Combined Pages 1 7

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

DATE PLOTTED: 13 October 2021 7:27 AM BY : GORAN MILENKOVIC

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035


Level 9, The Forum, 203 Pacific Highway
St. Leonards, NSW 2065
Tel: 02 9496 7700 Fax: 02 9439 5170
Web: www.cardno.com.au

HARRIS FARM MARKETS

ENGINEERING SERVICES
56-60 BURNS BAY
LANE COVE, NSW 2066
COVER SHEET AND
SCHEDULE OF DRAWINGS
SCHEDULE OF DRAWINGS
DRAWING No. DESCRIPTION
GENERAL

80821386-ST-0001 COVER SHEET AND SCHEDULE OF DRAWINGS

80821386-ST-0002 STRUCTURAL CONSTRUCTION NOTES

80821386-ST-0101 SEAFOOD BUTCHER BULKHEAD FRAMING PLANS, SECTIONS AND DETAILS

80821386-ST-0105 SEAFOOD BUTCHER BULKHEAD FRAMING SECTIONS AND DETAILS

80821386-ST-0110 MEZZANINE FRAMING PLANS, SECTIONS AND DETAILS

80821386-ST-0115 STEEL CONNECTIONS AND DETAILS SHEET 1

80821386-ST-0116 STEEL CONNECTIONS AND DETAILS SHEET 2


CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0001.dwg

Drawn Date Status


GM OCT 2021
© Cardno Limited All Rights Reserved. Checked Date PRELIMINARY
This document is produced by Cardno Limited solely PP OCT 2021 NOT TO BE USED FOR CONSTRUCTION PURPOSES
for the benefit of and use by the client in accordance Designed Date
JD OCT 2021
with the terms of the retainer. Cardno Limited does not
Verified Date Datum Scale Size
and shall not assume any responsibility or liability
whatsoever to any third party arising out of any use or
PP OCT 2021 AHD N/A A1
Approved Drawing Number Revision
reliance by third party on the content of this document.
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP


Rev. Date Description Des. Verif. Appd.
80821386-ST-0001 1
DATE PLOTTED: 13 October 2021 7:29 AM BY : GORAN MILENKOVIC

