A B C D E F G H J K

GENERAL NOTES:
S
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.

2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.

3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
PROVIDED AND EXPRESSED IN DCS.
1 PDI 1
L 4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
LL
PI 5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
A PIT DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
CHILLED WATER RETURN-A B
PI
A B
PG PIT FO

M
A B

CHILLED WATER SUPPLY-B


DUAL SEAL B
CHILLED WATER RETURN-B
NOTES:
B
NOTE-8 1. DELETED.
FO DRAIN-B

TG A 2. DELETED.
A
3. DELETED.
2 2
CHILLED WATER SUPPLY-A 4. DELETED.

5. DELETED.

6. DELETED.

7. OVER LOAD PROTECTION SHOULD BE PROVIEDE FOR P-7101, P-7102, P-7103, P-7111,
P-7112, P-7141, P-7311, P-7481 AND A-7101, A-7102, A-7103, A-7111, A-7112,
A-7141, A-7342A/B.

8. THE BUFFER IS 2''X8'' (DXL, 1MINUTE BUFFER VOLUME)

PUMP SEAL DETAIL (PLAN 53B) PUMP FLUSHING DETAIL (PLAN 32)

INSTRUMENT NUMBER CHILLED WATER LINE NUMBER VALVE NUMBER OPC VENDOR WISON
SERVICE P&ID
Interlock PIT-A PG PI-A PI-B PDI PIT-B TG FO-A FO-B CHILLED WATER SUPPLY-A CHILLED WATER RETURN-A CHILLED WATER SUPPLY-B CHILLED WATER RETURN-B SUPPLY LINE-A RETURN LINE-A SUPPLY LINE-B RETURN LINE-B DRAIN OPC NUMBER TO
P-7101 71-I-2121-A 71-S-217 71-PIT-910 71-PG-910 71-PI-910 71-PI-417 71-PDI-101 71-PIT-417 71-TG-910 71-FO-425 71-FO-417 70-WL-1500-1CS1S02-3/4''-IC 71-WM-1500-1CS1S02-3/4''-IC 70-WL-1398-1CS1S02-1/2''-IC 71-WM-1237-1CS1S02-1/2''-IC 71-GTV-130 71-GLV-136 71-GTV-100 71-GLV-108 71-GTV-116 4218 71-I-2121-A
P-7111 71-I-2121-B 71-S-218 71-PIT-911 71-PG-911 71-PI-911 71-PI-418 71-PDI-102 71-PIT-418 71-TG-911 71-FO-426 71-FO-418 70-WL-1501-1CS1S02-3/4''-IC 71-WM-1501-1CS1S02-3/4''-IC 70-WL-1397-1CS1S02-1/2''-IC 71-WM-1236-1CS1S02-1/2''-IC 71-GTV-131 71-GLV-137 71-GTV-101 71-GLV-109 71-GTV-117 4219 71-I-2121-B
3 P-7102 71-I-2122-A 71-S-220 71-PIT-912 71-PG-912 71-PI-912 71-PI-420 71-PDI-103 71-PIT-420 71-TG-912 71-FO-427 71-FO-420 70-WL-1502-1CS1S02-3/4''-IC 71-WM-1502-1CS1S02-3/4''-IC 70-WL-1396-1CS1S02-1/2''-IC 71-WM-1235-1CS1S02-1/2''-IC 71-GTV-132 71-GLV-138 71-GTV-102 71-GLV-110 71-GTV-118 4220 71-I-2122-A
3
P-7112 71-I-2122-B 71-S-219 71-PIT-913 71-PG-913 71-PI-913 71-PI-419 71-PDI-104 71-PIT-419 71-TG-913 71-FO-428 71-FO-419 70-WL-1503-1CS1S02-3/4''-IC 71-WM-1503-1CS1S02-3/4''-IC 70-WL-1395-1CS1S02-1/2''-IC 71-WM-1234-1CS1S02-1/2''-IC 71-GTV-133 71-GLV-139 71-GTV-103 71-GLV-111 71-GTV-119 4222 71-I-2122-B
P-7103 71-I-2123-A 71-S-221 71-PIT-914 71-PG-914 71-PI-914 71-PI-421 71-PDI-105 71-PIT-421 71-TG-914 71-FO-429 71-FO-421 70-WL-1504-1CS1S02-3/4''-IC 71-WM-1504-1CS1S02-3/4''-IC 70-WL-1393-1CS1S02-1/2''-IC 71-WM-1232-1CS1S02-1/2''-IC 71-GTV-134 71-GLV-140 71-GTV-104 71-GLV-112 71-GTV-120 4224 71-I-2123-A
P-7141 71-I-2124 71-S-223 71-PIT-916 71-PG-916 71-PI-916 71-PI-423 71-PDI-106 71-PIT-423 71-TG-916 71-FO-430 71-FO-423 70-WL-1505-1CS1S02-3/4''-IC 71-WM-1505-1CS1S02-3/4''-IC 70-WL-1394-1CS1S02-1/2''-IC 71-WM-1233-1CS1S02-1/2''-IC 71-GTV-135 71-GLV-141 71-GTV-105 71-GLV-113 71-GTV-121 4225 71-I-2124
P-7311 73-I-2301 73-S-224 73-PIT-910 73-PG-910 73-PI-910 73-PI-424 73-PDI-107 73-PIT-424 73-TG-910 73-FO-431 73-FO-424 70-WL-1506-1CS1S02-3/4''-IC 73-WM-1506-1CS1S02-3/4''-IC 70-WL-1392-1CS1S02-1/2''-IC 73-WM-1231-1CS1S02-1/2''-IC 73-GTV-130 73-GLV-132 73-GTV-106 73-GLV-114 73-GTV-122 5797 73-I-2301

PI H
900
74-BDG-2407-1CS1S01-1/2''-NI
VENT TO WARM FLARE
CHILLED WATER SUPPLY
PIT FO
900 SG
FO B
COOLER
901
FILL CUP
N6 SG
4 N8 A
CHILLED WATER RETURN 4
LIT LI H I
TG TG
900 900 L 234
LI
903
FO
444
N7
N4
N5 70-WL-1399-1CS1S02-1''-IC
74-WM-1238-1CS1S02-1''-IC SG REFERENCE DRAWINGS
900 DRAWING NO. TITLE
CHILLED WATER RETURN CHILLED WATER SUPPLY

N3 3/4''
BUFFER FLUID

FO
BUFFER FLUID

900

N9
INSTRUMENT NUMBER CHILLED WATER LINE NUMBER Jan 07,
SERVICE P&ID
SG-A SG-B TG FO CHILLED WATER SUPPLY CHILLED WATER RETURN
FO 0C 2021
ISSUED FOR CONSTRUCTION LYM ZLL YSS
N1 N3 1/2'' Oct 28,
P-7471 74-I-2407 74-SG-901 74-SG-902 74-TG-900 74-FO-445 70-WL-1400-1CS1S02-1''-IC 74-WM-1239-1CS1S02-1''-IC 74-FO-445 0B ISSUED FOR CONSTRUCTION LYM ZLL YSS
P-7472 74-I-2407 74-SG-903 74-SG-904 74-TG-901 74-FO-446 70-WL-1401-1CS1S02-1''-IC 74-WM-1240-1CS1S02-1''-IC 74-FO-446 2020
5 P-7473 74-I-2407 74-SG-905 74-SG-906 74-TG-902 74-FO-447 70-WL-1402-1CS1S02-1''-IC 74-WM-1241-1CS1S02-1''-IC 74-FO-447 0A
Sep 03,
2020
ISSUED FOR CONSTRUCTION LYM ZLL YSS
P-7201 72-I-2202-A 72-SG-901 - 72-TG-901 72-FO-448 70-WL-1409-1CS1S02-1''-IC 72-WM-1241-1CS1S02-1''-IC 72-FO-448
2020.11.30 Dec 20,
00 2019 ISSUED FOR CONSTRUCTION TXQ ZLL YSS
SIGN NOZZLE P-7471/7472/7473 SEAL DETAIL (PLAN 23+61 ) Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
2019
N1 SUCTION
REV DATE DESCRIPTION DRAWN CHECKED APPROVED

The information contained in this document is the confidential property of SABIC. It cannot be
FO

disclosed, copied or used for any other purpose without prior written approval from SABIC
N2 DISCHARGE
Saudi Basic Industries Corporation
N3 PUMP DRAIN CHILLED WATER SUPPLY
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia
A
N4 CHILLED WATER SUPPLY
CHILLED WATER RETURN Technology & Innovation
SABIC Technology Center
N5 CHILLED WATER RETURN B Jubail, Kingdom of Saudi Arabia

N6 VENT CANNED PUMP P-7312/P-7313 PROJECT DESCRIPTION


MP-151000100
N7 DRAIN UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 N8 FILL CUP DRAWING TITLE
INSTRUMENT CHILLED WATER LINE NUMBER VALVE TAG NUM DRAWN DATE
SERVICE P&ID LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
N9 NITROGEN PURGE NUMBER (FO) CHILLED WATER SUPPLY CHILLED WATER RETURN A B GLOBE
P-7312 73-I-2301-B 73-FO-432 70-WL-1403-1CS1S02-1/2''-IC 73-WM-1242-1CS1S02-1/2''-IC 73-GTV-496 73-GTV-498 73-GLV-498 CHECKED DATE SEALING SYSTEM
ZLL 01/07/21
P-7313 73-I-2301-C 73-FO-433 70-WL-1404-1CS1S02-1/2''-IC 73-WM-1243-1CS1S02-1/2''-IC 73-GTV-497 73-GTV-499 73-GLV-499 SEALING SYSTEM FOR PUMP
APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

STC-J 70 A1
P-7412 SEAL DETAIL (PLAN 11+52) PROJECT NO.
17093
CANNED PUMP FLUSHING DETAIL (PLAN ) A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300PE-DW02-7002-A 10 70-I-2001-A 1of1 0C
FILE NAME: 70-I-2001-A.PID

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES:
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.

2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.

3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
PROVIDED AND EXPRESSED IN DCS.
1 LSLL LALL I
1
4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
A
5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
LG LSL LAL
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
LEVEL
PSV
INDICATOR
BLOWDOWN LIQUID TO V-7481 LSH LAH

LSHH LAHH

PG

PCO
PRESSURE
COMPENSATOR
2 2

PDIT PDI I
L A

MECHANICAL SEAL

B
1/2"

CHILLED WATER RETURN F


1/2"
3 3
WATER JACKET
A
E CHILLED WATER SUPPLY
1/2"
B

SEAL FLUSHING OIL H A


1/2" 1/2"

HAND PUMP
FLANGE ATTACHMENT

4 4

REFERENCE DRAWINGS
DRAWING NO. TITLE

I
Valve Tag Instrument No. line number
Tag No. P&ID PSV Set Point PSV in bar(g)
A B GLOBE LALL LAL LAH LAHH PDIT PDT I(A) Chilled water supply Chilled water return vent
A-7101 71-I-2121-A 71-PSV -801 71-GTV-501 71-GTV-511 71-GLV-501 30 71-LALL-801 71-LAL-802 71-LAH-803 71-LAHH-804 71-PDIT-801 71-PDT-801 71-I-A7101 70-WL-1138-1CS1S02-1/2"-IC 71-WM-1150-1CS1S02-1/2"-IC 71-BDL-1150-1CS1S01-1/2"-NI
A-7102 71-I-2122-A 71-PSV -802 71-GTV-502 71-GTV-512 71-GLV-502 30 71-LALL-805 71-LAL-806 71-LAH-807 71-LAHH-808 71-PDIT-802 71-PDT-802 71-I-A7102 70-WL-1139-1CS1S02-1/2"-IC 71-WM-1151-1CS1S02-1/2"-IC 71-BDL-1151-1CS1S01-1/2"-NI
A-7103 71-I-2123-A 71-PSV -803 71-GTV-503 71-GTV-513 71-GLV-503 30 71-LALL-809 71-LAL-810 71-LAH-811 71-LAHH-812 71-PDIT-803 71-PDT-803 71-I-A7103 70-WL-1140-1CS1S02-1/2"-IC 71-WM-1152-1CS1S02-1/2"-IC 71-BDL-1152-1CS1S01-1/2"-NI
Jan 07,
A-7111 71-I-2121-B 71-PSV -804 71-GTV-504 71-GTV-514 71-GLV-504 35 71-LALL-813 71-LAL-814 71-LAH-815 71-LAHH-816 71-PDIT-804 71-PDT-804 71-I-A7111 70-WL-1141-1CS1S02-1/2"-IC 71-WM-1153-1CS1S02-1/2"-IC 71-BDL-1153-1CS1S01-1/2"-NI 0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
2021
A-7123A 71-I-2102 71-PSV-807A 71-GTV-505 71-GTV-515 71-GLV-507A 19 71-LALL-825A 71-LALL-826A 71-LALL-827A 71-LALL-828A 71-PDIT-807A 71-PDT-807A 71-I-A7123A 70-WL-1142-1CS1S02-1/2"-IC 71-WM-1154-1CS1S02-1/2"-IC 71-BDL-1154-1CS1S01-1/2"-NI
5 A-7123B 71-I-2102 71-PSV-807B 71-GTV-506 71-GTV-516 71-GLV-507B 19 71-LALL-825B 71-LALL-826B 71-LALL-827B 71-LALL-828B 71-PDIT-807B 71-PDT-807B 71-I-A7123B 70-WL-1143-1CS1S02-1/2"-IC 71-WM-1155-1CS1S02-1/2"-IC 71-BDL-1155-1CS1S01-1/2"-NI
Oct 28,
0B 2020 ISSUED FOR CONSTRUCTION LYM ZLL YSS
A-7125A 71-I-2102 71-PSV-808A 71-GTV-507 71-GTV-517 71-GLV-508A 19 71-LALL-829A 71-LALL-830A 71-LALL-831A 71-LALL-832A 71-PDIT-808A 71-PDT-808A 71-I-A7125A 70-WL-1144-1CS1S02-1/2"-IC 71-WM-1156-1CS1S02-1/2"-IC 71-BDL-1156-1CS1S01-1/2"-NI Sep 03,
0A 2020 ISSUED FOR CONSTRUCTION LYM ZLL YSS
A-7125B 71-I-2102 71-PSV-808B 71-GTV-508 71-GTV-518 71-GLV-508B 19 71-LALL-829B 71-LALL-830B 71-LALL-831B 71-LALL-832B 71-PDIT-808B 71-PDT-808B 71-I-A7125B 70-WL-1145-1CS1S02-1/2"-IC 71-WM-1157-1CS1S02-1/2"-IC 71-BDL-1157-1CS1S01-1/2"-NI Dec 20,
00 2019 ISSUED FOR CONSTRUCTION TXQ ZLL YSS
A-7112 71-I-2122-B 71-PSV -805 71-GTV-509 71-GTV-519 71-GLV-505 35 71-LALL-817 71-LAL-818 71-LAH-819 71-LAHH-820 71-PDIT-805 71-PDT-805 71-I-A7112 70-WL-1146-1CS1S02-1/2"-IC 71-WM-1158-1CS1S02-1/2"-IC 71-BDL-1158-1CS1S01-1/2"-NI
A-7141 71-I-2124 71-PSV -809 71-GTV-510 71-GTV-520 71-GLV-509 30 71-LALL-833 71-LAL-834 71-LAH-835 71-LAHH-836 71-PDIT-809 71-PDT-809 71-I-A7141 70-WL-1147-1CS1S02-1/2"-IC 71-WM-1159-1CS1S02-1/2"-IC 71-BDL-1159-1CS1S01-1/2"-NI REV DATE DESCRIPTION DRAWN CHECKED APPROVED

The information contained in this document is the confidential property of SABIC. It cannot be
A-7211 72-I-2201 72-PSV -801 72-GTV-501 72-GTV-503 72-GLV-501 19 72-LALL-801 72-LAL-802 72-LAH-803 72-LAHH-804 72-PDIT-801 72-PDT-801 72-I-A7211 70-WL-1148-1CS1S02-1/2"-IC 72-WM-1160-1CS1S02-1/2"-IC 72-BDL-1160-1CS1S01-1/2"-NI

disclosed, copied or used for any other purpose without prior written approval from SABIC
A-7231 72-I-2203 72-PSV -802 72-GTV-502 72-GTV-504 72-GLV-502 19 72-LALL-805 72-LAL-806 72-LAH-807 72-LAHH-808 72-PDIT-802 72-PDT-802 72-I-A7231 70-WL-1149-1CS1S02-1/2"-IC 72-WM-1161-1CS1S02-1/2"-IC 72-BDL-1161-1CS1S01-1/2"-NI Saudi Basic Industries Corporation
A-7342A 73-I-2304 73-PSV-801A 73-GTV-501 73-GTV-503 73-GLV-501A 19 73-LALL-801A 73-LALL-802A 73-LALL-803A 73-LALL-804A 73-PDIT-801A 73-PDT-801A 73-I-A7342A 70-WL-1150-1CS1S02-1/2"-IC 73-WM-1162-1CS1S02-1/2"-IC 73-BDL-1162-1CS1S01-1/2"-NI Engineering and Project Management
A-7342B 73-I-2302 73-PSV-801B 73-GTV-502 73-GTV-504 73-GLV-501B 19 73-LALL-801B 73-LALL-802B 73-LALL-803B 73-LALL-804B 73-PDIT-801B 73-PDT-801B 73-I-A7342B 70-WL-1151-1CS1S02-1/2"-IC 73-WM-1163-1CS1S02-1/2"-IC 73-BDL-1163-1CS1S01-1/2"-NI Jubail, Kingdom of Saudi Arabia

Technology & Innovation


SABIC Technology Center
Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION
MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE SEALING SYSTEM
ZLL 01/07/21
SEALING SYSTEM FOR AGITATOR
APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

PROJECT NO. STC-J 70 A1


17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300PE-DW02-7002-B 10 70-I-2001-B 1of1 0C
FILE NAME: 70-I-2001-B.PID

A B C D E F G H
A B C D E F G H J K

CONTROL DETAILS FOR PUMP


RUNNING STOP RUNNING STOP H/O/A HS STOP CONTROL DETAILS FOR AGITATOR
XXX
HS HS HS HS
STOP
XXX XXX XXX XXX
XL RUNNING STOP
ELECTRICAL FAULT ALARM
XXX
HS START
MCC XXX
1 XL
RUNNING/STOPPED
1
XXX
XL
MCC

M
ELECTRICAL FAULT ALARM
XXX
XL
REMOTE SELECTED
XXX

M
XL
RUNNING/STOPPED
XXX
JI
POWER
XXX
SI
SPEED INDICATION
XXX
SI
SPEED INDICATION
XXX
JI POWER
SIC XXX
SPEED CONTROL
XXX
SIC
SPEED CONTROL
XXX

2 2

INSTRUMENT TAGS
LOCAL REMOTE
PUMP TAG NO. ELECTRICAL
RUNNING REMOTE SPEED SPEED
LOCAL STOP H/O/A STOP FAULT POWER
STOPPED SELECTED INDICATION CONTROL
ALARM
P-7414A 74-HS-071 74-HS-073 74-HS-075 74-HS-016 74-XL-011 74-XL-010 74-XL-045 - - - INSTRUMENT TAGS
P-7414B 74-HS-072 74-HS-074 74-HS-076 74-HS-021 74-XL-015 74-XL-014 74-XL-046 - - - REMOTE
P-7125A 71-HS-066 71-HS-166 - 71-HS-056 71-XL-022 71-XL-021 - - 71-SI-901 71-SIC-901 AGITATOR TAG NO.
ELECTRICAL RUNNING/STO SPEED SPEED
P-7125B 71-HS-067 71-HS-167 - 71-HS-031 71-XL-026 71-XL-025 - - 71-SI-902 71-SIC-902 STOP START POWER
FAULT ALARM PPED INDICATION CONTROL
P-7211 72-HS-061 72-HS-161 - 72-HS-001 72-XL-040 72-XL-001 - - 72-SI-901 72-SIC-901
3 P-7213 72-HS-062 72-HS-162 - 72-HS-006 72-XL-055 72-XL-004 - - 72-SI-902 72-SIC-902 A-7101 71-HS-017 71-HS-018 71-XL-040 71-XL-039 - 71-JI-001 -
3
P-7231 72-HS-063 72-HS-163 - 72-HS-011 72-XL-008 72-XL-007 - - 72-SI-903 72-SIC-903 A-7102 71-HS-051 71-HS-052 71-XL-044 71-XL-043 - 71-JI-002 -
P-7232 72-HS-064 72-HS-164 - 72-HS-016 72-XL-012 72-XL-011 - - 72-SI-904 72-SIC-904 A-7103 71-HS-064 71-HS-055 71-XL-048 71-XL-047 - 71-JI-003 -
P-7234 72-HS-065 72-HS-165 - 72-HS-021 72-XL-016 72-XL-015 - - 72-SI-905 72-SIC-905 A-7111 71-HS-060 71-HS-068 71-XL-052 71-XL-051 - 71-JI-004 -
P-7242 72-HS-066 72-HS-166 - 72-HS-026 72-XL-056 72-XL-019 - - 72-SI-906 72-SIC-906 A-7123A 71-HS-067 71-HS-069 71-XL-080 71-XL-059 71-SI-006 - 71-SIC-007
P-7243 72-HS-067 72-HS-167 - 72-HS-031 72-XL-057 72-XL-022 - - 72-SI-907 72-SIC-907 A-7123B 71-HS-091 71-HS-073 71-XL-081 71-XL-062 71-SI-007 - 71-SIC-008
P-7244 72-HS-068 72-HS-168 - 72-HS-036 72-XL-058 72-XL-025 - - 72-SI-908 72-SIC-908 A-7125A 71-HS-075 71-HS-074 71-XL-082 71-XL-065 71-SI-008 - 71-SIC-009
P-7411A 74-HS-061 74-HS-161 - 74-HS-001 74-XL-042 74-XL-001 - - - - A-7125B 71-HS-078 71-HS-077 71-XL-083 71-XL-068 71-SI-009 - 71-SIC-010
P-7411B 74-HS-062 74-HS-162 - 74-HS-006 74-XL-043 74-XL-004 - - - - A-7112 71-HS-087 71-HS-065 71-XL-056 71-XL-055 - 71-JI-005 -
P-7481 74-HS-070 74-HS-170 - 74-HS-050 74-XL-050 74-XL-039 - - 74-SI-910 74-SIC-910 A-7141 71-HS-081 71-HS-080 71-XL-074 71-XL-071 - 71-JI-006 -
P-7314 73-HS-065 73-HS-165 - 73-HS-036 73-XL-032 73-XL-031 - - 73-SI-915 73-SIC-915 A-7211 72-HS-041 72-HS-040 72-XL-059 72-XL-028 - - -
P-7315 73-HS-066 73-HS-166 - 73-HS-037 73-XL-034 73-XL-033 - - 73-SI-916 73-SIC-916 A-7231 72-HS-044 72-HS-043 72-XL-060 72-XL-031 - - -
P-7508 - - - 75-HS-008 75-XL-009 75-XL-008 - - 75-SI-008 75-SIC-008 A-7342A 73-HS-024 73-HS-025 73-XL-027 73-XL-017 73-SI-001 73-JI-001 73-SIC-005
P-7101 71-HS-061 71-HS-161 - 71-HS-001 71-XL-002 71-XL-001 - 71-JI-007 71-SI-001 71-SIC-001 A-7342B 73-HS-032 73-HS-029 73-XL-028 73-XL-020 73-SI-002 73-JI-002 73-SIC-006
P-7102 71-HS-062 71-HS-162 - 71-HS-006 71-XL-006 71-XL-005 - 71-JI-008 71-SI-002 71-SIC-002
P-7103 71-HS-063 71-HS-163 - 71-HS-007 71-XL-010 71-XL-009 - 71-JI-009 71-SI-003 71-SIC-003
P-7111 71-HS-064 71-HS-164 - 71-HS-036 71-XL-014 71-XL-013 - 71-JI-010 71-SI-011 71-SIC-011
P-7112 71-HS-065 71-HS-165 - 71-HS-021 71-XL-018 71-XL-017 - 71-JI-011 71-SI-012 71-SIC-012
4 P-7141 71-HS-068 71-HS-168 - 71-HS-076 71-XL-030 71-XL-029 - 71-JI-012 71-SI-041 71-SIC-041 4
P-7311 73-HS-061 73-HS-161 - 73-HS-001 73-XL-002 73-XL-001 - 73-JI-013 73-SI-011 73-SIC-011
P-7312 73-HS-062 73-HS-162 - 73-HS-006 73-XL-024 73-XL-005 - - - -
P-7313 73-HS-063 73-HS-163 - 73-HS-011 73-XL-025 73-XL-008 - - - -
P-7341 73-HS-064 73-HS-164 - 73-HS-016 73-XL-026 73-XL-011 - - 73-SI-901 73-SIC-901
P-7412 74-HS-063 74-HS-163 - 74-HS-011 74-XL-044 74-XL-007 - - 73-SI-906 73-SIC-906
P-7421A 74-HS-064 74-HS-164 - 74-HS-026 74-XL-047 74-XL-018 - - 73-SI-907 73-SIC-907
P-7421B 74-HS-065 74-HS-165 - 74-HS-032 74-XL-048 74-XL-021 - - - - REFERENCE DRAWINGS
P-7461 74-HS-066 74-HS-166 - 74-HS-036 74-XL-049 74-XL-024 - - - - DRAWING NO. TITLE
P-7471 74-HS-067 74-HS-167 - 74-HS-041 74-XL-028 74-XL-027 - - - -
P-7472 74-HS-068 74-HS-168 - 74-HS-044 74-XL-032 74-XL-031 - - - -
P-7473 74-HS-069 74-HS-169 - 74-HS-047 74-XL-036 74-XL-035 - - - -
P-7114 71-HS-069 71-HS-169 - 71-HS-041 71-XL-084 71-XL-033 - - 71-SI-014 71-SIC-014
P-7115 71-HS-070 71-HS-170 - 71-HS-054 71-XL-085 71-XL-036 - - 71-SI-015 71-SIC-015
P-7604 - - - 76-HS-004 76-XL-005 76-XL-004 - - 76-SI-901 76-SIC-901

Jan 07,
0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
2021
Oct 28,
5 0B 2020 ISSUED FOR CONSTRUCTION LYM ZLL YSS
Sep 03,
0A 2020 ISSUED FOR CONSTRUCTION LYM ZLL YSS
Dec 20, ISSUED FOR CONSTRUCTION
00 2019 TXQ ZLL YSS

REV DATE DESCRIPTION DRAWN CHECKED APPROVED

The information contained in this document is the confidential property of SABIC. It cannot be
disclosed, copied or used for any other purpose without prior written approval from SABIC
Saudi Basic Industries Corporation
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia

Technology & Innovation


SABIC Technology Center
Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION
MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE PUMP AND AGITATOR CONTROL DETAIL
ZLL 01/07/21
APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

PROJECT NO. STC-J 70 A1


17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300PE-DW02-7002-C 10 70-I-2001-C 1of1 0C
FILE NAME: 70-I-2001-C.PID

A B C D E F G H
A B C D E F G H J K

PG PG
XXX XXX

1 1
EXT EXT EXT
PSV PD PSV PD PSV
XXX XXX XXX

VENDOR WISON

SET @ XXXBAR SET @ 1.00BAR SET @ 0.5BAR


PI H PI H I PI H
INT INT INT
XXX PSV XXX PSV 343 XXX PSV
XXX XXX XXX

PIT PIT PIT


XXX M XXX M XXX M

2 2
M M
SIC SIC
XXX XXX

DIAPHRAGM MEMBRANE PUMP WITH SIC DIAPHRAGM MEMBRANE PUMP WITHOUT DAMPER(P-7481)
DIAPHRAGM MEMBRANE PUMP WITHOUT SIC

3 3

LINE NUMBER
SERVICE P&ID DAMPER CONNECTION
PIT PI PI SET BAR PG PSV(EXT) PSV(EXT) SET BARG PUMP DISCHARGE LINE PUMP SUCTION LINE
P-7125A 71-I-2102 71-PIT-901 71-PI-901 4.9 BAR 71-PG-901 71-PSV-051 19 71-CA-1034-50SD0L01-1/4"-NI 71-CA-1033-50SD0L01-1/4"-NI 1/2''
P-7125B 71-I-2102 71-PIT-902 71-PI-902 4.9 BAR 71-PG-902 71-PSV-052 19 71-CA-1036-50SD0L01-1/4"-NI 71-CA-1036-50SD0L01-1/4"-NI 1/2''
P-7211 72-I-2201 72-PIT-901 72-PI-901 1.0 BAR 72-PG-901 72-PSV-001 4 72-HEM-2264-1SD0S01-1/2"-NI 72-HEM-2263-1SD0S01-1"-NI 1''
P-7213 72-I-2201 72-PIT-902 72-PI-902 2.3 BAR 72-PG-902 72-PSV-002 9 72-HEM-2271-1SD0S01-1/2"-NI 72-HEM-2266-1SD0S01-1"-NI 1''
P-7231 72-I-2203 72-PIT-903 72-PI-903 5.0 BAR 72-PG-903 72-PSV-007 19 72-HEM-1266-3SD0S01-1/2"-NI 72-HEM-1262-1SD0S01-1"-NI 1/2''
P-7232 72-I-2203 72-PIT-904 72-PI-904 5.0 BAR 72-PG-904 72-PSV-008 19 72-HEM-1267-3SD0S01-1/2"-NI 72-HEM-1263-1SD0S01-1"-NI 1/2''
P-7234 72-I-2203 72-PIT-905 72-PI-905 5.0 BAR 72-PG-905 72-PSV-009 19 72-HEM-3547-3SD0S01-1/2"-NI 72-HEM-1264-1SD0S01-1"-NI 1/2''
P-7242 72-I-2201 72-PIT-906 72-PI-906 4.9 BAR 72-PG-906 72-PSV-003 19 72-HEM-2272-3SD0S01-1/2"-NI 72-HEM-2267-1SD0S01-1"-NI 1/2''
P-7243 72-I-2201 72-PIT-907 72-PI-907 4.9 BAR 72-PG-907 72-PSV-004 19 72-HEM-2273-3SD0S01-1/2"-NI 72-HEM-2268-1SD0S01-1"-NI 1/2''
P-7244 72-I-2201 72-PIT-908 72-PI-908 4.9 BAR 72-PG-908 72-PSV-005 19 72-HEM-1628-3SD0S01-1/2"-NI 72-HEM-2269-1SD0S01-1"-NI 1/2''
P-7314 73-I-2301-B 73-PIT-902 73-PI-915 2.1 BAR 73-PG-902 73-PSV-159 8 73-P-4518-1SD0S01-1/2"-NI 73-P-4517-1SD0S01-1/2"-NI 1/2''
P-7315 73-I-2303-B 73-PIT-903 73-PI-916 8.25 BAR 73-PG-903 73-PSV-192 28 73-P-4516-3SA0S01-1/2"-NI 73-P-4511-1SA0S01-1/2"-NI 1/2''
P-7341 73-I-2305 73-PIT-901 73-PI-901 0.6 BAR 73-PG-901 73-PSV-023 8 73-HEM-3365-1SD0S01-1"-NI 73-HEM-3367-1SD0S01-1"-NI 1''
4 P-7414A 74-I-2401-B 74-PIT-906 74-PI-906 7.2 BAR 74-PG-906 74-PSV-003 28 74-P-3403-3SA0S01-1"-NI 74-P-3402-1SA0S01-1"-NI 1-1/2''
4
P-7414B 74-I-2401-B 74-PIT-907 74-PI-907 7.2 BAR 74-PG-907 74-PSV-004 28 74-P-3405-3SA0S01-1"-NI 74-P-3404-1SA0S01-1"-NI 1-1/2''
P-7421A 74-I-2403-B 74-PIT-908 74-PI-908 4.9 BAR 74-PG-908 74-PSV-005 19 74-TIB-4500-3SA0B02-1/2"-NI 74-TIB-4999-3SA0B02-1/2"-NI 1/2''
P-7421B 74-I-2403-B 74-PIT-909 74-PI-909 4.9 BAR 74-PG-909 74-PSV-008 19 74-TIB-1665-3SA0B02-1/2"-NI 74-TIB-1490-3SA0B02-1/2"-NI 1/2''
P-7481 74-I-2408 74-PIT-910 74-PI-910 0.5 BAR - 74-PSV-088 9 74-SUS-1320-1SD0S02-1"-NI 74-SUS-4460-1SD0S02-2"-NI -
P-7604 76-I-2614 76-PIT-901 76-PI-901 2.6 BAR 76-PG-901 76-PSV-016 10 76-DI-4918-1SA0S01-1/2"-NI 76-DI-1789-1SA0S01-1/2"-NI 1/2''
REFERENCE DRAWINGS
DRAWING NO. TITLE

Jan 07,
0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
2021
Oct 28,
5 0B 2020 ISSUED FOR CONSTRUCTION LYM ZLL YSS
Sep 03,
0A 2020 ISSUED FOR CONSTRUCTION LYM ZLL YSS
Dec 20, ISSUED FOR CONSTRUCTION
00 2019 TXQ ZLL YSS

REV DATE DESCRIPTION DRAWN CHECKED APPROVED

The information contained in this document is the confidential property of SABIC. It cannot be
disclosed, copied or used for any other purpose without prior written approval from SABIC
Saudi Basic Industries Corporation
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia

Technology & Innovation


SABIC Technology Center
Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION
MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE DIAPHRAGM MEMBRANE DETAIL
ZLL 01/07/21
APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

PROJECT NO. STC-J 70 A1


17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300PE-DW02-7002-D 10 70-I-2001-D 1of1 0C
FILE NAME: 70-I-2001-D.PID

A B C D E F G H
A B C D E F G H J K

TYPE-A GSM-G-1-V
TYPE A
TYPE-A2 GSM-LG-1-V
TYPE A2
TYPE-B/C GSL-2-PSV
TYPE B/C TYPE-E GSM-LG-1-V TYPE E GENERAL NOTES:
SAMPLING DEVICE
SAMPLING DEVICE SAMPLING DEVICE SAMPLING DEVICE 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
FOR SUSPENSION
FOR MONOMERS FOR MONOMERS FOR HEXANE AND NOMENCLATURE.
AND MOTHER LIQUOR
2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.
XT SERIES PTFE HOSE PG
TG PG 3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
A PROVIDED AND EXPRESSED IN DCS.
A
1 SAMPLE INLET A 1
B 4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
SAMPLE OUTLET
1/4-QC 1/4-QC DETAIL 5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
CONNECTOR CL150 CL600 CONNECTOR FOR SD-40 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
FO NOTE-2 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
VENT A CL600
CV1 TBV1 SAMPLE INLET
VENT A NV2 NV2 BV1 B
PG
CV1 NV1 PG SPRING NOTES:
CL600 CV1 NV1 PCV
B B RETURN
C DETAIL FOR SD-40
C
3
VALVE NITROGEN PURGE NOTES:
B
1 2
UBJ NV1
500 ML GEARED N/C
3
1 2 500 ML THREAD- A
CL600 BV1 B CL600 VALVE 1. 1 LITER MOBILE CYLINDER (70-SP-015) NOTE-4
GEARED CYLINDER CONNECTION A
SAMPLE INLET CYLINDER BV2
SPRING VALVE 1 2
SAMPLE OUTLET
BV1 C PG F1 2. MOBILE CYLINDER SHALL BE LARGER NOTE-3
RETURN SAMPLE INLET
3

BV3 THAN POT BY 110% VOL (70-SP-016)


1 2

VALVE 3
NV3 SPRING NV3 3SD0S01 1SA0S01
C PG TG
RETURN
A VALVE 3. QUICK COUPLING (70-SP-017)
1/4-QC MOBILE CYLINDER 500ML PG
1/4-QC
CONNECTOR 4. SPRING RETURN HANDLE VALVE (70-SP-018) B
CONNECTOR

BV4
NOTE-1
2 FJ SERIES METAL HOSE DETAIL FOR SD-8 2

TYPE D SAMPLE OUTLET 3SD0S01 1SA0S01


TYPE K TYPE 43
TYPE-K CUSTOMER SKETCH
HOLD SAMPLING DEVICE TYPE-L CUSTOMER SKETCH
FOR POWDER SAMPLING DEVICE FOR
TYPE L SAMPLING DEVICE FOR
CAUSTIC SOLUTION(NAOH)
CATALYST SLURRY
SAMPLING DEVICE FOR
40℃SOLIDFIED
SAMPLE INLET
3/8"
BV1 BV1 WATER FLUSHING
SPRING SPRING
RETURN RETURN
VALVE PG VALVE
12CG0T01 1SN0B01 BV1

1 BV2 0.5L SAMPLE BV3


0B0 CYLINDER
NV1
A SPRING
3 -1S BV2 3
-POW 6"x2" SAMPLE INLET
RETURN
6" BV2 VALVE
2"-POW-1SA0B01

NOTES:
MIN.

