5'-10"
17' 25'-3"
10"
PROPOSED BUILDING
32'-10"
32'-10"
27'
7'
SEPTIC TANK
RECHARGE PIT
6' BY 8'
5' BY 4'
14' 19'-11"
20'-5" 4'
4'
4'
3'
3'
SITE PLAN
CHECKED BY
01
DHARAN, SUNSARI
DATE : 2078-04-30
A B C
A B C
27'
1'-2" 8'-3" 1'-2" 12'-11" 1'-2" 1'-2" 8'-3" 1'-2" 12'-11" 1'-2"
9'-6" 14'-1" 9'-6" 14'-1"
3'-3"
3'-3"
W3 W6 W3 W6
1'-2"
1'-2"
1'-2"
1'-2"
4 D3 4 4 4
D3
10'-10"
10'-10"
10'-10"
BED ROOM
W6
13'3"X10'0" 11'7"X10'0"
9'-8"
9'-8"
9'-8"
9'-8"
8'11"X10'4" 11'0"X10'9"
D3 D3 D3
1'-2"
1'-2"
1'-2"
1'-2"
3 3 3 3
W2
T/B D2
UP
UP
5'1"X4'0"
X X X
11'-2"
11'-2"
11'-2"
11'-2"
X
10'
10'
10'
10'
W6
DINNING ROOM
42'-3"
12'10"X15'3"
38'
38'
41'
38'
38'
D3
D2
1'-2"
1'-2"
T/B
1'-2"
1'-2"
2 2 2 2
LIVING ROOM 7'0"X3'9"
T/B LIVING ROOM 8'7"X13'9"
W2
9'4"X4'10" D2 13'3"X10'2"
W4
14'-10"
14'-10"
14'-10"
14'-10"
13'-8"
13'-8"
13'-8"
13'-8"
BED ROOM
13'7"X12'2"
DW1
ROOM
W4
DW
8'11"X9'2"
VERANDHA
11'6"X7'9"
W6
1'-2"
1'-2"
1'-2"
1'-2"
1 1 1 1
1'-6"
1'
9'-6" 14'-1" 9'-6" 14'-1"
1'-2" 8'-3" 1'-2" 12'-11" 1'-2" 1'-2" 8'-3" 1'-2" 12'-11" 1'-2"
A B C A B C
DEPARTMENT OF ARCHITECTURE
PURWANCHAL CAMPUS
TITLE : FLOOR PLAN
ROLL NO. : PUR075BAR008 SCALE : 1:96
CHECKED BY
02
DHARAN, SUNSARI
DATE : 2078-04-30
A B C
26'-2"
1'-6" 15'-3"
3'-3"
1'-6"
W6
1'-2"
1'-2"
4 4
10'-10"
10'-10"
STORE ROOM
9'-8"
9'-8"
13'7"X10'0"
23'-2"
23'-2"
1'-2"
1'-2"
3 3
D3
X X
11'-2"
11'-2"
10'
10'
X X
42'-9"
DN UPPER TERRACE
42'-9"
41'-6"
41'-6"
D3
1'-2"
1'-2"
2 2
1'-6"
1'-6"
W5
OPEN TERRACE
LOWER TERRACE
1 1
14'-1"
1'-2" 12'-11" 1'-2"
27'
1'-6" 15'-3"
27'
A B C
ROOF PLAN
SECOND FLOOR PLAN
CHECKED BY
03
DHARAN, SUNSARI
DATE : 2078-04-30
9'-2"
1'-6"
NORTH ELEVATION EAST ELEVATION
CHECKED BY
04
DHARAN, SUNSARI
DATE : 2078-04-30
SOUTH ELEVATION WEST ELEVATION
CHECKED BY
05
DHARAN, SUNSARI
DATE : 2078-04-30
3'
1'-10" 1'-3"
4"
5'
4"
4'-9"
2'-8"
4" 4"
2'-1"
5"
5'
2'-6"
7'
4" 4"
2'-1"
5"
5'
2'-6"
4" 4"
10" 1'-8"
10" 1'-8"
3'-2"
3'-2"
1/8" Th. Cement Punning (1:1)
1/2" Th. Cement Plaster (1:4)
