Renovation/Improvement of
Individual Unit
PMD
REMINDERS
1. Construction permit valid only for 6 months from the date of the
application;
PMD
Construction Bond Fees
PMD
Specification of the Aircon Installation
Note:
• CONDENSER UNIT - should be installed in Balcony and with clearance back to wall of 14 cm.
•Strictly no mounted. Height of the angle bar should be at least at 30 cm. from the floor level.
PMD
PROHIBITIONS OF THE UNIT CONSTRUCTION
1. Do not remove tiles on the floors and walls, chisel or drill holes on
the toilet floors;
2. Do not drill holes in the toilet wall if without the assistance of the
site engineer, it may cause problem for the embedded pipes that
are inside in the wall ;
3. Do not store anything in hallways and stairways;
4. Fire escapes are not to be used unless during fire drills and
emergency situations ( as per BOF building code);
5. Repainting of exterior walls façade or any part of the exterior side
is not allowed;
6. It is illegal to tap the electricity from common area receptacles;
7. No construction debris is allowed in the common areas.
MATERIALS TO BE USED ONLY
PMD
B. Frame for the Partition and Ceiling
PMD
ADDITIONAL OUTLETS/LIGHTING INSTALLATION SHOULD BE
THE FOLLOWING MATERIALS TO BE USED ONLY:
1. Expose wires;
2. and use PVC Moulding only
3. Working time shall be from 8:00 AM to 5:00 PM only, Monday to Saturday. No work beyond
this time is allowed and strictly no work during weekends and holidays;
4. Sleeping or stay-in worker, cooking, loitering, littering and drinking of liquors inside the unit/
project is prohibited at all times. Contractors and workers should be complied these
guidelines; otherwise they shall be ejected out of the project by the security guards.
5. The unit owner are responsible for the conduct and behavior of their workers at all times
while within the premises of the project.
6. The unit owner must provide adequate Fire Extinguishers and Emergency Light in the
condo unit as required by the Bureau of Fire building code ordinance.
PMD
Alterations
1. No walls, roofs, fences or enclosures maybe placed to alter the basic design of
the unit or the limited common areas appurtenant thereto;
2. No grills or screen shall be installed at the exterior of the balcony. Planter boxes,
pots outside the door of each unit along the corridor are disallowed;
3. The implementation of the approved plan shall be for the account of the unit
owner or tenant;
5. Upon approval, the Property Administrator shall issue the necessary Permit to
Construct;
6. The Property Manager or its duly authorized representative can stop the
renovation and prevent entry of construction entry of construction workers
should there be violation/damages thereof.
( For complete alteration guidelines, please refer to the Rules and Regulation Booklet).
PMD
HOW TO APPLY CONSTRUCTION
BOND REFUND
PMD
CONSTRUCTION BOND REFUND PROCESS FLOW
ACTIVITIES DEPARTMENT RESPONSIBLE
START
COMPLETION OF CONSTRUCTION
BUYER
FILING OF
REFUND FORM BUYER
YES
YES
PROPERTY MANAGEMENT,
IF BEYOND REPAIR, C&C AND BUYER
CLEARANCE BOND FORFEITED
FROM CONDO
OK
CORP AND C&C
Start of 10 working
days
END
Updated With Arrears
If SPA
RELEASE OF CHECK
CASHIER AND BUYER
Every Friday YES Present SPA form,
2pm Onwards I.D, O.R original
with I.D of unit
END owner
NO
PMD Hold/
END
REMINDERS IN APPLYING FOR THE
CONSTRUCTION BOND REFUND
1. The check refund shall be in the name of the unit owner/principal buyer only.
2. Bring the Original Receipt of Construction bond upon claiming the refund check.
3. The EROCC personnel shall inspect the renovation/improvement works. Noted violation of
construction guidelines and restrictions may cause forfeiture of the bond.
4. Application for refund shall be on hold if unit owner has unsettle amount for water, electricity,
condo dues, monthly amortization and other special assessment.
6.2 Photocopy of government issued id’s with specimen signature of the principal
buyer;