500ML 0.5L
CYLINDER 1. DELETED. BOTTLE
BV3 2. SPRING RETURN HANDLE VALVE.
60º PG
3. THE SAMPLE BOTTLE DESIGN PRESSURE IS 10BARG.
N/C NOTE-1

3/8''-POW-50ST0L01
50ST0L01
1SA0B01

TYPE A
L=250 MM

N° SERVICE P&ID SAMPLE INLET LINE NUMBER SAMPLE OUTLET LINE NUMBER PG-A PG-B TG VALVE NUMBER-A VALVE NUMBER-B
NOTE-1 SD1 ETH 71-I-2100-B 71-P-3601-6SA0S01-1/2"-NI 71-BDG-3602-6SA0S01-1/2"-NI 71-PG-143 71-PG-143 71-TG-144 71-BLV-700 71-BLV-701
SD2 HYD 71-I-2100-B 71-GH-3603-6SA0S03-1/2"-NI 71-BDG-3604-6SA0S03-1/2"-NI 71-PG-144 71-PG-144 71-TG-145 71-BLV-702 71-BLV-703
NOTE-1 2"
TYPE A2
N° SERVICE P&ID SAMPLE INLET OUTLET LINE PG-A PG-B TG VALVE NUMBER-A VALVE NUMBER-B
71-BDL-3632-1SA0S03-1/2"-NI
4 SD3 BUTENE 71-I-2100 71-P-3631-6SA0S01-1/2"-NI
71-BDL-3632-6SA0S01-1/2"-NI
71-PG-145 71-PG-145 71-TG-146 71-BLV-704 71-BLV-705 4
NOTES: 71-BDL-3634-1CS1S01-1/2"-NI
SD39 HEXENE 71-I-2100 71-P-3633-6SA0S01-1/2"-NI 71-PG-146 71-PG-146 71-TG-147 71-BLV-706 71-BLV-707
1. SPRING RETURN HANDLE VALVE (70-SP-014) 71-BDL-3634-6SA0S01-1/2"-NI
TYPE B/C
N° SERVICE P&ID NITROGEN PURGE LINE NUMBER PG PCV VALVE NUMBER-AVALVE NUMBER-B
SD4 R-7101 71-I-2121-A 70-NL-4100-1CS1S01-1/2"-NI 71-PG-147 71-PCV-147 71-BLV-708 71-BLV-709
SD5 R-7102 71-I-2122-A 70-NL-4101-1CS1S01-1/2"-NI 71-PG-148 71-PCV-148 71-BLV-710 71-BLV-711
REFERENCE DRAWINGS
SD6 R-7103 71-I-2123-A 70-NL-4102-1CS1S01-1/2"-NI 71-PG-149 71-PCV-149 71-BLV-712 71-BLV-713
SD38 V-7141 71-I-2124 70-NL-4103-1CS1S01-1/2"-NI 71-PG-150 71-PCV-150 71-BLV-714 71-BLV-715 DRAWING NO. TITLE
SD7 V-7211 72-I-2201 70-NL-4104-1CS1S01-1/2"-NI 72-PG-151 72-PCV-151 72-BLV-700 72-BLV-701
SD36 V-7211 72-I-2201 70-NL-4105-1CS1S01-1/2"-NI 72-PG-154 72-PCV-154 72-BLV-702 72-BLV-703
TYPE G SD37 TK-7412 74-I-2401-A 70-NL-4106-1CS1S01-1/2"-NI 74-PG-155 74-PCV-155 74-BLV-700 74-BLV-701
TYPE G
SAMPLING DEVICE FOR N° SERVICE P&ID NITROGEN PURGE LINE NUMBER SAMPLE INLET LINE NUMBER SAMPLE OUTLET LINE NUMBERPG FO-A FO-B VALVE NUMBER-A VALVE NUMBER-B VALVE NUMBER-B
AL-ALKYL
72-HEM-3622-1SD0S01-1/2"-NI
SD8 V-7231 72-I-2203 70-NL-4107-1CS1S01-1/2"-NI 71-HEM-3621-3SD0S01-1/2"-NI 72-PG-152 72-FO-163 72-FO-164 72-BLV-706 72-BLV-707 72-BLV-708
72-HEM-3622-3SD0S01-1/2"-NI Jan 07,
0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
SD14 P-7421A 74-I-2403-B 70-NL-4108-1CS1S01-1/2"-NI 74-TIB-3625-3SA0B02-1/2"-NI 74-TIB-3626-3SA0B02-1/2"-NI 74-PG-166 74-FO-171 74-FO-172 74-BLV-701 74-BLV-702 74-BLV-703 2021
Oct 28,
SD13 P-7421B 74-I-2403-B 70-NL-4109-1CS1S01-1/2"-NI 74-TEA-3629-3SA0B02-1/2"-NI 74-TEA-3630-3SA0B02-1/2"-NI 74-PG-165 74-FO-173 74-FO-174 74-BLV-704 74-BLV-705 74-BLV-706 0B ISSUED FOR CONSTRUCTION LYM ZLL YSS
2020
TYPE D Sep 03,
5 N° SERVICE P&ID PG 0A 2020
ISSUED FOR CONSTRUCTION LYM ZLL YSS
SD10 DR-7201 72-I-2202-A 72-PG-156 Dec 20,
00 2019 ISSUED FOR CONSTRUCTION TXQ ZLL YSS
B C SD30 V-7202 72-I-2204-A 72-PG-157
BV1 BV2 Jul 01,
SD31 SI-7211 72-I-2211-A 72-PG-158 B2 ISSUED FOR HAZOP TXQ WL YSS
2019
SAMPLE INLET 1/2" 1/2" SD32 SI-7212 72-I-2211-A 72-PG-159
FO SAMPLE OUTLET REV DATE DESCRIPTION DRAWN CHECKED APPROVED

The information contained in this document is the confidential property of SABIC. It cannot be
SD33 SI-7213 72-I-2211-B 72-PG-160
A DETAIL

disclosed, copied or used for any other purpose without prior written approval from SABIC
SD34 SI-7214 72-I-2211-B 72-PG-161
FOR SD-8
SD35 CE-7201 72-I-2201 72-PG-162
Saudi Basic Industries Corporation
1/2"

BV3
TYPE E Engineering and Project Management
1/4" Jubail, Kingdom of Saudi Arabia
N° SERVICE P&ID SAMPLE INLET LINE NUMBER SAMPLE OUTLET LINE NUMBER PG-A PG-B FO VALVE NUMBER-A VALVE NUMBER-B
BV4 SD11 E-7315 73-I-2301-C 73-P-3635-3SA0S01-1/2"-NI 73-P-3636-3SA0S01-1/2"-NI 73-PG-163 73-PG-165 73-FO-163 73-BLV-700 73-BLV-701
NITROGEN PURGE SD12 C-7331B 73-I-2303-A 73-HEM-3637-3SD0S01-1/2"-NI 73-HEM-3638-3SD0S01-1/2"-NI 73-PG-164 73-PG-166 73-FO-164 73-BLV-702 73-BLV-703
Technology & Innovation
1/2"
? SD15 P-7411A/B 74-I-2401-B 74-P-3639-1SA0S01-1/2"-NI 74-P-3640-1SA0S01-1/2"-NI 74-PG-169 74-PG-171 74-FO-169 74-BLV-708 74-BLV-709 SABIC Technology Center
A CV1 BV5 73-P-3642-3SD0S01-1/2"-NI Jubail, Kingdom of Saudi Arabia
FO BV6 SD40 C-7332 73-I-2303-B 73-P-3641-1SA0S01-1/2"-NI 73-PG-170 73-PG-172 73-FO-170 73-BLV-704 73-BLV-705
73-P-3642-1SA0S01-1/2"-NI PROJECT DESCRIPTION
B TYPE K MP-151000100
UBJ
THREAD- N° SERVICE P&ID SAMPLE INLET LINE NUMBER UPP PROJECT
CONNECTION SD18 V-7123A 71-I-2103 71-CA-3633-50SD0L01-3/8"-NI STC-J UTILITIES PARK & PILOT PLANTS
SD19 V-7123B 71-I-2103 71-CA-3634-50SD0L01-3/8"-NI
6 PG
BV7
TYPE L DRAWING TITLE
DRAWN DATE
VENT 01/07/21
N° SERVICE P&ID SAMPLE INLET LINE NUMBER LYM PIPING AND INSTRUMENTATION DIAGRAM
BV8
SD41 V-7342B 73-I-2302 73-DCH-3638-1SA0S01-1"-NI CHECKED DATE SAMPLING DEVICES
MOBILE CYLINDER SD42 V-7342A 73-I-2304 73-DCH-3639-1SA0S01-1"-NI ZLL 01/07/21
500ML TYPE 43 APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE
N° SERVICE P&ID SAMPLE INLET LINE NUMBER WATER FLUSHING LINE NUMBER VALVE NUMBER
PROJECT NO. STC-J 70 A1
BV9 SD43 V-7204 72-I-2204-A 72-KC-3568-1SN0B01-1/2"-NI 70-SW-1604-12CG0T01-1/2"-NI 72-GTV-704
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
10 70-I-2002 1of1 0C
20300PE-DW02-7003
FILE NAME: 70-I-2002.PID

A B C D E F G H
A B C D E F G H J K

NOTES

1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS


AND NOMENCLATURE.
CB-A02/A04/A06 OMH-A03/A04/A05/A07/A14/A16 SU-7001 SU-7002 VA-7001
2. THE OIL FREE WASTE WATER WILL BE COLLECTED IN THE PROPOSED
CATCH BASIN PROCESS WASTE WATER MANHOLE OILY WATER SEPARATOR PROCESS WASTE WATER SUMP VALVE BOX SUMP AND WILL BE EVACUATED BY VACUUM TRUCKS PERIODICALLY
1 Service : PROCESS WASTE WATER Service : PROCESS WASTE WATER Service : OILY WATER Service : OILY WATER Service : OILY WATER
3. THE APPROXIMATE VOLUME OF THE SUMP PROVIDED IS 24 M3 WHICH
1
Dimension : 800.0 mm(L) x 800.0 mm(W) x 1000.0 mm(D) Dimension : 1000.0 mm(L) x 1000.0 mm(W) x 3000.0 mm(D) Dimension : 5800.0 mm(L) x 4000.0 mm(W) x 3700.0 mm(D) Dimension : 4000.0 mm(L) x 4000.0 mm(W) x 5000.0 mm(D) Dimension : 1800.0 mm(L) x 1500.0 mm(W) x 3700.0 mm(D)
Capacity : 3.00 m^3 Capacity : 9.99 m^3 WILL APPROXIMATELY HAVE ONE MONTH STORAGE.
Capacity : 0.64 m^3 Capacity : 24.00 m^3 Capacity : 24.00 m^3
MOC Class : CONCRETE EWITH EPOXY POLYURETHANE COATING MOC Class :CONCRETE WITH EPOXY POLYURETHANE COATING MOC Class : CONCRETE WITH POLYURETHANE SHEET MOC Class : CONCRETE WITH POLYURETHANE SHEET MOC Class : CONCRETE WITH POLYURETHANE SHEET 4.THE DETAILS FOR ALL UNDERGROUND PIPING SEE DRAWING 70-C-3103.
5.THE MATERIAL OF PIPING AND VALVE CONNECTED TO OVB-A01 SHALL BE
STAINLESS STEEL.
6.A BIRD SCREE SHALL BE SET AT VENT PIPE OUTLET AND THE ORIENTATION OF
VENT OUTLET SHALL NOT BE TOWARD TO MANHOLE

2 70-P11-001 NaOH System


PROCESS WASTE 2
PROCESS WASTE

PROCESS WASTE
WATER FROM SU-7401
PROCESS WASTE

PROCESS WASTE

PROCESS WASTE
WATER FROM SU-7301
WATER FROM V-7341

WATER FROM SU-7302

WATER FROM SU-7402

WATER FROM SAFTY PIT


4071

4074

4082

4367

4372

6906
74-I-2401-B

74-I-2401-A

74-I-2403-A
73-I-2305

73-I-2302

73-I-2304

3 3

OVB-A01
CB-A02 CB-A06 CB-A04
NOTE 5

FGS LIT
002 H
GDI H
0C
017

70-VA-1482-1CS1S02-4"-NI

70-VA-1481-1CS1S02-6"-NI
70-VA-1480-1CS1S02-4"-NI
NOTE 6 NOTE 6
TO VACUUM TRUCK TO VACUUM TRUCK
GD
4" GTV-056 017 LIT
NOTE 6
0C 002 GTV-055 4"
OMH-A16 OMH-A14
24" 24" 24" 24"

4 4
N1 M1 N3 M2 N2 M3 M1 N1 N2
L1

70-DCH-1478-1CS1S02-4"-NI
70-DO-11012-1CS1S02-4"-NI

H:-3200MM
OMH-A04
OMH-A03
OMH-A05
OMH-A07 4X10" H:-2600MM 70-DCH-1477-1CS1S02-8"-NI
CARBON STEEL PIPE
REFERENCE DRAWINGS
GTV-057 DRAWING NO. TITLE
70-C-3103 OILY WASTE WATER SEWER LAYOUT OF ACP AREA
76-C-1001 PLAN,PROCESS WASTE WATER OILY SEPARATOR & SUMP ĉ
2.0% 76-C-1002 PLAN,PROCESS WASTE WATER OILY SEPARATOR & SUMP Ċ
SLOPE
BOTTOM:-3400MM
BOTTOM:-4700MM 2.0% SLOPE
Feb 18,
VA-7001 0C ISSUED FOR CONSTRUCTION LXJ YYJ WZ
SU-7001 2021
Jan 21,
6"x4" 0B ISSUED FOR CONSTRUCTION LXJ YYJ WZ
SU-7002 2021
6"x4" Oct 29,
5 0A 2020
ISSUED FOR CONSTRUCTION LXJ YYJ WZ
Sep 24,
00 2020 ISSUED FOR CONSTRUCTION LXJ YYJ WZ
Jun 19,
B0 ISSUED FOR REVIEW XY CCL WZ
2019
REV DATE DESCRIPTION DRAWN CHECKED

Engineering and Project Management


Jubail, Kingdom of Saudi Arabia

SABIC Technology Center


Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION

MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LXJ 02/18/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE ACP WASTE WATER
YYJ 02/18/21 COLLECTING SYSTEM
APPROVED DATE
PLANT NAME AREA/UNIT SIZE
WZ 02/18/21
PROJECT NO. STC-J 70 A1
17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300WS-DW15-7301 10 70-I-2003 1OF1 0C
FILE NAME: 70-I-2003.PID

A B C D E F G H
A B C D E F G H J K
HIGH PRESSURE PURIFIED
NITROGEN
GENERAL NOTES˖
70-NH-2001-1CS1S01-2"-NI
173 70-I-2008 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS

70-NH-2002-1CS1S01-3/4"-NI
70-NH-1866-1CS1S01-1"-NI
HIGH PRESSURE PURIFIED AND NOMENCLATURE.
NITROGEN TO E-7342 70-P01-001 HP Purified N2(HPN)
70-P01-001 HP Purified N2(HPN) 70-NH-4438-1CS1S01-1"-NI

70-NH-5002-1CS1S01-1-1/2"-NI

70-NH-2066-1CS1S01-1"-NI
3796 73-I-2305 R-7101 TOP VENT 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
71-NH-2070-50SD0L01-3/8"-NI 70-NH-1910-1CS1S01-1/2"-NI UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.
XX2 25
71-I-2102 1795 71-I-2121-A CATALYST STORAGE
HIGH PRESSURE PURIFIED DRAIN
HIGH PRESSURE PURIFIED 70-NH-2015-1CS1S01-1/2"-NI 3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
TO ANALYZER AIT-104 70-NH-5003-1CS1S01-1/2"-NI NITROGEN TO E-7223 NITROGEN TO V-7342A/B 1766 71-I-2102 PROVIDED AND EXPRESSED IN DCS.
COLD HEXANE LINE 70-NH-1356-50SD0L01-3/8"-NI
1 70-NH-1866-1CS1S01-1"-NI
6984 71-I-2125
3797 72-I-2202-B
HIGH PRESSURE PURIFIED
6624 71-I-2123-B
TO 71-AIT-104-PSCS 4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1
TO V-7342A/B NITROGEN TO E-7133 P-7233
TO V-7111 TO P-7101 70-NH-2066-1CS1S01-1"-NI
70-NH-2004-1CS1S01-1/2"-NI 70-NH-5001-1CS1S01-1"-NI 70-NH-1000-50SD0L01-1/2"-NI 5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
6775 72-I-2201 3920 71-I-2123-A XXX1 71-I-2125
1591 71-I-2121-B 70-NH-2052-1CS1S01-1/2"-NI 833 71-I-2121-A PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
TO ANALYZER DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
TO R-7102 70-NH-2065-1CS1S01-1"-NI TO P-7111
6977 71-I-2125 70-NH-1001-50SD0L01-1/2"-NI 䎧࿻⛩〫ࣘࡠ74-I-2403-B
70-NH-2006-1CS1S01-1/2"-NI HIGH PRESSURE PURIFIED 834 71-I-2121-B
808 71-I-2122-A
70-NH-5000-1CS1S01-1"-NI NITROGEN TO E-7132
TO SD13
TO V-7112 3779 71-I-2122-A TO P-7102 70-NL-4109-1CS1S01-1/2"-NI
70-NH-1002-50SD0L01-1/2"-NI 7027 70-I-2002
70-NH-2005-1CS1S01-1/2"-NI HIGH PRESSURE PURIFIED 841 71-I-2122-A
807 71-I-2122-B
NITROGEN 71-AIT-102
TO R-7103 71-NH-2069-50SD0L01-1/4"-NI
70-NH-2008-1CS1S01-1/2"-NI 6992 71-I-2125 TO P-7112
810 71-I-2123-A 70-NH-1003-50SD0L01-1/2"-NI 䎧࿻⛩〫ࣘࡠ74-I-2403-A
HIGH PRESSURE PURIFIED 840 71-I-2122-B
70-NH-5002-1CS1S01-1"-NI NITROGEN TO E-7131 HIGH PRESSURE PURIFIED
HIGH PRESSURE PURIFIED
3776 71-I-2121-A NITROGEN TO P-7103
70-NH-2473-1CS1S01-1"-NI NITROGEN TO E-7153 70-NH-3008-1CS1S01-1/2"-NI
845 71-I-2123-A TO SD14
3921 71-I-2123-B HIGH PRESSURE PURIFIED 70-NL-4108-1CS1S01-1/2"-NI
1-1/2"x1" NITROGEN 71-AIT-100 7026 70-I-2002
TO V-7603 71-NH-2067-50SD0L01-1/4"-NI TO P-7141
7009 71-I-2125 70-NH-1004-50SD0L01-1/2"-NI
70-NH-2064-1CS1S01-1/2"-NI 1724 71-I-2124
2 902 76-I-2613 HIGH PRESSURE PURIFIED
NITROGEN 71-AIT-101
2
TO ETHYLENE 71-NH-2068-50SD0L01-1/4"-NI
DISTRIBUTION 6993 71-I-2125
70-NH-3009-1CS1S01-1/2"-NI 72-NL-2007-50SD0L01-3/8"-NI TO P-7221
1592 71-I-2100 HIGH PRESSURE 851 72-I-2202-B 䎧࿻⛩〫ࣘࡠ74-I-2401-A
HEADER PURIFIED NITROGEN
70-NH-1357-1CS1S01-1/2"-NI 72-NL-2030-1CS1S01-1"-NI TO BW-7206
6592 71-I-2121-B
862 72-I-2204-B
TO BW-7205 TO SD37
72-NL-2029-1CS1S01-1/2"-NI 70-NL-4106-1CS1S01-1/2"-NI
861 72-I-2204-B 7024 70-I-2002
TO F-7203
70-NL-2123-1CS1S01-1"-NI
855 72-I-2204-B
TO BW-7206
72-NL-2031-1CS1S01-1/2"-NI
863 72-I-2204-B
70-NL-2082-1CS1S01-1/2"-NI TO BW-7211
TO E-7314 6995 72-I-2211-A
70-NL-2050-1CS1S01-1/2"-NI 䎧࿻⛩〫ࣘࡠ72-I-2203
887 73-I-2301-B TO BW-7212
70-NL-2042-1CS1S01-1/2"-NI
6996 72-I-2211-A
TO SE-7201
TO E-7312 70-NL-4401-1CS1S01-1"-NI TO BW-7213 70-NL-4100-1CS1S01-1/2"-NI TO SD4
70-NL-1680-1CS1S01-3/4"-NI 4068 72-I-2210 1-1/2"x1/2" 72-NL-2043-1CS1S01-1/2"-NI
1802 73-I-2301-A 1931 72-I-2211-B 7018 70-I-2002
3 TO E-7311 72-NL-2041-1CS1S01-1/2"-NI 3
TO BW-7205
881 73-I-2301-A 72-NL-2027-1CS1S01-1/2"-NI TO V-7341
859 72-I-2204-A 70-NL-2063-1CS1S01-1/2"-NI
3364 73-I-2305
TO E-7315 2"x1" 1"x1/2"
TO F-7202
880 73-I-2301-C 72-NL-2125-1CS1S01-1"-NI
857 72-I-2204-A 䎧࿻⛩〫ࣘࡠ72-I-2203
TO V-7332 1"x1-1/2"
TO P-7221
4088 73-I-2303-B TO E-7201 70-NL-2085-1CS1S01-1/2"-NI
70-NL-2022-1CS1S01-1"-NI 6980 72-I-2202-B
854 72-I-2204-A 70-NL-4107-1CS1S01-1/2"-NI TO SD8
TO V-7342B TO
7025 70-I-2002
P-7231/P-7232/P-7234
882 73-I-2302 TO BW-7204 70-NL-1303-1CS1S01-1/2"-NI
72-NL-1246-1CS1S01-1/2"-NI 4200 72-I-2203
5888 72-I-2210
TO SD6
70-NL-4102-1CS1S01-1/2"-NI TO V-7231
7020 70-I-2002 70-NL-2066-1CS1S01-1/2"-NI
6904 72-I-2203
TO V-7342B TO BOTTOM OF 䎧࿻⛩〫ࣘࡠ73-I-2302
884 73-I-2302 V-7123 A/B
TO P-7341 70-NL-2014-1CS1S01-1/2"-NI
70-NL-2051-1CS1S01-3/4"-NI 1726 71-I-2102
889 73-I-2305
TO V-7211 TO V-7342B
1-1/2"x3/4" 70-NL-1109-50SD0L01-3/8"-NI
850 72-I-2201 TO V-7123A/B 888 73-I-2302
4 TO E-7221 70-NL-2038-1CS1S01-1"-NI 4
70-NL-2021-1CS1S01-1/2"-NI
70-NL-1110-50SD0L01-3/8"-NI

6625 71-I-2102
70-NL-2047-1CS1S01-1"-NI

70-NL-2063-1CS1S01-2"-NI
70-NL-1680-1CS1S01-3/4"-NI

70-NL-1107-50SD0L01-3/8"-NI

70-NL-4508-1CS1S01-1/2"-NI

5822 72-I-2202-B
70-NL-2048-1CS1S01-1/2"-NI

70-NL-2020-1CS1S01-1/2"-NI

TO P-7114
TO SD36 70-NL-2083-1CS1S01-1/2"-NI
6972 71-I-2121-B
70-NL-4105-1CS1S01-1/2"-NI
7023 70-I-2002 TO V-7231
70-NL-2018-1CS1S01-1/2"-NI 848 72-I-2203
TO SD7
70-NL-4104-1CS1S01-1/2"-NI TO V-7123 A/B
7022 70-I-2002 70-NL-2013-1CS1S01-1"-NI
1727 71-I-2102
LOW PRESSURE REFERENCE DRAWINGS
1-1/2"x1"
PURIFIED NITROGEN (4BARG) 70-NL-2002-1CS1S01-2"-NI DRAWING NO. TITLE
174 70-I-2008

75-NL-5061-1CS1S01-1"-NI
70-P01-002 LP purified N2(LPN) TO V-7517
TO V-7342A TO DR-7201 75-NL-5062-1CS1S01-1"-NI
73-NL-1310-1CS1S01-1/2"-NI 70-NL-2001-1CS1S01-1"-NI 6615 75-I-2503
6842 73-I-2304 5820 72-I-2202-A TO F-7520
TO V-7202 75-NL-5083-1CS1S01-1"-NI
TO V-7342A 70-NL-2028-1CS1S01-1/2"-NI 6863 75-I-2501
70-NL-2056-1CS1S01-1/2"-NI TO E-7332
894 73-I-2304 70-NL-4437-1CS1S01-2"-NI 860 72-I-2204-A
TO F-7510 Jan 07,
1542 73-I-2303-A 1-1/2"x1/2" 75-NL-5061-1CS1S01-1"-NI 0C 2021
ISSUED FOR CONSTRUCTION LYM ZLL YSS
2"x1-1/2" TO V-7202 & F-7221
6618 75-I-2503
Oct 28,
TO SLURRY RECEIVER ISSUED FOR CONSTRUCTION LYM ZLL YSS
70-NL-2033-1CS1S01-1/2"-NI 0B

70-NL-4435-1CS1S01-2"-NI
TO W-7513/14/15/16/17

70-NL-2045-1CS1S01-1"-NI
V-7141 TO V-7331 2020
70-NL-2016-1CS1S01-1/2"-NI 70-NL-2053-1CS1S01-1/2"-NI 865 72-I-2204-A 75-NL-5032-1CS1S01-1-1/2"-NI
Sep 03,
5 1723 71-I-2124 891 73-I-2303-A 6612 75-I-2501 0A 2020
ISSUED FOR CONSTRUCTION LYM ZLL YSS
TO V-7202 TO P-7508 Dec 20,
TO V-7342A 72-NL-2034-1CS1S01-1/2"-NI 70-NL-5023-1CS1S01-1/2"-NI 00 ISSUED FOR CONSTRUCTION TXQ ZLL YSS
70-NL-2055-1CS1S01-1"-NI TO SD5 866 72-I-2204-A 6989 75-I-2506 2019
893 73-I-2304 70-NL-4101-1CS1S01-1/2"-NI Jul 01,
7019 70-I-2002 TO HP-7501 B2 ISSUED FOR HAZOP TXQ WL YSS
75-NL-5007-1CS1S01-1/2"-NI 2019
TO P-7411A/B TO F-7212
70-NL-2060-1CS1S01-1"-NI 72-NL-2046-1CS1S01-1"-NI 5784 75-I-2504
898 74-I-2401-A 879 72-I-2211-A GTV-356 TO PK-7511
REV DATE DESCRIPTION DRAWN CHECKED
70-NL-5030-1CS1S01-1/2"-NI

The information contained in this document is the confidential property of SABIC. It cannot be
TO SLUDGE BARREL 5832 75-I-2506

disclosed, copied or used for any other purpose without prior written approval from SABIC
70-NL-2091-1CS1S01-1/2"-NI TO F-7211
1544 73-I-2304 1-1/2"x1/2" TO B-7201
70-NL-2081-1CS1S01-1"-NI 70-NL-4435-1CS1S01-2"-NI
6997 72-I-2211-A
1540 72-I-2213

TO TK-7411 & TK-7412 TO CE-7201 TO F-7213 TO SI-7211


70-NL-2059-1CS1S01-1"-NI 70-NL-2019-1CS1S01-1/2"-NI 72-NL-2080-1CS1S01-1"-NI 70-NL-2045-1CS1S01-1"-NI
897 74-I-2401-A 1789 72-I-2201 1905 72-I-2211-B 878 72-I-2211-B
SABIC Technology Center
70-NL-4600-1CS1S01-1/2"-NI TO 74-PSV-053/054 TO V-7461 Jubail, Kingdom of Saudi Arabia
70-NL-2062-1CS1S01-1/2"-NI
5847 74-I-2403-A 900 74-I-2406-A PROJECT DESCRIPTION
3/4"x1/2"
TO CO CATALYST MP-151000100
UNLOADING STORAGE TO V-7311
74-NL-4420-1CS1S01-1"-NI 70-NL-2049-1CS1S01-1/2"-NI UPP PROJECT
1531 74-I-2403-A 1378 73-I-2301-A
STC-J UTILITIES PARK & PILOT PLANTS
6 70-NL-5276-1CS1S01-1"-NI
TO P-7481 DRAWING TITLE
TO P-7115 DRAWN DATE
4285 74-I-2408 70-NL-2084-1CS1S01-1/2"-NI LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
6971 71-I-2122-B
TO HYDROGEN CHECKED DATE HIGH AND LOW PRESSURE
DISTRIBUTION ZLL 01/07/21 PURIFIED NITROGEN DISTRIBUTION
70-NL-3010-1CS1S01-1/2"-NI
1725 71-I-2100 TO SD38 APPROVED DATE
70-NL-4103-1CS1S01-1/2"-NI YSS 01/07/21 PLANT NAME AREA/UNIT SIZE
HEADER 7021 70-I-2002
PROJECT NO. STC-J 70 A1
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
10 70-I-2004 1of1 0C
20300PE-DW02-7004
FILE NAME: 70-I-2004.PID

A B C D E F G H
A B C D E F G H J K

GTV-531

GTV-514
70-SW-1017-12CG0T01-3/4"-NI GTV-549 70-SW-1019-12CG0T01-3/4"-NI GTV-543 SERVICE WATER TO

GTV-517
US-7017 US-7019 70-SW-4833-50SD0L01-3/8"-NI V-7342B 70-SW-1008-12CG0T01-3/4"-NI 70-SW-1015-12CG0T01-3/4"-NI
GTV-548 GTV-541 GTV-542 70-SW-1013-12CG0T01-3/4"-NI

GTV-523
GTV-546
GTV-547

GTV-540
SERVICE WATER TO 7016 73-I-2302 US-7008 70-SW-1003-12CG0T01-3/4"-NI US-7015
70-SW-1081-50SD0L01-3/8"-NI GTV-530 US-7013 GTV-513
70-SW-1016-12CG0T01-3/4"-NI V-7342A
GTV-521 GTV-522 GTV-512
70-SW-1010-12CG0T01-3/4"-NI 70-SW-1012-12CG0T01-1"-NI 70-SW-1012-12CG0T01-3/4"-NI GTV-515 GTV-516 TO SD43
US-7016 US-7010 7017 73-I-2304 US-7012 US-7003 70-SW-1604-12CG0T01-1/2"-NI
GTV-544 GTV-545 GTV-538 7029 70-I-2002
SERVICE WATER/ GTV-539 GTV-527 1"x3/4" GTV-528 GTV-529
70-SW-1740-12CG0T01-1"-NI
180 70-I-2008
TO V-7603 GTV-534

GTV-501
POTABLE WATER 70-P01-006 Service potable water (SW) 70-DI-1784-1SA0S01-1"-NI 70-SW-1004-12CG0T01-3/4"-NI 70-SW-1005-12CG0T01-1"-NI

GTV-511
1020 76-I-2613 GTV-524 GTV-525 GTV-518 GTV-519
US-7004
US-7007 US-7006 GTV-502
1 GTV-532 GTV-533 70-SW-1009-12CG0T01-3/4"-NI 1

GTV-526
TO P-7201 (PK-7201) SERVICE WATER TO 70-SW-1007-12CG0T01-3/4"-NI

GTV-520
70-DI-1782-1SA0S01-1/2"-NI US-7009
682 72-I-2202-A V-7342B

GTV-503
73-SW-1079-50SD0L01-1/2"-NI 70-SW-1006-12CG0T01-3/4"-NI
1313 73-I-2302
GTV-504

GTV-537
70-SW-1005-12CG0T01-3/4"-NI
70-SW-1014-12CG0T01-3/4"-NI US-7005
1"x3/4"

GTV-510 GTV-508 GTV-506


DEIONIZED WATER US-7014
70-DI-1780-1SA0S01-2"-NI GTV-535 GTV-536 GTV-505
179 70-I-2008 TO V-7342A 70-SW-1001-12CG0T01-3/4"-NI
70-SW-1741-12CG0T01-1"-NI US-7001

GTV-161
70-P01-008 Deionized water (DW) 1012 73-I-2304
TO PK-7511 70-WL-1046-1CS1S02-2"-IC 25 TO E-7602 GTV-507
70-DI-5014-1SA0S01-1"-NI 70-SW-1011-12CG0T01-3/4"-NI
5921 75-I-2506 3707 76-I-2613 US-7011

V-7501 (PK-7511) 70-WL-1138-1CS1S02-1/2"-IC 15 TO A-7101 GTV-509


75-DI-1783-1SA0S01-1"-NI 70-SW-1002-12CG0T01-3/4"-NI
1537 75-I-2509 6050 70-I-2001-B US-7002
TO P-7471
TO V-7604 70-WL-1400-1CS1S02-1"-IC 15
70-DI-1788-1SA0S01-1"-NI 6008 70-I-2001-A
1278 76-I-2614 TO P-7101 TO E-7451
TO P-7313 70-WL-1398-1CS1S02-1/2"-IC 15 70-WL-5054-1CS1S02-3/4"-IC 15
70-WL-1404-1CS1S02-1/2"-IC 15 6100 70-I-2001-A 4236 74-I-2405
6107 70-I-2001-A
TO P-7472
TO E-7315 70-WL-1401-1CS1S02-1"-IC 15 TO PK-7511
70-WL-1042-1CS1S02-1-1/2"-IC 25 6009 70-I-2001-A
1226 73-I-2301-C 70-WL-5028-1CS1S02-1-1/2"-IC 25
2 TO A-7342B 70-WL-1500-1CS1S02-3/4"-IC 15 TO P-7101 GTV-093
5844 75-I-2509 2
70-WL-1151-1CS1S02-1/2"-IC 15 6626 70-I-2001-A TO P-7508
TO P-7412 6058 70-I-2001-B 70-WL-1507-1CS1S02-1"-IC 15
TO P-7111
70-WL-1399-1CS1S02-1"-IC 15 TO A-7103 70-WL-1397-1CS1S02-1/2"-IC 15 6970 75-I-2506
70-WL-5001-1CS1S02-1-1/2"-IC 25
TO E-7503
5998 74-I-2401-A 70-WL-1140-1CS1S02-1/2"-IC 15 6101 70-I-2001-A 5791 75-I-2504
6052 70-I-2001-B TO E-7504
TO P-7473 3"x1-1/2"
3/4"x1/2" TO A-7112 70-WL-1964-50SD0L01-3/8"-IC 15
TO E-7461
70-WL-1146-1CS1S02-1/2"-IC 15 70-WL-1402-1CS1S02-1"-IC 15 6010 70-I-2001-A 70-WL-1964-1CS1S02-3/4"-IC 25 1CS1S02 50SD0L01
70-WL-1043-1CS1S02-2"-IC 25 6049 70-I-2001-B TO LP-001 (PK-7511)
1030 74-I-2406-D 3"x2" 70-WL-1964-1CS1S02-2"-IC 25
TO A-7211 70-WL-1501-1CS1S02-3/4"-IC 15 TO P-7111 70-WL-5001-1CS1S02-3"-IC 25 6964 75-I-2504