GENERAL STRUCTURAL NOTES STRUCTURAL STEELWORK STEEL STUD WALLS


MATERIALS
1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS DRAWINGS, 1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS4100, AS/NZS1554, AND
SPECIFICATIONS AND ADDITIONAL WRITTEN INSTRUCTIONS THAT MAY BE ISSUED DURING THE AS/NZS5131 EXCEPT WHERE VARIED BY THE CONTRACT DOCUMENTS. PURLINS AND GIRTS 1. ALL FRAMING SECTIONS SHALL BE MANUFACTURED FROM CONTINUOUSLY GALVANISED STEEL
COURSE OF THE CONTRACT. THE INFORMATION CONTAINED ON THESE DRAWINGS IS FOR SHALL BE IN ACCORDANCE WITH AS/NZS4600 CONFORMING TO AS1397-1977 AND AS1538.
STRUCTURAL ENGINEERING PURPOSES ONLY. ALL DISCREPANCIES THAT COULD RESULT IN 2. ALL STEEL SHALL BE IN ACCORDANCE WITH: 2. GALVANISED MATERIALS UP TO 3.2mm IN THICKNESS SHALL HAVE A MINIMUM AVERAGE COATING
CHANGES TO THE STRUCTURAL DETAILS SHALL BE REFERRED TO THE STRUCTURAL ENGINEER - AS/NZS1163 FOR GRADE 350 RHS SECTIONS MASS OF 275g/m².
PRIOR TO PROCEEDING WITH CONSTRUCTION. - AS/NZS1163 FOR GRADE 200 CHS SECTIONS UP TO 165mm O.D. FABRICATION AND ERECTION
IF IN DOUBT ASK - AS/NZS1163FOR GRADE 350 CHS SECTIONS EXCEEDING 165mm O.D. 3. ALL STRUCTURAL COMPONENTS MAY BE PREFABRICATED INTO FRAMES EITHER IN THE SHOP OR
2. THE CONTRACTOR SHALL CHECK AND BE RESPONSIBLE FOR THE CORRECTNESS OF ALL - AS1397 FOR GRADE G450 Z350 PURLINS AND GIRTS ON SITE BEFORE ERECTION.
DIMENSIONS AND ANY DISCREPANCY SHALL BE REPORTED IMMEDIATELY TO THE - AS/NZS3678 FOR GRADE 250 HOT ROLLED PLATES, FLOORPLATES AND SLABS 4. STRUCTURAL COMPONENTS SHALL BE CUT ACCURATELY TO LENGTH SO THAT THEY FIT FIRMLY
SUPERINTENDENT. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING FROM THE DRAWINGS. - AS/NZS3679.1 FOR GRADE 300 PLUS HOT ROLLED BARS AND SECTIONS AGAINST ABUTTING MEMBERS AND SHALL BE HELD FIRMLY IN POSITION UNTIL SECURELY
3. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THE SAFETY AND STABILITY OF NEW AND - AS/NZS3679.2 FOR GRADE 300 WELDED WB & WC SECTIONS FASTENED.
EXISTING STRUCTURES DURING CONSTRUCTION. TEMPORARY STRUCTURES, FORMWORK, THE FABRICATOR SHALL SUPPLY CERTIFICATION TO THE STRUCTURAL ENGINEER CONFIRMING
5. STUDS SHALL BE SEATED SQUARELY IN BOTTOM PLATES WITH WEBS AT 90° TO THE FACE OF THE
FALSEWORK,TEMPORARY BRACING, SHORING AND THE LIKE SHALL BE THE SOLE RESPONSIBILITY COMPLIANCE OF STRUCTURAL STEEL TO THE RELEVANT STANDARD PRIOR TO FABRICATION.
WALL.
OF THE CONTRACTOR. 3. WHERE CONNECTIONS ARE NOT DETAILED, THEY SHALL BE PROVIDED WITH A MINIMUM 10mm
6. STUDS SHALL BE ACCURATELY LOCATED, PLUMBED AND SECURELY FASTENED TO FLANGES OF
4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER FORTY EIGHT (48) HOURS BEFORE THE THICK CLEAT PLATE WITH 2M20 8.8/S BOLTS. THE CONTRACTOR SHALL PROVIDE ALL CLEATS
TOP AND BOTTOM PLATES.
REINFORCEMENT IS COMPLETED. THE CONTRACTOR SHALL ALLOW TWO (2) HOURS AFTER THE AND DRILL ALL HOLES NECESSARY FOR FIXING STEEL TO STEEL AND TIMBER TO STEEL
WHETHER OR NOT THEY ARE DETAILED ON THE DRAWINGS. 7. MULTIPLE STUDS SHALL BE SECURELY SPLICED AT ALL POINTS OF CONCENTRATED LOAD.
COMPLETION OF THE REINFORCEMENT FOR THE ENGINEER'S INSPECTION.
4. ALL DETAILS, GAUGE LINES ETC. WHERE NOT SPECIFICALLY SHOWN ARE TO BE IN 8. PLATES SHALL BE SECURELY SPLICED AT ENDS TO MAINTAIN CONTINUITY.
5. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE RELEVANT AND
CURRENT AUSTRALIAN STANDARDS AND WITH THE BY-LAWS AND ORDINANCES OF THE RELEVANT ACCORDANCE WITH AISC DESIGN CAPACITY TABLES FOR STRUCTURAL STEEL AND AISC 9. SPLICES IN STUDS SHALL NOT BE PERMITTED.
BUILDING AUTHORITIES EXCEPT WHERE VARIED BY THE PROJECT SPECIFICATION. STANDARDISED STRUCTURAL CONNECTIONS. 10. IN ORDER TO MAINTAIN STRUCTURAL INTEGRITY AND TO SUPPORT LINING, SHORT STUDS SHALL
6. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH ALL WORKCOVER REQUIREMENTS AND 5. THE DISTANCE BETWEEN CENTRES OF FASTENERS AND THE MINIMUM DISTANCE FROM THE BE PROVIDED BETWEEN BOTTOM PLATES AND WINDOW SILLS, BETWEEN TOP PLATES AND
OCCUPATIONAL HEALTH AND SAFETY ACT REGULATIONS. CENTRE OF A FASTENER TO THE EDGE OF A PLATE OR FLANGE OF A ROLLED SECTION SHALL WINDOW HEADS, AND BETWEEN TOP PLATES AND DOOR HEADS, OR IN OTHER AREAS AROUND
COMPLY WITH AS4100 AND AS/NZS5131 OPENINGS.
7. NO CHANGES SHALL BE MADE WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.
6. ALL BEAMS SHALL BE SUPPLIED WITH NATURAL CAMBER UP. ADDITIONAL CAMBER SHALL BE AS 11. ALL FRAMES SHALL BE ADEQUATELY BRACED FOR TRANSPORT AND TO RESIST WIND LOAD IN
8. CONSTRUCTION FROM THESE DRAWINGS AND ASSOCIATED CONSULTANTS' DRAWINGS SHALL NOT
NOTED ON THE DRAWINGS. FABRICATED AND HOT DIP GALVANISED STEEL SHALL COMPLY WITH SERVICE.
COMMENCE UNTIL APPROVED BY THE LOCAL AUTHORITIES AND PRINCIPAL CERTIFYING
AUTHORITY. THE FABRICATION TOLERANCES IN ACCORDANCE WITH AS4100. 12. STRUCTURALLY ADEQUATE HEADS SHALL BE FITTED OVER OPENINGS IN WALLS AND AREAS
7. WELDING SHALL BE CARRIED OUT IN ACCORDANCE WITH AS/NZS1554. WELDING CONSUMABLES WHERE MAJOR LOADS OCCUR AWAY FROM STUDS.
9. 'U.N.O.' OR 'UNO' DENOTES 'UNLESS NOTED OTHERWISE' ON THE DRAWINGS.
SHALL BE E48XX OR W50X. ALL WELDS SHALL BE 6mm CONTINUOUS FILLET WELD (6 CFW) U.N.O. 13. THE PREFERRED METHOD OF FASTENING IS BY WELDING, USING THE METAL INERT GAS
10. ALL LEVELS ARE IN METRES AND ALL DIMENSIONS ARE IN MILLIMETRES U.N.O.
BUTT WELDS WHERE INDICATED "FSBW" ON THE DRAWINGS SHALL BE COMPLETE PENETRATION TECHNIQUE (MIG). CARBON ARC WELDING MAY ALSO BE USED, OR ALTERNATIVE FASTENING
BUTT WELDS AS DEFINED IN AS/NZS1554. ALL WELDS SHALL BE CATEGORY SP U.N.O. METHODS OF ADEQUATE STRENGTH, SUCH AS SELF-DRILLING SELF-TAPPING SCREW, OR
8. BOLTING CATEGORY WHERE SHOWN SHALL BE AS FOLLOWS IN ACCORDANCE WITH AS4100 AND APPROVED BLIND RIVETS.
AS/NZS5131: 14. ALL WELDS SHALL BE CLEANED AND TOUCHED UP WITH AN APPROVED ZINC RICH PAINT.
4.6/S = COMMERCIAL BOLTS OF GRADE 4.6 TO AS 1111, SNUG TIGHTENED. 15. LIFTING, LOADING AND TRANSPORTATION OF PREFABRICATED FRAMES SHALL BE ACCOMPLISHED
8.8/S = HIGH STRENGTH STRUCTURAL BOLTS OF GRADE 8.8 TO AS/NZS1252, SNUG TIGHTENED. WITH SUFFICIENT CARE TO PREVENT LOCAL DAMAGE TO FRAMES.
8.8/TB = HIGH STRENGTH STRUCTURAL BOLTS OF GRADE 8.8 TO AS/NZS1252 FULLY TENSIONED 16. SITE CONNECTIONS SHALL BE AS SPECIFIED.
TO AS/NZS5131 AS BEARING JOINT.
17. THE BOTTOM PLATE SHALL BE SECURELY ANCHORED TO THE SUB-FLOOR WITH ENGINEER TO
8.8/TF = HIGH STRENGTH STRUCTURAL BOLTS OF GRADE 8.8 TO AS/NZS1252 FULLY TENSIONED
NOMINATE
TO AS/NZS5131 AS A FRICTION JOINT WITH FACING SURFACES LEFT UNCOATED.
18. PERMANENT EARTHING OF COMPLETED STEEL FRAMES IS ESSENTIAL AND SHALL BE CARRIED
9. NO CONNECTION SHALL HAVE LESS THAN 2M20 8.8/S BOLTS U.N.O. NO BOLT THREAD SHALL BE
OUT IN ACCORDANCE WITH THE REGULATIONS OF THE LOCAL ELECTRICAL AUTHORITY. IN
PERMITTED WITHIN THE BEARING LENGTH. HIGH STRENGTH BOLTS, NUTS AND WASHERS SHALL
ADDITION, WHEN POWER TOOLS ARE TO BE USED, STEEL FRAMING SHOULD BE EARTHED
COMPLY WITH AS/NZS1252 AND SHALL BE INSTALLED IN ACCORDANCE WITH AS4100 AND
TEMPORARILY AS SOON AS POSSIBLE DURING ERECTION.
AS/NZS5131. TEST CERTIFICATES CONFIRMING BOLT COMPLIANCE TO AS/NZS1252 SHALL BE
SUPPLIED TO THE STRUCTURAL ENGINEER PRIOR TO ERECTION. ALL HIGH STRENGTH BOLTS 19. HOLES FOR PLUMBING OR ELECTRICAL SERVICES SHALL BE EITHER PLAIN HOLES OF NOT MORE
DENOTED 8.8/TB OR 8.8/TF SHALL BE INSTALLED USING APPROVED LOAD INDICATING WASHERS THAN 25mm DIA. OR FLANGED HOLES NOT MORE THAN 33mm DIA. WITH FLANGES 5mm MINIMUM
OR BY TURN OF NUT CONTROL OF TENSIONING. LENGTH, AND SHALL BE PLACED ONLY IN APPROVED LOCATIONS. FOR ELECTRICAL SERVICES,
PLAIN HOLES SHALL BE PROVIDED WITH BUSHES OR GROMMETS.
