CE 511 | CONSTRUCTION METHOD AND MANAGEMENT

1st SEMESTER AY 2021-2022 | LABORATORY EXERCISE NO. 4 | BSCE-5A | CBDL

WORK BREAKDOWN
STRUCTURE
CONSTRUCTION OF 2 STORY
RESIDENTIAL BUILDING

Construction CONSTRUCTION
Activities

FOUNDATION EXTERNAL
INTERNAL
DESIGN

ELECTRICAL EXCAVATION MASONRY WORKS


CONTRACTS

ELECTRICAL ROUGH-IN CONCRETE


POURING & CURING PLASTERING
REVIEW AND
REVISIONS OF TERMINAL INSTALLATION
CONTRACTS TILE INSTALLATION
STRIPPING
HVAC INSTALLATION

CONSTRUCTION OF 1ST PAINTING


FLOOR TO 2ND FLOOR
PLUMBING

REINFORCEMENT OF
PLUMBING ROUGH-IN
BEAMS, COLUMNS,
INTERNAL SLABS & STAIRCASE LANDSCAPING

SETTING
PLIMBING
FIXTURES
CONCRETE POURING &
CURING
CLEANING & TESTING
PREPARED BY: MARK NEL CASIMERO BSCE-5A
STRIPPING