70-WL-1140-1CS1S02-3/4"-IC 15
70-WL-1148-1CS1S02-1/2"-IC 15 6627 70-I-2001-A GTV-092
6056 70-I-2001-B 2"x3/4" 3/4"x3/8"
TO P-7312
70-WL-1403-1CS1S02-1/2"-IC 15 TO ANALYZER 70-WL-1502-1CS1S02-3/4"-IC 15 TO P-7102 TO LP-001 (PK-7511)
6106 70-I-2001-A 70-WL-1088-1CS1S02-1/2"-IC 15 6628 70-I-2001-A 6966 75-I-2504
6957 71-I-2125 70-WL-1965-50SD0L01-3/8"-IC 15
TO P-7102 TO E-7502
TO A-7141 70-WL-1396-1CS1S02-1/2"-IC 15 70-WL-5008-1CS1S02-1-1/2"-IC 25
70-WL-1147-1CS1S02-1/2"-IC 15 6102 70-I-2001-A 5831 75-I-2506
TO E-7331
6055 70-I-2001-B 1-1/2"x1" 70-WL-1038-1CS1S02-1"-IC 15 TO P-7112 TO E-7504
1028 73-I-2303-A 70-WL-1395-1CS1S02-1/2"-IC 15 70-WL-5017-1CS1S02-1"-IC 15
6103 70-I-2001-A 5829 75-I-2506
TO A-7342A TO E-7145
70-WL-1028-1CS1S02-1-1/2"-IC 25

70-WL-5001-1CS1S02-3"-IC 25
70-WL-1150-1CS1S02-1/2"-IC 15 70-WL-1503-1CS1S02-3/4"-IC 15 TO P-7112 TO E-7601
6059 70-I-2001-B 1025 71-I-2124 70-WL-1044-1CS1S02-2"-IC 25
6629 70-I-2001-A 1031 76-I-2613
TO A-7102
70-WL-1139-1CS1S02-1/2"-IC 15 70-WL-1504-1CS1S02-3/4"-IC 15 TO P-7103
TO E-7312 6051 70-I-2001-B
70-WL-1040-1CS1S02-2"-IC 25 6630 70-I-2001-A
TO DR-7201
1042 73-I-2301-A 70-WL-2001-1CS1S02-1"-IC 15 TO P-7103
3 5821 72-I-2202-A 70-WL-1149-1CS1S02-1/2"-IC 15 TO A-7231 3
70-WL-1393-1CS1S02-1/2"-IC 15
70-WL-1038-1CS1S02-1-1/2"-IC 25

6104 70-I-2001-A 6057 70-I-2001-B


TO A-7111
TO E-7314 70-WL-1141-1CS1S02-1/2"-IC 15 TO P-7311
70-WL-1041-1CS1S02-2"-IC 25 6053 70-I-2001-B 70-WL-1143-1CS1S02-1/2"-IC 15 TO A-7123B
1785 73-I-2301-B 70-WL-1392-1CS1S02-1/2"-IC 15 6099 70-I-2001-A
TO E-7603 6046 70-I-2001-B
70-WL-1047-1CS1S02-2"-IC 25 TO P-7311 TO A-7123A
3710 76-I-2613 70-WL-1506-1CS1S02-3/4"-IC 15 70-WL-1142-1CS1S02-1/2"-IC 15
6631 70-I-2001-A 6054 70-I-2001-B
TO E-7341 TO P-7201 1"x1/2"
70-WL-1039-1CS1S02-2"-IC 25 72-WL-1409-1CS1S02-1"-IC 15 TO P-7141
1029 73-I-2304 6892 70-I-2001-A 70-WL-1505-1CS1S02-3/4"-IC 15
4"x3" 3"x2" 6632 70-I-2001-A
TO A-7125B
70-WL-1145-1CS1S02-1/2"-IC 15 TO P-7141 TO PK-7203
6048 70-I-2001-B 70-WL-1394-1CS1S02-1/2"-IC 15 70-WL-1200-1CS1S02-2"-IC 25
6105 70-I-2001-A 5890 72-I-2213
TO A-7125A
70-WL-1144-1CS1S02-1/2"-IC 15
CHILLED WATER 6047 70-I-2001-B
SUPPLY 3/4"x1/2" 70-WL-1021-1CS1S02-3"-IC 25
70-WL-1020-1CS1S02-6"-IC 25
176 70-I-2008

GTV-012
70-P01-009 Chilled water supply/return (CW) 2"
CHILLED WATER RETURN 70-WM-1073-1CS1S02-6"-IC 25
70-I-2008 1070
70-WM-1022-1CS1S02-3"-IC 15
FROM E-7315 FROM P-7141
73-WM-1070-1CS1S02-1-1/2"-IC 15 71-WM-1233-1CS1S02-1/2"-IC 15 70-WM-1200-1CS1S02-2"-IC 15
FROM PK-7203
73-I-2301-C 1174 70-I-2001-A 6098
4 FROM P-7141 72-I-2213 5891 4

70-WM-1154-1CS1S02-1-1/2"-IC 15
70-WM-1162-1CS1S02-3/4"-IC 15

70-WM-1152-1CS1S02-3/4"-IC 15
70-WM-1067-1CS1S02-4"-IC 15

FROM E-7312 71-WM-1505-1CS1S02-3/4"-IC 15 FROM E-7451


73-WM-1068-1CS1S02-2"-IC 15 70-I-2001-A 6634 74-WM-5055-1CS1S02-3/4"-IC 15
74-I-2405 4235

76-WM-1075-1CS1S02-2"-IC 15
73-I-2301-A 1177 73-WM-1506-1CS1S02-3/4"-IC 15 FROM P-7311
70-I-2001-A 6635 FROM E-7601
70-WM-1072-1CS1S02-2"-IC 15
FROM E-7314 73-WM-1231-1CS1S02-1/2"-IC 15 FROM P-7311 76-I-2613 787
73-WM-1069-1CS1S02-2"-IC 15
73-I-2301-B 1169 70-I-2001-A 6092 FROM E-7501
71-WM-1232-1CS1S02-1/2"-IC 15 FROM P-7103 75-WM-5027-1CS1S02-1-1/2"-IC 15
75-I-2509 5845
70-WM-1067-1CS1S02-2"-IC 15 FROM E-7341 GTV-095
70-I-2001-A 6097
FROM E-7504
73-I-2304 490 71-WM-1504-1CS1S02-3/4"-IC 15 FROM P-7103 70-WM-9239-1CS1S02-1"-IC 15
4"x3" 3"x2" 70-I-2001-A 6639
75-I-2506 5828
FROM A-7103 FROM P-7112
71-WM-1152-1CS1S02-1/2"-IC 15 71-WM-1503-1CS1S02-3/4"-IC 15 70-WM-1248-1CS1S02-1"-IC 15 2"x1-1/2"
FROM E-7502
70-I-2001-B 6069 70-I-2001-A 6633 FROM P-7201 70-WM-5008-1CS1S02-2"-IC 15 70-WM-5008-1CS1S02-1-1/2"-IC 15
75-I-2506 5830
3/4"x1/2"
FROM P-7112 70-I-2001-A 6940
71-WM-1234-1CS1S02-1/2"-IC 15 70-WM-5001-1CS1S02-3"-IC 15
FROM A-7342B FROM LP-001 (PK-7511)
73-WM-1163-1CS1S02-1/2"-IC 15 70-I-2001-A 6096 3"x2" 2"x3/4"
FROM E-7602 75-WM-1963-50SD0L01-3/8"-IC 15
70-I-2001-B 6066 FROM P-7102 75-I-2504 6965
71-WM-1235-1CS1S02-1/2"-IC 15 76-I-2613 3708 GTV-097
70-I-2001-A 6095 3"x1-1/2" FROM LP-001 (PK-7511)
73-WM-1243-1CS1S02-1/2"-IC 15 FROM P-7313 FROM P-7473 75-WM-1966-50SD0L01-3/8"-IC 15
74-WM-1241-1CS1S02-1"-IC 15 75-I-2504 6967
70-I-2001-A 6109 71-WM-1150-1CS1S02-1/2"-IC 15 FROM A-7101
70-I-2001-A 6007
70-I-2001-B 6067
5 FROM P-7312 71-WM-1502-1CS1S02-3/4"-IC 15
TO P-7102
70-WM-5001-1CS1S02-1-1/2"-IC 15
FROM E-7503
70-WM-1242-1CS1S02-1/2"-IC 15 70-I-2001-A 6638 75-I-2504 5792
FROM E-7603
70-I-2001-A 6108 FROM P-7111 70-WM-1076-1CS1S02-2"-IC 15
71-WM-1501-1CS1S02-3/4"-IC 15 FROM P-7508
76-I-2613 3709
70-I-2001-A 6636 75-WM-1507-1CS1S02-1"-IC 15
FROM A-7342A 75-I-2506 6969
73-WM-1162-1CS1S02-1/2"-IC 15 71-WM-1236-1CS1S02-1/2"-IC 15 FROM P-7111
FROM A-7111
70-I-2001-B 6065 70-I-2001-A 6094 71-WM-1153-1CS1S02-1/2"-IC 15 FROM A-7231
3/4"x1/2" 70-I-2001-B 6070 70-WM-1161-1CS1S02-1/2"-IC 15

The information contained in this document is the confidential property of SABIC. It cannot be
74-WM-1240-1CS1S02-1"-IC 15 FROM P-7472
70-I-2001-B 6064
FROM A-7141

disclosed, copied or used for any other purpose without prior written approval from SABIC
71-WM-1159-1CS1S02-1/2"-IC 15 70-I-2001-A 6006
FROM E-7145
70-I-2001-B 6062 FROM P-7101 71-WM-1058-1CS1S02-1-1/2"-IC 15
71-WM-1500-1CS1S02-3/4"-IC 15 FROM A-7123B
71-I-2124 1798 71-WM-1155-1CS1S02-1/2"-IC 15
70-I-2001-A 6637
FROM E-7461 70-I-2001-B 6072
74-WM-1071-1CS1S02-2"-IC 15 FROM P-7101
71-WM-1237-1CS1S02-1/2"-IC 15 FROM DR-7201
74-I-2406-D 454 70-I-2001-A 6093 72-WM-2003-1CS1S02-1"-IC 15
72-I-2202-A 5819 71-WM-1154-1CS1S02-1/2"-IC 15 FROM A-7123A
FROM P-7471 1-1/2"x1"
FROM P-7412 74-WM-1239-1CS1S02-1"-IC 15 70-I-2001-B 6071
70-WM-1238-1CS1S02-1"-IC 15 70-I-2001-A 6005 1"x1/2"
74-I-2401-A 5999 FROM ANALYZER
71-WM-1089-1CS1S02-1/2"-IC 15 PROJECT DESCRIPTION
71-I-2125 6958 3/4"x1/2" 71-WM-1156-1CS1S02-1/2"-IC 15 FROM A-7125A
MP-151000100
FROM E-7331 70-I-2001-B 6073
70-WM-1066-1CS1S02-1"-IC 15 UPP PROJECT
73-I-2303-A 413
1-1/2"x1" 71-WM-1157-1CS1S02-1/2"-IC 15
FROM A-7125B STC-J UTILITIES PARK & PILOT PLANTS
6 FROM A-7211
70-I-2001-B 6060 DRAWING TITLE
72-WM-1160-1CS1S02-1/2"-IC 15 DRAWN DATE
70-I-2001-B 6063 LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE WATER DISTRIBUTION
FROM A-7102 ZLL 01/07/21
71-WM-1151-1CS1S02-1/2"-IC 15
70-I-2001-B 6068 APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

FROM A-7112 STC-J 70 A1


71-WM-1158-1CS1S02-1/2"-IC 15 PROJECT NO.
17093
70-I-2001-B 6061 A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300PE-DW02-7005 10 70-I-2005 1of1 0C
FILE NAME: 70-I-2005.PID

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES˖
TO E-7123
70-HOS-1756-3CS1S01-1-1/2"-IH 25 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
976 74-I-2407 AND NOMENCLATURE.
TO V-7342A
70-HOS-1760-3CS1S01-1"-IH 25
TO V-7342B 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
70-HOS-1753-3CS1S01-1"-IH 25 70-HOS-1755-3CS1S01-1-1/2"-IH 25 TO E-7122 TO E-7121
980 73-I-2304 973 73-I-2302 70-HOS-1754-3CS1S01-1-1/2"-IH 25 UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.
975 74-I-2407 974 74-I-2407
3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
HOT OIL SUPPLY PROVIDED AND EXPRESSED IN DCS.
1 178 70-I-2008
70-HOS-1750-3CS1S01-3"-IH 40 1
4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
TO E-7311 TO E-7313
70-HOS-1758-3CS1S01-1-1/2"-IH 25 70-HOS-1759-3CS1S01-1-1/2"-IH 25 5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
978 73-I-2301-A 979 73-I-2301-C PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
70-P01-010 Hot oil supply/return (HO) FROM E-7122 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.

GTV-014
70-HOR-1795-3CS1S01-1-1/2"-IH 25

3"
74-I-2407 553

70-HOR-1800-3CS1S01-1"-IH 25 FROM V-7342A FROM V-7342B FROM E-7123 FROM E-7121


NOTES:
70-HOR-1793-3CS1S01-1"-IH 25 70-HOR-1796-3CS1S01-1-1/2"-IH 25 70-HOR-1794-3CS1S01-1-1/2"-IH 25
73-I-2304 1305 73-I-2302 1418 74-I-2407 555 1. DELETED.
74-I-2407 547
70-HOS-1775-3CS1S01-3"-IH 40
HOT OIL RETURN 2. THE DETAIL OF SAFETY SHOWER AND EYE WASH.
70-HOR-1790-3CS1S01-3"-IH 40
70-I-2008 1492
70-HOR-1799-3CS1S01-1-1/2"-IH 25 FROM E-7313
70-HOR-1798-3CS1S01-1-1/2"-IH 25 FROM E-7311 73-I-2301-C 1171

GTV-586
73-I-2301-A 70-SA-1007-1CS1S02-3/4"-NI

GTV-575
997

GTV-592
70-SA-1014-1CS1S02-3/4"-NI GTV-584

GTV-557
GTV-573 GTV-574 US-7007 GTV-591 70-SA-1006-1CS1S02-3/4"-NI
XL

GTV-569
US-7014 70-SA-1003-1CS1S02-3/4"-NI US-7006
70-SA-1019-1CS1S02-3/4"-NI

GTV-581 GTV-583
70-SA-1017-1CS1S02-3/4"-NI GTV-568 70-SA-1008-1CS1S02-3/4"-NI US-7003 70-SA-1013-1CS1S02-3/4"-NI GTV-596 GTV-597 70-SA-1015-1CS1S02-3/4"-NI
GTV-567
GTV-582 US-7013

GTV-589
US-7017 US-7019 GTV-587 US-7015
US-7008

GTV-595
GTV-555 GTV-594

GTV-598
GTV-556

GTV-572
GTV-560
2 2

GTV-585
70-SA-1010-1CS1S02-3/4"-NI GTV-580

GTV-588
70-P01-004 Utility Air (UA) 70-SA-1016-1CS1S02-3/4"-NI GTV-579

GTV-593
GTV-590
US-7016 US-7010 US-7012
UTILITY AIR GTV-558 GTV-559 GTV-570 GTV-571 1"X3/4"

GTV-609
70-SA-1004-1CS1S02-2"-NI 70-SA-1012-1CS1S02-1"-NI
181 70-I-2008

GTV-566
GTV-561
ANTI-SCALD

GTV-578
70-SA-1005-1CS1S02-1"-NI GTV-608
70-SA-1018-1CS1S02-3/4"-NI 70-SA-1500-1CS1S02-1"-NI
TO P-7342 VALVE
70-SA-1021-1CS1S02-3/4"-NI US-7005
US-7018 4066 73-I-2304 GTV-599 1"X3/4"
70-INAD-012 GTV-564 GTV-565 US-7004 70-SA-1001-1CS1S02-3/4"-NI TREADLE
TO 75-PCV-229 GTV-606
GTV-576

GTV-604
GTV -192 1"X3/4" 70-SA-1020-1CS1S02-3/4"-NI GTV-577 TO E-7332 70-AI-5019-12CG0T02-1/2"-NI

70-AI-5020-12CG0T02-2"-NI
70-AI-1002-12CG0T02-1"-NI 5835 US-7001

GTV-605
US-7020 75-I-2508 GTV-607
1003 73-I-2303-A

GTV-563
GTV-562

GTV-602
70-INAD-013 INSTRUMENT AIR TO 70-AI-1022-12CG0T02-1"-NI 70-SA-1011-1CS1S02-3/4"-NI
GTV -193 70-AI-1013-12CG0T02-1"-NI PK-7331 70-INAD-019 US-7011
70-AI-1035-12CG0T02-1"-NI GTV -181 1X3/4" GTV-603
70-INAD-009 6540 73-I-2303-B TAG NUMBER INSTRUMENT NUMBER
70-INAD-014 1-1/2"x1" GTV -189
70-AI-1021-12CG0T02-1"-NI 70-SA-1002-1CS1S02-3/4"-NI
DETAIL
71-AI-1055-50SD0L01-3/8"-NI US-7002
GTV -194 INSTRUMENT AIR TO xxx 71-I-2125 70-INAD-018 SS-7016 70-XL-160
GTV -180 1X3/4"
PK-7461 70-AI-1015-12CG0T02-1"-NI GTV-600 70-SA-1009-1CS1S02-3/4"-NI
70-AI-1018-12CG0T02-1"-NI

70-AI-1001-12CG0T02-2"-NI TO DISTILED HEXANE ANALYZER 70-AI-1020-12CG0T02-1"-NI SS-7015 70-XL-161


70-AI-1003-12CG0T02-1-1/2"-NI

70-INAD-015 US-7009
70-AI-1019-12CG0T02-1"-NI

5953 74-I-2406-C 70-AI-5020-12CG0T02-2"-NI 70-INAD-017


70-AI-1017-12CG0T02-1"-NI

1780 71-I-2125
GTV -188

GTV-601
GTV -179 1X3/4" SS-7014 70-XL-162
70-AI-1012-12CG0T02-1"-NI
70-INAD-008 70-AI-1008-12CG0T02-1"-NI GTV -178 2"x1-1/2" TO 75-PCV-230
GTV -190 70-AI-1010-12CG0T02-1"-NI 70-INAD-002 SS-7008 70-XL-163
70-AI-5020-12CG0T02-1/2"-NI
3 70-INAD-006 GTV -185 5840 75-I-2509 3
70-AI-1005-12CG0T02-1"-NI SS-7004 70-XL-164
GTV -187
70-AI-1013-12CG0T02-2"-NI
70-AI-1016-12CG0T02-2"-NI

1-1/2"x1" GTV -191 2"x1-1/2" 70-INAD-016


70-INAD-011 GTV -184 70-PW-1680-12CG0T01-1-1/2"-IC 15 SS-7010 70-XL-165
70-AI-1006-12CG0T02-1"-NI 70-PW-1684-12CG0T01-1-1/2"-NI
2"x1-1/2" 70-INAD-004 71-AI-1054-50SD0L01-1/4"-NI SS-7019
GTV -186 xx1 71-I-2125
70-AI-1004-12CG0T02-1"-NI GTV -157
CSO SS-7007 70-XL-166
70-AI-1011-12CG0T02-1"-NI 70-INAD-001 NOTE-2
GTV -182
GTV -167
GTV -164

GTV -163
GTV -162
GTV -165

70-PW-1674-12CG0T01-1-1/2"-IC 15

GTV -268

GTV -269

GTV -270
SS-7012 70-XL-167
GTV -166

GTV -272
70-INAD-007 SS-7005

2"
2"X1-1/2" 1-1/2X1" GTV -183 GTV -152
INSTRUMENT AIR CSO SS-7017 70-XL-168
70-AI-1000-12CG0T02-3"-NI NOTE-2
182 70-I-2008
70-PW-1673-12CG0T01-1-1/2"-IC 15 70-PW-1673-12CG0T01-1-1/2"-IC 15 SS-7003 70-XL-169

GTV -171
SET @2.5 BARG SS-7009

1-1/2"
70-P01-005 Instrument Air (IA)
70-PW-1687-12CG0T01-1-1/2"-NI GTV -151
70-AI-1007-12CG0T02-1"-NI CSO SS-7011 70-XL-170
PCV NOTE-2
70-PW-1678-12CG0T01-1-1/2"-IC 15 70-INAD-003
CSO 162 GTV -115 70-PW-1679-12CG0T01-1-1/2"-IC 15 SS-7006 70-XL-171
PCV SS-7018
PCV SS-7014 SET @2.5 BARG
166 GTV -156
GTV -122

SET @2.5 BARG GTV -142 1-1/2"X1/2" 1-1/2"X1/2" 70-XL-172


160 CSO NOTE-2 SS-7013
1/2" NOTE-2
70-PW-1666-12CG0T01-1-1/2"-IC 15 70-AI-1009-12CG0T02-1"-NI
PCV SET @2.5 BARG 1-1/2"X1/2" 70-PW-1675-12CG0T01-1-1/2"-IC 15 70-PW-1685-12CG0T01-1-1/2"-NI
70-INAD-005 SS-7005 70-XL-173
GTV -141 165 SS-7001
SS-7016 GTV -149 1-1/2"X1" GTV -116 GTV -153
1-1/2"X1/2"

GTV -127
CSO SS-7008 CSO NOTE-2 SS-7001 70-XL-174

GTV -126
1-1/2"X1/2" 1-1/2"X1/2"
GTV -223

1/2" CSO 1/2"


GTV -119 NOTE-2 1-1/2"X1/2" 1-1/2"X1/2" 70-PW-1676-12CG0T01-1-1/2"-IC 15
1/2" 70-PW-1672-12CG0T01-1/2"-IC 15 NOTE-2
SS-7009 70-XL-175
4 CHILLED POTABLE
70-AI-1014-12CG0T02-1"-NI
70-INAD-010 GTV -152
SS-7002 4
WATER SUPPLY
70-PW-1663-12CG0T01-1-1/2"-IC 15 GTV -117 CSO NOTE-2 SS-7005 70-XL-176
1581 70-I-2008
(FOR EYE WASH

BLV-061
PCV SS-7018 70-XL-177
AND SAFETY SHOWER) PCV SET @2.5 BARG 70-PW-1664-12CG0T01-1-1/2"-IC 15

1"
SET @2.5 BARG 164 PCV
161 SET @2.5 BARG SS-7019 70-XL-178
70-PW-1677-12CG0T01-1-1/2"-IC 15 SET @2.5 BARG 167
GTV -121

GTV -144 CSO


SS-7015 SS-7017 PCV 70-PW-1686-12CG0T01-1-1/2"-NI
REFERENCE DRAWINGS
GTV -120

CSO GTV -145 SS-7013


GTV-173

1-1/2"X1/2" 1-1/2"X1/2" 1-1/2"X1/2" 1-1/2"X1/2" 168 䝽㇑㠚ᐡᯠ໎Ⲵʽ?

GTV -125
1/2" NOTE-2 SET @2.5 BARG CSO 1/2" NOTE-2 GTV -150 1-1/2"X1/2" 1-1/2"X1/2"
GTV -117

1/2" NOTE-2 FO DRAWING NO. TITLE


CSO

70-PW-1670-12CG0T01-1-1/2"-IC 15 022
70-PW-1668-12CG0T01-1-1/2"-IC 15 1-1/2"X1/2" 70-PW-1671-12CG0T01-1-1/2"-IC 25 SS-7011
1-1/2"X1/2"
GTV -148
GTV -124

SS-7004 1-1/2"X1/2" 1-1/2"X1/2"


CSO NOTE-2 70-PW-1683-12CG0T01-1-1/2"-NI
GTV -118

GTV -143
1/2" CSO NOTE-2 1/2"
PCV 70-PW-1670-12CG0T01-1-1/2"-IC 15
70-PW-1667-12CG0T01-1-1/2"-IC 15 SS-7006
163
SS-7007 GTV -123
70-P01-007 Chilled Potable Water (PW) GTV -146 CSO NOTE-2
CSO NOTE-2 Jan 07,
0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
70-PW-1665-12CG0T01-1-1/2"-IC 15 2021
SS-7010 Oct 28,
GTV -154 0B ISSUED FOR CONSTRUCTION LYM ZLL YSS
2020
CSO NOTE-2 70-PW-1669-12CG0T01-1-1/2"-IC 15
Sep 03,
5 70-PW-1665-12CG0T01-1/2"-IC 15 SS-7003 0A 2020
ISSUED FOR CONSTRUCTION LYM ZLL YSS
SS-7012 GTV -145
GTV -155 70-PW-1682-12CG0T01-1-1/2"-NI CSO NOTE-2 Dec 20,
00 ISSUED FOR CONSTRUCTION TQX ZLL YSS

BLV-062
CSO NOTE-2 2019
CHILLED POTABLE
Jul 01,

1"
WATER RETURN 70-PW-1363-12CG0T01-1-1/2"-IC 15 B2 ISSUED FOR HAZOP TQX WL YSS
2019
70-I-2008 6378
GTV-635
GTV-627

GTV-644
REV DATE DESCRIPTION DRAWN CHECKED

BLV-079
GTV-621

70-GI-1012-1CS1S01-1"-NI

3/4"
70-GI-1014-1CS1S01-3/4"-NI 70-GI-1006-1CS1S01-3/4"-NI

The information contained in this document is the confidential property of SABIC. It cannot be
GTV-612

70-GI-1008-1CS1S01-3/4"-NI
70-GI-1019-1CS1S01-3/4"-NI

disclosed, copied or used for any other purpose without prior written approval from SABIC
70-GI-1017-1CS1S01-3/4"-NI US-7014 US-7008 US-7006
GTV-630

US-7019 GTV-626 GTV-634 GTV-642 GTV-643


US-7017 GTV-625 70-GI-1012-1CS1S01-3/4"-NI Engineering and Project Management
GTV-619 GTV-620 70-GI-1013-1CS1S01-3/4"-NI
GTV-610 GTV-611 70-GI-1004-1CS1S01-3/4"-NI US-7012
GTV-615

US-7013 Jubail, Kingdom of Saudi Arabia


GTV-633

US-7004 GTV-631 1"X3/4" GTV-632 GTV-645 GTV-646


70-GI-1016-1CS1S01-3/4"-NI GTV-629 70-GI-1015-1CS1S01-3/4"-NI
GTV-628
US-7016 US-7015
UTILITY NITROGEN
GTV-613 GTV-614 GTV-648 GTV-649 SABIC Technology Center
70-GI-1664-1CS1S01-1"-NI
1578 70-I-2008
Jubail, Kingdom of Saudi Arabia
70-GI-4400-1CS1S01-1/2"-NI
70-GI-4402-1CS1S01-1/2"-NI

1"
GTV-618

GTV-652
GTV-641

PROJECT DESCRIPTION
70-GI-1020-1CS1S01-3/4"-NI GTV-653 70-GI-1009-1CS1S01-3/4"-NI
70-P01-003 Utility N2 (LN) 70-GI-1003-1CS1S01-3/4"-NI 70-GI-1005-1CS1S01-1"-NI MP-151000100
US-7020 TO COLD FLARE US-7003 US-7009
UPP PROJECT

GTV-659
GTV-616 GTV-617 70-GI-4401-1CS1S01-1/2"-NI GTV-640 GTV-651
GTV-639
5704 74-I-2408 70-GI-1005-1CS1S01-3/4"-NI STC-J UTILITIES PARK & PILOT PLANTS
GTV-638

6 US-7005
GTV-624

DRAWING TITLE
70-GI-1007-1CS1S01-3/4"-NI 1"X3/4"GTV-658 DRAWN DATE
70-GI-1010-1CS1S01-3/4"-NI 01/07/21
US-7007 TO WARM FLARE 70-GI-1001-1CS1S01-3/4"-NI LYM PIPING AND INSTRUMENTATION DIAGRAM
US-7010 GTV-637
GTV-636 US-7001 HOT OIL & AIR DISTRIBUTION
GTV-623 CHECKED DATE

GTV-657
GTV-622 4214 70-I-2007 GTV-656 01/07/21
ZLL
70-GI-1011-1CS1S01-3/4"-NI
TO NORMAL VENTING APPROVED DATE
US-7011 YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

GTV-655
5701 74-I-2408 GTV-654

GTV-661
PROJECT NO. STC-J 70 A1
17093
70-GI-1002-1CS1S01-3/4"-NI A.I.D. DRAWING NUMBER SHT. NO. REVISION
US-7002 DRAWING NO.
20300PE-DW02-7006 10 70-I-2006 1of1 0C
GTV-660
FILE NAME: 70-I-2006.PID

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES˖
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.
71-BDL-1150-1CS1S01-1/2"-NI 71-PSV-801
70-I-2001-A 6877 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
71-PSV-804 UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.
71-BDL-1153-1CS1S01-1/2"-NI
70-I-2001-A 6876
BLOWDOWN LIQUID 3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
71-PSV-802 FROM V-7123A/B
1 71-BDL-1151-1CS1S01-1/2"-NI FROM E-7342 PROVIDED AND EXPRESSED IN DCS. 1
70-I-2001-A 6875 71-I-2102 4828
73-I-2305 3910 4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
71-BDL-1159-1CS1S01-1/2"-NI 71-PSV-809
70-I-2001-A 6872 FROM PSV-050
FROM PSV-028 5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
71-BDL-1152-1CS1S01-1/2"-NI 71-PSV-803 73-I-2305 1815 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
71-I-2121-B 1237
70-I-2001-A 6873 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
71-PSV-805 FROM PSV-024
71-BDL-1158-1CS1S01-1/2"-NI FROM PSV-038
71-I-2121-A 767
70-I-2001-A 6874
71-I-2122-A 724 NOTES˖
70-BDL-2322-1CS1S01-1"-NI
FROM PSV-056 FROM PSV-042
70-BDL-2321-1CS1S01-1-1/2"-NI
73-I-2305 1153 71-I-2122-B 1133
FROM PSV-015 71-PSV-808A
70-BDG-2113-1CS1S01-2"-NI 71-BDL-1156-1CS1S01-1/2"-NI
71-I-2102 1424 72-PSV-801
70-I-2001-A 6870 72-BDL-1160-1CS1S01-1/2"-NI
4"x2" 71-PSV-808B 70-I-2001-A 6866
70-GF-1004-1CA1S01-1/2"-NI 71-BDL-1157-1CS1S01-1/2"-NI
FROM NATURAL GAS FROM PSV-011 70-I-2001-A 6871
HEADER 1/2" 1/2" 70-BDG-2111-1CS1S01-2"-NI BLOWDOWN GAS
71-I-2102 1232 FROM 72-PSV-401 73-BDG-4500-1CS1S01-2"-NI
5754 70-I-2008 70-BDL-2320-1CS1S01-3/4"-NI 73-I-2303-B 4086
72-I-2202-B 5950
BLV-049

70-BDG-1226-1CS1S01-1/2"-NI

70-BDG-2321-1CS1S01-2"-NI

70-BDL-3483-1CA1S01-1"-NI
70-BDL-2316-1CA1S01-1"-NI
70-BDG-2114-1CS1S01-2"-NI

70-BDG-2116-1CS1S01-2"-NI
71-PSV-807A

70-BDG-2115-1CS1S01-2"-NI
GTV-015

70-BDG-2117-1CS1S01-2"-NI
72-BDL-5336-1CA1S01-1"-NI
70-P01-011 Natural Gas FROM PSV-013 71-BDL-1154-1CS1S01-1/2"-NI FROM PK-7331
2 FG
70-BDG-2112-1CS1S01-2"-NI
71-I-2102 1236
70-I-2001-A 6867 70-BDG-2314-1CS1S01-2"-IS 40
73-I-2303-A 439
2
71-PSV-807B
069 71-BDL-1155-1CS1S01-1/2"-NI
70-I-2001-A 6868
FROM PSV-047 FROM PSV-061
74-GI-4400-1CS1S01-1/2"-NI 70-BDG-2214-1CS1S01-2"-NI 72-PSV-802 70-BDG-2423-1CS1S01-4"-NI
72-I-2203 1239 72-BDL-1161-1CS1S01-1/2"-NI 74-I-2406-A 1284
BLV-002 GLV-036 70-I-2001-A 6869
UTILITY NITROGEN CSO 70-BDL-2319-1CS1S01-1-1/2"-NI
1/2"
4214 70-I-2006 70-BDL-2318-1CS1S01-2"-NI
GTV-016

BLV-004 GLV-035
10"x8" 70-BDG-4402-1CS1S01-10"-NI

70-P01-003 Utility N2 (LN)


70-BDG-4402-1CS1S01-8"-NI FROM PSV-068
70-BDG-2121-1CS1S01-2"-NI
70-P02-001 Blowdown off Gas (BG) 71-I-2124 1694
BLOWDOWN LIQUID
FROM E-7153 FROM PSV-002
71-BDL-2404-1CA1S01-1"-NI 70-BDL-2100-1CA1S01-1"-NI
71-I-2123-B 3923 71-I-2121-B 1620

1-1/2"x1" FROM PSV-005 BLOWDOWN LIQUID


70-BDL-2120-1CA1S01-1"-NI FROM E-7151
71-I-2123-B 1555 70-BDL-3468-1CA1S01-1"-NI
71-I-2121-B 3926
FROM PSV-022 FROM PSV-033
FROM P-7314 70-BDG-2310-1CS1S01-3"-IH 40 BLOWDOWN LIQUID
3 73-BDG-4517-1CS1S01-1/2"-NI
DISCHARGE LINE 73-I-2301-A 1179 73-I-2302 1189 70-BDL-3467-1CA1S01-1"-NI FROM PSV-100 3
73-I-2301-B 4282 71-I-2121-A 3777
FROM PSV-225
BLOWDOWN LIQUID
73-I-2301-C 1228 FROM E-7131
70-BDL-3466-1CA1S01-1"-NI

70-BDG-2313-1CS1S01-3"-IS 40
FROM P-7315 71-BDG-1069-1CS1S01-1"-IS 15 FROM AIT-102 71-I-2121-A 3925
DISCHARGE LINE 71-I-2125 7008 FROM PSV-052 2"x1"
70-BDG-4511-1CS1S01-1/2"-NI BLOWDOEN LIQUID
73-I-2303-B 4283 71-I-2123-A 1552 FROM PSV-101

70-BDG-2312-1CS1S01-2"-NI

3"x2"
71-BDG-1068-1CS1S01-1"-IS 15 FROM AIT-101 70-BDL-3480-1CA1S01-1"-NI
3/4"x1/2" 71-I-2122-A 3780
71-I-2125 7007
BLOWDOWN LIQUID
71-BDG-1910-1CS1S01-1"-IS 15 FROM AIT-100 FROM E-7132
70-BDL-3469-1CA1S01-1"-NI
BLOWDOWN GAS 71-I-2125 7006 71-I-2122-A 3927