10. PROVIDE SEAL PLATES TO ALL HOLLOW SECTIONS. PROVIDE VENT HOLES IN CLOSED SECTIONS
TO BE HOT DIP GALVANISED. 20. SERVICE PIPES SHALL BE EFFECTIVELY SEPARATED FROM STEEL FRAMING BY LAGGING OR
SIMILAR MATERIAL.
11. ALL STEEL MEMBERS SHALL BE SUPPLIED IN SINGLE LENGTHS. SPLICES SHALL ONLY BE
FINISHES
PERMITTED IN LOCATIONS SHOWN ON THE STRUCTURAL DRAWINGS.
21. ON COMPLETION OF FRAMING, ALL DEBRIS SHALL BE REMOVED FROM CAVITIES IN BOTTOM
12. THE CONTRACTOR SHALL PREPARE AND SUBMIT WORKSHOP DRAWINGS IN PDF FORMAT TO PLATES.
THE STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO COMMENCING FABRICATION. DESIGN LOADS
PERMISSION TO USE DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR
DIMENSIONS, FIT AND COMPLIANCE WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. 22. INTERNAL PARTITION STUD WALLS SHALL BE DESIGNED TO RESIST AN ULTIMATE LIMIT STATE
WIND PRESSURE OF 0.375kPa DEFLECTION UNDER A SERVICEABILITY LIMIT STATE OF 0.25kPa
13. THE FABRICATION AND ERECTION OF THE STRUCTURAL STEELWORK SHALL BE UNDERTAKEN SHALL BE LIMITED TO HEIGHT/250 FOR NON-YIELDING RESTRAINTS AND HEIGHT/500 FOR
BY A QUALIFIED PERSON EXPERIENCED IN SUCH SUPERVISION, IN ORDER TO ENSURE THAT ALL DEFLECTING RESTRAINTS, SO AS TOTAL SUPERIMPOSED WALL PANEL DEFLECTION IS
REQUIREMENTS OF THE DESIGN ARE MET. HEIGHT/250.
14. PROVIDE FIRE RATING TO STRUCTURAL STEEL AS REQUIRED BY THE BUILDING CODE OF 23. ALL INTERNAL AND EXTERNAL STUD WALLS (U.N.O.) SHALL BE DESIGNED FOR TWO 350mm WIDE
AUSTRALIA AND THE SPECIFICATION AS SUMMARISED IN THE BCA PARAMETERS & STRUCTURAL SHELVES WITH A VERTICAL LOAD OF 50kg/m EACH. STOREROOMS SHALL BE DESIGNED FOR 4
FRL - TABLE BCA1.1 ON THIS DRAWING. ROWS x 350mm WIDE SHELVES WITH A VERTICAL LOAD OF 50kg/m EACH.
15. STRUCTURAL STEELWORK SHALL BE PROTECTED FROM THE ENVIRONMENT IN ACCORDANCE 24. ALL STUD WALLS SHALL BE DESIGNED FOR AN IMPACT LOAD OF 0.8kN APPLIED 1000mm ABOVE
WITH AS/NZS2312 AND AS/NZ5131 STEELWORK SHALL HAVE THE SURFACE TREATMENT U.N.O. FLOOR LEVEL. FURNISH REPORTS/CERTIFICATES SHOWING THE TESTED PARTS OF THE
NOTED IN TABLE S1.1 BELOW PARTITION WALL CAN WITHSTAND THE IMPACT AT THE SPECIFIED ENERGY LEVEL WITHOUT
PERMANENT DEFORMATION, DAMAGE OR FAILURE OF THE FASTENINGS.
STEELWORK SURFACE TREATMENTS - TABLE S1.1
SURFACE 25. EXTERNAL VENEER AND LINED WALLS DESIGN STUDS IN ACCORDANCE WITH AS1538 FOR THE
ELEMENT PROTECTIVE COATING APPROPRIATE WIND FORCES AS NOTED IN AS1170.2 AND THE APPROPRIATE EARTHQUAKE
PREPARATION
DESIGN PRESSURES FOR NON DUCTILE EXTERIOR WALL PANELS AS REQUIRED BY AS1170.4.
INTERNAL (NOT EXPOSED INORGANIC ZINC SILICATE TO 75um DRY FILM UNDER THE SERVICEABILITY LIMIT STATE, THE MAXIMUM SUPERIMPOSED DEFLECTION OF THE
TO WEATHER) THICKNESS STUD SHALL BE HEIGHT/500 (OR BETTER) WHERE HEIGHT IS BETWEEN RESTRAINTS. PROVIDE
EXTERNAL (EXPOSED TO ABRASIVE BLAST HOT DIP GALVANISED TO AS/NZS4680, CALCULATIONS TO THE STRUCTURAL ENGINEER FOR REVIEW PRIOR TO COMMENCING
WEATHER >1km FROM AS/NZS4791, OR AS/NZS4792. MINIMUM FABRICATION.
CLEANED TO
THE COAST) COATING MASS 600g/m2. 26. REFER TO THE ARCHITECTS SPECIFICATION FOR RW RATING, FIRE RATING, INSULATION,
CLASS 2 21 TO
EXTERNAL (EXPOSED TO AS1627 HOT DIP GALVANISED TO AS/NZS4680, NOGGINGS AND SUBSIDIARY FRAMINGS, FIXINGS, STUD REINFORCEMENTS AND CONSTRUCTION
WEATHER <1km FROM AS/NZS4791, OR AS/NZS4792. MINIMUM JOINTS.
THE COAST) COATING MASS 600g/m2. AND TWO COATS OF 27. PROVIDE FINAL CERTIFICATION FROM A PRACTICING NPER STRUCTURAL ENGINEER FOR THE
EPOXY MICACEOUS IRON OXIDE. DESIGN AND INSTALLATION OF THE STUD WALLS.
ALL BOLTS, WASHERS, - HOT DIP GALVANISED TO AS1214
AND NUTS
DESIGN LIFE OF COATINGS: 25 YEARS TO FIRST MAINTENANCE
EXPOSURE TO ENVIRONMENT: CATEGORY B (LOW)
CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0002.dwg