3" Th. P.C.C. M15 (1:2:4)
6" Th. Stone Soling
8" Th. Sand Filling
Rammed Earth
SECTION AT -
CHECKED BY
06
DHARAN, SUNSARI
DATE : 2078-04-30
6'-8" 3'-6" 10"
11'
10"
FLIGHT NO. 1
1'-10" 1'-3"
3'-6"
4"
FLIGHT NO. 2
1 2 3 4 5 6 7 8 9
2'-1"
9'-10"
10'
1'-1"
5"
10
2'-6"
4"
19 18 17 16 15 14 13 12 11
1'-3" 1'-8"
3'-6"
5"
FLIGHT NO. 3
4'-3"
10'
5"
11'
2'-6"
(1:32)
1'-6"
3'-2"
10"
1
2" SCREED
7"
2'-6"
(1:64)
CHECKED BY
07
DHARAN, SUNSARI
DATE : 2078-04-30
LINTEL LINTEL
FRAME FRAME
PANEL IN OUT
7'
7'
OUT
IN
LINTEL
IN OUT
Sill Level
FRAME
ELEVATION
A SECTION AT A-A
6'
A
WINDOW 6
TRIBHUWAN UNIVERSITY NAME : ASHESH REGMI
SUBJECT : WORKING DRAWING
INSTITUTE OF ENGINEERING SHEET
PURWANCHAL CAMPUS
DEPARTMENT OF ARCHITECTURE TITLE : OPENING DETAIL
ROLL NO. : PUR075BAR008 SCALE : 1:48
CHECKED BY
08
DHARAN, SUNSARI
DATE : 2078-04-30
A B C A B C
9'-7" 14'-1"
4 4 4 4
5'
5'
5'
5'
2'
2'
1'
1'
F1 F1 F2
5'
10'-10"
10'-10"
8'-10"
5'-10"
9'-10"
9'-10"
5'-10"
5'-10"
2'
F1
0"
3 3 3 3
2'
2'
5'
5'
5'
1'
1'
F1 F1 F2
11'-2"
5'
10'-2"
10'-2"
2' 7'-7" 2' 11'-7" 2'
11'-2"
11'-2"
9'-2"
6'-2"
6'-2"
2 2 2 2
5'
2'
5'
5'
1'
1'
F1 F1 F2
10'-1"
13'-1"
10'-1"
10'-1"
14'-1"
14'-1"
15'-1"
15'-1"
1 1 1 1
5'
2'
5'
5'
1'
1'
F1 F1 F2
1' 8'-7" 1' 13'-1 1/16" 5' 4'-7" 5' 7'-1 1/16" 5'
11 15/16"
5' 4'-7" 5' 7'-1 1/16" 5'
9'-7" 14'-1"
A B C A B C
DEPARTMENT OF ARCHITECTURE
PURWANCHAL CAMPUS
TITLE : FOOTING AND TRENCH PLAN
ROLL NO. : PUR075BAR008 SCALE : 1:96
09
DATE : 2078-05-20 CHECKED BY
DHARAN, SUNSARI
A B C A B C
9'-7" 14'-1"
9'-7" 14'-1"
4 4 4 4
1'
1'
1'
X X Y Y
10'-10"
10'-10"
10'-10"
10'-10"
9'-10"
9'-10"
9'-10"
3 3 3 3
1'
1'
1'
10'-2"
10'-2"
10'-2"
11'-2"
11'-2"
11'-2"
11'-2"
2 1'-0 9/16" 2 2 2
1'
1'
14'-0 7/16"
14'-1"
15'-1"
15'-1"
14'-1"
15'-1"
1 15'-1" 1 1 1
1'
1'
1'
A B C A B C
3"
4" 1' 4"
A1 A2
4'-6"
STIRRUP 8 MM
C/C
3"
C/C
2- 12 DIAMETER TH
12MM DIAMETER @ 6" C/C
12MM DIAMETER @ 6" C/C
B2
FOUNDATION PLAN - F2
PLINTH LEVEL
TIE BEAM
TIE BEAM