70-BDG-2118-1CS1S01-2"-NI
FROM BUFFER 1-1/2"x1"
BLOWDOWN LIQUID
70-BDG-2219-1CS1S01-1/2"-NI 71-BDG-1911-1CS1S01-2"-IS 15
74-I-2405 4234 FROM PSV-111
70-BDL-3484-1CA1S01-1"-NI
71-I-2123-A 4036
FROM PSV-015 BLOWDOWN LIQUID
70-BDG-2311-1CS1S01-4"-NI
FROM E-7133
73-I-2301-B 1341 70-BDL-3482-1CA1S01-1"-NI
FROM PSV-044 6"x4" 71-I-2123-A 3919
70-BDG-2315-1CS1S01-3"-NI
73-I-2304 495 FROM PSV-043 1-1/2"x1"
70-BDG-2120-1CS1S01-2"-NI
71-I-2122-B 6862
4 4
70-BDG-4402-1CS1S01-12"-NI 12"x10"

70-P02-001 Blowdown off Gas (BG)


FROM P-7411A
SUCTION LINE FROM HEXANE B/L
74-I-2401-B 4053 70-BDL-2105-1CS1S01-1/2"-NI
71-I-2100 1571 REFERENCE DRAWINGS
FROM P-7411A FROM
FROM P-7414A
HEXANE/HEPTANE B/L
DRAWING NO. TITLE
DISCHARGE LINE DISCHARGE LINE 70-BDL-2106-1CS1S01-1/2"-NI
74-I-2401-B 4054 71-I-2100 1572
74-I-2401-B 576

FROM P-7411B FROM H2 B/L


SUCTION LINE 70-BDG-2103-1CS1S01-1/2"-NI
FROM P-7414A SUCTION LINE 71-I-2100 1569
74-I-2401-B 577 74-I-2401-B 1497 1"x1/2"
FROM P-7414B FROM PSV-108
SUCTION LINE
FROM P-7411B 70-BDL-3461-1CS1S01-1"-NI Jan 07,
ISSUED FOR CONSTRUCTION LYM ZLL YSS
DISCHARGE LINE 71-I-2100 4426 0C 2021
74-I-2401-B 574 Oct 28,
74-I-2401-B 3951 0B ISSUED FOR CONSTRUCTION LYM ZLL YSS
FROM P-7414B 70-BDG-2119-1CS1S01-2"-NI FROM PSV-029 2020
Sep 03,
5 DISCHARGE LINE
VENT FROM P-7412 70-BDG-2410-1CS1S01-6"-NI FROM PSV-007 71-I-2121-B 6861 0A 2020
ISSUED FOR CONSTRUCTION LYM ZLL YSS
74-I-2401-B 575 Dec 20,
70-BDG-2415-1CS1S01-1/2"-NI

74-I-2401-A 5995 74-I-2401-B 1193


70-BDG-2416-1CS1S01-1/2"-NI
70-BDG-2418-1CS1S01-1/2"-NI

70-BDG-2413-1CS1S01-1/2"-NI

70-BDG-1641-1CS1S01-1/2"-NI
70-BDG-2419-1CS1S01-1/2"-NI

70-BDG-2420-1CS1S01-1/2"-NI

00 ISSUED FOR CONSTRUCTION TXQ ZLL YSS


70-BDG-2407-1CS1S01-1/2"-NI
70-BDG-2417-1CS1S01-1/2"-NI

FROM P-7412 SUCTION FROM E-7223 2019


70-BDG-2412-1CS1S01-1/2"-NI

FROM PSV-009 72-BDL-1190-1CA1S01-1"-NI Jul 01,


LINE 70-BDG-2411-1CS1S01-6"-NI 72-I-2202-B 7012 B2 ISSUED FOR HAZOP TXQ WL YSS
2019
74-I-2401-A 1190 74-I-2401-A 1488 FROM ANALYZER
10"x6" AIT-104 PSV REV DATE DESCRIPTION DRAWN CHECKED

73-PSV-801B 71-I-2125 6985


73-BDL-1163-1CS1S01-1/2"-NI FROM AIT-104 COLD
70-I-2001-A 6864
Engineering and Project Management

71-BDL-2852-1CA1S01-1"-NI
HEXANE LINE

71-BDL-2853-1CA1S01-1"-NI
71-I-2125 6983 Jubail, Kingdom of Saudi Arabia
73-PSV-801A
70-BDG-2412-1CS1S01-2"-NI 73-BDL-1162-1CS1S01-1/2"-NI
70-I-2001-A 6865
3"x2" SABIC Technology Center
Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION
70-BDL-2317-1CS1S01-3/4"-NI MP-151000100
BLOWDOWN GAS
70-BDG-4402-1CS1S01-12"-NI
6004 74-I-2408 UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE LIQUID AND GAS BLOWDOWN
ZLL 01/07/21
APPROVED DATE
YSS 01/07/21 PLANT NAME AREA/UNIT SIZE

PROJECT NO. STC-J 70 A1


17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20300PE-DW02-7007 10 70-I-2007 1of1 0C
FILE NAME: 70-I-2007.PID

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES˖
PI PDI H PI H
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
BATTERY LIMIT 084 013 088 L
AND NOMENCLATURE.
PG
PIT FI 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
PG 086
027 UNIT NUMBER CODE "70" UNLESS OTHERWISE SPECIFED.
084 085 PG PIT
087 088

1/2"
3. ALL ROTATING EQUIPMENT RUN/STOP SIGNAL AND SHUT DOWN ALARMS SHALL BE
FIT FE PROVIDED AND EXPRESSED IN DCS.
HIGH PRESSURE PURIFIED
1 NITROGEN 70-SP-001 1/2" 027 027
4. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1
70-NH-3210-1CS1S01-2"-NI HIGH PRESSURE PURIFIED
3517 19-I-2265 NOTE-2 NITROGEN
BLV-051 BLV-052 70-NH-2001-1CS1S01-2"-NI 5. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,

GTV-174
173 70-I-2004 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
PDI H BLV-053 BLV-003 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
70-P01-001 HP Purified N2(HPN)
014

BLV-001
71-VA-2947-1CS1S01-2"-IS 15

1/2"
2"
NOTE-4 BLV-063
PIC
1"E2" I I I PI H S S NOTES:
026 SET @ 6 BARG 360 C 130 206 007 L 195 005 1. SAFETY DEVICES AGAINST LIQUID EXPANSION SHALL BE INSTALLED UPSTREAM
PIT 2" PG LL BATTERY LIMIT.
PSV I I I I FI
FO P 026 PG 005
002 223 218 219 220 PIT PG 2. DELETED.
006 034 I 014
PV 007 006

1/2"
2"x1" I I I I 201 3. TO BE DEFINED AFTER FLARE HEADER SIZING.
026 FE
70-NH-3217-1CS1S01-2"-NI 234 132 217 221 1/2" FIT
70-NH-3216-1CS1S01-2"-NI 2"x1" 2"x1" 70-SP-002 014 LOW PRESSURE 4. TO SAFE LOCATION.
014 PURIFIED NITROGEN
BLV-058 BLV-057 FC 1" BLV-056 BLV-054 70-NL-2002-1CS1S01-2"-NI 5. POSMONERS SHALL GIVE ALARM IF VALVES ARE NOT COMPLETELY OPEN.
174 70-I-2004
1-1/2" PI H
HH NOTE-9 BLV-055 BLV-004
TI H 013 L 6. MINIMUM DISTANCE FROM BATTERY LIMIT.
GLV-003 LL 70-P01-002 LP purified N2(LPN)
2 004 2

BLV-002
7. PIPING CLASS ACCORDING OSBL DESIGN.

1/2"
2"
TIT TE PG PIT FIT FI
8. TO BE DEFINED ACCORDING OSBL PRESSURE REQUIREMENTS.
PCV TG 012 BLV-050 007 007
SET @ 3.8 BARG 004 004 013
001 006 9. LL TRIP ALL AGITATOR AND P-7412, P-7471/7472/7473.
CHILLED WATER
CHILLED WATER SUPPLY 70-WL-1020-1CS1S02-6"-IC 25 SUPPLY
6"x3" 6"x3"70-WL-1020-1CS1S02-6"-IC 25 6"x4" 6"x4"
3519 16-I-2273 176 70-I-2005 I I I I I
GTV-018 GTV-170
GTV-042

GTV-043
GTV-022 201 025 017 019 023
GTV-102

PG PIT PI
1/2"

1/2" 1/2" H
6"x4" 6"x4" L TE TIT TI
015 014 014 70-P01-009 Chilled water supply/return (CW)
4" 001 001 001
CHILLED WATER CHILLED WATER
RETURN GLV-171 RETURN
70-WM-1073-1CS1S02-6"-IC 25 70-WM-1073-1CS1S02-6"-IC 25
16-I-2273 3521 70-I-2005 1070

GTV-104
GTV-103

GTV-023 GTV-017
1/2"

1/2"
PG TG PIT PI H FIT FIQ H TI TIT TE
SET @ 3.5 BARG 032 007 033 033 L 017 017 L 005 005 005 OSBL
PCV
HOT OIL SUPPLY 002 HOT OIL SUPPLY 00-HS-001 00-S-001
3"x2" 3"x2" 70-HOS-1750-3CS1S01-3"-IH 40
3522 15-I-2271 C 178 70-I-2006 HS 00-S HS

GTV-105
GTV-024 GTV-079 70-HOS-1750-3CS1S01-3"-IH 40 001 001 001
GTV-007

GTV-041

3 GTV-550 3

1/2"
TO UTILITY DISTRIBUTION
GTV-169
1/2"

1-1/2" PG PIT PI TI TIT TE


017 017 L 003 003 003 70-P01-010 Hot oil supply/return (HO)
016
GLV-080
S
HOT OIL RETURN
HOT OIL RETURN FROM UTILITY 001
70-HOR-1790-3CS1S01-3"-IH 40 70-HOR-1790-3CS1S01-3"-IH 40
15-I-2271 3523 70-I-2006 1492
GTV-168

GTV-025

GTV-008
1/2"

DISTRIBUTION
PG PIT PI H

1/2"
021 021 L FIT FIQ HS HS HS HS HS
020
010 010 002 003 004 005 006
DEMINERALIZED
DEIONIZED WATER 70-DI-1780-1SA0S01-2"-NI WATER
70-DI-1780-1SA0S01-2"-NI
3515 14-I-2275 179 70-I-2005

GTV-106
GTV-026 70-P01-008 Deionized water (DW)

1/2"
TO UTILITY DISTRIBUTION
GTV-009

FIT FIQ
1/2"

Globe valve PG PIT PI H


L 011 011
022 023 023 S S S S S S S
002 081 004 005 006 121 117
SERVICE WATER 70-SW-1740-12CG0T01-1"-NI SERVICE WATER
70-SW-1740-12CG0T01-1"-NI
4 3524 14-I-2275 180 70-I-2005 4
GTV-107

GTV-027
1/2"

GTV-010
70-P01-006 Service potable water (SW) TO UTILITY DISTRIBUTION
PG
PIT PI
1/2"
H
024 L
025 025 FE FIT FIQ
012 012 012
SERVICE AIR 70-SA-1004-1CS1S02-2"-NI SERVICE AIR
EP OL
S 70-SA-1004-1CS1S02-2"-NI NOTE-2
3525 18-I-2267 181 70-I-2006
GTV-021
GTV-295

TO UTILITY DISTRIBUTION REFERENCE DRAWINGS


GTV-005

70-P01-004 Utility Air (UA)


PG PIT PI
1/2"

1/2"

H
027 029 029 L FIT FIQ DRAWING NO. TITLE
THE LOWEST POINT FE 013 013
INSTRUMENT AIR 0.1 deg 013 INSTRUMENT AIR
EP OL
S 70-AI-1000-12CG0T02-3"-NI 70-AI-1000-12CG0T02-3"-NI NOTE-2
3526 18-I-2267 182 70-I-2006
GTV-020
GTV-294

70-P01-005 Instrument Air (IA) TO UTILITY DISTRIBUTION


GTV-006

PIC
1/2"
1/2"

001 PIT PG PG
THE LOWEST POINT 001 002 FI
P 001 Jan 07,
001 0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
2021
PV
PG PIT PI H
1/2"

Oct 28,
001 0B ISSUED FOR CONSTRUCTION LYM ZLL YSS
003 002 002 L 2020
LP NITROGEN (6 BARG) 70-SP-003 1/2" Sep 03,
5 3527 19-I-2265
70-GI-1700-1CS1S01-1"-NI 0A 2020
ISSUED FOR CONSTRUCTION LYM ZLL YSS
LP NITROGEN
BLV-062 BLV-064 FO BLV-061 FIT 70-GI-1664-1CS1S01-1"-NI Dec 20,
BLV-065 ISSUED FOR CONSTRUCTION TXQ ZLL YSS
GTV-175

1578 70-I-2006 00 2019


1/2"

1" 001 BLV-006


BLV-060 Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
GLV-001 70-P01-003 Utility N2 (LN) 2019
PG PIT PI H
BLV-005

FIT FIQ
1/2"

REV DATE DESCRIPTION DRAWN CHECKED


004 003 003 L 1"
002 002
CHILLED POTABLE WATER CHILLED POTABLE
SUPPLY 70-PW-1663-12CG0T01-1-1/2"-IC 15 BLV-059 1-1/2"x1" 1-1/2"x1" 70-PW-1663-12CG0T01-1-1/2"-IC 15 WATER SUPPLY
4037 14-I-2275 1581 70-I-2006 Engineering and Project Management
GTV-108

Jubail, Kingdom of Saudi Arabia


GTV-004

GTV-019
1/2"
1/2"

70-P01-007 Chilled Potable Water (PW)


CHILLED POTABLE CHILLED POTABLE
WATER RETURN 70-PW-1363-12CG0T01-1-1/2"-IC 15 WATER RETURN SABIC Technology Center
70-PW-1363-12CG0T01-1-1/2"-IC 15 Jubail, Kingdom of Saudi Arabia
14-I-2275 6377 70-I-2006 6378
GTV-462

GTV-461 PROJECT DESCRIPTION


1/2"

MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
NATURAL GAS
6 5755 12-I-2211
70-GF-1001-1CA1S01-1"-NI DRAWING TITLE
NATURAL GAS TO DRAWN DATE
GTV-096

WARM FLARE LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM


1/2"

70-P01-011 Natural Gas


70-GF-1004-1CA1S01-1/2"-NI
5754 70-I-2007 CHECKED DATE UTILITY BATTERY LIMITS
ZLL 01/07/21
NATURAL GAS TO
NORMAL VENTING APPROVED DATE
70-GF-1003-1CA1S01-1/2"-NI YSS 01/07/21 PLANT NAME AREA/UNIT SIZE
5753 74-I-2408 STC-J 70 A1
PROJECT NO.
NATURAL GAS TO
COLD FLARE 17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
70-GF-1002-1CA1S01-1/2"-NI
DRAWING NO.
5752 74-I-2408 10 70-I-2008 1of1 0C
20300PE-DW02-7008
FILE NAME: 70-I-2008.PID

A B C D E F G H
A B C D E F G H J K
HIGH PRESSURE PURIFIED GENERAL NOTES˖

6SA0S01
NITROGEN

1SA0S03
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
70-NH-3009-1CS1S01-1/2"-NI BLOWDOWN GAS TO
1592 70-I-2004
71-BDG-2102-1SA0S03-1/2"-NI COLD FLARE HEADER AND NOMENCLATURE.
70-P01-001 HP Purified N2(HPN)
1568 74-I-2408 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.

71-P-1001-6SA0S01-1/2"-NI
BLV-015 BLV-016
FIQ FO 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
HH 004

1CS1S01
6SA0S01
SD 004

BLV-467
PIT S S S PI H 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
1 1

BLV-485
1 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
004 033 046 039 004 L
LL DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
PG
010 FIT
SET@18 BARG
PCV 004
004 ETHYLENE TO R-7101,
ETHYLENE FC R-7102 & R-7103
71-P-1111-6SA0S01-1"-NI
3529 11-I-2220 1910 71-I-2120
1"x1/2" 1"x1/2"
BLV-018 BLV-045 BLV-442 70-P04-001 Ethylene (C2) ACP
XV
001

NOTES:
LOW PRESSURE 1. SAFETY DEVICES AGAINST LIQUID EXPANSION SHALL BE INSTALLED UPSTREAM

6SA0S03

1CS1S01
PURIFIED NITROGEN BATTERY LIMIT.
70-NL-3010-1CS1S01-1/2"-NI
1725 70-I-2004
TO BLOWDOWN GAS 2. HEADER SIZES TO BE CONFIRMED WITH UPP OSBL.

70-P01-002 LP purified N2(LPN) 1569 70-I-2007 3. TO BE DEFINED AFTER FLARE HEADER SIZING.
71-BDG-2103-1CS1S01-1/2"-NI

71-GH-1001-6SA0S03-1/2"-NI
BLV-013 BLV-014 FIQ
70-P02-001 Blowdown off Gas (BG) 4. TO SAFE LOCATION.
003 FO
2 2

1CS1S01
6SA0S03
5. POSMONERS SHALL GIVE ALARM IF VALVES ARE NOT COMPLETELY OPEN.

BLV-468
SD 005
BLV-484

H
PI PIT PG 2 6. MINIMUM DISTANCE FROM BATTERY LIMIT.
FIT
005 005 011
PCV SET@18 BARG L 003 7. PIPING CLASS ACCORDING OSBL DESIGN.

50SD0L01
6SA0S03
003 TO R-7101/R-7102 &
HYDROGEN R-7103 8. TO BE DEFINED ACCORDING OSBL PRESSURE REQUIREMENTS.
FC 71-GH-1100-6SA0S03-1/2"-NI
3530 11-I-2232 C 1929 71-I-2120
BLV-046 BLV-042 9. KEEP RELATED XVS CLOSE FOR IA SAFE CONNECTION.
71-GH-1100-50SD0L01-3/8"-NI 70-P04-002 Hydrogen (H2) ACP
XV
XY 003
007 3/4 D 1 BLOWDOWN LIQUID
SET@54BARG TO HEADER
EB PG 71-BDL-3463-1SA0S03-1"-NI 71-BDL-3463-1SA0S03-1"-NI
009 PSV 4179 74-I-2408
S NOTE-9
104 FIT FIQ
002 71-P-2367-6SA0S02-3/4"-NI S S S S S
006 006 PROPYLENE TO 002 033 039 046 300
PROPYLENE 1"x3/4" 1"x1/2" 71-P-2366-6SA0S02-1"-NI PK-7461
1"x1/2"
3531 11-I-2215 1923 74-I-2406-D
BLV-017

BLV-011
70-P04-003 Propylene (C3) ACP
3 PG
3
008

ACP WARM FLARE


EP OL
TO OSBL WARM FLARE S GAS FROM V-7481
BLV-021 71-RV-4401-1CS1S01-12"-NI 71-RV-4401-1CS1S01-12"-NI NOTE-3
12-I-2278-A 3532 74-I-2408 352
CSO 70-P02-001 Blowdown off Gas(BG) NO POCKET
BLV-020

PG
1/2"

093 FIT FIQ

TO OSBL NORMAL 093 093 ACP NORMAL VENTING


VENTING FLARE 71-FLG-5120-1CA1S01-6"-NI HEADER
BLV-036 71-FLG-5120-1CA1S01-6"-NI NOTE-3
12-I-2278-C 4180 74-I-2408 4181
NO POCKET
CSO
BLV-035
1/2"

PG
094
ACP COLD FLARE
TO OSBL COLD FLARE HEADER
BLV-038 71-BC-5121-1SA0S03-4"-NI 71-BC-5121-1SA0S03-4"-NI NOTE-3
12-I-2278-B 4183 74-I-2408 4182
CSO NO POCKET
4 4
BLV-039
1/2"

BLOWDOWN LIQUID
TO HEADER
71-BDL-2104-1SA0S03-1/2"-NI
4449 74-I-2408
HH 3/4 D 1

71-P-1002-6SA0S01-1/2"-NI
S PI H TO COLD FLARE
SET@45 BARG
BLV-047

1SA0S03 71-BDL-3460-1SA0S03-1"-NI
PG PIT
215 081 L
SD
6938 74-I-2408 REFERENCE DRAWINGS
6SA0S01 LL 1SA0S03 HH
FIT S FIQ H DRAWING NO. TITLE

BLV-469
007 081 3
6SA0S01 050 215 050
SET@18 BARG PSV
PCV 110 6SA0S01 50SD0L01
005 BUTENE TO
BUTENE 71-P-1121-6SA0S01-3/4"-NI REACTORS R-7101,
FC
3533 11-I-2217 71-P-1120-6SA0S01-1/2"-NI 1679 71-I-2120
BLV-009 BLV-043
BLV-022

70-P04-004 Butene (C4) ACP


R-7102 & R-7103
XY XV BLV-489 71-P-1011-50SD0L01-3/8"-NI
TO BLOWDOWN Jan 07,
004 004 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
70-P04-004 Butene (C4) ACP LIQUID 2021
71-BDL-2105-1CS1S01-1/2"-NI Oct 28,
S 1571 70-I-2007 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
2020
215 TO BLOWDOWN
5 Sep 03,

71-P-1003-6SA0S01-1/2"-NI
70-P02-001 Blowdown off Gas (BG)
HH 3/4 D 1 1CS1S01 LIQUID 0A ISSUED FOR CONSTRUCTION TXQ ZJ YSS
S PI 2020

BLV-470
H SET@45 BARG 71-BDL-3461-1CS1S01-1"-NI 6SA0S01
1CS1S01 216 080 4426 70-I-2007 Nov 29,
BLV-019

L HH 00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS


NOTE-9 SD FIT S FIQ H 2019
6SA0S01 PG LL
PIT 39 052 216 052 Jul 01,
ISSUED FOR HAZOP TXQ WL
PSV B2 YSS
SET@18 BARG 080 080 2019
PCV 108 71-P-1012-50SD0L01-3/8"-NI
71-P-3418-6SA0S01-3/4"-NI REV DATE DESCRIPTION DRAWN CHECKED
006 HEXENE TO
HEXENE FC REACTORS R-7101,
71-P-3417-6SA0S01-1/2"-NI
3534 11-I-2216 1791 71-I-2120
Engineering and Project Management
BLV-024

BLV-477
BLV-008 BLV-044
BLV-465

XV BLV-490 R-7102 & R-7103


70-P04-005 Hexene(C6=) ACP 6SA0S01 50SD0L01 Jubail, Kingdom of Saudi Arabia
011
6CS1S01 6SA0S01 TO BLOWDOWN
XY LIQUID
71-BDL-2106-1CS1S01-1/2"-NI SABIC Technology Center
011 1572 70-I-2007 Jubail, Kingdom of Saudi Arabia
71-P-1004-1CS1S01-1/2"-NI

H FIQ
PI PROJECT DESCRIPTION
S 3/4 D 1 70-P02-001 Blowdown off Gas (BG)
051
BLV-048

082 SET@10.5 BARG MP-151000100


216 L
PG PIT
PSV UPP PROJECT
BLV-471

079 082 71-BDL-3457-1CS1S01-1"-NI FIT


106 STC-J UTILITIES PARK & PILOT PLANTS
051
6 FC
TO MOTHER LIQUOR DRAWING TITLE
HEXANE / HEPTANE 71-P-1462-1CS1S01-3/4"-NI 71-P-1461-1CS1S01-1"-NI BLV-491 TANK TK-7412/TK-7411 DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
3363 10-I-2207-B C 2057 74-I-2401-A
BLV-023

BLV-007 70-P05-001 Hexane/heptane(C6/C7) GLV-004 CHECKED DATE MAIN MATERIAL BATTERY LIMITS
71-P-1461-1CS1S01-1"-NI ZJ 01/07/21
BATTERY LIMIT XV
APPROVED DATE
XY 012 PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
012 STC-J 71 A1
PROJECT NO.
HS 17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
012 DRAWING NO.
10 71-I-2100 1of1 0C
20301PE-DW02-7102
FILE NAME: 71-I-2100.PID

A B C D E F G H
A B C D E F G H J K
71-TEA-1024-50SD0L01-1/2"-NI
TEAL FROM P-7421B GENERAL NOTES˖
70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT) 71-TEA-1026-50SD0L01-1/2"-NI 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS

BLV-054
BLV-533

BLV-063
74-I-2403-B 2251
AND NOMENCLATURE.

2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
71-P-1139-1SA0S01-1/2"-NI 71-P-1140-1SA0S01-1/2"-NI HEXANE VAPOR TO NORMAL UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
VENTING HEADER
71-P-1135-1SA0S01-1/2"-NI 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1429 74-I-2408
LOW PRESSURE 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURIFIED NITROGEN PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
1 71-NL-2013-1CS1S01-1"-NI
70-I-2004 1727 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
1
DISTILLED HEXANE
NOTE-14A 74-P-1438-1SA0S01-3/4"-NI BLV-064 NOTE-14A 70-P01-002 LP purified N2(LPN)
NOTES:

1/2"

1/2"
337 74-I-2405 BLOWDOWN GAS
1CS1S01 1CS1S01 1232 70-I-2007 1. DELETED.
FROM P-7411 71-NL-1651-1CS1S01-1/2"-NI
50SD0L01 50SD0L01
70-P05-001 Hexane/heptane(C6/C7)

71-TEA-1026-50SD0L01-1/2"-NI
71-NL-2068-1CS1S01-1/2"-NI 70-P02-001 Blowdown off Gas (BG) 2. SHORTEST DISTANCE.

NOTE-16 71-TEA-1024-50SD0L01-1/2"-NI

71-BDG-2111-1CS1S01-2"-NI
71-NL-1097-50SD0L01-3/8"-NI

71-NL-1096-50SD0L01-3/8"-NI

BLV-053 71-P-1133-1SA0S01-1/2"-NI
50SD0L01 1/2"

1/2"
71-P-1023-50SD0L01-3/8"-NI

1"x1/2"
1SA0S01 3. NO POKETS; WITH LONG RADIUS BENDS.
3/4"x1/2"

71-P-1132-1SA0S01-1/2"-NI
LOW PRESSURE PV
1SA0S01

PURIFIED NITROGEN 50SD0L01 PV


I PV 015 B 4. DELETED.
6625 70-I-2004 015 A
1E2

71-P-1025-50SD0L01-3/8"-NI
202 012 A PV
70-NL-2038-1CS1S01-1"-NI

PSV SET@10 BARG 5. USE A CAPILLARY ( DIA 2 MM) L=24 M.

BLV-052
BLV-067
BLV-060

BLV-056 BLV-057
012 B DETAIL
70-P01-002 LP purified N2(LPN) I 013

1/2"
1/2"
102 BLOWDOWN GAS
71-BDG-2112-1CS1S01-2"-NI 6. DELETED.

GLV-010

GLV-009

GLV-007
I

FC
GLV-008
030 1236 70-I-2007

1/2"

1/2"
FO
P 1E2 019 FO P
7. DELETED.

FC

BLV-066
BLV-065

71-NL-2069-1CS1S01-1/2"-NI
70-P02-001 Blowdown off Gas (BG)

3SA0S01 BLV-062
HH SET@10 BARG BLV-055
DETAIL 1SA0S01 1CS1S01 I 1SA0S01

NOTE-16
I H 1SA0S01 1CS1S01 8. MINIMUM.

71-P-4412-1SA0S01-1"-NI
102 PIC PSV 3SA0S01
032
030 012 011

1SA0S01
L S 9. DELETED.
NOTE-14B NOTE-14B
71-P-4413-1SA0S01-1"-NI

I 001 PIT
PIT 71-P-1136-1SA0S01-1-1/2"-NI 71-P-1137-1SA0S01-1-1/2"-NI 10. DELETED.
71-P-1022-1SA0S01-3/4"-NI

017 XV 015
012
2 XV NOTE 24 11. DELETED. 2
013 NOTE 24 HH PG
1SA0S01 3SA0S01

PG 027 I PIC H PV PV

1SA0S01 3SA0S01
018

BLV-051
M

BLV-088
017
M A7123 B 015 016 A 12. PAD FLANGE, MIN DISTANCE.
L NOTE-20 016 B
NOTE-20
FC

GLV-006
GTV-044

GLV-005
FC 13. DELETED.

1/2"
GTV-045
I S I I

1/2"
P

FC
FO

BLV-050
BLV-089
A7123 A 001 203 032 14. CHECK VALVE 14A TO BE A DIFFERENT TYPE THAN THE 14B.
1" LS LAHH I 1" 1"
P5 1SA0S01 1CS1S01
005 005 017
1" P3 P4 P1 1-1/2" P2 1" P3 P4 P1 1-1/2" P2 P5 15. SOFT SELECTOR SWITCH BETWEEN VESSEL CONFIGERATION AND INTERLOCK.
1/2'' 8" 1" 1/2'' 8" LS LAHH I IF V-7125A IS NOT SELECTED, THEN I-028 CAN NOT BE ACTIVE.
K2 2" K2 2" NOTE-14B 1D1 IF V-7125B IS NOT SELECTED, THEN I-035 CAN NOT BE ACTIVE.
006 006 019
A-7123A 71-NL-1131-50SD0L01-3/8"-NI A-7123B SET@10 BARG
K1 3" PSV 16. CHECK VALVE TO BE A DIFFERENT TYPE THAN THE CHECK VALVE IN
K1 3" BLOWDOWN GAS
71-BDG-2113-1CS1S01-2"-NI 74-TEA-5103-3SA0S01-1/2".
015

BLV-109 71-NL-1090-50SD0L01-3/8"-NI
1424 70-I-2007
1-1/2"x1" 2"x1" 17. SLOPE AS MUCH AS POSSIBLE.
70-P02-001 Blowdown off Gas (BG)
PIC PIT
71-P-1024-50SD0L01-3/8"-NI 71-P-1138-1SA0S01-1-1/2"-NI 18. THE CONNECTION OF PIPING IN HIGH POINT.
1/2"x3/8" 1"x1/2"
71-NL-1129-50SD0L01-3/8"-NI

016 016
3/4"x1/2" HH 19. S-029 HAS A 15MIN DELAY TO ACTIVE.

BLV-106
1CS1S01 LIT LI HH
LIT LI
BLV-061 1/2"x3/8"

H H
1SA0S01 011 011 PG 20.TO BE VISIBLE TO CATALYST CHARGING.
50SD0L01 012 012 L
L 019
BLV-110

50SD0L01 LL
71-NL-1130-50SD0L01-3/8"-NI

LL
3 3
V-7123A V-7123B TIT TI
BLV-108 S I I
BLV-107

TE
010 010
009 026 026 A 026 B
1-1/2" K3 TE
71-CA-1098-50SD0L01-3/8"-NI
1-1/2" K3 TIT
71-CA-1099-50SD0L01-3/8"-NI 010
009 GTV-046
1" 3/8" P8 1"
DETAIL P8 DETAIL 1" 3/8"
1" 103 21. P5 NOZZLE SHALL BE 1/2'' AND 85 DEG FROM VERTICAL. THE 1/4'' DIP PIPE SHALL
103 P6 GTV-047 P6

71-P-1138-1SA0S01-1-1/2"-NI
K4 3" BE REMOVABLE AND THE DIP PIPE SHALL BE 10MM INSIDE THE VESSEL.
3" EL 11.74M
K4 TI
71-BDG-1226-1CS1S01-1/2"-NI 22. CHECK VAVLE SHOULE BE DIFFERENT TYPE.
70-P07-001 Catalyst system(CAT) 009
1" P7 1" P7
BLOWDOWN GAS 71-BDG-1225-1CS1S01-1/2"-NI 23. DETAILS SHOW ON THE 70-I-2001-C/D.
70-I-2007 4828
24. DETAILS SHOW ON THE 70-I-2001-B/C.
BLV-068

BLV-058
70-P02-001 Blowdown off Gas (BG)
NOTE-12 NOTE-12
25. THE OPERATOR CONTROLS THE SPEED BY INPUTTING FLOWRATE.
71-CAW-2136-1SD0S01-1/2"-NI 1"x1/2" 1"x1/2"
CATALYST WASTE 71-CAW-2135-1SD0S01-1/2"-NI LOW PRESSURE
BLV-097
71-CAW-2137-1SD0S01-1/2"-NI 70-P07-001 Catalyst system(CAT) 70-NL-2014-1CS1S01-1/2"-NI NOTE-22 PURIFIED NITROGEN
73-I-2304 1423 71-NL-2014-1SD0S01-1/2"-NI
70-I-2004 1726
MIN.
4 TO V-7342 A
NOTE-3
NOTE-18 BLV-0591SD0S01 1CS1S01 4
71-CA-1099-50SD0L01-3/8"-NI 70-P01-002 LP purified N2(LPN)
I I

BLV-006
NOTE-3 017 019
71-CA-1098-50SD0L01-3/8"-NI
I I 70-P05-001 Hexane/heptane(C6/C7)
1SD0S01 XV
1SA0S01 023 025 026 DISTILLED HEXANE
FROM P-7411 A/B
74-I-2405 373
FC REFERENCE DRAWINGS
1SA0S01
71-CA-1098-50SD0L01-3/8"-NI

50SD0L01 CATALYST FROM DRAWING NO. TITLE


71-P-1436-1SA0S01-1/2"-NI
NOTE-17 R-7101/7102/7103
71-CA-1030-50SD0L01-1/4"-NI
V-7123A /B 71-I-2123-A 651
BLV-534

BLV-049
CATALYST STORAGE VESSEL 71-SP-008
A-7123A /B Type : VERTICAL AGITATED VESSEL
70-P07-001 Catalyst system(CAT)
71-P-1032-50SD0L01-1/4"-NI CATALYST FROM
R-7101/7102/7103
CATALYST STORAGE VESSEL AGITATOR Dimension : 700.0 mm(ID) x 1120.0 mm(H-T/T) NOTE-5 71-CA-1031-50SD0L01-1/4"-NI NOTE-17
MOC : STAINLESS STEEL Design Press. : 10.0 barg / -1.0 barg 71-I-2123-A 1617
Motor Power : 1.100 kW Design Temp. : 180.00 C 71-SP-008 BLV-535
MOC Class : STAINLESS STEEL CATALYST TO Jan 07,
0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
1/2" X 1/2" PSV 2021
Trim : 1SD0S01 NOTE-5 71-P-1100-50SD0L01-1/4"-NI R-7101/7102/7103
SET@19 BARG 051 Oct 28,
71-CA-1099-50SD0L01-3/8"-NI

Insulation : IH 1340 71-I-2121-A 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS


71-CA-1093-50SD0L01-3/8"-NI 2020
71-CA-3299-50SD0L01-1/2"-NI
5 PG Sep 03,

BLV-084
MIN BLV-081 MIN 71-CA-3298-50SD0L01-1/2"-NI 0A ISSUED FOR CONSTRUCTION LYM ZJ YSS

BLV-095
70-P07-001 Catalyst system(CAT) 2020
S
71-P-1138-1SA0S01-1-1/2"-NI

026
S
P-7125A /B Nov 29,
BLV-076

002 1/2"x1/4" CATALYST TO 00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS


BLV-077

CATALYST DOSING PUMP A-7125A /B 001 BLV-073 1/2"x1/4" NOTE-8 BLV-071 R-7101/7102/7103
2019
Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
Type : DIAPHRAGAM MEMBRANE CATALYST DOSING VESSEL AGITATOR
NOTE-2

BLV-120
71-CA-1034-50SD0L01-1/4"-NI 1759 71-I-2121-A 2019
Capacity : 0.0300 m^3/hr MOC : STAINLESS STEEL
71-CA-1035-50SD0L01-1/4"-NI

BLV-404

HIGH PRESSURE PURIFIED REV DATE DESCRIPTION DRAWN CHECKED


D/P : 16.000 bar Motor Power : 1.100 kW S NOTE-23 P-7125A

71-CA-1036-50SD0L01-1/4"-NI
I NITROGEN
Motor Power : 0.750 kW 001 SIC
I I 71-CA-3301-50SD0L01-1/2"-NI 70-I-2004 1766 70-P01-001 HP Purified N2(HPN)
A7125 B

71-NH-2015-1CS1S01-1/2"-NI
901
71-CA-1033-50SD0L01-1/4"-NI

026 A NOTE-25
028 Engineering and Project Management
BLV-083

71-P-1196-1SA0S01-1-1/2"-NI 1/2" X 1/2" DISTILLED HEXANE


71-CA-3300-50SD0L01-1/2"-NI FROM P-7411 A/B Jubail, Kingdom of Saudi Arabia
NOTE-24 I SET@19
V-7125A /B
3/8"x1/4"

I PSV PG
BLV-411

XL BARG 74-I-2405 1273

BLV-078
A-7125A 035
05

CATALYST DOSING VESSEL A-7125B


BLV-096

A7125 A NOTE-24 052 028


4-

3/8"x1/4" 021 70-P05-001 Hexane/heptane(C6/C7)


VL

Type : STIRRED VESSEL 1/2"x1/4" SABIC Technology Center


B
BLV-075

I LAHH 1/2"x1/4"
OS

Dimension : 350.0 mm(ID) x 800.0 mm(H-T/T) NOTE-8 Jubail, Kingdom of Saudi Arabia
94

Design Press. : 10.0 barg / -1.0 barg P1 025 001 P1


4-

OS

1
2

45
45
VL

BLV-111

1-1/2"x1" 5"
C

BLV-074 BLV-070

71-CA-1038-50SD0L01-1/4"-NI
5" 1-1/2"x1"
V-
V-

71-CA-1029-50SD0L01-1/4"-NI

Design Temp. : 180.00 C


B

PROJECT DESCRIPTION
" 8/

71-CA-1037-50SD0L01-1/4"-NI

74-P-1437-1SA0S01-1/2"-NI
BL
BL

MOC Class : STAINLESS STEEL I I I 3 MP-151000100


1"P4 P7 1" 3/8" 1"P4 P7 1" 3/8" P-7125B
Trim : 3SD0S01 I LAHH LS 036 A 036 B 035 LS
Insulation : NI
3/8"
1"P3 P2 1" 1"P3 P2 1" NOTE-23 UPP PROJECT
023 009 009 001 I
P5 3/4" 2"K2 P5 3/4" NOTE-21 I S
1CS1S01
STC-J UTILITIES PARK & PILOT PLANTS
2"K2

BLV-082
026 B
6 2"K1 BLV-455
2"K1
BLV-454 028 002 3SD0S01 DRAWING TITLE
I I I LI H LIT 2" K3 NOTE-21 LI H 2"K3 LIT DRAWN DATE
01/07/21

BLV-072
I LYM PIPING AND INSTRUMENTATION DIAGRAM

BLV-069
029 B 029 A 028 010 L 010 002 L 002 P8 SIC
P6 1/2" 1" P6 V-7125B
EL 10.15M 035 CATALYST STORAGE

BLV-066
LL LL XL CHECKED DATE
GTV-049

1" FO
GTV-050

EL 10.15M 1/2" 902 NOTE-25 50SD0L01 ZJ 01/07/21


CATALYST WASTE P8 BLV-086 BLV-085
V-7125A 71-CA-1033-50SD0L01-1/4"-NI 025 076
TO V-7342A 3SD0S01 APPROVED DATE
71-CAW-2132-3SD0S01-1/2"-NI 71-CAW-2133-3SD0S01-1/2"-NI BLV-112 BLV-005 YSS 01/07/21
PLANT NAME AREA/UNIT SIZE
73-I-2304 1434
NOTE-18 PROJECT NO. STC-J 71 A1
70-P07-001 Catalyst system(CAT) 71-CA-1038-3SD0S01-1/2"-NI
HS 17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
NOTE-15 3SD0S01 1SA0S01
DRAWING NO.
094 71-CA-1037-3SD0S01-1/2"-NI 10 71-I-2102 1of1 0C
20301PE-DW02-7103
FILE NAME: 71-I-2102.PID

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES˖
HP-7101A~L 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.
HOPPER
TYPE :HOPPER
DIMENSION :101.6MM(OD)X678.2MM(L) 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
DESIGN PRESS :10.0BARG/-0.1BARG UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
71-NL-1096-50SD0L01-3/8''-NI
PG DESIGN TEMPERATURE:-5.00 C/180 C
71-NL-1097-50SD0L01-3/8''-NI
3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.