Drawn Date Client


GM OCT 2021 HARRIS FARM MARKETS
© Cardno Limited All Rights Reserved. ® Checked Date Project Status
ENGINEERING SERVICES
This document is produced by Cardno Limited solely for the
PP
Designed
OCT 2021
Date
PRELIMINARY
benefit of and use by the client in accordance with the 56-60 BURNS BAY NOT TO BE USED FOR CONSTRUCTION PURPOSES
JD OCT 2021
terms of the retainer. Cardno Limited does not and shall not LANE COVE, NSW 2066 Datum Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035
Level 9, The Forum, 203 Pacific Highway
PP OCT 2021 Title
STRUCTURAL CONSTRUCTION NOTES AHD N/A A1
party arising out of any use or reliance by third party on the Approved
St. Leonards, NSW 2065 Drawing Number Revision
content of this document.
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP Tel: 02 9496 7700 Fax: 02 9439 5170


Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au
80821386-ST-0002 1
DATE PLOTTED: 13 October 2021 7:31 AM BY : GORAN MILENKOVIC

2 3
4 3 5 6 7 8 9 1005 10 11 1005 12 13
J
10865

150 1700 150 1700 150 1700 150 1700 150 1700 1615 150 2230 150 2230 150 2230 150 2230 150 2230 150 2230 150

K TR/4

TR/2

TR/2

TR/2

TR/2

TR/2

TR/2

TR/3

TR/3

TR/3

TR/3

TR/3

TR/3

TR/3
VAULT
ED CE SC

102 516
ILING
SC FEATU
RE 1
3
SC

SC
SC
S1 S1 S1 S1 S1 S1 S1 S1 S1 SB1 S1 S1

SC

SC

SC
SC

SC

SC

SC

SC
1

3
3

1
1
1

1
1236
R1 R1 R1 R1 R1 R1

VAULT
VAULT

TR/1
R1 R1 R1 R1 R1 R1

ED C E
SB2 SB2
ED CE

TR/1

TR/1

TR/1

TR/1

105
ILING
SC
ILING

S1

SC
1
FEATU

3
FEA

VAULT

TR/1

TR/1

TR/1

TR/1

TR/1
VAULT
TURE

TR/2
E

ED C E

ED CE
SJ1 SJ1 SJ1 SJ1 SJ1 SJ1
J

ILING

ILING
FEATU
SJ1 SEAFOOD

FE
CJ1 CJ1 CJ1 CJ1 CJ1

VAU

TR/1
TR/1

ATURE

7751
BUTCHER
7739

LTE
RE

D
TR/1

CEIL

VAUL

VAUL

VAUL

VAUL

VAUL
IN G

TED

TED

TED

TED

TED
VAULTE
VAULT

FEA

CEIL

CEIL

CEIL

CEIL

CEIL
5792

TUR
ED CE

D CEILIN

ING F

ING F

ING F

ING F

ING F
E
ILING

EATU

EATU

EATU

EATU

EATU
SC

G FEAT
3

EX OL.
FE

RE

RE

RE

RE

RE
ATURE

.
C

SC
SC

URE

2
2

SC
3

TR/2
R1 R1 R1
R1 R1 R1 R1 R1 R1 R1 R1 R1
K

SC
TR/4

3
FCH: 2.750 FCH: 2.750
SB2 600
SB2 SB2 600
SB2
(TYP.) (TYP.)
1
1005

4 3 5 6 7 8 9 10 11 12 13

H
RT
NO
SEAFOOD AND BUTCHER SHOP STEEL FRAMING PLAN
SCALE 1:50

STEEL MEMBER SCHEDULE


Mark Type Size Remark
SC1 COLUMN 100x100x4 SHS
SC2 COLUMN 150x150x4 SHS
12mm BASE PLATE WITH 4M20 CHEMSET
SC3 COLUMN 150x100x5.0 RHS
BOLT. EMBED 150mm MINIMUM INTO SLAB

SB1 BEAM 200UB22 2 END PLATES, 4M16 AT SPLICE


SB2 BEAM 200UB22 10 CLEATS, 2M16 TO SC1
WH1 BEAM 75x75x4.0 SHS CURVED CEILING HANGING BEAM

CJ1 JOIST Z10012 LAPPED 600, 1 ROW BRIDGING, AT 450 CTS.