4 NO.S 16MM
DIAMETER AT CORNER
GROUND LEVEL
1'
DAIMETER AT MIDDLE
FOUNDATION BEAM
FOUNDATION BEAM
STIRRUP 8 MM
TIE BEAM
5'
4" 4"
5'
1'
1'
9"
9"
3" 3"
3" 3"
4'-9" 3"
3" 4'-6" 3"
SECTION AT B1-B2
SECTION AT A1-A2
5'
7"
7"
3" 1'-3"
2" 1'-3"
7"
7"
2" 1'-6" 3" 1'-6"
BRICK MASONRY(1:6)
7"
7"
3" 1'-9"
2" 1'-9"
3"
3"
3" THICK P.C.C(1:3:6) 3" THICK P.C.C(1:3:6)
1 LAYER FLAT BRICK SOLING
3"
3"
1 LAYER FLAT BRICK SOLING
COMPACTED EARTH COMPACTED EARTH
2-16 dia(TH) 2-16 dia(TH) 2-16 dia(TH)+1-12DAI 2-16 dia(TH) 2-16 dia(TH) 2-16 dia(TH)+1-12DAI 2-16 dia(TH)
2-16 dia(TH)
Dia8MM Dia8MM Dia8MM 2LVS@4"C/C Dia8MM 2LVS@4"C/C Dia8MM Dia8MM 2LVS@4"C/C
Dia8MM 2LVS@4"C/C Dia8MM 2LVS@4"C/C Dia8MM 2LVS@4"C/C
2LVS@6"C/C 2LVS@6"C/C 2LVS@6"C/C
4 3 2 1
A B C
2'-7" 2'-7" 4' 4'
2-16 dia(TH)+1-12DAI 2-16 dia(TH)+1-12DAI 2-16 dia(TH) 2-16 dia(TH)+1-12DAI
2-16 dia(TH) 2-16 dia(TH)+1-12DAI 2-16 dia(TH) 2-16 dia(TH) 2-16 dia(TH)+1-12DAI 2-16 dia(TH)
Dia8MM Dia8MM 2LVS@4"C/C Dia8MM 2LVS@4"C/C Dia8MM Dia8MM 2LVS@4"C/C
Dia8MM 2LVS@4"C/C
2LVS@6"C/C 2LVS@6"C/C
8MM diaTOP DIST. BAR @6C/C 8MM diaTOP DIST. BAR @6C/C 8MM diaTOP DIST. BAR @6C/C 8MM diaTOP DIST. BAR @6C/C
2'-6" 2'-6" 2'-9" 2'-9" 3'-6" 3'-6"
4 3 2 1
0.3 L 0R LD
WHICHEVER IS GREATER
LD SPACING OF STIRRUPS > 4"
0.25 L 0R LD
WHICHEVER IS GREATER LD
3
8
3-DAI16 3-DAI16
1 2 3 4
1 2 3 4
1 2 3 4
3-DAI16 3-DAI16
1 2 3 4
TYP.ANCHORAGE OF BEAM
JUNCTION OF BEAM AND COLUMN PLAN BARS IN AN EXTERNAL JOINT
EXCEPT TOP FLOOR
2"MAX
TYPICAL SECONDARY
BEAM JOINT DETAIL
1'-2"
19
FLIGHT NO. 1
FLIGHT NO. 2
11
18
1 2 3 4 5 6 7 8 9
.
Ld 8 mm. Ø @ 8" c/c 10 10
10'
10"
8'
17
6.57"
19 18 17 16 15 14 13 12 11
16 12mm. Ø @ 8" c/c 9 FLIGHT NO. 3
10"
15 12mm. Ø @ 8" c/c
STAIRCASE PLAN
6.57"
14
.
Ld
13
12mm. Ø @ 8" c/c
8 mm. Ø @ 8" c/c 12
10" 10" 3'-9" 10" 3'-9" 10"
11 12mm. Ø @ 4" c/c
.
Ld 8
5"
3
7"
. 10"
Ld
6.57"
12mm. Ø @ 4" c/c
2
10'-10"
10'-10"
11'-2"
11'-2"
14'-10"
14'-10"
9'-5" 14'-2"
DETAILS
10 DIA @6"C/C
8 DIA @7"C/C