BLV-139A/B
046A/B 70-P01-002 LP purified N2(LPN) MOC CLASS : STAINLESS STEEL
TYPE A
1 TRIM : 1SD0S01 1
INSULATION : NI 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
71-P-1023-50SD0L01-3/8''-NI PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
3/8" CATALYST DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
71-P-1025-50SD0L01-3/8''-NI
GLV-296A/B 70-P05-001 Hexane/heptane(C6/C7) ADDITION
BLV-133A/B
71-SP-007A

L- A321- VL B
NOTES:
71-SP-008A
1. HOPPER WITH CAPACITY OF 3.785 LITERS(12 NUMBERS).

2. USE A CROSS COMPONENT(LOW DEAD VOLUME).

1/2"x3/8" 3. STATIC WEIGH SYSTEM WITH TWO LOAD CELLS.

4. SD18 OR SD19 WILL BE CONNECTED IN PLACE OF LINE / TUBING TO V-7125 A/B,


WHEN A SAMPLE IS TAKEN. SAMPLING TO BE DONE AND COMPOSITION VERIFIED
NOTE-1 BEFORE CONNECTING TO V-7215 A/B
NOTE-3
5. SHALL BE ROUTED AROUND CONNECTION.
W
6. XV TO BE INSTALLED AT HIGHEST POINT ON TRANSFER LINE.
HP-XXX
WIT WI
NOTE-9 7. WHEN CONFIRMED THE HOPPER PROPER CONNECTED,USE HS-095A/096A FOR
001 001
2 PERMISSION; WHEN FINISHED LOADING RESET THE HS FOR NOT PERMISSION. 2
1"x1/2"
8. THE LENGTH OF THE HOSE OF HOPPER DOWNSTREAM SHALL BE MINIMUM TO AVOID
PG BENDS.

BLV-122A-L
9. MOVABLE GROUNDING WIRE REQUIRED WITH HOPPERS.

PG 10. CAN ONLY USE TO CLOSE IT


71-SP-008B 047A/B

MIN.
BLV-126A/B
A B
1/2" V-7123 A XV-028 I-202 HS-095A HS-095B WIT-001 WI-001 I-017 I-030 PG-038 71-SP-007A 71-SP-008A 71-PG-046A/B
71-SP-007B
ZIO ZSO V-7123 B XV-030 I-203 HS-096A HS-096B WIT-002 WI-002 I-019 I-032 PG-039 71-SP-007B 71-SP-008B 71-PG-047A/B

NOTE-8
NOTE-7
PG-040
BLV-138A/B

BLV-140A/B
ZIC ZSC PG-041

HS
NOTE 10
70-P07-001 Catalyst system(CAT)
PG-043
FC
B PG-045
XV

BLV-134A/B
3 PG-062 3
PG-063
I I
PG-064
I PG-065
PG-066
DETAIL 102 PG-067

O/C
HS
NOTE-7
A

4 71-NL-1130-50SD0L01-3/8''-NI 4
71-NL-1090-50SD0L01-3/8''-NI TYPE D
70-P05-001 Hexane/heptane(C6/C7)

71-P-1022-50SD0L01-3/8''-NI
71-P-1024-50SD0L01-3/8''-NI CATALYST SLURRY
B/ A
92 TRANSFER
1-
70-P01-002 LP purified N2(LPN) VL
B /B
I I I
REFERENCE DRAWINGS
2A
14

71-NL-1129-50SD0L01-3/8''-NI
V-

71-NL-1131-50SD0L01-3/8''-NI DRAWING NO. TITLE


GL

XV
/B
0

70-P01-002 LP purified N2(LPN)


1

7A
P-0

13
-S

V-
71

BL

NOTE-2

/B
30A
NOTE-6 B/ A341-
VL B

V-1
/B

A90
6A

0- P

BL
13

S- 1
V-

7 Jan 07,
BL

B/ A 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS


5 2021
21-
VL B Oct 28, ISSUED FOR CONSTRUCTION LYM ZJ YSS
0B 2020
5 V-7123A/B 0A
Sep 03,
2020
ISSUED FOR CONSTRUCTION LYM ZJ YSS
NOTE-5
Nov 29,
00 2019 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
70-P07-001 Catalyst system(CAT) 71-CA-1098-50SD0L01-3/8''-NI Jul 01,
ISSUED FOR HAZOP
B2 TXQ WL YSS
71-CA-1099-50SD0L01-3/8''-NI 2019
71-BDG-1226-1CS1S01-1/2''-NI
B/ A REV DATE DESCRIPTION DRAWN CHECKED
23
71-BDG-1225-1CS1S01-1/2''-NI
1-
VL
B
BLOWDOWN GAS B/ A1
" 2/ 31
1 - VL Engineering and Project Management
10 " 2/ B 1 Jubail, Kingdom of Saudi Arabia
S1 1 10-
SC PS-
110
B

L0 17
4A/

70-P02-001 Blowdown off Gas(BG) DS


B/ A
-1 2

05
24
BLV

1-
VL
SABIC Technology Center
B Jubail, Kingdom of Saudi Arabia
MIN.
00 9B

" 8/ PROJECT DESCRIPTION


3
-

MP-151000100
71-SP

SD DETAIL 103 71-SP-009A/B XV-024 I-023 I-029A I-029B UPP PROJECT


5A/B

18 19
71-SP-010 XV-025 I-025 I-036A I-036B STC-J UTILITIES PARK & PILOT PLANTS
BLV-13

6 NOTE-4
71-SP-011 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
71-CA-1098-50SD0L01-3/8''-NI CHECKED DATE CATALYST SECTION DETAILS
71-CA-1099-50SD0L01-3/8''-NI V-7125A/B ZJ 01/07/21
APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
PROJECT NO. STC-J 71 A1
17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20301PE-DW02-7104
10 71-I-2103 1of1 0C
FILE NAME: 71-I-2103.PID

A B C D E F G H
A B C D E F G H J K

FROM HS-100
1144 71-I-2125
FIC GENERAL NOTES˖
009
L 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.
FV
FIT

50SD0L01
50SD0L01
6SA0S03

6SA0S03
P 009 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
009
UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
71-GH-1013-50SD0L01-3/8"-NI
3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
BLV-166 FC 1/2" BLV-167

BLV-192
1 1/2" 1/2" 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
1
FIC PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
034
L
HYDROGEN FROM
BATTERY LIMIT FV

50SD0L01
6SA0S03

50SD0L01
FIT

6SA0S03
71-GH-1100-50SD0L01-3/8"-NI P 034
1929 71-I-2100 034
70-P04-002 Hydrogen (H2) ACP 1/2"
1/2"
FROM HS-101 C NOTES:

BLV-191
BLV-165 FC 1/2" BLV-168 FIC
1141 71-I-2125 1.MIN. DISTANCE TO R-7101.
019
2.MIN. DISTANCE TO R-7102.
FV

50SD0L01
50SD0L01
6SA0S03
FIT

6SA0S03
P 019 3.MIN. DISTANCE TO R-7103.
019
71-GH-1010-50SD0L01-3/8"-NI

BLV-190
BLV-171 FC BLV-170
1/2" 1/2"

FIC
2 2
FROM HS-102 036
FIC
1762 71-I-2125
015 FV

50SD0L01
6SA0S03

50SD0L01
FIT

6SA0S03
P 036
FV 036
FIT

50SD0L01
50SD0L01
6SA0S03

6SA0S03
P 015 1/2" 1/2"
015
C

BLV-189
BLV-172 FC 1/2" BLV-169 71-GH-1015-50SD0L01-3/8"-NI
C

BLV-187
BLV-174 FC 1/2" BLV-175
1/2" 1/2"

FIC
038 H
FIC
FV 016

50SD0L01
6SA0S03

50SD0L01
FIT

6SA0S03
P 038
038

1/2" FIT
P
3 BLV-173 016 50SD0L01 3
FC 1/2" BLV-176

BLV-188
1/2" BLV-162 6SA0S01 ETHYLENE TO R-7101
71-P-1112-6SA0S01-1/2"-NI 71-P-1113-6SA0S01-1/2"-NI
C 1688 71-I-2121-A

BLV-186
H BLV-163 FC
FIC 70-P04-001 Ethylene (C2) ACP
FV
1"x1/2" 018 016
ETHYLENE FROM BATTER LIMIT
71-P-1111-6SA0S01-1"-NI
1910 71-I-2100
FIT P
70-P04-001 Ethylene (C2) ACP
018 50SD0L01
6SA0S01
ETHYLENE TO R-7102
71-P-1114-6SA0S01-1/2"-NI 71-P-1115-6SA0S01-1/2"-NI
C 1687 71-I-2122-A

BLV-185
BLV-160 FC BLV-161 H
FIC S
70-P04-001 Ethylene (C2) ACP

020 026
FV
018 S
FIT 033
P
020
50SD0L01
BLV-158 6SA0S01 ETHYLENE TO R-7103
4 71-P-1116-6SA0S01-1/2"-NI 71-P-1117-6SA0S01-1/2"-NI 4
1686 71-I-2123-A
FC BLV-159

BLV-183
FROM RIC-100G H FV 70-P04-001 Ethylene (C2) ACP
FV
FIC FIT 022
1143 71-I-2125 P 020

50SD0L01
50SD0L01

6SA0S01
022 022 XV
6SA0S01

BUTENE FROM 016 BUTENE/HEXENE


BATTERY LIMIT 1/2" TO REACTOR R-7101
71-P-1011-50SD0L01-3/8"-NI 1/2" 71-P-1016-50SD0L01-3/8"-NI
1679 71-I-2100 C 1685 71-I-2121-A REFERENCE DRAWINGS
BLV-154 FC BLV-157 FC BLV-156

BLV-184
BLV-182

70-P04-004 Butene (C4) ACP


70-P04-004 Butene (C4) ACP DRAWING NO. TITLE
NOTE-1
FROM RIC-100 I H
FIC
1486 71-I-2125 FV
024 S
P 024
FIT 039
50SD0L01
6SA0S01
50SD0L01
6SA0S01

024
HEXENE S
FROM BATTERY LIMIT H
71-P-1012-50SD0L01-3/8"-NI 1/2" 1/2" FIC 026
1791 71-I-2100
026 Jan 07,
BLV-181

70-P04-005 Hexene(C6=) ACP BLV-153 FC BLV-155 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
2021
FROM RIC-101 G FV Oct 28,
P 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
1139 71-I-2125 026 2020
FIT Sep 03,
5 XV
50SD0L01

50SD0L01
6SA0S01

0A ISSUED FOR CONSTRUCTION LYM ZJ YSS

6SA0S01
026 2020
017 BUTENE/HEXENE Nov 29,
1/2" 1/2" 71-P-1017-50SD0L01-3/8"-NI TO REACTOR R-7102 00 2019 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
FROM RIC-101 I
C 1684 71-I-2122-A Jul 01,
1485 71-I-2125 B2 ISSUED FOR HAZOP TXQ WL YSS
BLV-180
BLV-150 1/2" BLV-152 FC BLV-151

BLV-193
FC 2019
NOTE-2 70-P04-004 Butene (C4) ACP REV DATE DESCRIPTION DRAWN CHECKED
FIC H FV
S
028 028
FROM RIC-102 G H P 046
FIC FIT BUTENE/HEXENE Engineering and Project Management

50SD0L01
6SA0S01
1135 71-I-2125 028 S TO REACTOR R-7103 Jubail, Kingdom of Saudi Arabia
030
026 1683 71-I-2123-A
FV BLV-148 1/2"
71-P-1019-50SD0L01-3/8"-NI P
030
BLV-179

FIT 1/2" FC 1/2" BLV-149 70-P04-004 Butene (C4) ACP SABIC Technology Center
50SD0L01
6SA0S01

XV
50SD0L01
50SD0L01
6SA0S01

6SA0S01

030 Jubail, Kingdom of Saudi Arabia


018
PROJECT DESCRIPTION
1/2" 1/2"
71-P-1018-50SD0L01-3/8"-NI MP-151000100
C
BLV-178

FC FC UPP PROJECT

BLV-194
BLV-147 BLV-164 BLV-144
NOTE-3 STC-J UTILITIES PARK & PILOT PLANTS
FROM RIC-102 I H FV
6 FIC
1484 71-I-2125 032 DRAWING TITLE
032 DRAWN DATE
FIT
P
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
50SD0L01
6SA0S01

032 CHECKED DATE MONOMER FLOW METERS


ZJ 01/07/21
71-P-1020-50SD0L01-3/8"-NI BLV-146 1/2" APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
BLV-177

1/2" FC BLV-145 PROJECT NO. STC-J 71 A1


6SA0S01
50SD0L01

17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION


DRAWING NO.
10 71-I-2120 1of1 0C
20301PE-DW02-7105
FILE NAME: 71-I-2120.PID

A B C D E F G H
A B C D E F G H J K
R-7101 E-7131 E-7101
GENERAL NOTES˖
1ST REACTOR 1ST REACTOR COOLER A-7101 HS
1ST REACTOR OUTER COOLER
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.
Type : VERTICAL AGITATED VESSEL Type : JACKETED PIPE / DOUBLE PIPE 099
Heat Duty : 0.500 kW 1ST REACTOR AGITATOR Type : JACKED PIPE / DOUBLE PIPE
Dimension : 450.0 mm x 2425.5 mm(H-T/T) 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
MOC : STAINLESS STEEL S S Heat Duty : 27.000 kW
Design Press. : 18.0 barg / -1.0 barg Surface Area : 0.100 m^2 UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
Motor Power : 1.100 kW 053 054 Surface Area : 2.100 m^2
Design Temp. : 210.00 C Shell Design Press. : 18.0 barg / -1.0 barg
TIC XY Shell Design Press. : 25.0 barg / -1.0 barg
MOC Class : STAINLESS STEEL Tube Design Press. : 18.0 barg / -1.0 barg 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
Tube Design Press. : 28.5 barg / -1.0 barg
Trim : 3SD0S01 Shell Design Temp. : -29.00 C / 120.00 C 011 099 PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE
Shell Design Temp. : 210.00 C / -5.00 C
Insulation : IH Tube Design Temp. : -29.00 C / 210.00 C MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
HIGH PRESSURE PURIFIED Tube Design Temp. : 210.00 C / -5.00 C
MOC : CARBON STEEL / STAINLESS STEEL (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE AND 4 METER FOR SLURRY
1 NITROGEN XV MOC : CARBON STEEL / STAINLESS STEEL 1
Insulation : IC /IS TIT TE PUMP SUCTION LINES.
70-NH-5002-1CS1S01-1"-NI Insulation : IH /IH
3776 70-I-2004 099
PSV 011 011 HEXANE VAPOR TO
70-P01-001 HP Purified N2(HPN) 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D

BLV-070
100 BLV-298 71-P-1039-50SD0L01-1/4"-ET 25
ANALYZER
BLOWDOWM LIQUID 71-P-1039-50SD0L01-1/4"-NI ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
71-BDL-3467-1CA1S01-1"-NI 1576 71-I-2125
70-I-2007 3777 WISON NOTE-16 (MINIMUM).
P MIN. FC
1CS1S01 3/4 D 1 1"x1/4" CAE 1/4"
70-P02-001 Blowdown off Gas (BG) 70-P12-001 Reaction System 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
TV SET@ 15 BARG
COLD HEXANE TO 3CA1S01
011 BLV-223 71-P-2482-3CA1S01-3/4"-IC 15
P-7461 P2 1'' 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
71-P-2479-3CA1S01-1"-IC 15 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
74-I-2406-A 770
1" 1" 1" P4 P6 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
1" 3/4"
TI TIT TE FC NOTES:

GTV-054
70-P06-001 Cold Hexane (C6) 014
014 014 1. REDUCER TO BE AS CLOSE AS POSSIBLE TO E-7131. NO POCKETS. PIPE FROM

1"
E-7131 R-7101 TO E-7131 TO BE AS CLOSE TO STRAIGHT AS PSSIBLE. NO HORIZONTAL RUNS.
COLD HEXANE FROM
P-7461
74-P-2476-3CA1S01-1"-IC 15 1" P3 P5 3/4" 4. TO SAFE LOCATION.
1291 74-I-2406-A HEXANE FROM
GLV-001 HH HH 74-P-1400-50SD0L01-3/8"-NI P-7414A/B 7. VALVE XV-039 TO BE AS CLOSE AS POSSIBLE TO SUS-1173,

71-P-1080-50SD0L01-1/8"-ET
BLOWDOWN LIQUID PIC H PI H P1 1'' XV-015 & P-1400 TO BE AS CLOSE AS POSSIBLE TO XV-039.
71-BDL-3466-1CA1S01-1"-NI BLV-211BLV-212 74-I-2405 4061
024 027 L NOTE 1

GLV-002
70-I-2007 3925 L 70-P05-001 Hexane/heptane(C6/C7)
LC LC LL 2"x1" 8. DELETED.
70-P02-001 Blowdown off Gas (BG) LL
1CA1S01 3CA1S01 FO
TO ANALYZER 9. PAD FLANGE AT ALL BOTTOM VESSEL FLANGES.
2 S JI H 001 2
71-I-2125 1582
033 001
PSV 3/4 D 1 10. THE LINE TO BE SLOPED TOWARD THE VESSEL AS MUCH AS POSSIBLE.
BLOWDOWN GAS 024 SET@ 18 BARG XV

71-P-1624-3SA0S01-2"-NI
70-BDG-2114-1CS1S01-2"-NI 2"x1" PIT S 11. MINIMUM DISTANCE.
PSE 015
70-I-2007 767 PIT XV
024 001
024 027 XL 50SD0L01 12. THESE TWO CHECK VALVES TO BE DISSIMILAR TYPES.
70-P02-001 Blowdown off Gas (BG) XV 044
NOTE-21

FC
1/2" 1-1/2"x3/4" 039 SUSPENSION TO
AS MUCH AS POSSIBLE 039 3SA0B01 13. A BUTTON IS SET TO SELECT HOT BOILING MODE OR NORMAL OPERATION MODE BY
BLV-204 1-1/2"x1" V-7111
I 1/2" NOTE-10 OPERATOR. FOR NORMAL OPERATION MODE, TIC-012 AND TI-013 HIGH ALARM
71-P-1143-3SA0S01-1-1/2"-IS 40 S 2071 71-I-2121-B
A7101 F1 SET POINT IS 91ć AND S-033 TRIP SET POINT IS 94ć. WHEN HOT BOILING MODE
1CS1S01 3SA0S01 HH NOTE-7 FC NOTE-20 FO 71-SUS-1174-3SA0B01-1-1/2"-IS 15

BLV-203
038 DI IS SELECTED, TIC-012 AND TI-013 HIGH ALARM SET POINT WILL BE CHANGED
H
S 021
70-P12-001 Reaction System TO 155ć. S-033 TRIP SET POINT WILL BE CHANGED TO 160ć .
3SA0S01 033 71-SUS-1176-3SA0B01-1-1/2"-IS 15 ALL FEED XV'S SHALL BE CLOSED.
FROM PSV-040
1CS1S01

BLV-218
71-I-2122-A 6878

71-VA-2942-1CS1S01-1"-IS
BLV-205

2"x1-1/2"
BLV-069

71-VA-2944-1CS1S01-1"-IS 15
I HH

WISON
PG 1-1/2" S TI HS I

CAE
HIGH PRESSURE PURIFIED H

GTV-056
NITROGEN 013 321 FROM PSV-032
70-NH-1910-1CS1S01-1/2"-NI M 033 008 047 321
1795 70-I-2004 NOTE-13 TIMER 71-I-2121-B 6880
I NOTE 4
P1 1ST REACTOR
70-P01-001 HP Purified N2(HPN) 2" 2" 325 3/4 D 1 HOT BOILING OPERATION SELECTOR

71-SUS-1174-3SA0B01-1"-IS 15
1-1/2" P3 8" K2 S
PRESSURE SIGNAL K3 3" SET@ 21.4 BARG
K1 DIT PG
S 217
4218 70-I-2001-A TIT TE 030
3 217
S
021
008 008
1-1/2"x1" TO SAFE LOCATION 15. DENSIMETER SHALL BE REPLACED BY SPOOL PIECE FOR BOILING OUT. 3
NOTE-15
2" P2 033 HHH FIT FI 71-VA-2945-1CS1S01-1"-IS 15
R-7101 PSV 16. LINE TO ANALYZER TO BE ELECTRIC TRACING TO 140 ć .
HH 021 021 71-WJ-1616-3CS1S01-3/4"-IH
LIT LIC H 026
JACKET WATER TO E-7601 17. VALVES XV-019/032 SHALL BE AS CLOSE AS POSSIBLE TO XV-085.
014 014 CSO
PDI LL
3697 76-I-2613
001 L 18. INSULATION THE ELBOW OF E-7101.
GTV-053
LL A-7101 71-WJ-1604-3CS1S01-2"-IH 25 70-P13-001 Jacket Water Supply/Return (JW)
TE 19. FOR HORIZONTAL REDUCER FOR THE SUS LINES, SIZE REDUCTION SHALL BE
HH P4 THE HIGHEST
TIC TIT 1-1/2" BLV-216 015 FROM THE UPPER SIZE ONLY, THE LOWER SIDE OF THE REDUCER SHALL BE FLAT.
H POINT TEMPERATURE
K4 SIGNAL TO 74-TV-011B
012 012 3" 3"x2"
L MIN. TIT TIC 20. THE DISTANCE AND SIZE BETWEEM XV-039 AND XV-044 WILL BE 800MM.
GTV-055 3990 74-I-2407
NOTE-13 TE 015 015
012 LIT 3SA0B01 50SD0L01 1" P4 P6 HS S
P1 2" 3/4" 033 033
TE 015
013 1" P10 BLV-221 TEMPERATURE
1ST REACTOR SHUT DOWN

71-P-1041-50SD0L01-3/8"-NI
1-1/2"x1" SIGNAL TO 76-TV-011A
HH NOTE-18
TI H S TIT GTV-057 P5 K6 3" 1-1/2"x1" 4056 76-I-2613

71-SUS-1173-3SA0B01-1-1/2"-IS 25
013 033 013 1-1/2" K5 1/2"
1/2" P9 P8
P7 P6 21. RUPTURE DISK REQUIRED.
S NOTE-17 1/2" 1/2" 1" P2 P3 P5
1/2" EL 10.75M 1" 2" 3/4"
FC S LI E-7101 22. DELETED.
BLV-208

033 71-SP-004
BLV-004

4 217 015 4
1/2"x1/4"

L JACKET WATER FROM


23. DETAILS SHOW ON THE 70-I-2001-A.
BLV-213

I LL E-7121
50SD0L01
3SD0S01

CSO 74-WJ-1739-3CS1S01-2"-IH 25
321 XV 74-I-2407 563
FROM PIC-100D 085 GTV-001 70-P13-001 Jacket Water Supply/Return (JW) SEAL FLUSHING HEXANE FROM
ETHYLENE PARTIAL
71-P-1118-6SA0S01-1/2"-NI

S P-7414A/B
NOTE-11

50SD0L01
3SD0S01

PRESSURE
NOTE-9 71-P-1044-50SD0L01-3/8"-NI
033 74-I-2405 6952
BLV-654
50SD0L01
1145 71-I-2125 SELECTOR BLV-476 3SA0B01 70-P05-001 Hexane/heptane(C6/C7)
SD
HS I 1/2" I REFERENCE DRAWINGS
I NOTE-17 4 FLUSH HEXANE FROM P-7414
049 336 217 74-P-1040-50SD0L01-3/8"-NI DRAWING NO. TITLE
026 B 74-I-2405 398
CATALYST FROM TIMER XV
XV FI FIT 70-P05-001 Hexane/heptane(C6/C7) HIGH PRESSURE PURIFIED
P-7125B 032
71-SUS-1170-3SA0B01-1"-IS 15

064 L 037 037 NITROGEN


71-CA-1036-50SD0L01-1/4"-NI 70-NH-1000-50SD0L01-1/2"-NI
1759 71-I-2102 LL 70-I-2004 833
71-SUS-1171-3SA0B01-2"-IS 25

70-P07-001 Catalyst system(CAT) AFT BLV-197


CATALYST TO R-7102 70-P01-001 HP Purified N2(HPN)

BLV-068
71-CA-1046-50SD0L01-1/4"-NI
71-I-2122-A 754 PG
XV
71-P-1578-50SD0L01-1/4"-NI

CATALYST FROM 019 014 Jan 07,

50SD0L01
0C ISSUED FOR CONSTRUCTION LYM ZJ YSS

3SA0B01
P-7125A S 2021
71-CA-1034-50SD0L01-1/4"-NI I Oct 28,
1340 71-I-2102 033 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS

2"x1-1/2"
026 A 2020
70-P07-001 Catalyst system(CAT) BLV-209
Sep 03,
5 CATALYST TO R-7102
71-CA-1045-50SD0L01-1/4"-NI
NOTE-17 AFT
BLV-195 BLV-214 0A 2020
ISSUED FOR CONSTRUCTION LYM ZJ YSS
71-I-2122-A 1606 Nov 29,
00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
ACTIVATED 2"x1-1/2" MIN 2019
1-1/2" Jul 01,
HEXANE/HEPTANE NOTE-12 BLV-003 ISSUED FOR HAZOP TXQ WL YSS
72-HEM-1302-50SD0L01-1/4"-NI 2-1/2"x2" B2 2019
296 72-I-2203 BLV-198 BLV-207
NOTE-11
BLV-196
1-1/2"

REV DATE DESCRIPTION DRAWN CHECKED


FROM P-7231
NOTE-11
BLV-462

TEAL/TIBA FROM 70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT)


P-7421A P 71-SUS-1172-3SA0B01-1"-IS 15
74-CTP-1044-50SD0L01-1/2"-NI NOTE-23
BLV-200

1666 74-I-2403-B 71-SUS-1175-3SA0B01-1-1/2"-IS 15 Engineering and Project Management


1"

P-7101
3/8"x1/4"

BLV-202 1/2"x1/4" S Jubail, Kingdom of Saudi Arabia


SIC
NOTE-11

S
217
026 001
SI
I S 001 SABIC Technology Center
I S XL JI
ETHYLENE/HYDROGEN FROM 321 XV H S
033 217
Jubail, Kingdom of Saudi Arabia
BATTERY LIMIT 1/2" 034 033 001 007 300 SUSPENSION TO
71-P-1113-6SA0S01-1/2"-NI PROJECT DESCRIPTION
1688 71-I-2120 V-7342A/B
FC MP-151000100
BLV-220

70-P04-001 Ethylene (C2) ACP BLV-201 6882 71-I-2123-B


ETHYLENE FLUSH
HEXANE / HEPTANE
UPP PROJECT
70-P12-001 Reaction System SUSPENSION TO
71-P-1043-50SD0L01-3/8"-NI BLV-008 1/2" STC-J UTILITIES PARK & PILOT PLANTS
396 74-I-2405 V-7342A/B
6
NOTE-11

70-P05-001 Hexane/heptane(C6/C7) 6883 71-I-2123-B DRAWING TITLE


FROM P-7414 A/B 50SD0L01 6SA0S01 DRAWN DATE
SUSPENSION TO LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
HEXANE / HEPTANE 5 DEGREE 70-P12-001 Reaction System
V-7342A/B
FEED FROM P-7414 A/B CHECKED DATE FIRST REACTOR 1
74-P-1042-50SD0L01-3/8"-NI 6884 71-I-2123-B ZJ 01/07/21
397 74-I-2405 P-7101
70-P05-001 Hexane/heptane(C6/C7) MOTHER LIQUOR BLV-009 APPROVED DATE

FROM P-7242
1 ST REACTOR PUMP YSS 01/07/21
PLANT NAME AREA/UNIT SIZE

BUTENE / HEXENE 72-HEM-2272-3SD0S01-1/2"-NI Type : CENTRIFUGAL PROJECT NO. STC-J 71 A1


FROM BATTREY LIMIT 70-P04-004 Butene (C4) ACP
539 72-I-2201 Capacity : 20.0000 m^3/hr 17093
71-P-1016-50SD0L01-3/8"-NI 70-P10-001 Mother liquor(ML)
D/P : 7.400 bar
A.I.D. DRAWING NUMBER SHT. NO. REVISION
1685 71-I-2120 DRAWING NO.
Motor Power : 55.000 kW 20301PE-DW02-7106 10 71-I-2121-A 1of1 0A
FILE NAME: 71-I-2121-A.PID

A B C D E F G H
A B C D E F G H J K

E-7151 V-7111 A-7111


FLASH VESSEL 1ST CONDENSER 1ST FLASH VESSEL 1E2 GENERAL NOTES˖
1ST FLASH VESSEL AGITATOR SET@ 5 BARG
Type : SHELL & TUBE/BEM Type : VERTICAL AGITATED VESSEL PSV
MOC : STAINLESS STEEL 71-BDG-2119-1CS1S01-2"-NI BLOWDOWN GAS
Heat Duty : 1.400 kW Dimension : 300.0 mm / 650.0 mm x 1464.0 mm(H-T/T) 029 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
Motor Power : 1.100 kW
Surface Area : 0.492 m^2 Design Press. : 18.0 barg /-1.0 barg 6861 70-I-2007 AND NOMENGCLATURE.
Shell Design Press. : 19.5 barg / -1.0 barg Design Temp. : 210.00 C /-5 C 70-P02-001 Blowdown off Gas (BG)
MOC Class : STAINLESS STEEL PSE 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Tube Design Press. : 25.0 barg / -1.0 barg
Shell Design Temp. : 130.00 C / -29.00 C Trim : 3SD0S01 029 HIGH PRESSURE PURIFIED UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
Insulation : IH 71-P-3455-3SA0S01-1"-NI
Tube Design Temp. : 130.00 C / -29.00 C NITROGEN
MOC : CARBON STEEL / STAINLESS STEEL 70-NH-2004-1CS1S01-1/2"-NI 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
1 HIGH PRESSURE
PURIFIED NITROGEN Insulation : IC /IC
70-I-2004 1591 PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE 1
71-P-3454-3SA0S01-1"-NI
70-NH-1357-1CS1S01-1/2"-NI BLV-238 FO BLV-235 70-P01-001 HP Purified N2(HPN) FROM HS-101 H2/C2 MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
6592 70-I-2004 RATIO 2ND REACTOR (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.