TR1 TRUSS 75x75x4.0 SHS TOP AND BOTTOM CHORD, 50x50x4.0 DIAGONALS
TR2 TRUSS 75x75x4.0 SHS TOP AND BOTTOM CHORD, 50x50x4.0 DIAGONALS
CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0101.dwg

TR3 TRUSS 75x75x4.0 SHS TOP AND BOTTOM CHORD, 50x50x4.0 DIAGONALS

DIA 12 WITH POSITION TRUSS VERTICAL AT INTERSECTION


R1 ROAD BRACING TURNBUCKLE 8mm OF R1
CLEATS, 1M16 BOLT

S1 STRUT 125x75x3.0 RHS 10 CLEAT, 2M16

Drawn Date Client


GM OCT 2021 HARRIS FARM MARKETS
© Cardno Limited All Rights Reserved. ® Checked Date Project Status
ENGINEERING SERVICES
This document is produced by Cardno Limited solely for the
PP
Designed
OCT 2021
Date
PRELIMINARY
benefit of and use by the client in accordance with the 56-60 BURNS BAY NOT TO BE USED FOR CONSTRUCTION PURPOSES
JD OCT 2021
terms of the retainer. Cardno Limited does not and shall not LANE COVE, NSW 2066 Datum Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035
Level 9, The Forum, 203 Pacific Highway
PP OCT 2021 Title
SEAFOOD BUTCHER BULKHEAD FRAMING AHD 1:50 A1
party arising out of any use or reliance by third party on the Approved
St. Leonards, NSW 2065 Drawing Number Revision
content of this document. PLANS, SECTIONS AND
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP Tel: 02 9496 7700 Fax: 02 9439 5170


Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au DETAILS 80821386-ST-0101 1
DATE PLOTTED: 13 October 2021 7:32 AM BY : GORAN MILENKOVIC

TR/1
3 4 5 6 7 8 9 10 11 12 13
TR/1 CJ/1 TR/1 TR/1 TR/1 TR/2 TR/1 CJ/1 TR/1 TR/1 TR/1 TR/1 TR/1 TR/2 TR/1 CJ/1 TR/1

SB2 SB2 SB2 SB2 RL: 83.800 PLANT ROOM

SC2 BEYOND
SC3 BEYOND

SC3 BEYOND

SC2 BEYOND

SC3 BEYOND
RL: 80.590 LEVEL 03 SFL

SECTION 1
SCALE 1:50 1001

CJ1 NOTE: POSITION OF VERTICAL 8 CLEAT, 2M12


CHORD AT INTERSECTION PURLIN BOLTS A B D C

SB
WITH BRACING (TYPICAL) 0105 0105 0105 0105

1
2
SB

RL: 83.800 PLANT ROOM

TR/2
TR/3 10 CLEATS, TR/1 LINE OF R1 BRACING LINE OF R1 BRACING 10 PLATES,

SC2
2M16 BOLTS 4M16 BOLTS
SC1

RL: 80.590 LEVEL 03 SFL

SECTION 2 SECTION 3
SCALE 1:50 1001 SCALE 1:50 1001

600 600 600 600


100x75X10UA, 100x75X10UA,
2M16 BOLTS 2M16 BOLTS
2

2
SB
SB

SB
2

TR/1 TR/2 TR/2 TR/2 TR/2


CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0105.dwg

100x100X4SHS
STUB

10 CLEATS,

SC2
2M16
10 PLATES,
4M16 BOLTS

DETAIL A DETAIL B DETAIL C DETAIL D


SCALE 1:10 0105 SCALE 1:10 0105 SCALE 1:10 0105 SCALE 1:10 0105

Drawn Date Client


GM OCT 2021 HARRIS FARM MARKETS
© Cardno Limited All Rights Reserved. ® Checked Date Project Status
ENGINEERING SERVICES
This document is produced by Cardno Limited solely for the
PP
Designed
OCT 2021
Date
PRELIMINARY
benefit of and use by the client in accordance with the 56-60 BURNS BAY NOT TO BE USED FOR CONSTRUCTION PURPOSES
JD OCT 2021
terms of the retainer. Cardno Limited does not and shall not LANE COVE, NSW 2066 Datum Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035
Level 9, The Forum, 203 Pacific Highway
PP OCT 2021 Title
SEAFOOD BUTCHER BULKHEAD FRAMING AHD 1:50 A1
party arising out of any use or reliance by third party on the Approved
St. Leonards, NSW 2065 Drawing Number Revision
content of this document. SECTIONS AND
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP Tel: 02 9496 7700 Fax: 02 9439 5170


Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au DETAILS 80821386-ST-0105 1
DATE PLOTTED: 13 October 2021 8:01 AM BY : GORAN MILENKOVIC

