BAPCO - 001 CS Castings
BAPCO - 001 CS Castings
TITLE: TECHNICAL DELIVERY CONDITIONS FOR CARBON STEEL CASTINGS FOR TECHNIP BAPCO
PROJECT
1.0 SCOPE:
This Procedure describes the requirements for Carbon Steel Castings specific to Technip Bapco project.
2.0 APPLICATION:
The Foundries shall manufacture the casting strictly to this procedure, when specified in the Purchase Order.
Raw material shall be checked for chemical composition using Spectrometer. The accepted Raw material shall
be stored separately with Identification. Special NACE blooms only to be used which was refined through
Vaccum Degassing process.
Raw material shall be stored in covered area and free from Oil, Grease and other contamination.
4.2.2 Bath analysis shall be done after melting to check the chemistry by Spectrometer. Based on bath
analysis, Ferro alloy addition shall be done as required.
4.2.4 Deoxidation shall be done in the ladle by using suitable deoxidising chemical.
QAF-024 R2
B) Minor weld repairs shall be carried out Shielded Metal Arc Welding (SMAW) process and shall be subjected to
PWHT treatment
C) PWHT shall be carried out between 621 to 640 deg C and shall be recorded.
QAF-024 R2
DPE shall be conducted on non-magnetic castings and where MPE is not feasible. The testing procedure shall
be in accordance with ASTM E165. Acceptance Criteria: ASME B16.34, Annex B Appendix III, Section 2.1
For class 900 & above, in hydrogen service shall have a casting quality factor of 100 percent. The examination
shall be performed by radiography in accordance with ASME Section VIII, Division 1, Appendix 7.
12.0 CERTIFICATION:
Material Certificates shall be in accordance with EN 10204 Type 3.1 (3.1B) and as a minimum shall include:
13.0 MARKING:
Marking shall be carried out as per L&T Valves drawings.
QAF-024 R2