Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

8D : GQE REQUIREMENTS

Service qualité Fournisseur - Usine de FLINS Janvier 2014


PREAMBLE

This tutorial is suppose to help you document a GQE following an occured incident on
your parts.
It enables you to document the GQE steps according to our requirements.
It reminds you of the GQE steps deadlines.

Service qualité Fournisseur - Usine de FLINS Janvier 2014


Answer deadlines for 8D steps

t0 t0 + t0 + t0 +

The supplier is alerted. 48H max 10 days max 30 days max


F F F

R R R

1 2 3 4 5 6 7 8
Follow-up
Problem Other similar Final Final action Confirmation
First analysis Immediate action
details concerned analysis plan of final
action plan action plans Capitalisa-
products
tion

P D P D C A
Supplier responsibilty: Forward the synthesis (document) and proofs (file) of
F the 8D approach

Renault responsibility : validate


R
- Comprehensiveness and adequacy of the taken action plans
- Respected deadlines (complimentary informations or audit if needed)

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 1 : Problem details

REQUIRED FIELDS

1 – GQE editor’s name and


function.

2 – GQE validator’s name and


function (example : head of
quality).

Detailed description of detected


defect.

REQUIRED FIELD

Description of detected defect.

REQUIRED FIELD

Recurrence : same client effect on same


product on period shorter than a year.

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 1 : example

OK
Service qualité Fournisseur - Usine de FLINS Janvier 2014
8D Step 2 : Similar risky products

Complimentary description: Is
there a risk for other similar
products ?
COMPULSORY ANSWERS WITH
COMPULSORY COMMENTS.

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 2 : example

OK

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 3 : First analysis

REQUIRED FIELS
COMPULSORY ANSWERS WITH
5 why of non détection as file
COMPULSORY COMMENTS.
attachment and explanations in
this field.

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 3 : example

OK

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 4 : Immediate action plan

Client protection description.

REQUIRED FIELD

Client protection with taken actions.

All OK and NOK sorted quantities must figure here

ALL DOCUMENTS DESCRIBING AND/OR


EXPLAINING THE NON DETECTION CAUSES
AND THE ACTIONS TAKEN TO PROCTECT
CLIENT. (ex. : 5 why, warning form at
working post …)

DO NOT FORGET TO SEND Steps 1 to 4 AFTER COMPLETING THEM !

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 4 : example

OK

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 5 : Final analysis

Complimentary description of
causes if necessary.

REQUIRED FIELDS

Retranscription of multiple
causes with actions takers and
mobilised services (set of
explanatory documents in file
attachment).

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 5 : example

OK
Service qualité Fournisseur - Usine de FLINS Janvier 2014
8D Step 6 : Final action plan

Complimentary descripton of
taken action plans.

REQUIRED FIELDS

Actions taken by supplier too clear defect on


futur pieces, action taker, action takers’ service
and dates when actions are taken (every action
must be linked to a cause described in Step 5).

ALL DOCUMENTS DISCRIBING AND / OR


EXPLAINING ANALYSIS AND TAKEN
ACTIONS TO ERADICATE DEFECT
(Ishikawa diagram, failure tree, …)

DO NOT FORGET TO SEND STEPS 5 and 6 AND COMPLETING THEM !

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 6 : example

OK

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 7 : Final action plans confirmation

No as default
REQUIRED FIELD
REQUIRED FIELD
Proofs that the the final taken
actions plans are efficient (ex. :
quantity of built pieces with no
defect).

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 7 : example

OK

Service qualité Fournisseur - Usine de FLINS Janvier 2014


8D Step 8 : Follow-up actions and capitalisation

Complimentary description of all


updated proof elements to
eradicate defect (watch plans,
AMDEC …)

REQUIRED FIELDS

Involved supplier documents to eradicate


defect on future pieces, action takers and dates
of document updates.

ATTACH DOCUMENTS MENTIONNED ABOVE


TO DESCRIBE AND / OR EXPLAIN
EFFICIENCY OF TAKEN ACTIONS PLANS.

DO NOT FORGET TO SEND STEPS 7 and 8 AFTER COMPLETING THEM !


Service qualité Fournisseur - Usine de FLINS Janvier 2014
8D Step 8 : example

OK

Service qualité Fournisseur - Usine de FLINS Janvier 2014

You might also like