E F H

STEEL MEMBER SCHEDULE


11 11 Mark Type Size Remark
SC1-SC4, SC6, SC7 COLUMN 150x150x6 SHS 10 BASE PLATE, 4M20 CHEMSET, 150mm EMBEDMENT
SC5 COLUMN 200x200x5.0 SHS REFER DETAIL

3
SC

SC

SC
SB1 SB1 SB1
SC8-SC9 COLUMN 200x200x5.0 SHS 10 BASE PLATE, 4M20 CHEMSET, 150mm EMBEDMENT
10 CJ1
10 10 BASE PLATE, 4M20 CHEMSET, 150mm EMBEDMENT,
SC10-SC11 COLUMN 150x150x4 SHS
12 CAP PLATE, 4M20 TO BEAMS
3 /O
SC1 32x0.8 GI STRAP BRACING FIXED
SC13-SC15 COLUMN 150x150x4.0 RHS 10 BASE PLATE, 4M20 BOLTS TO BEAM
TO TOP FLANGE OF JOISTS

SB6
CJ1 CJ1 SB1 BEAM 310UB32
SB2 BEAM 410UB54

SB4

SB4
( ** )

SB5
SB3 BEAM 200UB18 16 END PLATE, 4M20 TO SB4, 10 CLEAT, 2M16 TO SB5
SB4 BEAM 310UB32
CJ1
UPCYCLE SB5 BEAM 310UB32
KITCHEN SB6 BEAM 200UB18
9 9

6
SB1

SC
5
SC
8 CLEAT, 2M12 PURLIN BOLTS, 10 FULL HEIGHT CLEAT
8 8 CJ1 JOIST C25024 AT 600 CTS
AT EVERY FOURTH JOIST
SB1 4 SB1
SC ( * * ) - DENOTES MODIFICATION TO ROOF TRUSS TO FUTURE DETAILS

SB4
SB4

SB4
SB5
CJ1 CJ1 CJ1

9
SC
SB2 SC SB2
8
7

7 7
SC

SB3 SB3

6 6
4/O
1
SC
SB6

SB4

SB4

SB6
SB4

( ** )

CJ1 CJ1 CJ1 CJ1

SB3
SB3
C12
S
5 0 SB1 SB1 5
C1
/O

11
15

SC

S
SC

NEW PENETRATION
EX. DUCT IN SLAB

4 4

EX.
GOODS
LIFT
EXISTING COLUMN
TO REMAIN
CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0110.dwg

E F H

MEZZANINE FRAMING PLAN


SCALE 1:50

Drawn Date Client


GM OCT 2021 HARRIS FARM MARKETS
© Cardno Limited All Rights Reserved. ® Checked Date Project Status
ENGINEERING SERVICES
This document is produced by Cardno Limited solely for the
PP
Designed
OCT 2021
Date
PRELIMINARY
benefit of and use by the client in accordance with the 56-60 BURNS BAY NOT TO BE USED FOR CONSTRUCTION PURPOSES
JD OCT 2021
terms of the retainer. Cardno Limited does not and shall not LANE COVE, NSW 2066 Datum Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035
Level 9, The Forum, 203 Pacific Highway
PP OCT 2021 Title
MEZZANINE FRAMING AHD 1:50;10 A1
party arising out of any use or reliance by third party on the Approved
St. Leonards, NSW 2065 Drawing Number Revision
content of this document. PLANS, SECTIONS AND
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP Tel: 02 9496 7700 Fax: 02 9439 5170


Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au DETAILS 80821386-ST-0110 1
DATE PLOTTED: 13 October 2021 8:44 AM BY : GORAN MILENKOVIC

1 EXISTING 150x100 RHS


0115 COLUMN

SB5
10 PLATE, FSBW FLANGES ONLY 10 PLATE, 20 END PLATES, 10 STIFFENER 20 END PLATES,
300x12 PLATES CUT IN HALF AND WELDED 2M20 BOLTS (TYPICAL) 2M20 BOLTS 4M20 BOLTS PLATES 4M20 BOLTS
TO EXISTING COLUMN AND NEW SHS AT
TOP AND BOTTOM BEAM FLANGE LEVEL SB5 SB5
EXISTING 150x100 RHS SB1
SB5 460UB 460UB SB5

1
SB
10 PLATE,
200x200x5 SHS CUT IN HALF
SB5

2M20 BOLTS 600

SC5
AND RE-WELDED AND
WELDED TO 300x12 PLATES
10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT
250
AT EVERY 4TH JOIST (TYPICAL)

SC8
10 STIFFENER
PLATES, BOTH
SIDES

SC5 - PLAN AT BEAM LEVEL SECTION 1


SCALE 1:10 SCALE 1:10 1015

SC8 TO SB5 CONNECTION DETAIL


SCALE 1:10
400x200x16 BASE PLATE, PROFILE TO SUIT
EXISTING COLUMN WELD TO EXISTING COLUMN.
4M20 CHEMSET, 200 EMBEDMENT.
10 STIFFENERS PLATES AT 10 PLATE, FSBW FLANGES ONLY 10 PLATE,
TOP AND BOTTOM FLANGE 2M20 BOLTS (TYPICAL) 2M20 BOLTS
LEVELS
SB5 SB1
SB1 SB1

