SCOPE OF WORK ACCOMMODATION ASUQ MINE

Descriptions Qty Unit


10 Junior rooms
1 Clearing of obstruction materials
Cleaning & removal of unnecessary debris, rubbish materials and
disposed of properly 1 LS
at designated maaden location
2 Excavation
Excavation in any class of ground including rock, commencing at
existing ground level including surface treatment and earthwork 100 M3

3 Vapor barrier
Supply & installation of vapor barrier 400 microns polythene sheet
underneath the lean 1 LS
concrete
4 Lean Concrete
Supply & installation of blinding lean concrete grade M5 (5 N/mm2)
6 M3
including formwork.
5 Reinforced Cement concrete
Supply & installation of RC foundation grade 25 25 N/mm2 after 28
days including reinforcement steel bars 14 as specified and 15 M3
formwork.
Supply & installation of RC column grade 25 25 N/mm2 after 28
days including reinforcement steel bars 14mm stirrups 8mm as 7 M3
specified andformwork.
Supply & installation of RC grade beam grade 25 25 N/mm2 after 9 M3
28 days
Floor including
slab reinforcement
thickness steel#bars
10cm wiremech 10mm14mm stirrups
spacing 15cm8mm
350 as 180 M3
6 specified
kg/m3 and formwork.
Back Filling
Back filling with approved material layer by layer including
compaction and test compaction 180 M3
7 Block work
Supply and installation of block work(20x20x40 cm ) reinforced
with 12 mm dia steel rebar at every 600 mm spacing on center for 425 M2
vertical and every 3 layer for horizontal
8 Plaster Work
Plaster work on wall both side external
& enternal 658 M2
11 Roof
Supply & installation of RC flat slab thickness 22cm 2 layer spacing 180 M2
15cm
Cearamic grade
tile 25 25 N/mm2 after 28 days including reinforcement
steel
supplybars
and12mm
install as specified
ceramic and
tiles forformwork.
floor including skirting 180 M2
12 supply and install wc ceramic tiles for wall 192 M2
15 Doors
Supply fabrication & Installation of double leave steel door with
frames, door hinges, door closer and hardware's and other 1 Ea
required accessories
Supply fabrication & Installation of single leave wood door with
frames, door hinges, and hardware's and other required 10 Ea
accessories
Supply fabrication & Installation of single leave aluminum door
with frames, door hinges, and hardware's and other required 10 Ea
16 accessories
Window
Supply & Installation of aluminum hinged
10 Ea
window with framing and other requires accessories
17 Paint
17-A Interior Wall Paint
Preparation of plaster surface & applying 2 coat of emulsion paint on
468 M2
interior walls,
17-B Exterior Wall Paint
Preparation of plaster surface & applying 2 coat of Emulsion paint
on Exterior walls, 190 M2
18 Ceiling
installation of ceiling (size 60x60 cm) with complete installation 180 M2
19 materials
Electrical work and accessories
Supply and installation panel board 12 brakers 2 EA
Supply & installation of lighting system LED lights 220v, 20w, 60 Hz
30 EA
diam 20 cm with all installation materials and breaker wiring for
rooms and
Supply wc
& installation of lighting system LED lights 220v, 20w, 60 Hz
10 Ea
dia 14cm with all installation materials and breaker wiring for rooms
and wc & installation of lighting system LED lights 220v,panel 60x60
Supply
5 Ea
80w, 60 Hz with all installation materials and braker wiring for
corridor
Supply and installation of power socket including wiring 33 EA
Supply and installation of main power cable from power source of
1 EA
Maaden to building including all necessary accessories

