Professional Documents
Culture Documents
SEM 1a - Rubric of Communication Project Proposal Presentation (30%) - V3 (Measurement System)
SEM 1a - Rubric of Communication Project Proposal Presentation (30%) - V3 (Measurement System)
Important device/ tool/ technique/ software Important device/ tool/ technique/ software
Important device/ tool/ technique/ software
Project description on the needed for the measurement system are needed for the measurement system are
It is unclear what is being Description on the measurement needed for the measurement system are
described in a clear and easy to described in a clear, concise and easy to
measurement system and the proposed. The measurement system and the application is not clear. described in an adequate manner, though
understand manner, with a few understand manner with the aid of picture or
application system is not suitable for the It may be verbose or utilize a lot of the need for greater clarity is apparent.
exceptions. conceptual drawing or audio.
proposed application. field-specific jargon.
The proposed application is adequate.
The proposed application is useful. The proposed application is useful and
interesting.
Few important device/ tool / software Most of the important device/ tool /
None of the important device/ tool / Some of the important device/ tool / software All required device/ tool / software needed for
needed for the project are calculated in software needed for the project are
software needed for the project are needed for the project are calculated in the project are calculated in terms of quantity
Budget (Appropriateness terms of quantity and amount. Market calculated in terms of quantity and
calculated in terms of quantity and terms of quantity and amount. Market price and amount. Market price survey is done. Able
& Justification) price survey is not performed. A amount. Market price survey is mostly
amount. Market price survey is not survey is done on some of it. Able to ensure to propose cheap/alternative/recycle solution
feasible and low-cost project is done. Able to ensure a feasible and low-
performed. Non-feasible project. a feasible and low-cost project. and ensure a feasible and low-cost project.
uncertain. cost project.
Timeline:
Timeline appears to meet less than half Timeline meets most of the activities Timeline may not be clearly presented but Timeline is clearly presented and is clearly
SEM 1 (Measurement Timeline is not suitable for the
of the activities proposed. Not clearly proposed. Timeline may not be clearly appears to be suitable for all the activities suitable for and meets all the activities
System) & SEM 2 activities described.
presented. presented. described. described.
(Application)
____________________________________________________________________________________________________________________________________