200
EXISTING 150x100 RHS

4
SB
SC

200
1
2
SB4

600
0115

SC1
400
10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT
AT EVERY 4TH JOIST (TYPICAL)
200x200x5 SHS CUT IN HALF
AND RE-WELDED

SC1 - PLAN AT BEAM LEVEL SECTION 2 SC5 BASE PLATE DETAIL


SCALE 1:10 SCALE 1:10 1015 SCALE 1:10

10 STIFFENERS PLATES AT
TOP AND BOTTOM FLANGE
LEVELS 10 PLATE, FSBW FLANGES ONLY 10 PLATE,
2M20 BOLTS (TYPICAL) 2M20 BOLTS
5

SB1 SB1
SB

SB1 SB1

SC
2
3
600
0115
SB5

SC2
CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0115.dwg

10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT


AT EVERY 4TH JOIST (TYPICAL)

SC2 - PLAN AT BEAM LEVEL SECTION 3


SCALE 1:10 SCALE 1:10 1015

Drawn Date Client


GM OCT 2021 HARRIS FARM MARKETS
© Cardno Limited All Rights Reserved. ® Checked Date Project Status
ENGINEERING SERVICES
This document is produced by Cardno Limited solely for the
PP
Designed
OCT 2021
Date
PRELIMINARY
benefit of and use by the client in accordance with the 56-60 BURNS BAY NOT TO BE USED FOR CONSTRUCTION PURPOSES
JD OCT 2021
terms of the retainer. Cardno Limited does not and shall not LANE COVE, NSW 2066 Datum Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035
Level 9, The Forum, 203 Pacific Highway
PP OCT 2021 Title
STEEL CONNECTIONS AND AHD 1:10 A1
party arising out of any use or reliance by third party on the Approved
St. Leonards, NSW 2065 Drawing Number Revision
content of this document. DETAILS
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP Tel: 02 9496 7700 Fax: 02 9439 5170


Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au SHEET 1 80821386-ST-0115 1
DATE PLOTTED: 13 October 2021 8:45 AM BY : GORAN MILENKOVIC

SB4
5 10 STIFFENERS PLATES AT
10 STIFFENERS PLATES AT 0116 TOP AND BOTTOM FLANGE
TOP AND BOTTOM FLANGE SB1 LEVELS SB2 SB2
LEVELS
SB1 SB2 SB2

SC

SB
3

SC
SB4

SB
4 600 600

6
0116

SC9
SC3
10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT 10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT 10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT
AT EVERY 4TH JOIST (TYPICAL) AT EVERY 4TH JOIST (TYPICAL) AT EVERY 4TH JOIST (TYPICAL)

SC3 - PLAN AT BEAM LEVEL SECTION 4 SC9 - PLAN AT BEAM LEVEL SECTION 5
SCALE 1:10 SCALE 1:10 1016 SCALE 1:10 SCALE 1:10 1016
SB4

10 STIFFENERS PLATES AT

4
SB1

SB
TOP AND BOTTOM FLANGE
LEVELS
SC
10

SB1
6
0116

SC9
10 PCLEAT, 2M12 PURLIN BOLTS FULL HEIGHT CLEAT
AT EVERY 4TH JOIST (TYPICAL)

SC10 - PLAN AT BEAM LEVEL SECTION 6


SCALE 1:10 SCALE 1:10 1015
CAD File: N:\Projects\808\FY21\386_HFM Lane Cove\011_STR\Drawings\Build\80821386-ST-0116.dwg

Drawn Date Client


GM OCT 2021 HARRIS FARM MARKETS
© Cardno Limited All Rights Reserved. ® Checked Date Project Status
ENGINEERING SERVICES
This document is produced by Cardno Limited solely for the
PP
Designed
OCT 2021
Date
PRELIMINARY
benefit of and use by the client in accordance with the 56-60 BURNS BAY NOT TO BE USED FOR CONSTRUCTION PURPOSES
JD OCT 2021
terms of the retainer. Cardno Limited does not and shall not LANE COVE, NSW 2066 Datum Scale Size
Verified Date
assume any responsibility or liability whatsoever to any third Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035
Level 9, The Forum, 203 Pacific Highway
PP OCT 2021 Title
STEEL CONNECTIONS AND AHD 1:10 A1
party arising out of any use or reliance by third party on the Approved
St. Leonards, NSW 2065 Drawing Number Revision
content of this document. DETAILS
XREF's:

1 13/10/2021 PRELIMINARY ISSUE JD PP PP Tel: 02 9496 7700 Fax: 02 9439 5170


Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au SHEET 2 80821386-ST-0116 1

You might also like