Peta Sistem Penyaliran Tambang - Kelas 04 - Kelompok 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4902.6221 5902.6221 6902.

6221
PETA SISTEM PENYALIRAN TAMBANG
DTH 64

DTH 61

16111.7497
GW 1 DTH 62
GW 10

16111.7497
DTH 84
DTH 59
DTH 60 GW 2

DTH 63 DTH 85

GW 9
DTH 57

DTH 58

DTH 1
DTH 56 SUMP 1 GW 3

1 :20.000
GW 8
GW 1
GW 7
GW 4 DTH 86

GW 10
Pipa
GW 2

Kontur
GW 6

DTH 28 GW 3
15111.7497

15111.7497
DTH 53
GW 5
DTH 52
DTH
DTH 69
DTH 26
DTH 54 DTH 71

DTH 27 DTH 51
GW 4
DTH 70
Stream Line
GW 9

DTH 50

Sump
DTH 73
SUMP 2 GW 5

DTH 23
DTH 2 GW 6
DTH 74

DTH 25
DTH 40
Kolam Pengendapan 1
GW 7 DTH 75
GW 8

DTH 24 DTH 39
DTH 76

Kolam Pengendapan 2
DTH 22 DTH 48 DTH 72
DTH 49
14111.7497

14111.7497
DTH 21

DTH 46
DTH 78

DTH 83

Dosen Pengampu
DTH 79

KELAS 04
DTH 82
DTH 18 DTH 47

DTH 17

KELOMPOK 01
DTH 16

A.A Inung Arie Adnyano, S.T., M.T.


DTH 38 GW 1
DTH 86
DTH 13 DTH 15
DTH 83 GW 2
GW 10 GW 8
DTH 82 GW 9

DTH 3
DTH 85 DTH 84
GW 9
GW 3 DTH 80
GW 4 GW 7 DTH 45

DTH 4
DTH 11 DTH 81
DTH 37
DTH 36 SUMP 3
GW 5 DTH 42 GW 6
DTH 44
GW 10
GW 6 SUMP 4

DTH 4 GW 7 GW 8 GW 5
DTH 2 DTH 6
DTH 3 DTH 9
DTH 5
GW 1 GW 4
GW 2 DTH 43
GW 3
DTH 8
DTH 1

4902.6221 5902.6221 6902.6221

You might also like