20 AC Ea.
supply & installation of AC
(split type - 12K BTU) (hot and cold) including all installation 10 Ea.
materials and braker brand carrier , LG or Sumsung
Bathroom
21 Bathroom constructed , water supply, sewage system including toilet
seat , ceramic basin and kit shower, accessories set , instant gyeser 10 Ea
1ceiling exhaust fun and all requiered accessories to install it
Sewer line
Supply and installation of pipe dia 6 inch from Manhols and connect
1 LS
directly to existing Manhol or existing septic tank
5 senior rooms
Clearing of obstruction materials
1 LS
Excavation
Excavation in any class of ground including rock, commencing at
existing ground level including surface treatment and earthwork 80 M3

Vapor barrier
Supply & installation of vapor barrier 400 microns polythene sheet
underneath the lean 1 LS
concrete
Lean Concrete
Supply & installation of blinding lean concrete grade M5 (5 N/mm2)
4 M3
including formwork.
Reinforced Cement concrete
Supply & installation of RC foundation grade 25 25 N/mm2 after 28
days including reinforcement steel bars 14 as specified and 9 M3
formwork.
Supply & installation of RC column grade 25 25 N/mm2 after 28
days including reinforcement steel bars 14mm stirrups 8mm as 3 M3
specified andformwork.
Supply & installation of RC grade beam grade 25 25 N/mm2 after
28 days including reinforcement steel bars 14mm stirrups 8mm as 5 M3
specified and formwork.
Floor slab thickness 10cm wiremech # 10mm spacing 15cm 350 95 M3
kg/m3
Back Filling
Back filling with approved material layer by layer including
compaction and test compaction 120 M3

Block work
Supply and installation of block work(20x20x40 cm ) reinforced
with 12 mm dia steel rebar at every 600 mm spacing on center for 253 M2
vertical and every 3 layer for horizontal
Plaster Work
Plaster work on wall both side external
& enternal 421 M2

Roof
Supply & installation of RC flat slab thickness 22cm 2 layer spacing
15cm grade 25 25 N/mm2 after 28 days including reinforcement 95 M2
steel bars 12mm as specified and formwork.
Cearamic tile
supply and install ceramic tiles for floor including skirting 90 M2
supply and install wc ceramic tiles for wall 105 M2
Doors
Supply fabrication & Installation of single leave steel door with
frames, door hinges, door closer and hardware's and other 5 EA
required accessories size 1m x 2.10
Supply fabrication & Installation of single leave aluminum door
with frames, door hinges, and hardware's and other required 5 Ea
accessories size 0.8 x 2.1m
Window
Supply & Installation of aluminum hinged
5 EA
window with framing and other requires accessories size 1m x 1m
Supply & Installation of aluminum hinged
5 EA
window with framing and other requires accessories size 0.4m x 0.4m
Paint
Interior Wall Paint
Preparation of plaster surface & applying 2 coat of emulsion paint on
280 M2
interior walls,
Exterior Wall Paint
Preparation of plaster surface & applying 2 coat of Emulsion paint
on Exterior walls, 175 M2

Ceiling

installation of ceiling (size 60x60 cm) with complete installation


materials 130 M2

Electrical work and accessories


Supply and installation panel board 6 line line Alfanar 5 EA
Supply & installation of lighting system LED lights 220v, 20w, 60 Hz
15 EA
dia 20 cm with all installation materials and breaker wiring for
rooms and
Supply wc
& installation of lighting system LED lights 220v, 20w, 60 Hz
5 EA
dia 14cm with all installation materials and breaker wiring for rooms
and wc and installation of power socket including wiring
Supply 15 Ea
Supply and installation of main power cable from power source of
1 LS
Maaden to building including all necessary accessories

AC
supply & installation of AC
(split type - 12K BTU) (hot and cold) including all installation 5 Ea.
materials and braker brand carrier , LG or Sumsung
Bathroom
Bathroom constructed , water supply, sewage system including toilet
seat , ceramic basin and kit shower, accessories set , instant gyeser 5 EA
1ceiling exhaust fun and all requiered accessories to install it
Sewer line
Supply and installation of UPVC pipe dia 6 inch from Manhol and
1 LS
connect directly to existing septic tank or existing Manhol
TOTAL