VFD) for fans & pumps.
 Erection, Testing & Commissioning of Motor up to 16.5MW 11KV Air/Water cooled, DC Drives and associated
switchgears.
 Erection, Testing & Commissioning of Intelligent MCC’s & PCC’s Panels up to 11KV Switchgear system.
 Erection, Testing & Commissioning of UPS up to 3 Phase, 2 X 80KVA, 220V AC.
 Erection, Testing & Commissioning of DC battery and charging system up to 2X1850 AH, 220V DC Distribution.
 Erection, Testing & Commissioning of Diesel Generator system up to 2 MVA, 1500RPM, 415V.
 Short Circuit Calculation, Relay coordination, Cable sizing, bus bar, earthing system according to the load
analysis and routing, lighting and illumination design.
 Executed a project of 400KV transmission line interconnection with PSEB (Punjab state electricity Board) to TSPL
power station for a line length of 200Kms in India.
 Evaluating Design, Coordinating with Consultants, Clients and Sub-Contractor for execution.
 Formulating the detailed Project Report, Contract Agreement and Project Execution after discussion with Client
and Project Team.
 Finalizing the resource requirement for the Project as per the Project Requirement.
 Coordinating with Client for completion of the Project as per the schedule, Approved Drawing and the Technical
Specification.
 Monitoring the Project Status by conducting the periodic review meeting with Client, Project Team and the Sub-
Contractor.
 Coordinating with the Accounts team for Preparation and Submission of Billing.
 Preparation of Project Reports and circulating the same to the concerned Team.

DECLERATION:

I hereby declare that all the information mentioned above is true to the best of my knowledge.

Place: Tamilnadu.

Date: 28.08.2021

(MURUGAN PARAMASIVAM)