BLV-243
70-P01-001 HP Purified N2(HPN) 1"x1/2" 1/2" 1/2" 1"x1/2" 71-I-2125 2075
4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
FIT FV ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
SET @1.5 BARG
1CS1S01 040 040 PG (MINIMUM).
1" P2 PCV
700

BLV-239
3CA1S01 LARGE 700 5. THE VENT LINE OF THE REACTORS FLUSH VESSELS SHALL BE 3D BEND SLOPE.
FIC LOW PRESSURE
COLD HEXANE FROM
P-7461 040 P XY H PURIFIED NITROGEN
PIT FG 6. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
74-P-1456-3CA1S01-1"-IC 15 1" 700
465 74-I-2406-A 700 70-I-2004 6972
BLV-010 P3 L 700 N3 7. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
70-P06-001 Cold Hexane (C6) P6 3/4" HS PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
046 70-NL-2083-1CS1S01-1/2"-NI
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
HH HH 1" 1-1/4" N2 70-P01-002 LP purified N2(LPN)
PIC H PI H

71-P-1166-3SA0S01-1"-NI
71-P-3471-3SA0S01-1"-NI
L 034 E-7151 GLV-016
032 L SMALL
LL N1 1-1/4"X1" 1-1/4"
LL SELECTOR FIC
XL XV
3/4" 042 P
S
P-7114
S S HS 1" 051 FV
700 HS NOTES:
018 218 041
038 038 P5 FIT 042
PSV

BLV-072
P4 1. DELETED.
2 NOTE-6 JI H 042 2
1/2"

BLV-251
3/4 D 1 028 S SIC XL

BLV-252
004 HEXANE VAPOR TO NORMAL
SET@ 18 BARG PIT PIT 038 1"x1/2" 1/2" 1"x1/2" 033 VENTING HEADER 2. MIN. DISTANCE FROM TEE TO VALVE PV-040.
1" P1 FO 014
1CS1S01 2"x1" C
BLOWDOWN GAS 032 034 71-P-1653-3SA0S01-2"-IS 15 781 74-I-2408
BLV-240 1/2" BLV-236 3. NO POCKETS. ANY HORIZONTAL PIPE TO BE SLOPED TO V-7111 AT 5 DEG OR GREATER
3SA0S01 71-P-1145-3SA0S01-1"-NI
BLV-228

BLV-253
1/2"
70-I-2007 1237 NOTE-22 NOTE-3 NOTE-23 1/2" USE 3D ELBOWS.
71-BDG-2115-1CS1S01-2"-NI 2"x1" AS MUCH S I S
AS POSSIBLE

BLV-232
PSE 001 A7111 038 4. TO SAFE LOCATION.
1-1/2"x3/4" BLOWDOWN LIQUID
70-P02-001 Blowdown off Gas (BG) 028 LO PSV 71-BDL-2100-1CA1S01-1"-NI
71-P-1144-3SA0S01-1-1/2"-IS 15 1OO2 1620 70-I-2007 5. VALVE XV-021 & P-1401 SHALL BE POSITIONED AS CLOSE TO XV-059A/B AS POSSIBLE.
8" 002
1-1/2" K1 2"
1/2" BLV-229 P1 70-P02-001 Blowdown off Gas (BG)
1CS1S01

P2 3/4 D 1 6. A BUTTON IS SET TO SELECT HEXANE MODE OR HEPTANE MODE BY OPERATOR.


3SA0S01

71-P-2475-3CA1S01-3/4"-IC TE TIT TI
SET@ 15 BARG FOR HEXANE MODE, HIGH ALARM SET POINT OF 71-PIT-032/034 IS 12 BARG,
A-7111 017 017 017 HIGH HIGH ALARM SET POINT OF 71-PIT-032/034 IS 15 BARG.FOR HEPTANE MODE,
PG
COLD HEXANE TO P-7461 HIGH ALARM SET POINT OF 71-PIT-032/034 IS 2 BARG, HIGH HIGH ALARM SET
035 71-P-2473-3CA1S01-1"-IC 15
NOTE-10 POINT OF 71-PIT-032/034 IS 4 BARG.
779 74-I-2406-A
GLV-015 70-P06-001 Cold Hexane (C6)
S 3CA1S01 7. DELETED.
SUSPENSION FROM
MIN. 1CA1S01
P-7101 BLOWDOWN LIQUID
71-SUS-1174-3SA0B01-1-1/2"-IS 15 EP OL
S
P5 1" 218 HHH 71-BDL-3468-1CA1S01-1"-NI 8. DELETED.
2071 71-I-2121-A HH 3926 70-I-2007
1-1/2" LIT S LIC H BLV-256 BLV-255
70-P12-001 Reaction System 3/4 D 1 PG LC LC 70-P02-001 Blowdown off Gas (BG) 9. PAD FLANGE AT ALL BOTTOM VESSEL FLANGES.
2" 016 038 016 L PSV SET@ 21.4 BARG
BLV-254 NOTE-10 P4 LL 71-VA-2944-1CS1S01-1"-IS 15
036
TG
TO SAFE LOCATION
032 10. THE LINE TO BE SLOPED TOWARD THE VESSEL AS MUCH AS POSSIBLE.
3 PRESSURE SIGNAL V-7111 004 6880 71-I-2121-A 3
S NOTE-4
4219 70-I-2001-A 3/4"x1/2" 11. DELETED.
71-WJR-1056-3CS1S01-1/2"-IS 15 JACKET WATER TO E-7601
218 1/2" 71-WJR-1055-3CS1S01-1/2"-IS 15
3696 76-I-2613 12. THESE TWO CHECK VALVES TO BE DISSIMILAR TYPES.
P8 GLV-014

GTV-063
70-P13-001 Jacket Water Supply/Return (JW)
1-1/2" P9 FROM P-7471 13. DELETED.
1/2" 71-WJS-1027-3CS1S01-1/2"-IS 15
P7
74-I-2407 3732 14. OPERATOR SHALL SELECT THE OPERATION MODE(UNI, BI OR ACP MODE).
GTV-002 MINIMUM DISTANCE BETWEEN XV-059A AND PV-006.
PDI 3/4" P10 P6 2"
K2 EL 9.945M FO
15. FOR K1 MODE.
002 L NOTE-9 S S 071
LL
039 046 NOTE-14 16. XV-059A AND PV-006 HAVE MIN DISTANCE FROM LINE 71-SUS-1652.
TE TIT
TIMER
022 022 S I HS 17. FOR HORIZONTAL REDUCER FOR THE SUS LINES, SIZE REDUCTION SHALL BE
038 326 048 FROM THE UPPER SIZE ONLY, THE LOWER SIDE OF THE REDUCER SHALL BE FLAT.
PIC
006 18. XV-059A AND XV-042 DISTANCE AND SIZE WILL BE 1150MM.
TI XV-059B AND XV-020 DISTANCE AND SIZE WILL BE 1150MM.
I
022
L 322 19. DETAILS SHOW ON THE 70-I-2001-A/C.
P
PIT I 71-SUS-2168-3SA0B01-1-1/2"-IS 15
PV NOTE-2 20. DELETED.
4 2"x1-1/2"
006
006 323 XV
XV 4
059 B 21. DELETED.
71-SUS-2170-3SA0B01-1-1/2"-IS 15 S LOP
E 020
EP OL
1-1/2"x1"
EP OL SUSPENSION TO R-7103
22. RUPTURE DISK IS REQUIRED.
S
1-1/2"x1" 1" 1-1/2"x1" NOTE-16 S
71-SUS-2168-3SA0B01-1-1/2"-IS 15
FO 1995 71-I-2123-A
CAMFLEX NOTE-14 FC NOTE-15
1-1/2" 23. DETAILS SHOW ON THE 70-I-2001-B/C.

BLV-011
70-P12-001 Reaction System
FC

1/2"
3SA0B01
XV
I FI FIT 50SD0L01
L
059 A REFERENCE DRAWINGS
218 031 031
LL FC DRAWING NO. TITLE
NOTE-5

NOTE-18
BLV-227

71-SUS-1652-3SA0B01-1-1/2"-IS 15
SIC

1/2"
3SA0B01
011 S S
50SD0L01
218 300
I
HIGH PRESSURE PURIFIED Jan 07,

NOTE-16
NITROGEN 218 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
71-NH-1001-50SD0L01-1/2"-NI 2021
834 70-I-2004 Oct 28, ISSUED FOR CONSTRUCTION LYM YSS
0B ZJ
2020
71-SUS-2162-3SA0B01-1-1/2"-IS 15

BLV-230
70-P01-001 HP Purified N2(HPN) XL S Sep 03,
5 PG FO ISSUED FOR CONSTRUCTION LYM ZJ YSS
013 038 XV
0A 2020
029 002 74-P-1401-50SD0L01-3/8"-NI HEXANE FROM Nov 29,
021 EP OL P-7414A/B 00 ISSUED FOR HAZOP TXQ ZJ YSS
SI
S 2019
2"x1-1/2"

74-I-2405 4062 Jul 01,


011 B2 ISSUED FOR REVIEW TXQ WL YSS
BLV-231 FO FO GLV-003 2019
70-P05-001 Hexane/heptane(C6/C7)
2"x1-1/2" 3SA0B01 50SD0L01
REV DATE DESCRIPTION DRAWN CHECKED
JI H
XV
010
2-1/2"x1-1/2" BLV-237 042
MIN. BLV-257
BLV-234
SUSPENSION TO Engineering and Project Management
71-SUS-2161-3SA0B01-1-1/2"-IS 15 R-7102 Jubail, Kingdom of Saudi Arabia
P-7111 EP OL
S
BLV-241

2002 71-I-2122-A
NOTE-19
70-P12-001 Reaction System SEAL FLUSH HEXANE
74-P-1091-50SD0L01-3/8"-NI
FROM P-7414 SABIC Technology Center
74-I-2405 1804 Jubail, Kingdom of Saudi Arabia
70-P05-001 Hexane/heptane(C6/C7) PROJECT DESCRIPTION
SUSPENSION TO MP-151000100
V-7342AB
71-SUS-1179-3SA0B01-1"-IS 15 UPP PROJECT
6885 71-I-2123-B
STC-J UTILITIES PARK & PILOT PLANTS
70-P12-001 Reaction System
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE FIRST REACTOR 1
P-7111 P-7114 ZJ 01/07/21
1 ST FLASH VESSEL PUMP 1ST FLASH VACUUM PUMP APPROVED DATE
PLANT NAME AREA/UNIT SIZE
Type : CENTRIFUGAL YSS 01/07/21
Type : VACUUM PUMP
Capacity : 7.0000 m^3/hr STC-J 71 A1
Capacity : 6.0000 m^3/hr PROJECT NO.
D/P : 5.000 bar 17093
D/P : 0.800 bar A.I.D. DRAWING NUMBER SHT. NO. REVISION
Motor Power : 45.000 kW Motor Power : HOLD DRAWING NO.
10 71-I-2121-B 1of1 0C
20301PE-DW02-7107
FILE NAME: 71-I-2121-B.PID

A B C D E F G H
A B C D E F G H J K
E-7132 R-7102 E-7102 GENERAL NOTES˖
A-7102 2ND REACTOR COOLER 2ND REACTOR 2ND REACTOR OUTER COOLER S S
Type : JACKETED PIPE / DOUBLE PIPE Type : JACKETED PIPE / DOUBLE PIPE HS 053 054 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
2ND REACTOR AGITATOR Type : VERTICAL AGITATED VESSEL
Heat Duty : 0.500 kW Heat Duty : 27.000 kW 100 A AND NOMENGCLATURE.
MOC : STAINLESS STEEL Dimension : 450.0 mm x 2300.0 mm(H-T/T)
Surface Area : 0.100 m^2 Design Press. : 18.0 barg / -1.0 barg Surface Area : 2.100 m^2
Motor Power : 1.100 kW 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Shell Design Press. : 18.0 barg / -1.0 barg Design Temp. : 210.00 C Shell Design Press. : 25.0 barg / -1.0 barg TIC TIT TE XV
Tube Design Press. : 18.0 barg / -1.0 barg UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
MOC Class : STAINLESS STEEL Tube Design Press. : 28.5 barg / -1.0 barg 100 VAPOR HEXANE TO
Shell Design Temp. : -29.00 C / 120.00 C 034 034 034
Trim : 3SD0S01 Shell Design Temp. : 210.00 C / -5.00 C 71-P-1053-50SD0L01-1/4"-ET 25 ANALYZER
BLV-263 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
Tube Design Temp. : -29.00 C / 210.00 C Insulation : IH Tube Design Temp. : 210.00 C / -5.00 C
1603 71-I-2125 PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE
HIGH PRESSURE PURIFIED MOC : CARBON STEEL / STAINLESS STEEL MOC : CARBON STEEL / STAINLESS STEEL WISON NOTE-22 MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
1 NITROGEN Insulation : IC /IS
70-NH-5000-1CS1S01-1"-NI
Insulation : IH /IH MIN. CAE 1/4" 1/4" FC 70-P12-001 Reaction System
(MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE AND 4 METER FOR SLURRY 1
3779 70-I-2004 PSV SUSPENTION FROM PUMP SUCTION LINES.
V-7111

BLV-074
70-P01-001 HP Purified N2(HPN)
3/4 D 1 101 71-SUS-2161-3SA0B01-1-1/2"-IS 15
P 71-I-2121-B 2002 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
BLOWDOWN LIQUID SET@ 15 BARG
71-BDL-3480-1CA1S01-1"-NI ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
1"x1/4" 70-P12-001 Reaction System
70-I-2007 3780 1CS1S01 (MINIMUM).
COLD HEXANE TO 70-P02-001 Blowdown off Gas (BG)
3CA1S01 BLV-075 71-P-2483-3CA1S01-3/4"-IC 15
P-7461 P2 1'' 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
71-P-2480-3CA1S01-1"-IC 15 1"
74-I-2406-A 726 74-P-1402-50SD0L01-3/8"-NI HEXANE FROM P-7414
1" 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
BLV-282 BLV-283 P4 P6 3/4"
FC 74-I-2405 4063 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.

GLV-004
TI TIT TE TV DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.

GTV-065
70-P05-001 Hexane/heptane(C6/C7)
70-P06-001 Cold Hexane (C6) E-7132

1"
020 020 020 034

71-P-1081-50SD0L01-1/8"-ET
COLD HEXANE FROM FO
1"
P-7461
74-P-2477-3CA1S01-1"-IC 15 P3 P5 103 NOTES:
1290 74-I-2406-A 3/4"
GLV-003 HH
BLOWDOWN LIQUID PI P1 1'' 4. DENSIMETER SHALL BE REPLACED BY SPOOL PIECE FOR BOILING OUT.
71-BDL-3469-1CA1S01-1"-NI BLV-291 BLV-262 H S
70-I-2007 3927 040 L 001
LC LC XV 7. TO SAFE LOCATION.
LL XV
70-P02-001 Blowdown off Gas (BG)
1CA1S01 3CA1S01 2"x1" 104 71-SUS-1666-3SA0B01-2"-IS 15
NOTE-12 057

FC
12. REDUCER TO BE AS CLOSE AS POSSIBLE TO E-7132. NO POCKETS.
TO ANALYZER ROOM HH I 50SD0L01 XV
H
SUSPENSION TO PIPE FROM R-7102 TO E-7132 TO BE AS CLOSE TO STRAIGHT AS
2 PIC S A7102 HH 3SA0B01 2

71-P-1146-3SA0S01-2"-NI
DI 1" 2"x1"EP OL S 061 V-7112 POSSIBLE. NO HORIZONTAL RUNS.

1/2"
71-I-2125 1159 H
038 L 039
LL 023 2190 71-I-2122-B

71-SUS-1669-3SA0B01-1-1/2"-IS 25
3/4 D 1 PSV NOTE-26 2"x1-1/2" 13. VALVE XV-057 TO BE AS CLOSE AS POSSIBLE TO SUS-1668.
FO

BLV-276
BLV-281
FC XV-104 & P-1402 SHOULD BE AS CLOSE AS POSSIBLE
SET@ 18 BARG 038 XL 2"
PIT PIT NOTE-13 NOTE-19
PSE TO XV-057.
BLOWDOWN GAS 043
71-BDG-2116-1CS1S01-2"-NI 038 038 040
70-I-2007 724 JI H 16. DELETED.
2"x1"
70-P02-001 Blowdown off Gas (BG) 1/2" NOTE-27 S 002 2"x1-1/2" FI
S 17. PAD FLANGE AT ALL BOTTOM VESSEL FLANGES.
CSC 1-1/2"x3/4" AS MUCH AS F2 023
039 71-SUS-2171-3SA0B01-2"-IS 25 039
71-P-1147-3SA0S01-1-1/2"-IS 40

BLV-293
POSSIBLE 18. MINIMUM DISTANCE.
BLV-275 S NOTE-4
1CS1S01 3SA0S01

BLV-274
1CS1S01 3SA0S01

WISON
044 HH 19. THE LINE TO BE SLOPED TOWARD THE VESSEL AS MUCH AS POSSIBLE.

CAE
DIT FIT TI

GTV-066
H
M 023 023 002
TIMER 3/4 D 1 20. THESE TWO CHECK VALVES TO BE DISSIMILAR TYPES.
1-1/2"
I I SET@ 21.4 BARG
K2 PSV
BLV-073

PG P3 21. A BUTTON IS SET TO SELECT HOT BOILING MODE OR NORMAL OPERATION MODE BY
K1 2" 2" 322 327
042 K3 040 71-VA-2942-1CS1S01-1"-IS 15 VENT TO SAFE OPERATOR. FOR NORMAL OPERATION MODE, TIC-018 AND TI-019 HIGH ALARM
HIGH PRESSURE PURIFIED TIT TE PG
NITROGEN 3" LOCATION SET POINT IS 91ć AND S-039 TRIP SET POINT IS 94ć. WHEN HOT BOILING MODE
70-NH-2006-1CS1S01-1/2"-NI S S 002 002 044 IS SELECTED, TIC-018 AND TI-019 HIGH ALARM SET POINT WILL BE CHANGED
6878 71-I-2121-A
808 70-I-2004
2" P2 220 039 71-SUS-1669-3SA0B01-1-1/2"-IS 25 TO 155ć. S-039 TRIP SET POINT WILL BE CHANGED TO 160ć .
HHH ALL FEED XV'S SHALL BE CLOSED.

GTV-072
70-P01-001 HP Purified N2(HPN) R-7102 THE HIGHEST 71-WJ-1609-3CS1S01-3/4"-IH 25
PDI S HH CSO
JACKET WATER TO E-7602
3 LIT LIC POINT 71-WJ-1607-3CS1S01-2"-IH 25 3
003 220 H 3705 76-I-2613
L 018 018 NOTE-7
LL LL GTV-068
HS I MODE SELECTION
70-P13-001 Jacket Water Supply/Return (JW)
FOR DIFFERENT SET POINT

71-SUS-1666-3SA0B01-1"-IS 25
PRESSURE SIGNAL A-7102 3"x2" TE 014 322
4220 70-I-2001-A NOTE-21 3"
HH BLV-292 MIN. 1/2" 1/2" 021 TEMPERATURE 22. LINE TO ANALYZER TO BE ELECTRIC TRACING TO 140 ć .
TIT K4 P4
TIC H SIGNAL TO 74-TV-012B
1-1/2" TIT TIC
018 L 018 BLV-294 3991 74-I-2407 23. VALVES XV-022/051 SHALL BE AS CLOSE AS POSSIBLE TO XV-086.
3SA0B01 50SD0L01 021 021
TE LIT 24. INSOLATE THE ELBOW OF E-7102.
018 1-1/2"x1" 2" P4 P6 3/4"
020

71-P-1065-50SD0L01-3/8"-NI
NOTE-21 TEMPERATURE 25. FOR HORIZONTAL REDUCER FOR THE SUS LINES, SIZE REDUCTION SHALL BE
HH TE SIGNAL TO 76-TV-012A FROM THE UPPER SIZE ONLY, THE LOWER SIDE OF THE REDUCER SHALL BE FLAT.
TI H S 1" P10 P1 1"
019 4057 76-I-2613
019 039 1-1/2"x1" 26. THE DISTANCE AND SIZE BETWEEN XV-057 AND XV-061 WILL BE 1100MM.
S

71-SUS-1668-3SA0B01-1-1/2"-IS 25
TIT GTV-067 1/2" K6 3" NOTE-24
039
019 K5 P5 1/2" P2 P3 2" P5
P6 P9 P8 1" E-7102
P7 1" 3/4" HS S
FROM PIC-101D S 1/2" 1/2"
1/2"x1/4" FC

EL 10.75M 066 039


ETHYLENE PARTIAL SELECTOR 1/2"
BLV-284
71-SP-005
039
BLV-272

TIMER
BLV-273

3SA0B01
50SD0L01
PRESSURE I JACKET WATER FROM E-7112
HS CSO 27. RUPTURE DISK IS REQUIRED.
1142 71-I-2125 337 BLV-481 74-I-2407 566
50SD0L01

070
3SD0S01

71-P-1161-50SD0L01-1/4"-NI

XV 71-P-1045-50SD0L01-3/8"-NI GTV-004 74-WJ-1606-3CS1S01-2"-IH 28. DELETED.


I
4 I FLUSHING HEXANE FROM 4
I 322 086 70-P13-001 Jacket Water Supply/Return (JW)
026 A 70-P05-001 Hexane/heptane(C6/C7) P-7414A/B 29. DETAILS SHOW ON THE 70-I-2001-A.
50SD0L01
3SD0S01

026 B S
74-I-2405 6953
CATALYST FROM 220
NOTE-17
1/2"

P-7125B SEAL FLUSH HEXANE


71-CA-1046-50SD0L01-1/4"-NI XV I
754 71-I-2121-A S 70-P05-001 Hexane/heptane(C6/C7) FROM P-7414 A/B
051
EP OL

74-P-1052-50SD0L01-3/8"-NI
BLV-516

302 220 SD
NOTE-23 1/4" 74-I-2405 402
S

70-P07-001 Catalyst system(CAT) 5


CATALYST TO R-7103
71-CA-1047-50SD0L01-1/4"-NI
1/4"BLV-265 HIGH PRESSURE PURIFIED
NITROGEN
REFERENCE DRAWINGS
FI FIT
71-P-1119-6SA0S01-1/2"-NI

71-I-2123-A 1608 AFT 70-NH-1002-50SD0L01-1/2"-NI DRAWING NO. TITLE


L
NOTE-18

CATALYST FROM LI 039 039 70-I-2004 841


LL

BLV-279
71-SUS-2165-3SA0B01-2"-IS 25

P-7125A
XV 020 L 70-P01-001 HP Purified N2(HPN)
71-CA-1045-50SD0L01-1/4"-NI LL PG
1606 71-I-2121-A 022
031
70-P07-001 Catalyst system(CAT)
AFT BLV-280
CATALYST TO R-7103 XV 2"x1-1/2"
71-CA-1048-50SD0L01-1/4"-NI BLV-296 BLV-300
71-I-2123-A 1605 062
ACTIVATED Jan 07,
2"x1-1/2" 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS

50SD0L01
3SA0B01
HEXANE/HEPTANE 2021
71-SUS-1667-3SA0B01-1"-IS 15

72-HEM-1301-50SD0L01-1/4"-NI Oct 28,


294 72-I-2203 2-1/2"x2" MIN. BLV-278 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
2020
NOTE-20 BLV-005

BLV-264
NOTE-18
5 FROM P-7232
BLV-266 0A
Sep 03,
ISSUED FOR CONSTRUCTION LYM ZJ YSS
BLV-350

TEAL/TIBA FROM 70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT) P 2020


P-7421 A/B 1/2"x1/4" S Nov 29,
74-CTP-1049-50SD0L01-1/2"-NI NOTE-18 00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
1669 74-I-2403-B 039 NOTE-29 2019
P-7102
BLV-268

BLV-271 Jul 01,


B2 ISSUED FOR HAZOP TXQ WL YSS
MOTHER LIQUOR 2019
NOTE-18 SIC S S
3/8"x1/4"

FROM P-7243 REV DATE DESCRIPTION DRAWN CHECKED


71-HEM-2273-3SD0S01-1/2"-NI S 002 220 302
540 72-I-2201 I S XL
026
71-SUS-2180-3SA0B01-1"-IS 15

70-P10-001 Mother liquor(ML)


322 I 039 005
NOTE-18

S 220 Engineering and Project Management


S
XV 039 JI Jubail, Kingdom of Saudi Arabia
H 300
ETHYLENE/HYDROGEN 053
FROM BATTERY LIMIT SI 008
71-P-1115-6SA0S01-1/2"-NI 002 SUSPENSION TO
1687 71-I-2120
BLV-269 71-SUS-2172-3SA0B01-1-1/2"-IS 15 V-7432A SABIC Technology Center
BLV-290

70-P04-001 Ethylene (C2) ACP 1/2"


ETHYLENE FLUSH FC 3488 71-I-2123-B Jubail, Kingdom of Saudi Arabia
HEXANE FROM BLV-013 1/2" 70-P12-001 Reaction System PROJECT DESCRIPTION
SUSPENSION TO
71-P-1050-50SD0L01-3/8"-NI
1267 74-I-2405 71-SUS-2180-3SA0B01-1"-IS 15 V-7432A MP-151000100
P-7414A/B 70-P05-001 Hexane/heptane(C6/C7)
6889 71-I-2123-B UPP PROJECT
BUTENE / HEXENE 50SD0L01 6SA0S01
FROM BATTERY LIMIT
70-P12-001 Reaction System
SUSPENSION TO
STC-J UTILITIES PARK & PILOT PLANTS
6 1684 71-I-2120
71-P-1017-50SD0L01-3/8"-NI
71-SUS-1667-3SA0B01-1"-IS 15 V-7432A DRAWING TITLE
DRAWN DATE
6890 71-I-2123-B
NOTE-18

70-P04-004 Butene (C4) ACP LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
FEED HEXANE FROM P-7414 A/B
1740 74-I-2405
74-P-1051-50SD0L01-3/8"-NI P-7102 CHECKED
ZJ
DATE
01/07/21
SECOND REACTOR
70-P05-001 Hexane/heptane(C6/C7) BLV-012 2 ND REACTOR PUMP APPROVED DATE
Type : CENTRIFUGAL YSS 01/07/21 PLANT NAME AREA/UNIT SIZE
Capacity : 20.0000 m^3/hr PROJECT NO. STC-J 71 A1
D/P : 7.400 bar 17093
Motor Power : 55.000 kW A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20301PE-DW02-7108 10 71-I-2122-A 1of1 0C
FILE NAME: 71-I-2122-A.PID

A B C D E F G H
A B C D E F G H J K

V-7112 A-7112 PSV GENERAL NOTES˖


043
2 ND FLASH VESSEL 2ND FLASH VESSEL AGITATOR
PSE 1" E 2" BLOWDOWN GAS
043 SET@ 5 BARG 71-BDG-2120-1CS1S01-2"-NI 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
Type : VERTICAL AGITATED VESSEL MOC : STAINLESS STEEL 6862 70-I-2007 AND NOMENGCLATURE.
Dimension : 650.0 mm / 400.0 mm x 1564.0 mm(H-T/T) Motor Power : 1.100 kW
Design Press. : 18.0 barg /-1.0 barg 70-P02-001 Blowdown off Gas (BG)
Design Temp. : 210.00 C /-5 C 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
HIGH PRESSURE PURIFIED UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
MOC Class : STAINLESS STEEL NITROGEN
Trim : 3SD0S01 71-NH-2005-1CS1S01-1/2"-NI
Insulation : IH 70-I-2004 807 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
1 70-P01-001 HP Purified N2(HPN)
PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE 1
MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
FROM HS-102 H2/C2 (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.
HH HH
HS PIC H PI H RATIO 3RD REACTOR
4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
019 046 L 048 L 71-I-2125 2087 ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
LL LL (MINIMUM).
NOTE 6 PG SET @
71-P-1148-3SA0S01-1"-NI 1.5 BARG

71-P-1153-3SA0S01-1"-NI
1" FOBLV-320 710 70-NL-2084-1CS1S01-1/2"-NI 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
S S H
C PIT LOW PRESSURE
1/2 D 1/2 044 044 PURIFIED NITROGEN 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
BLV-319 1" XY 710 FG N3
SET@ 18 BARG L PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
710 70-I-2004 6971 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
FIT FV 710

BLV-321
PSV I S PCV
046 046

3SA0S01 1CS1S01
PIT PIT 70-P01-002 LP purified N2(LPN)
042 A7112 001 710
046 048 P
BLOWDOWN GAS PSE XL 1-1/4"
71-BDG-2117-1CS1S01-2"-NI FIC 1"
042

71-P-1155-3SA0S01-1"-NI
055 NOTES:

BLV-306

71-P-1154-3SA0S01-1"-NI
70-I-2007 1133 N2
NOTE-27 2"x1/2" NOTE-8 046 N1 1-1/4"X1"
AS MUCH XV 1-1/4" 1. DELETED.
CSC AS POSSIBLE 2"x1" P-7115
70-P02-001 Blowdown off Gas (BG) 710
1/2" BLV-309 1-1/2"x1/2" S
JI H HS 2. DELETED.
044 SIC
71-P-1149-3SA0S01-1-1/2"-IS 15 1OO2 S S

L=2 M
1CS1S01 005 063
3SA0S01 015 3. DELETED.
2 1" 219 044 2
4. DELETED.
GLV-019 XL

BLV-313
PRESSURE SIGNAL HS

BLV-314
S PDI PG 5. DELETED.
4222 70-I-2001-A FIC 036 054 VAPOR HEXANE TO
219 004 L 049 P2
LL 1-1/2" 048 E-7153
P1
2" 6. A BUTTON IS SET TO SELECT HEXANE MODE OR HEPTANE MODE BY OPERATOR.
K1 8" 2272 71-I-2123-B FOR HEXANE MODE, HIGH ALARM SET POINT OF 71-PIT-046/048 IS 12 BARG,
P BLV-323 71-P-1150-3SA0S01-1"-NI HIGH HIGH ALARM SET POINT OF 71-PIT-046/048 IS 15 BARG.FOR HEPTANE MODE,
SUSPENSION FROM FIT
A-7112 S HIGH ALARM SET POINT OF 71-PIT-046/048 IS 2 BARG, HIGH HIGH ALARM SET
P-7102 048 FV 70-P12-001 Reaction System
NOTE-19 POINT OF 71-PIT-046/048 IS 4 BARG
71-SUS-1666-3SA0B01-1-1/2"-IS 25 219 048
2190 71-I-2122-A 1" 1"x1/2" 1"x1/2"
7. TO SAFE LOCATION.
70-P12-001 Reaction System S C
044 BLV-318 FO BLV-317 1"
8. VERTICAL PIPE.
1-1/2"
P5 1" HHH
P4 3/4 D1 9. MIN. DISTANCE FROM TEE TO VALVE PV-008.
BLV-316 HH SET@ 21.4 BARG
LIT LIC H PSV PG TG TO SAFE LOCATION 10. DELETED.
019 019 L 046 71-VA-2943-1CS1S01-1"-IS 15 050 005
LL 6881 71-I-2123-A
NOTE-7 11. DELETED.

3/4"x1/2" 71-WJR-1060-3CS1S01-1/2"-IS 15 JACKET WATER TO E-7602 12. DELETED.


1/2" 71-WJR-1057-3CS1S01-1/2"-IS 15
3 P8
3706 76-I-2613 13. DELETED. 3
70-P13-001 Jacket Water Supply/Return (JW) GLV-020

GTV-073
GTV-074

1/2"
FROM P-7472 14. DELETED.
3/4" P10 P9 1-1/2" 74-WJS-1029-3CS1S01-1/2"-IS 15
2" 74-I-2407 3731
P7 15. VALVE PV-008 TO BE AS CLOSE AS POSSIBLE TO XV-066.
P6 GTV-005
1/2"
1-1/2" K2
16. DELETED.
BLV-322

NOTE-17 EL 9.945M FO
V-7112 S S 072 17. PAD FLANGE AT ALL BOTTOM VESSEL FLANGES.
044 046
18. DELETED.
TIMER
I I 19. THE LINE TO BE SLOPED TOWARD THE VESSEL AS MUCH AS POSSIBLE.
PIC
TE TIT 323 328
008 20. DELETED.
025 025
21. DELETED.
2"x1-1/2"

H P 22. PV-064 AND XV-066 ARE CLOSED TO LINE 71-SUS-2174.XV-008 &


TI
P-1403 TO BE AS CLOSE AS POSSIBLE TO XV-066.
L 025
PIT XV
PV 23. THE DISTANCE AND SIZE BETWEEN XV-066 AND XV-076 WILL BE 1100MM.
NOTE-22 008 XV 076
008 SUSPENSION TO
4 71-SUS-2175-3SA0B01-1"-IS 15
NOTE-15
NOTE-9
066 R-7103 24. DETAILS SHOW ON THE 70-I-2001-A. 4
71-SUS-2169-3SA0B01-2"-IS 15
2086 71-I-2123-A
FO NOTE-22 FC 25. DELETED.
2"x1" FO 2"
71-SUS-2173-3SA0B01-1-1/2"-IS 15

CAMFLEX 70-P12-001 Reaction System


1-1/2"x1" 3SA0B01 26. DELETED.
I FI FIT 50SD0L01

FC
27. RUPTURE DISK IS REQUIRED.
219 L 033 033
LL XV FO HIGH PRESSURE PURIFIED
008 008 NITROGEN REFERENCE DRAWINGS
70-NH-1003-50SD0L01-1/2"-NI
70-I-2004 840 DRAWING NO. TITLE

GLV-005
PG 70-P01-001 HP Purified N2(HPN)
BLV-307
HEXANE FROM P-7414
021 74-P-1403-50SD0L01-3/8"-NI
71-SUS-2174-3SA0B01-1-1/2"-IS 15 74-I-2405 4064
70-P05-001 Hexane/heptane(C6/C7)
SEAL FLUSH HEXANE
2"x1-1/2" FROM P-7414 A/B
BLV-308 74-P-1054-50SD0L01-3/8"-NI
74-I-2405 1805
3SA0B01 50SD0L01 BLV-327 70-P05-001 Hexane/heptane(C6/C7) Jan 07,
2"x1-1/2" 0C 2021
ISSUED FOR CONSTRUCTION LYM ZJ YSS
Oct 28,
0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
2-1/2"x1-1/2" 2020
BLV-305 BLV-312 Sep 03,
5 MIN. ISSUED FOR CONSTRUCTION LYM ZJ YSS
0A 2020
Nov 29,
NOTE-18 00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
2019
BLV-310

NOTE-24
CSC

Jul 01,
P-7112 B2 ISSUED FOR HAZOP TXQ WL YSS
S S 2019
I 219 300 REV DATE DESCRIPTION DRAWN CHECKED
219
SIC SI
012 012
Engineering and Project Management
JI H S XL Jubail, Kingdom of Saudi Arabia
011 044 017 SUSPENSION TO
71-SUS-2178-3SA0B01-1"-IS 15 V-7342 A/B
2083 71-I-2123-B SABIC Technology Center
70-P12-001 Reaction System Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION

MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 P-7112 P-7115 DRAWING TITLE
2ND FLASH VESSEL PUMP 2ND FLASH VACUUM PUMP
DRAWN DATE
PIPING AND INSTRUMENTATION DIAGRAM
LYM 01/07/21
Type : CENTRIFUGAL Type : VACUUM PUMP
Capacity : 7.0000 m^3/hr CHECKED DATE SECOND REACTOR
Capacity : 9.8000 m^3/hr
D/P : 5.200 bar D/P : 0.700 bar ZJ 01/07/21
Motor Power : 45.000 kW Motor Power : 2.200 kW APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
PROJECT NO. STC-J 71 A1
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
10 71-I-2122-B 1of1 0C
20301PE-DW02-7109
FILE NAME: 71-I-2122-B.PID

A B C D E F G H
A B C D E F G H J K
E-7133 A-7103 R-7103 E-7103
3RD REACTOR COOLER HS
3RD REACTOR OUTER COOLER GENERAL NOTES˖
3RD REACTOR AGITATOR 098 3RD REACTOR
Type : JACKETED PIPE / DOUBLE PIPE Type : JACKETED PIPE / DOUBLE PIPE
MOC : STAINLESS STEEL Type : VERTICAL AGITATED VESSEL 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
Heat Duty : 0.500 kW Heat Duty : 27.000 kW
Motor Power : 1.100 kW Dimension : 450.0 mm x 2425.5 mm(H-T/T) AND NOMENCLATURE.
Surface Area : 0.100 m^2 Surface Area : 2.100 m^2
Shell Design Press. : 18.0 barg / -1.0 barg Design Press. : 18.0 barg / -1.0 barg
TIC Design Temp. : 210.00 C Shell Design Press. : 25.0 barg / -1.0 barg 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Tube Design Press. : 18.0 barg / -1.0 barg S S
033 MOC Class : STAINLESS STEEL Tube Design Press. : 28.5 barg / -1.0 barg UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
BLOWDOWN LIQUID Shell Design Temp. : -29.00 C / 120.00 C 054 053
71-BDL-3484-1CA1S01-1"-NI PSV Trim : 3SD0S01 Shell Design Temp. : 210.00 C / -5.00 C
70-I-2007 4036 Tube Design Temp. : -29.00 C / 210.00 C Tube Design Temp. : 210.00 C / -5.00 C 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
MOC : CARBON STEEL / STAINLESS STEEL 111 Insulation : IH
TIT TE XV MOC : CARBON STEEL / STAINLESS STEEL PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE
1 70-P02-001 Blowdown off Gas (BG) Insulation : IC /IS 3/4 D 1
033 033 098 Insulation : IH /IH MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
1
SET@ 15 BARG
HEXANE VAPOR TO ANALYZER (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE AND 4 METER FOR SLURRY
HIGH PRESSURE
PURIFIED NITROGEN 1/4" NOTE-23 71-P-1055-50SD0L01-1/4"-ET 25 PUMP SUCTION LINES.
70-NH-5001-1CS1S01-1"-NI BLV-078 BLV-357 71-P-2486-3CA1S01-3/4"-IC
1297 71-I-2125
3920 70-I-2004 BLV-136
1"x1/4" MIN. WISON FC 1/4" 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
70-P01-001 HP Purified N2(HPN) TI TIT TE 1CS1S01 3CA1S01 TV CAE
70-P12-001 Reaction System
ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
COLD HEXANE TO P2 1''
026 026 026 SUSPENSION FROM (MINIMUM).
P-7461 033
71-P-2481-3CA1S01-1"-IC 15 71-SUS-2169-3SA0B01-2"-IS 15 P-7112
74-I-2406-A 675 71-I-2122-B 2086 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
BLV-353 FC BLV-351 P4 1" P6 3/4"

71-P-1082-50SD0L01-1/8"-ET
1" 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,

GTV-076
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.

1"
70-P06-001 Cold Hexane (C6)
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
E-7133
COLD HEXANE FROM P-7461 P5
74-P-2478-3CA1S01-1"-IC 15 P3 1" 3/4"
SUSPENSION FROM
1286 74-I-2406-A V-7111
71-SUS-2168-3SA0B01-1-1/2"-IS 15
GLV-007 P1 1'' 71-I-2121-B 1995
NOTES:
BLOWDOWN LIQUID
71-BDL-3482-1CA1S01-1"-NI BLV-356 BLV-355 70-P12-001 Reaction System 4. DENSIMETER SHALL BE REPLACED BY SPOOL PIECE FOR BOILING OUT.
70-I-2007 3919 HH 2"x1" HEXANE FROM P-7414
LC LC PI H 74-P-1404-50SD0L01-3/8"-NI 7. TO SAFE LOCATION.
70-P02-001 Blowdown off Gas (BG) 74-I-2405 4065
1CA1S01 3CA1S01 054 L

GLV-006
2 LL
70-P05-001 Hexane/heptane(C6/C7)
9. VERTICAL PIPE AS MUCH AS POSSIBLE. 2
TO ANALYZER ROOM HH FO
PIC H XV
S 10.THE LINE TO BE SLOPED TOWARD THE VESSEL AS MUCH AS POSSIBLE.
71-I-2125 1610 006 006
052 L

71-P-1152-3SA0S01-2"-NI
PSV 046 FC

BLV-329
LL XV 11.CONNECTION FROM TOP OF PIPE.
053 PSE XV
1/2 D 1/2 50SD0L01
053 PIT PIT 088 041 15.XV-088 TO BE AS CLOSE AS POSSIBLE TO LINE SUS-2183.
SET@ 18 BARG XL NOTE-15 3SA0B01 SUSPENSION TO V-7141
BLOWDOWN GAS 052 054 047 2"x1" 71-SUS-2184-3SA0B01-2"-IS 25

NOTE-11
71-BDG-2118-1CS1S01-2"-NI 3647 71-I-2124 18.DELETED.

BLV-349
70-I-2007 1552 71-P-1151-3SA0S01-1-1/2"-IS 40 NOTE-10 NOTE-27
1" FO
2"x1/2" AS MUCH AS H FIT FC
70-P12-001 Reaction System
19.PAD FLANGE AT ALL BOTTOM VESSEL FLANGES.
70-P02-001 Blowdown off Gas (BG) S JI HH
NOTE-28 POSSIBLE

BLV-352

71-SUS-2184-3SA0B01-1"-IS 15
CSC 1-1/2"x1/2" 046 003 008 TI H

NOTE-4
1/2" 20.MINIMUM DISTANCE.
FI 016
BLV-344 2"x1-1/2" DIT

BLV-360
BLV-345 F3 008 21.THESE TWO CHECK VALVES TO BE DISSIMILAR TYPES.
I 008 FROM PSV-046
1CS1S01 3SA0S01 3SA0S01 71-VA-2943-1CS1S01-1"-IS 15
A7103

WISON
71-SUS-2192-3SA0B01-2"-IS 25 71-I-2122-B 6881 22.A BUTTON IS SET TO SELECT HOT BOILING MODE OR NORMAL OPERATION MODE BY
HH

CAE
TE TIT

GTV-077
1CS1S01 DI S
M H 3/4 D 1 OPERATOR. FOR NORMAL OPERATION MODE, TIC-023 AND TI-024 HIGH ALARM
S 016 016 SET POINT IS 91ć AND S-046 TRIP SET POINT IS 94ć. WHEN HOT BOILING MODE
BLV-076

PG 008 046 SET@ 21.4 BARG


HIGH PRESSURE PURIFIED 052 71-VA-2941-1CS1S01-1"-IS 15 IS SELECTED, TIC-023 AND TI-024 HIGH ALARM SET POINT WILL BE CHANGED
NITROGEN 056 S P3 8" P1K2 S PSV
70-NH-2008-1CS1S01-1/2"-NI K1 2" TO 155ć. S-046 TRIP SET POINT WILL BE CHANGED TO 160ć .
2"
810 70-I-2004 001 1-1/2" K3 3" 221 TIMER 058 1-1/2"x1" ALL FEED XV'S SHALL BE CLOSED.
I
70-P01-001 HP Purified N2(HPN) TO SAFE LOCATION
3 PRESSURE SIGNAL S HS I 3

GTV-084
S 329 NOTE-7 3RD REACTOR
P2 2" 71-WJ-1635-3CS1S01-2"-IH 25JACKET WATER TO E-7603
4224 70-I-2001-A 046 THE HIGHEST POINT 71-WJ-1637-3CS1S01-3/4"-IH 25 013 323 HOT BOILING OPERATION SELECTOR
221 R-7103 CSO
HHH 3712 76-I-2613
HH 23. LINE TO ANALYZER TO BE ELECTRIC TRACING TO 140 ć .
LIT LIC GTV-079
H
TE 70-P13-001 Jacket Water Supply/Return (JW)
24. XV-072 AND XV-023 ARE CLOSED TO XV-087.
021 021 I
LL 027 PG TEMPERATURE
TE
323 SIGNAL TO 71-TV-013B 25. INSULATION THE ELBOW OF E-7103.
PDI 023 TIT TIC 058
A-7103 1/2" NOTE-22 3992 74-I-2407
005 L HH 3"x2" 027 027 26. FOR HORIZONTAL REDUCER FOR THE SUS LINES, SIZE REDUCTION SHALL BE

71-SUS-2307-3SA0B01-1-1/2"-IS 25
TIC TIT 1-1/2" 3" BLV-339 NOTE-20 BLV-361
LL H P4 FROM THE UPPER SIZE ONLY, THE LOWER SIDE OF THE REDUCER SHALL BE FLAT.
K4 P4 1-1/2"x1"
023 L 023 1/2" 2" P6
3/4" TEMPERATURE
NOTE-22
3SA0B01 SIGNAL TO 76-TV-013A 27. THE DISTANCE AND SIZE BETWEEN XV-088 AND XV-041 WILL BE 1400MM. XV-006 AND

50SD0L01
1" 4058 76-I-2613 P-1404 SHOULD BE AS CLOSE AS POSSIBLE TO XV-088.
LIT

71-P-1101-50SD0L01-3/8"-NI
P1
022 1-1/2"x1" NOTE-25
TE

71-SUS-2183-3SA0B01-1-1/2"-IS 25
1"P10 HS S
024 1" 3RD REACTOR SHUT DOWN
P2 2" P3 P5 3/4" 099 046
TI
HH
S TIT GTV-078 K5 E-7103
H 3" K6
1/2" 1/2" JACKET WATER FROM P-7473
024 046 024 1/2" 1/2" 1" CSO 74-WJ-1636-3CS1S01-2"-IH 25
P9 P7 P6 P8 74-I-2407 570
P5
S
1/2"

EL 10.75M SD GTV-006 70-P13-001 Jacket Water Supply/Return (JW) 28. RUPTURE DISK REQUIRED.
FLUSH HEXANE
046 NOTE-19
4 71-SP-006 6 4
FC

FROM P-7414 A/B


BLV-343

S
BLV-342

XV
NOTE-24 BLV-333

1/2"x1/4" 29. DELETED.


FROM PIC-102D 046 74-I-2405 6954
087
ETHYLENE PARTIAL TIMER BLV-483 70-P05-001 Hexane/heptane(C6/C7) 30. DETAILS SHOW ON THE 70-I-2001-A.
50SD0L01

71-P-1046-50SD0L01-3/8"-NI
3SD0S01

PRESSURE
HS I NOTE-20 HIGH PRESSURE PURIFIED
71-P-2167-50SD0L01-1/4"-NI

6980 71-I-2125 NITROGEN


092 338 3SA0B01 50SD0L01 70-NH-3008-1CS1S01-1/2"-NI
1/2" 70-I-2004 845
50SD0L01

SELECTOR I I FI FIT
3SD0S01

BLV-521

I 70-P01-001 HP Purified N2(HPN)


L
026 B 323 221
LL
041 041 SEAL FLUSH HEXANE REFERENCE DRAWINGS
CATALYST FROM P-7125B 74-P-1059-50SD0L01-3/8"-NI FROM P-7414 A/B
71-CA-1047-50SD0L01-1/4"-NI XV DRAWING NO. TITLE
1608 71-I-2122-A 74-I-2405 2306
072 70-P05-001 Hexane/heptane(C6/C7)
1/4" S
71-SUS-2182-3SA0B01-2"-IS 25

BLV-335

BLV-077
71-SUS-2179-3SA0B01-1"-IS 15

70-P07-001 Catalyst system(CAT)


XV 221 PG
1/4" 1/4"
063 025
CATALYST TO V-7125B AFT

3SA0B01
NOTE-24

1CS1S01
71-CA-1031-50SD0L01-1/4"-NI
71-I-2102 1617
LI
CATALYST FROM P-7125A
71-CA-1048-50SD0L01-1/4"-NI XV 2"x1-1/2"
022 BLV-348 BLV-358 Jan 07,
1605 71-I-2122-A L 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
023 LL 2020
I BLV-347 Oct 28,
70-P07-001 Catalyst system(CAT) S 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
2020
026 A 1/4" BLV-354 2-1/2"x2"
5 046 Sep 03,
BLV-334 NOTE-20

CATALYST TO V-7125A BLV-336 2"x1-1/2" MIN. 0A ISSUED FOR CONSTRUCTION TXQ ZJ YSS
71-CA-1030-50SD0L01-1/4"-NI NOTE-24 AFT 2020
71-I-2102 651 Nov 29,
ACTIVATED HEXANE/HEPTANE S 00 2019 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
NOTE-20
FROM P-7234 046 S Jul 01,
BLV-338

72-HEM-1300-50SD0L01-1/4"-NI NOTE-21 BLV-007 P-7103 B2 ISSUED FOR HAZOP TXQ WL YSS


1/4" NOTE-30 SI 300 2019
1771 72-I-2203
BLV-453

70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT) SIC 003 REV DATE DESCRIPTION DRAWN CHECKED
TEAL/TIBA FROM P-7421A/B P
74-CTP-1056-50SD0L01-1/2"-NI 003 S S
2260 74-I-2403-B
BLV-341 1/2"x1/4" 221 303
MOTHER LIQUOR FROM P-7244 JI H
72-HEM-1628-3SD0S01-1/2"-NI I
Engineering and Project Management
543 72-I-2201 009
S XL Jubail, Kingdom of Saudi Arabia
3/8"x1/4"

I S S 221
70-P10-001 Mother liquor(ML) 046 009
323 026 046
NOTE-20

NOTE-20

XV SUSPENSION TO
SABIC Technology Center
ETHYLENE FROM V-7342AB
BATTERY LIMIT 074 71-SUS-2186-3SA0B01-1-1/2"-IS 15 Jubail, Kingdom of Saudi Arabia
FC 6886 71-I-2123-B
71-P-1117-6SA0S01-1/2"-NI 71-P-1637-6SA0S01-1/2"-NI
1686 71-I-2120 PROJECT DESCRIPTION
BLV-362

1/2" 70-P12-001 Reaction System


70-P04-001 Ethylene (C2) ACP BLV-340 SUSPENSION TO MP-151000100
ETHYLENE FLUSH HEXANE FROM BLV-015 1/2"
71-P-1057-50SD0L01-3/8"-NI V-7342AB
BLV-014

1266 74-I-2405 71-SUS-2185-3SA0B01-1"-IS 15 UPP PROJECT


6887 71-I-2123-B
P-7414A/B
70-P05-001 Hexane/heptane(C6/C7)
50SD0L01 6SA0S01 STC-J UTILITIES PARK & PILOT PLANTS
FEED HEXANE FROM 70-P12-001 Reaction System SUSPENSION TO
6 P-7414 V-7342AB DRAWING TITLE

74-P-1058-50SD0L01-3/8"-NI 71-SUS-2179-3SA0B01-1"-IS 15 DRAWN DATE


6888 71-I-2123-B 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
1265 74-I-2405 LYM
BUTENE/HEXENE 70-P05-001 Hexane/heptane(C6/C7)
P-7103 CHECKED DATE THIRD REACTOR
FROM BL ZJ 01/07/21
71-P-1018-50SD0L01-3/8"-NI 3 RD REACTOR PUMP APPROVED DATE
1683 71-I-2120 Type : CENTRIFUGAL PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
70-P04-004 Butene (C4) ACP Capacity : 20.0000 m^3/hr STC-J A1
PROJECT NO. 71
D/P : 7.400 bar 17093
Motor Power : 55.000 kW A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20301PE-DW02-7110 10 71-I-2123-A 1of1 0C
FILE NAME: 71-I-2123-A.PID

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES˖
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.

2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
E-7153
CONDENSER 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
1 Type : SHELL & TUBE / BEU PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE 1
Heat Duty : 2.700 kW MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
Surface Area : 3.277 m^2 (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.
Shell Design Press. : 20.0 barg / -1.0 barg
Tube Design Press. : 25.0 barg / -1.0 barg 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
ELBOW (MINMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
Shell Design Temp. : 130.00 C / -29.00 C
(MINMUM).
Tube Design Temp. : 130.00 C / -29.00 C
MOC : STAINLESS STEEL / STAINLESS STEEL
5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
S Insulation : IC /IC
052 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
HEXANE VAPOR TO NORMAL DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
VENTING HEADER
XY 71-P-1156-3SA0S01-1"-NI
716 74-I-2408
080 3/4 D 1
SET@ 15 BARG PSV
005 BLOWDOWN LIQUID NOTES:
71-BDL-2120-1CA1S01-1"-NI
1555 70-I-2007 1. THE VENTING SHOULD BE SET AT THE HIGHEST POINT.
XV
HEXANE VAPOR FROM

71-P-2474-3CA1S01-3/4"-IC 25
70-P02-001 Blowdown off Gas (BG)
V-7112 080
71-P-1150-3SA0S01-1"-NI HIGH PRESSURE
2272 71-I-2122-B PURIFIED NITROGEN
2 FC BLV-371 BLV-079 70-NH-2473-1CS1S01-1"-NI 2
HEXANE VAPOR FROM 70-P12-001 Reaction System 1" 70-I-2004 3921
V-7141 71-P-1157-3SA0S01-1"-NI 2"x1" PG TG 3CA1S01 1CS1S01
1800 71-I-2124 023 NOTE-1 003
BLV-368

BLV-370

BLV-369
COLD HEXANE TO P-7461
71-P-2472-3CA1S01-1-1/2"-IC 25
712 74-I-2406-A
GLV-024

2"x1"
P1 2" P5
2" 1-1/2" P4

GTV-086
70-P06-001 Cold Hexane (C6)

P2 1/2" 1-1/2"
P3 COLD HEXANE FROM
SUSPENSION FROM E-7153 P-7461
GTV-007
V-7141 74-P-1458-3CA1S01-1-1/2"-IC 25
71-SUS-2197-3SA0B01-2"-NI 74-I-2406-A 1289
6891 71-I-2124
LC LC
71-BDL-2404-1CA1S01-1"-NI BLOWDOWN LIQUID
BLV-373 BLV-372
3 FROM R-7103 3923 70-I-2007
3
71-SUS-2179-3SA0B01-1"-IS 15
6888 71-I-2123-A 3CA1S01 1CA1S01 70-P02-001 Blowdown off Gas (BG)
MOTHER LIQUOR TO V-7141
71-HEM-2163-3SD0S01-1/2"-NI
FROM P-7103 71-SUS-2185-3SA0B01-1"-IS 15 710 71-I-2124
GLV-023 70-P10-001 Mother liquor(ML)
6887 71-I-2123-A

FROM P-7103
71-SUS-2186-3SA0B01-1-1/2"-IS 15
6886 71-I-2123-A

FROM V-7112 71-SUS-2178-3SA0B01-1"-IS 15


2083 71-I-2122-B
SUSPENSION FROM
R-7102 71-SUS-2172-3SA0B01-1-1/2"-IS 15
3488 71-I-2122-A

FROM P-7102 71-SUS-1667-3SA0B01-1"-IS 15


6890 71-I-2122-A

4 FROM P-7102 71-SUS-2180-3SA0B01-1"-IS 15 4


6889 71-I-2122-A

FROM V-7111
6885 71-I-2121-B 71-SUS-1179-3SA0B01-1"-IS 15

FROM P-7101
71-SUS-1172-3SA0B01-1"-IS 15 REFERENCE DRAWINGS
6883 71-I-2121-A
DRAWING NO. TITLE
FROM P-7101
71-SUS-1175-3SA0B01-1-1/2"-IS 15
6882 71-I-2121-A

FROM R-7101
71-SUS-1170-3SA0B01-1"-IS 15
6884 71-I-2121-A

Jan 07,
0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
BLV-397
BLV-242

BLV-359
BLV-206

BLV-267

BLV-337
BLV-285
BLV-199

BLV-277

2021
BLV-210

BLV-311

BLV-346
1-1/2"
1-1/2"

CSC

1" Oct 28,


SUSPENSION TO 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
2020
5 DEGREE V-7342A/B
5 MIN. 71-SUS-2160-3SA0B01-2"-IS 15
1801 73-I-2304 0A
Sep 03,
2020
ISSUED FOR CONSTRUCTION LYM ZJ YSS
3SA0B01 Nov 29,

BLV-391
BLV-001

BLV-007

00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS


1/2"

3SA0S01

1/2"
70-P12-001 Reaction System 2019
3SA0B01 Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
FLUSHING HEXANE 2019
50SD0L01 FROM P-7414A/B
74-P-1450-3SA0S01-1/2"-NI REV DATE DESCRIPTION DRAWN CHECKED
BLV-071

74-I-2405 1274
70-P05-001 Hexane/heptane(C6/C7)

Engineering and Project Management


HIGH PRESSURE Jubail, Kingdom of Saudi Arabia
70-NH-1356-50SD0L01-3/8"-NI PURIFIED NITROGEN
70-I-2004 6624
70-P01-001 HP Purified N2(HPN) SABIC Technology Center
Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION

MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE THIRD REACTOR
ZJ 01/07/21
APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
PROJECT NO. STC-J 71 A1
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20301PE-DW02-7111 10 71-I-2123-B 1of1 0C
FILE NAME: 71-I-2123-B.PID

A B C D E F G H
A B C D E F G H J K

V-7141 E-7145 GENERAL NOTES˖


A-7141 SUSPENSION RECEIVER SUSPENSION COOLER
P 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
SUSPENSION RECEIVER AGITATOR Type : VERTICAL AGITATOR VESSEL Type : JACKET PIPE/DOUBLE PIPE 71-WM-1061-1CS1S02-3/4"-IC 15 AND NOMENCLATURE.
Heat Duty : 12.900 kW THE HIGHEST PG
MOC : STAINLESS STEEL Dimension : 650.0 mm(ID) x 2450.0 mm(H-T/T) 3/4 D 1 PSV
Motor Power : 1.100 kW Design Press. : 18.0 barg / -1.0 barg Surface Area : 1.050 m^2 POINT 037 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
SET@ 15 BARG 072 TG TV

GTV-096
Design Temp. : 210.00 C Shell Design Press. : 25.0 barg / -1.0 barg UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.

71-VA-2940-1CS1S01-1"-IS 15
LOW PRESSURE PURIFIED Tube Design Press. : 25.0 barg / -1.0 barg 035 032
NITROGEN MOC Class : STAINLESS STEEL CHILLED WATER
Trim : 3SD0S01 Shell Design Temp. : 210.00 C / -5.00 C RETURN 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
70-NL-2016-1CS1S01-1/2"-NI 1-1/2"x1" 1-1/2"x1"
1723 70-I-2004 Insulation : NI Tube Design Temp. : 210.00 C / -5.00 C 71-WM-1058-1CS1S02-1-1/2"-IC 15 PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE
MOC : CARBON STEEL / STAINLESS STEEL 1798 70-I-2005
1 70-P01-002 LP purified N2(LPN) GLV-028 GTV-089 1" GTV-088 MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER 1
Insulation : IC /NI (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.

GTV-554
NOTE-4 FO

3/4"
SUSPENSION FROM P-7103
71-SUS-2184-3SA0B01-2"-IS 15 1-1/2" 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
3647 71-I-2123-A
ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
HEXANE VAPOR TO 70-P12-001 Reaction System GLV-025 (MINIMUM).
E-7153 PV

BLV-080 FC BLV-081
71-P-1157-3SA0S01-1"-NI HH 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
71-I-2123-B 1800 PIC 069 A
H

GLV-026
069 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,

1/2"
PV

BLV-376
1D2 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
SET@ 18 BARG 069 B
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.

FO 1"
PSV GLV-027
1/2"

P P

GTV-092
068
NOTES:
BLV-375
1CS1S01

1"
70-P01-009 Chilled water supply/return (CW)
BLOWDOWN GAS 3SA0S01
PIT 1. CONNECTION TO CENTRIFUGE SHALL BE AS SHORT AS POSSIBLE AND HAVE
70-I-2007 1694 PSE PIT 1-1/2" VERTICAL ROUTING.
PG 069 3/4"
P4 P6
068 077

BLV-409
070 2. IN THE HIGHEST POINT OF THE CIRCUIT.
71-BDG-2121-1CS1S01-2"-NI NOTE-10 1-1/2"x1"
HH
BLV-377

P1 3. FLUSHING AS UPSTREAM AS POSSIBLE.


PI H S 1-1/2"x1" 1"
70-P02-001 Blowdown off Gas (BG) CSC
BLV-374 077 L 052
NOTE-5 4. SAFETY VALVE SHALL BE POSITIONED IN THE HIGHEST POINT OF THE CIRCUIT AND
2 1/2" RELIEFING TO SAFE LOCATION. 2

71-SUS-2196-3SA0B01-1-1/2"-NI
1-1/2"x1"P2 P3 P5
1CS1S01 3SA0S01

71-P-1629-3SA0S01-1-1/2"-IS 40
PRESSURE SIGNAL 1" 1-1/2" E-7145 3/4" 5. WITH LONG RADIUS BENDS.
S PDI
4225 70-I-2001-A
223 006 L 6. AT LOWEST POINT IN LINE BETWEEN V-7141 AND E-7145.
MOTHER LIQUOR LL
S CHILLED WATER SUPPLY
FROM E-7153 70-WL-1028-1CS1S02-1-1/2"-IC 25 7. PAD FLANGES AT ALL BOTTOM VESSEL FLANGES.
71-HEM-2163-3SD0S01-1/2"-NI 001 70-I-2005 1025

GTV-094
710 71-I-2123-B
GTV-028
PIT PI 8. FOR HORIZONTAL REDUCER FOR THE SUS LINES, SIZE REDUCTION SHALL BE

3/4"
BLV-381
70-P10-001 Mother liquor(ML)
076 076 FROM THE UPPER SIZE ONLY, THE LOWER SIDE OF THE REDUCER SHALL BE FLAT.
L= 1.5 M MIN

XL SD

2"
071 IS-15.0 mm 38 9. MINIMUM.

BLV-395
I NI-15.0 mm
A7141 NOTE-2
JI 10. RUPTURE DISK REQUIRED.
H
006 BLV-392 11. DELETED.
2"x1-1/2" NOTE-9
BLV-379

BLV-394
BLV-378

12. DETAILS SHOW ON THE 70-I-2001-A.


S 081
223 HHH 13. CONNECT FROM THE TOP OF 71-SUS-2199. MIN. DISTANCE TO THE XV-031.
NOTE-13
GTV-091

2"x1/2"
M HH
S LIC H 14. CHECK VALVE TO BE A DIFFERENT TYPE.
2"
052 025 L

NOTE-9
8" P1 XV
3 1" K1 LL 3
2" 031
P4 1-1/2"
P3

2" LI H
P2 026 L MOTHER LIQUOR
V-7141 LL 3SA0B01 1SD0S01 FROM P-7211
71-HEM-2264-1SD0S01-1/2"-NI
72-I-2201 5721
S BLV-414 70-P10-001 Mother liquor(ML)
NOTE-14
TE 223 LOW ORESSURE
A-7141 K3 3" 3SA0B01 1CS1S01
031 PURIFIED NITROGEN
HH LIT LIT 71-NL-2097-1CS1S01-1/2"-NI
K4 72-I-2201 4422
TI H TIT 025
1-1/2" 026 BLV-412 BLV-413
031 031 DISTILLED HEXANE
L
1/2" 1/2" FROM P-7411
74-P-1072-50SD0L01-3/8"-NI
TE 74-I-2405 1272
BLV-015

1SA0B01 3SA0B01
70-P05-001 Hexane/heptane(C6/C7)
032 CAMFLEX
FO 3SA0B01 50SD0L01

FC
TIT TIC 003
GTV-090 1-1/2" K5 032 032 FI FIT
P10 K6 LV
P5 3" I L 035 035
4 P6 025 LL 4
1-1/2" 2" 223 SUSPENSION TO
CE-7201
EL 10.4M 71-SUS-2199-1SA0B01-1"-NI
BLV-406

BLV-380

NOTE-7 1711 72-I-2201


70-P12-001 Reaction System

71-SUS-1630-3SA0B01-1-1/2"-NI
3SD0S01
FO 1SA0S01 1-1/2"x1/2"
075
DISTILLED HEXANE/HEPTANE 71-P-1102-1SA0S01-1/2"-NI REFERENCE DRAWINGS
FROM P-7411A/B
74-P-1443-1SA0S01-1/2"-NI MIN.
1508 74-I-2405 BLV-396 DRAWING NO. TITLE
70-P05-001 Hexane/heptane(C6/C7)
BLV-016 BLV-001
HH
1SA0S01 3SA0B01 PIT S PI H
SI L
075 239 075
XL 041 LL
SIC
71-SUS-2197-3SA0B01-2"-NI

029
041
PG Jan 07,
S 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS
JI 074 BLV-410 FLUSH HEXANE 2021
300 H
74-P-1060-50SD0L01-3/8"-NI Oct 28,
ISSUED FOR CONSTRUCTION LYM ZJ YSS
029 74-I-2405 1739 0B 2020
70-P05-001 Hexane/heptane(C6/C7)
5 Sep 03,
I 2"x1-1/2"
HIGH PRESSURE 0A ISSUED FOR CONSTRUCTION LYM ZJ YSS
PURIFIED NITROGEN 2020
S S 223 70-NH-1004-50SD0L01-1/2"-NI Nov 29,
70-I-2004 1724 00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
239 223 2019
BLV-385 BLV-386 Jul 01,
2"x1-1/2" 70-P01-001 HP Purified N2(HPN)
B2 ISSUED FOR HAZOP TXQ WL YSS
2-1/2"x2" 2019
NOTE-5 71-SUS-2194-3SA0B01-2"-NI
BLV-408
BLV-388
REV DATE DESCRIPTION DRAWN CHECKED
P-7141 NOTE-6 MIN.
BLV-387
NOTE-12
BLV-457

BLV-390

Engineering and Project Management


71-SUS-2198-3SA0B01-1"-NI Jubail, Kingdom of Saudi Arabia
BLV-389
71-SUS-3160-3SA0B01-1"-NI
SABIC Technology Center
BLV-405 Jubail, Kingdom of Saudi Arabia
SUSPENSION TO
V-7342AB PROJECT DESCRIPTION

6891 71-I-2123-B MP-151000100


70-P12-001 Reaction System UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
P-7141 DRAWN DATE
PIPING AND INSTRUMENTATION DIAGRAM
LYM 01/07/21
SUSPENSION RECEIVER PUMP CHECKED DATE SLURRY RECIVER
Type : CENTRIFUGAL 01/07/21
ZJ
Capacity : 20.0000 m^3/hr
APPROVED DATE
D/P : 7.410 bar PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
Motor Power : 55.000 kW STC-J A1
PROJECT NO. 71
17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
10 71-I-2124 1of1 0C
20310PE-DW02-7112
FILE NAME: 71-I-2124.PID

A B C D E F G H
A B C D E F G H J K

HIGH PRESSURE
GENERAL NOTES˖
PSL XY XY
PURIFIED NITROGEN 70-NH-2065-1CS1S01-1"-NI
601 601 602
6977 70-I-2004 1ST REACTOR 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
70-P01-001 HP Purified N2(HPN) PRESSURE (PIC-024) AND NOMENCLATURE.
INSTRUMENT AIR VTP006
71-AI-1001-12CG0T02-2"-NI 71-I-2121-A 1582
1780 70-I-2006 VTP001 1ST REACTOR PRESSURE 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
71-AI-1001-12CG0T02-2"-NI 70-P01-005 Instrument Air (IA) BLV-128 AI ETHYLENE UNIT NUMBER CODE "71" UNLESS OTHERWISE SPECIFED.
BLOWDOWN GAS TO
ETHYLENE

2"x1"
NORMAL VENTING 100 A FRACTION
ETHYLENE PARTIAL PRESSURE 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1 74-I-2408 7005 71-BDG-1909-1CS1S01-1"-IS 15 VTP002 71-AIT-100 PIC
XV-019/XV-032 1
AI HYDROGEN 1145 71-I-2121-A
BLOWDOWN GAS TO 1ST REACTOR 100 D 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
WARM FLARE 71-AI-1051-12CG0T02-1/2"-NI 100 B FRACTION PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
71-BDG-1910-1CS1S01-1"-IS 15 BLV-129 AIT HYDROGEN
N4 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
70-I-2007 7006 HYDROGEN

1"x1/2"
100
CSO PI PARTIAL PRESSURE
70-P02-001 Blowdown off Gas (BG) AI BUTENE
71-AI-1051-50SD0L01-1/4"-NI 100 E
N3 100 C FRACTION HYDROGEN TO
ETHYLENE RATIO
TO FIC-009/FIC-034 NOTES:
1/2"x1/4" BLV-130 BUTENE RIC HS
71-AI-1051-12CG0T02-1/2"-NI 1144 71-I-2120 2. THESE ITEMS SHALL BE INSTALLED ON TWO SIDES OF THE WALL.
ANALYZERS AI 100 F 100
HEXENE
HEXANE VAPOR FROM R-7101 100 D FRACTION 3. COMPONENT ARRANGEMENT FOR THE ANALYZER PACKAGE MAY VARY, SHALL BE
71-P-1039-50SD0L01-1/4"-ET 25
HEXENE BUTENE TO FINALIZED PER ANALYZER VENDOR INFORMATION.
1576 71-I-2121-A N1 TO FIC-022
NOTE-4 RIC ETHYLENE RATIO
GLV-012 N34 4. LINE TO ANALYZER TO BE ELECTRIC TRACING TO 140 ć .
70-P12-001 Reaction System FSL AI AI AI 1143 71-I-2120
100 G
001 100 H 100 F ISO-HEPTANE 100 G
ETHANE METHANE HEXENE TO 5. GC WILL MEASURE C2, C4, C6 AND H2, HEXENE AND HEPTANE ISOMERS.
FSL TO FIC-024 PARTIAL PRESSURE OF C2 WILL CONTROL THE FEEDING CATALYST RATE.
RIC ETHYLENE RATIO
HIGH PRESSURE 004 AI AI AI
1486 71-I-2120
PURIFIED NITROGEN 100 E 100 J N-BUTANE 100 K 100 I 6. P-7233 WILL BE PART OF SAMPLING PREPARATION UNIT.
71-NH-2067-50SD0L01-1/4"-NI NITROGEN
7009 70-I-2004 N-HEXANE
BLV-463 BLV-464 2ND REACTOR 7. AS CLOSE AS POSSIBLE TO PUMP P-7233 DISCHARGE LINE.
BLOWDOWN GAS TO 70-P01-001 HP Purified N2(HPN) PRESSURE (PIC-038)
71-AI-1053-50SD0L01-1/4"-NI

WARM FLARE N9 AI ETHYLENE


BLV-132 71-I-2122-A 1159 8.ANALYZER HOUSE FLAMMABLE GAS DETECTOR ACTIVATED WILL CAUSE S-054.
71-BDG-1068-1CS1S01-1"-IS 15 101 A FRACTION
2 70-I-2007 7007
CSO 71-AIT-101 ETHYLENE ETHYLENE 2
FSL AIT PARTIAL PRESSURE XV-022/XV-051
70-P02-001 Blowdown off Gas (BG) PIC
002 2ND REACTOR 101 1142 71-I-2122-A
101 D
FSL AI HYDROGEN
005 ANALYZERS FRACTION HS
101 B HYDROGEN
HEXANE VAPOR FROM R-7102 HYDROGEN 032
71-P-1053-50SD0L01-1/4"-ET 25 PARTIAL PRESSURE
N6 PI
1603 71-I-2122-A AI BUTENE
NOTE-4 GLV-017 101 E
101 C FRACTION
70-P12-001 Reaction System BUTENE HYDROGEN TO TO FIC-012 / FIC-036
AI HEXENE RIC ETHYLENE RATIO HS
1141 71-I-2120 S S
101 D FRACTION 101 F 101
71-AI-1052-50SD0L01-1/4"-NI HEXENE 001 053
N8 N35
BLV-134 TO HS-046
HIGH PRESSURE 2075 71-I-2121-B
PURIFIED NITROGEN AI AI AI
71-NH-2068-50SD0L01-1/4"-NI 101 H 101 F ISO-HEPTANE 101 G BUTENE TO TO FIC-026 FD FD
6993 70-I-2004 ETHANE METHANE ETHYLENE RATIO
RIC
BLV-461 BLV-460 1139 71-I-2120 004 005
70-P01-001 HP Purified N2(HPN) AI AI AI 101 G
101 E 101 J N-BUTANE 101 K
N-HEXANE NITROGEN HEXENE TO
TO FIC-028
RIC ETHYLENE RATIO
3 101 I
1485 71-I-2120 3
BLOWDOWN GAS TO
N14 AI ETHYLENE
WARM FLARE 3RD REACTOR
71-BDG-1069-1CS1S01-1"-IS 15 BLV-135 FRACTION
102 A
ETHYLENE PRESSURE (PIC-052)
70-I-2007 7008
CSO
71-AIT-102 71-I-2123-A 1610
70-P02-001 Blowdown off Gas (BG) FSL
AI HYDROGEN
003 3RD REACTOR ETHYLENE
102 B FRACTION PARTIAL PRESSURE XV-023/XV-072
FSL AIT HYDROGEN
PIC
HEXANE VAPOR FROM 6980 71-I-2123-A
006 102 102 D
R-7103 71-P-1055-50SD0L01-1/4"-ET 25 AI
NOTE-4 BUTENE
1297 71-I-2123-A N11 FRACTION
102 C HYDROGEN
GLV-022 BUTENE
PARTIAL PRESSURE
70-P12-001 Reaction System PI
71-AI-1053-50SD0L01-1/4"-NI
N13 AI 102 E
BLV-137 HEXENE
102 D FRACTION
N36 HEXENE HYDROGEN TO FIC-014/FIC-038
71-NH-2069-50SD0L01-1/4"-NI RIC ETHYLENE RATIO HS
6992 70-I-2004 1762 71-I-2120
HEXANE TO TK-7412 70-P01-001 HP Purified N2(HPN) BLV-250 BLV-249 102 F 102
AI AI AI
71-HEM-2380-3SD0S01-1/2"-NI TO HS-063
73-I-2303-A 6975 102 H 102 F ISO-HEPTANE 102 G
70-P10-001 Mother liquor(ML) BLV-448 ETHANE METHANE 2087 71-I-2122-B
CHILLED WATER 1CS1S02 50SD0L01
RETURN 71-WM-1089-1CS1S02-1/2"-IC 15 AI AI AI
1/2X3/8" 71-WM-1089-50SD0L01-3/8"-IC 15 BUTENE TO
4 70-I-2005 6958
N17
102 E 102 J N-BUTANE 102 K
NITROGEN RIC ETHYLENE RATIO
TO FIC-030 4
1CS1S02 50SD0L01 BLV-138 N21 71-AIT-103 N-HEXANE 1135 71-I-2120
CHILLED WATER 70-P01-009 Chilled water supply/return (CW) 102 G
SUPPLY 70-WL-1088-1CS1S02-1/2"-IC 15
70-WL-1088-50SD0L01-3/8"-IC 15
6957 70-I-2005 N20 H HEXENE TO
1/2X3/8" BLV-139 DISTILLED AI TO FIC-032
H2O RIC ETHYLENE RATIO
71-NH-2070-50SD0L01-3/8"-NI HEXANE 103 A 1484 71-I-2120
XX1 70-I-2004 N37 CONTENT
BLV-297 102 I
70-P01-001 HP Purified N2(HPN) BLV-295 ANALYZERS
xx1 70-I-2006
71-AI-1054-50SD0L01-1/4"-NI 71-AI-1054-50SD0L01-1/4"-NI
N18 H
REFERENCE DRAWINGS
AI
70-P01-005 Instrument Air (IA) PIPING INSTRUMENT BLV-140 O2 DRAWING NO. TITLE
73-HEM-1353-3SD0S01-1/2"-NI 103 B
N16 CONTENT
HEXANE VAPOR FROM BLV-423 BLV-447
PK-7331 70-P10-001 Mother liquor(ML) 1/2", RF, CL300 N19
1644 73-I-2303-A 71-HEM-1071-3SD0S01-1/2"-NI
1/2", RF, CL300
BLV-431 N24
71-AI-1055-50SD0L01-3/8"-NI
xxx 70-I-2006
BLV-141
76-AIT-101 76-AIT 76-AI HC Jan 07,
70-P01-005 Instrument Air (IA) 0C ISSUED FOR CONSTRUCTION LYM ZLL YSS
2021
VENT GAS FROM V-7603 001 001
76-VA-3000-50SD0L01-1/4"-IS 15 Oct 28, ISSUED FOR CONSTRUCTION LYM YSS
N23 0B ZLL
6960 76-I-2613 71-WJ-1900-1CS1S01-1"-NI 2020
BLV-446 N25 Sep 03,
5
BLV-416

70-P02-001 Blowdown off Gas(BG) ISSUED FOR CONSTRUCTION TXQ ZLL YSS
GTV-142 0A 2020
70-P01-001 HP Purified N2(HPN) Nov 29,
00 2019 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
BLOWDOWN LIQUID
3SD0S01 Jul 01,
1SD0S01 71-BDL-2852-1CA1S01-1"-NI B2 ISSUED FOR HAZOP TXQ WL YSS
MOTHER LIQUOR TO 6985 70-I-2007 2019
V-7341 BLV-424 70-P02-001 Blowdown off Gas (BG)
71-HEM-2164-1SD0S01-1"-NI VTP011 VTP014 TO FIC-007 REV DATE DESCRIPTION DRAWN CHECKED
73-I-2305 166 AIC TEAL
1147 74-I-2403-B
70-P10-001 Mother liquor(ML) BLV-425 71-AIT-104 104 A
TEAL
CONTENT
1SD0S01
3SD0S01

SD ALUMINUM AIT TO FIC-005


ACTIVATED HEXANE/HEPTANE
1", RF 4"x1" N22 ALKYL AIC TIBA
Engineering and Project Management
8 104 1146 74-I-2403-B
1638 72-I-2203 VTP007 104 B CONTENT Jubail, Kingdom of Saudi Arabia
71-AIT-104-PSCS ANALYZERS TIBA DISTILLED HEXANE
BLV-426
VTP013

FROM V-7231 BLV-430 NOTE-7 BLV-429 71-P-1435-1SA0S01-1"-NI FROM P-7411A/B


70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT) VTP008 NOTE-2
VTP010 74-I-2405 6963
VTP017 VTP009 SABIC Technology Center
71-HEM-1156-3SD0S01-1"-NI VTP012 XL XL XL XL 70-P05-001 Hexane/heptane(C6/C7)
BLV-444 BLV-445 NOTE-2,6 VTP016 Jubail, Kingdom of Saudi Arabia
71-HEM-1269-1SD0S01-1"-NI 104 A 104 B 104 C 104 D
P-7233 1", RF
I ANALYZER MAINTENANCE
PROJECT DESCRIPTION
FUNCTION STATUS DEWAXER
BLV-443

104 3SD0S01 3SA0S01 STATUS DEMAND CONTROL RINSING HOT ACTIVE HIGH PRESSURE MP-151000100
71-NH-1866-1CS1S01-1"-NI PURIFIED NITROGEN
71-NH-2066-1CS1S01-1"-NI 1SD0S01 1SA0S01 UPP PROJECT
BLV-427

XX2 70-I-2004 HS 70-I-2004 6984


BLV-365 BLV-366 STC-J UTILITIES PARK & PILOT PLANTS
608 FAILURE
70-P01-001 HP Purified N2(HPN)
6 3CA1S01 1CS1S01 COLD HEXANE TO DRAWING TITLE
P-7461 DRAWN DATE
S HS 71-P-2850-3CA1S01-1"-IC 15 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
LYM
607 6976 74-I-2406-A
053 START BLV-499 CHECKED DATE ANALYZER ROOMS
70-P06-001 Cold Hexane (C6) COLD HEXANE FROM ZLL 01/07/21
S HS P-7461
74-P-2851-3CA1S01-1"-IC 15 APPROVED DATE
PLANT NAME AREA/UNIT SIZE
ACTIVATED HEXANE/HEPTANE 054 606 STOP 74-I-2406-A 6961 YSS 01/07/21
BLV-498 PROJECT NO. STC-J 71 A1
72-I-2203 168 3CA1S01 1CA1S01 BLOWDOWN LIQUID 17093
TO V-7231 70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT) 71-BDL-2853-1CA1S01-1"-NI A.I.D. DRAWING NUMBER SHT. NO. REVISION
6983 70-I-2007 DRAWING NO.
71-HEM-2166-1SD0S01-1"-NI BLV-367 BLV-364 70-P02-001 Blowdown off Gas (BG) 10 71-I-2125 1of1 0C
20301PE-DW02-7113
FILE NAME: 71-I-2125.PID

A B C D E F G H
A B C D E F G H J K
V-7211 V-7212A /B CSO BLOW DOWN GAS
72-P-2219-1CS1S01-2"-NI 72-BDG-2211-1CS1S01-2"-NI
CENTRIFUGE VESSEL CENTRIFUGE DIP POT 534 74-I-2408 GENERAL NOTES˖
Type : VERTICAL AGITATED VESSEL BLV-021 BLV-550
Type : VERTICAL VESSEL
DISTILLED HEXANE
Dimension : 800.0 mm(ID) x 1400.0 mm(H-T/T) Dimension : 250.0 mm(ID) x 2000.0 mm(H-T/T)
72-P-1535-1SA0S01-1"-NI
FROM P-7411 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
Design Press. : 10.0 barg / -1.0 barg Design Press. : 10.0 barg / -1.0 barg AND NOMENCLATURE.
Design Temp. : 200.00 C Design Temp. : 180.00 C 74-I-2405 1271
MOC Class : STAINLESS STEEL HH SET@ 0.25 BARG 70-P05-001 Hexane/heptane(C6/C7)
MOC Class : CARBON STEEL PI PCV 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Trim : 1SA0S01 2X3 H LOW PRESSURE
Trim : 1SA0S01 FO 110 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
Insulation : IH Insulation : IH SET@ 0.5 BARG 024 PURIFIED NITROGEN
024 L 72-NL-2020-1CS1S01-1/2"-NI
PSV 70-I-2004 850 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
1 TO NORMAL VENTING 72-BDG-2210-1CS1S01-4"-NI BLV-065 4"x3"
70-P01-002 LP purified N2(LPN) PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE 1
74-I-2408 1161 024 HIGH PRESSURE
72-P-1074-1SA0S01-1/2"-NI MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER

BLV-018
CSO PG S
PURIFIED NITROGEN
4"x2" 70-NH-2052-1CS1S01-1/2"-NI (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.
BLV-048

BLV-016

72-P-4601-1SA0S01-1/2"-NI
006

BLV-070
TO NORMAL VENTING 082 70-I-2004 6775

CSC

CSO
72-BDG-2327-1CS1S01-1"-NI 1/2"

GLV-009

GLV-008
4"
74-I-2408 6939 70-P01-001 HP Purified N2(HPN) 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
FIC ELBOW (MINMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
DISTILLED HEXANE
SET@ 0.25 BARG 72-P-1231-1CS1S01-4"-NI PG PIT 013 FROM P-7411 (MINMUM).
PCV FIT
BLOWDOWN GAS TO 72-P-1233-1CS1S01-2"-NI 026 024 74-I-2405 6986
CY-7221 021 NOTE-6 013 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
70-P05-001 Hexane/heptane(C6/C7) MOTHER LIQUOR TO
72-P-1235-1CS1S01-1"-IH 25
72-I-2202-A 4213 P V-7311 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
1"X1"

1"x1/2"
1"x1/2"
GTV-002

GTV-003
70-P14-001 Product powder 70-P10-001 Mother liquor(ML) SET@ 0.4 BARG SET@9 BARG C 3371 73-I-2301-A PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
FI

72-HEM-2288-1SD0S01-1"-NI
PCV DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.

72-HEM-2270-3SD0S01-1/2"-NI
LOW ORESSURE
PSV FV
014

BLV-091

BLV-071
70-P10-001 Mother liquor(ML)
PURIFIED NITROGEN 022 70-P01-002 LP purified N2(LPN)

72-NL-2223-1CS1S01-1/2"-NI
72-NL-2019-1CS1S01-1/2"-NI 013

72-P-1232-1SA0S01-2"-NI
P9 2" 1" 2" 2" 1" 2" P8 1/2" 002 MOTHER LIQUOR TO
1789 70-I-2004
LG 1/2" P1 P2 P3A P3B P5 P4 LG TK-7412
LOW ORESSURE 72-HEM-2292-1SD0S01-1"-NI FIT 2058 74-I-2401-A
001 002 PG
2"

BLV-072
PURIFIED NITROGEN
-0.1 2" 014 BLV-064 FO
72-NL-2097-1CS1S01-1/2"-NI
71-I-2124 4422
K1 K2 033 NOTE-4 NOTES:
BV 72-HEM-2277-3SD0S01-1/2"-NI

3SD0S01
1CS1S01 1SA0B02 1. CENTRIFUGE TO DRYER CONNECTION SHALL HAVE A VERTICAL ROUTING.

BLV-086

1SD0S01
1"x1/2"
72-BDG-2327-1CS1S01-1"-NI

011

BLV-088
K3 2" 100MM~200MM 100MM~250MM 2"

1/2"

BLV-366
XV MOTHER LIQUOR TO V-7231
SUB-MERGE SUB-MERGE 72-HEM-2266-1SD0S01-1"-NI BLV-011 BLV-013 BLV-012 2. DELETED.
K4
2 2

BLV-042
HS I 024 1-1/2"x1" 538 72-I-2203

1/2"

BLV-087
P6 P7 BLV-009

BLV-052

BLV-055 BLV-053
024 341 70-P10-001 Mother liquor(ML) 3. VALVE TO BE AS CLOSE TO TEE AS POSSIBLE.

1/2"
1/2"
BLV-066
FO 72-NL-2222-1CS1S01-2"-NI S
V-7212A 1/2" V-7212B 1/2" BLV-365
BLV-008 1SD0S01 72-HEM-2271-3SD0S01-1/2"-NI
BLV-068

GLV-003
NOTE-9 P-7213 XL

GLV-002

1/2"
1SA0B02 4. FOR NORMAL OPERATION, CONTROL VALVE SHOULD BE 100% OPENING. ONCE
CSO

S 023 081 1/2" EL 10.2M 1/2"


BLV-074

1SD0S01
4"

1/2" BLV-364 ZSO ZIO USING THE LINE TO V-7311, CONTROL VALVE SHOULD BE AUTOMATIC.
081 NOTE-11 004
1SA0B02 GLV-001

72-SP-009
1/2"
NOTE-6 72-HEM-1702-1SA0B02-1/2"-NI HH 010 010

BLV-095
HEXANE TO V-7342B GTV-004
72-SP-018

PIT S PI 5. FRESH HEXANE/HEPTANE WILL BE USED FOR FLUSHING THE CENTRIFUGE BOWL

1SA0S01
H

1SA0B02
72-SP-017

73-I-2302 5719 PRIOR TO SHUT DOWN.


72-P-1310-1SA0S01-1/2"-IH 25 72-HEM-1701-1SA0B02-1/2"-NI 031 088 031 ZSC ZIC
HS
4"x2"

70-P10-001 Mother liquor(ML) 72-SP-019


72-VA-4939-1CS1S01-1"-NI 010 010 6. 72-P-1232 CONNECT TO TOP OF 72-P-1231.
SIC S S 006 1/2"X1/2" (THE CONNECTION POINT IS LOWER THAN THE POSITION OF CE-7201)
TO SAFE SIC 902 088 084 SET@ 19 BARG
LOCATION
II M SIC FIC

72-HEM-2279-3SD0S01-1/2"-NI
001 PSV 7. THE EL. IS TO THE INLET OF PUMPS.
001 TS H SI 908 017
SUSPENSION FROM
005 8. PROVIDE BREAK FLANGES FOR INSTALLATION AND MAINTENANCE.

72-P-1232-1SA0S01-2"-NI
V-7141 201-T01 001

72-HEM-2269-1SD0S01-1"-NI
71-SUS-2199-1SA0B01-1"-NI 72-HEM-2283-1SD0S01-1/2"-NI
1711 71-I-2124 SE H
72-SP-023 PG 9. 10-15 MIN PER 3 DAYS (WILL BE CONFIRMED BY THE VENDOR).
CE-7201 300 S
70-P12-001 Reaction System L 035 72-HEM-1628-3SD0S01-1/2"-NI
EL 17.2M TS H 081 FIT 10. DELETED.
NOTE-5 202-T01 XL
017
BLV-035

BLV-033

BLV-077
SE H 025 11. DETAILS SHOW ON 70-I-2001-D.

BLV-078
301 L BLV-038 BLV-039
MOTHER LIQUOR TO R-7103
BLV-017 72-SP-021
72-SP-022

HH BLV-025 C 543 71-I-2123-A


3 INTERLOCK SIGNAL BLV-034 BLV-069
VT H II SI SIC BLV-026 S S 3

BLV-059

BLV-060
BLV-046 1/2"

1SA0B02 1SD0S01
I-460 FROM PK-7201 300

1/2"
1/2"
002 002 002 HS 70-P10-001 Mother liquor(ML) 082 081

BLV-371
6979 72-I-2202-A 72-BDG-2326-1CS1S01-1"-NI P-7244
CSO

S S 036
1SD0S01

NOTE-1

BLV-054
1CS1S01
72-SP-005

1SA0B01

NOTE-11
1CS1S01

046 084 PIT GLV-005

1/2"
1/2"

1SA0B02 3SD0S01
S 039

BLV-079
S S
081 S HH
095 002 PI H S
TO DRYER DR-7201 001
72-POW-1280-1SA0B01-6"-NI TI TIT
XL 72-HEM-1708-1SA0B02-1/2"-NI 039 095
72-I-2202-A 579 007 007
70-P14-001 Product Powder 72-HEM-2260-1SD0S01-2"-NI 028
TE 72-HEM-1707-1SA0B02-1/2"-NI

72-HEM-2274-3SD0S01-1/2"-NI
007 1/2"X1/2" PSV SIC FIC
BLV-019

CSO
SET@ 19 BARG

72-HEM-2268-1SD0S01-1"-NI
004 907 016
I HH 72-HEM-2284-1SD0S01-1/2"-NI
H LIC PG
A7211 L
MOTHER LIQUOR
FC 003 034
FROM P-7221 LL FIT
72-HEM-2280-1SD0S01-1/2"-IC 1/2" XL

BLV-080
016
1-1/2"x1/2"
594 72-I-2202-B M
BLV-041 022

BLV-082
70-P10-001 Mother liquor(ML)

GTV-001
MOTHER LIQUOR TO R-7102
BLV-031 BLV-032
4 XV 4
C 540 71-I-2122-A
012 2" P1 P4 1-1/2" BLV-028
2" K1

BLV-050

BLV-051
1SA0B02 1SD0S01
8" 1-1/2" P3 BLV-027

1/2"

1/2"
P2 HS

BLV-047

BLV-370
P-7243 031 72-HEM-2273-3SD0S01-1/2"-NI
S S
NOTE-11
039 084 PIT GLV-006 70-P10-001 Mother liquor(ML)

BLV-067
1/2"

1/2"
038
S S

1SA0B02 3SD0S01
HH

BLV-081
LIT 3" LIT
093 002 PI H S REFERENCE DRAWINGS
S 3" K2
001 K3 A-7211 003 038 093 DRAWING NO. TITLE
082 72-HEM-1706-1SA0B02-1/2"-NI
S S
084 082 72-HEM-1705-1SA0B02-1/2"-NI 1/2"X1/2"
SET@ 19 BARG SIC FIC

72-HEM-2276-3SD0S01-1/2"-NI
PSV 906 015
HH
LI H 003
72-HEM-2267-1SD0S01-1"-NI

001 L 72-HEM-2285-1SD0S01-1/2"-NI
LL Jan 07,
0C ISSUED FOR CONSTRUCTION LYM MQ YSS
PG 2021
031 Oct 28, ISSUED FOR CONSTRUCTION LYM YSS
FIT 72-HEM-2272-3SD0S01-1/2"-NI 0B MQ
H V-7211 2020
FIC SIC

BLV-083
015 Sep 03,
5 012 1"X1" 901 K6 3" 1-1/2"
K4 70-P10-001 Mother liquor(ML)
0A 2020
ISSUED FOR CONSTRUCTION LYM MQ YSS
P5 3"
BLV-085

SET@ 7 BARG K5 P6 BLV-022 BLV-030 1/2" MOTHER LIQUOR TO R-7101 Dec 09,
TE TIT 1" 1-1/2" 00 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
PSV C 539 71-I-2121-A 2019
72-HEM-2281-1SD0S01-1"-NI 010 010 BLV-040 Jul 01,
001
-073

BLV-062

BLV-049
EL 8.2M ISSUED FOR HAZOP TXQ WL YSS
BLV-014

1-1/2"x1" BLV-029 72-SP-010 B2


1-1/2"

BLV-369
2019
CSO

1/2"

1/2"
HS
1/2"

FIT 72-SP-012
BLV-044
BLV

72-SP-011
PG
72-HEM-2265-1SD0S01-1"-NI TI P-7242 026 REV DATE DESCRIPTION DRAWN CHECKED
012 HS NOTE-7 1SD0S01
029 010 NOTE-11

BLV-084
1SA0B02

BLV-063
XL 001 PIT GLV-004 ZSO ZSC ZSC ZSO
BLV-075

1/2"
1SA0S01 1SD0S01 72-HEM-2261-1SD0S01-1-1/2"-NI 1/2"
1"x1/2"

MOTHER LIQUOR TO 72-HEM-1704-1SA0B02-1/2"-NI 3SD0S01


030 008 008
001 M 016 016
BLV-089

CE-7201 1SA0B02 Engineering and Project Management


72-HEM-2264-1SD0S01-1/2"-NI BLV-037 BLV-036 BLV-020 72-HEM-1703-1SA0B02-1/2"-NI
5721 C BLV-024 HH ZSC ZSO Jubail, Kingdom of Saudi Arabia
71-I-2124 72-HEM-2263-1SD0S01-1"-NI 72-HEM-2262-1SD0S01-1-1/2"-NI PI H S
BLV-076

MIN. S S XL 014 014 ZIO ZIC ZIC ZIO


BLV-058

BLV-057
BLV-094

1SD0S01 NOTE-3 030 089


1/2"

1/2"

70-P10-001 Mother liquor(ML) SD NOTE-11 72-P-1451-1SA0S01-1/2"-NI 089 033 019


BLV-043

1SA0B02 016 016 008 008


P-7211
1/2"

36
1/2" 1SD0S01 SABIC Technology Center
S S ZIC ZIO
1SA0B02 Jubail, Kingdom of Saudi Arabia
PIT 72-HEM-1709-1SA0B02-1/2"-NI 014 014
002 084
GLV-007 028 PROJECT DESCRIPTION
HH
PI S 72-HEM-1710-1SA0B02-1/2"-NI MP-151000100
H
028 086 UPP PROJECT
S S S STC-J UTILITIES PARK & PILOT PLANTS
BLV-045

081 084 086 MOTHER LIQUOR TO


1"

6 DISTILLED HEXANE FROM P-7411


72-P-1444-1SA0S01-1/2"-NI 70-P10-001 Mother liquor(ML) V-7342A/B DRAWING TITLE
386 74-I-2405 72-HEM-2275-1SA0B02-1"-NI DRAWN DATE
3973 73-I-2304 LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
70-P05-001 Hexane/heptane(C6/C7)
P-7211 CE-7201 P-7244 P-7243 P-7242 P-7213 DECANTER CENTRIFUGE
A-7211 MOTHER LIQUOR PUMP
CHECKED DATE

MOTHER LIQUOR PUMP DECANTER CENTRIFUGE MOTHER LIQUOR PUMP MOTHER LIQUOR PUMP MQ 01/07/21
CENTRIFUGE VESSEL AGITATOR MOTHER LIQUOR PUMP
Type : DIAPHRAGM MEMBRANE TYPE : SOLID BOWL Type : DIAPHRAGM MEMBRANE Type : DIAPHRAGM MEMBRANE Type : DIAPHRAGM MEMBRANE APPROVED DATE
MOC : STAINLESS STEEL Type : DIAPHRAGM MEMBRANE 01/07/21
PLANT NAME AREA/UNIT SIZE
Capacity : 0.8000 m^3/hr CAPACITY : 75 KG/HR Capacity : 0.2500 m^3/hr Capacity : 0.1000 m^3/hr Capacity : 0.8000 m^3/hr YSS
Motor Power : 1.100 kW Capacity : 0.1000 m^3/hr STC-J A1
D/P : 3.000 bar D/P : 16.000 bar D/P : 16.000 bar D/P : 7.310 bar PROJECT NO. 72
DESIGN P : 0.5 BARG D/P : 16.000 bar
Motor Power : 0.860 kW Motor Power : 0.860 kW Motor Power : 0.750 kW Motor Power : 1.500 kW 17093
DESIGN T : 120° C Motor Power : 0.750 kW A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
INSULATION : IH 10 72-I-2201 1of1 0C
20302PE-DW02-7201
FILE NAME: 72-I-2201.PID

A B C D E F G H
A B C D E F G H J K

PIA I GENERAL NOTES˖


BW-7201 BW-7202 BW-7203 CY-7221 DR-7201 E-7224 B-7221 P-7201 401 L 464
BUCKET WHEEL BUCKET WHEEL BUCKET WHEEL CYCLONE DRYER WATER HEATER DRAFT FAN WATER CIRCULATING PUMP 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
LL PG AND NOMENCLATURE.
401
PIT 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
°C
°C °C °C °C 401 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.

N2 3" 72-P-1244-1SD0S01-3"-IH 25
HEXANE VAPOR 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1 72-P-1243-1SD0S01-3"-IH 25 N1 3" 2066 72-I-2202-B 1
GTV-607 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
TO C-7221 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
GTV-606 N3 1/4" DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.

72-P-1235-1CS1S01-1"-IH 25

" 4/
N2 3" B-7221

1x"
LOW PRESSURE PURIFIED

2/
1
NITROGEN FROM NL-2021
72-P-1242-1SD0S01-3"-IH 25 72-NL-2024-1SD0S01-1/2"-NI 72-I-2202-B 6192
N1 3"
POWDER
72-POW-1280-1SA0B01-6"-NI
579 72-I-2201 I SI HC
VERTICAL LINE VFD
FROM CE-7201 70-P14-001 Product Powder CY-7221 I I 452 465 465

PSET=0.60 barg
450 451 NOTES:
XL XL
PCV HS HS
70-P01-002 LP purified N2(LPN) 468 467 1. VALVE GROUP POSITION SHALL NOT BE TRAP LIQUID.
LOW PRESSURE 404 460 461
PURIFIED NITROGEN BLV-601 1SD0S01 50SD0L01 RUNNING FAULT
72-NL-2001-1CS1S01-1"-NI 2. ELEVATION 20M.
72-NL-2001-1SD0S01-1"-NI HS HS XL XL START STOP
5820 70-I-2004
1"x1/4" BLV-602 453 454 462 463
1SD0S01 3. ADEQUATE SPACE SHOULD BE RESERVED FOR MAINTENANCE OF DR-7201'S SHAFT.
HEXANE VAPOR FROM 1CS1S01 1SD0S01 START STOP FAULT RUNNING
50SD0L01

1"x1/4"
E-7221 HS I I I 72-P-1235-1CS1S01-1"-IH 25
N3 6" 4. PENDING FOR DRYER VENDOR DATA. REFER TO VENDOR'S P&ID 3950-00000-04036-0101.

PSET=0.60 barg
72-P-1240-1SD0S01-3"-IH 25 BLOWDOWN GAS
2 5818 72-I-2202-B N1 6" XL XL 464 464 450 451
FROM CE-7201 AS HAZOP COMMENTS OF PACKAGE HASN'T BEEN CLOSED, THIS PART OF P&ID IS HOLD. 2
451 452 STOP
I I I I 72-I-2201 4213
1"x1/4" FAULT RUNNING
455 453 452 451 HS N2 1/4"

START

72-NL-2003-50SD0L01-1/4"-NI
1SD0S01 70-P14-001 Product powder S I
50SD0L01 I 405 XL XL I
113 450
450 BW-7203 N3 6" 456 457 452
XL XL HS 72-WM-2003-1CS1S02-1"-IC 15

STOP
INTERLOCK SIGNAL
407 408 404 PCV FAULT RUNNING
I-460 TO CE-7201 CHILLED WATER
I 402 RETURN
72-I-2201 6979 RUNNING FAULT DETAIL-A
460 5819 70-I-2005
XL XL GTV-608 the connection of N6a,b is the same with DETAIL-A
401 402 SI

72-POW-1286-1SA0B01-6"-IH 40
I 401 70-P01-009 Chilled water supply/return (CW)

72-WM-2004-1CS1S02-1"-NI
72-NL-2004-50SD0L01-1/4"-NI

PSV FAULT RUNNING


452

BLV-604

VERTICAL LINE
404 STOP I
1D2 I 70-P14-001 Product Powder
HS ST 457 72-DI-1771-1SA0B01-1-1/2"-IH-40
PSET=4.00 barg 450
XL XL 416 401 HH
72-DI-1781-1SA0S01-1"-NI 417 418 I PIA H I TIA H
SE HH L

72-POW-1287-1SA0B01-6"-IS 25
RUNNING FAULT 451
TIA
402 L 457 410 DETAIL-B
TO SAFE LOCATION 401 H
401 L 72-P-1248-1SD0S01-1-1/2"-IH 25 the connection of N14e~h, N15a~d and
JI
FIC N15e~h are the same with DETAIL-A
1-1/2"x1"

3 419
XL XL 403 PIT
3

BLV-601
413 414 TIT TE 402 TE TIT
I FAULT RUNNING
BW-7201 401 401 410 410
VFD
458 HS HS VFD SI

4"x3"
N9 8"

GTV-609
411 412 406 N3 3" HH(SG) GAS PURGE FOR START-UP AT HIGHEST POINT OF THE PIPE
N8A 1-1/2" N16 6"
SI M N1 6" N8B 1-1/2" N4 6" N7 2"
START STOP HC 1"x3/4" 72-DI-1774-1SA0S01-1"-IH 25
415 410 N11 1/2"
72-DI-1773-1SA0S01-1"-IH 40

HH
TICA H N15A~D N15E~H 1/2" 72-DI-1777-1SA0S01-3/4"-IH 25 72-WL-2001-1SA0B01-1"-NI
403 L 1"x3/4" 1/2" N10 1/2"
TIT TE DETAIL-C DETAIL-C
I
403 403
462 72-DI-1777-1SA0B01-3/4"-IH-40
N6A~B
I I
GTV-604

1-1/2"
HH N14A~D DR-7201 N14E~H 1/2" 450 451
TI DETAIL-A 1/2"
XL XL
422 423 426 N18C 1"
DETAIL-B
72-DI-1771-1SA0S01-1-1/2"-IH 25
FAULT RUNNING
GTV-605

SE N17 1" N18A 1"


N19A HS HS
4 HS HS TE TIT 400 N19B 1-1/2"
N17B 1" N18B 1" 1-1/2" N13 N17C 1"
4
443 444
420 421 426 426 2"
ST TIT TE TE TIT START STOP
FG FG FG FG FG FG
STOP START 400 402 402 409 409 I
N2 1" E-7224 405 A 405 B 405 C 405 D 405 E 405 F N2 6"

2"x3/4"
452
BW-7202
BLV-642

BLV-643

BLV-644

BLV-645
BLV-640

BLV-641

XL XL CONTROL HH HH N1 6"
427 428 PANEL TIA H I I TIA H
402 L 458 458 409 L REFERENCE DRAWINGS
SIA XL XL
FAULT RUNNING N3 1" N1 1" L
400 446 447 DRAWING NO. TITLE
N2 1/4" G
PSET=0.60 barg N3 6" FAULT RUNNING
I HS
72-DI-1002-1SA0S01-1-1/2"-IH 25

72-DI-1772-1SA0S01-3/4"-IH 25
453 424

VERTICAL LINE
XL XL
GTV-603

I STOP 441 442


BLV-603
455 MIN. FAULT RUNNING
PCV

72-SP-024
I GTV-611 HS XY XV
403 Jan 07,
458 0C ISSUED FOR CONSTRUCTION LYM MQ YSS
061 A 061 A 061 2021
Oct 28, ISSUED FOR CONSTRUCTION YSS
I 0B LYM MQ
2020
450 PG FT PG Sep 03,
5 403
HS XY 662-
D 101 0A 2020
ISSUED FOR CONSTRUCTION LYM MQ YSS
N2 1-1/2" 061 B 061 B
" 3x"

I T
VL B
Dec 09,

BLV-267
2"x1-1/2" 00 ISSUED FOR CONSTRUCTION TXQ MQ YSS
6

451 N1 2" 72-DI-1776-1SA0S01-1-1/2"-IH 25 ZIT ZST 2019


862-

Jul 01,
GTV-602 061 061 B2 ISSUED FOR HAZOP TXQ WL YSS
2019
VL B
GTV-610

GTV-613

I PSET=3.50 barg PCV REV DATE DESCRIPTION DRAWN CHECKED


ZID ZSD
455
L=635MM

P-7201 401 061 061


72-DI-1778-1SA0S01-1-1/2"-IH 25 SD
XL HS Engineering and Project Management
FAULT START
FAULT RUNNING

432 430 10
XL 72-POW-1281-1SA0B01-6"-IH 40 72-POW-1281-1SA0B01-6"-IS 15 POWDER TO SE-7201 Jubail, Kingdom of Saudi Arabia

XL 437 HS 2067 72-I-2210


RUNNING STOP
433 XL 431
70-P14-001 Product Powder SABIC Technology Center
436 Jubail, Kingdom of Saudi Arabia
HS PROJECT DESCRIPTION

PSET=3.00 barg 434 STOP MP-151000100


PCV I I UPP PROJECT
DEMINERALIZED 406 451 450
WATER
STC-J UTILITIES PARK & PILOT PLANTS
70-DI-1782-1SA0S01-1/2"-NI
6 682 70-I-2005 PK-7201 DRAWING TITLE
DRAWN DATE
GTV-601
GTV-627

GTV-030
CHILLED WATER 70-P01-008 Deionized water (DW) DRYING PACKAGE LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
SUPPLY 72-WL-2002-1CS1S02-1"-NI CHECKED DATE POWDER DRYING
70-WL-2001-1CS1S02-1"-IC 15 MQ 01/07/21
5821 70-I-2005
BLV-605 APPROVED DATE
GTV-612

70-P01-009 Chilled water supply/return (CW) PLANT NAME AREA/UNIT SIZE


YSS 01/07/21
1/2"

PROJECT NO. STC-J 72 A1


17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20302PE-DW02-7202 10 72-I-2202-A 1of1 0C
FILE NAME: 72-I-2202-A.PID

A B C D E F G H
A B C D E F G H J K

PICA H PY GENERAL NOTES˖


C-7221 E-7221 E-7223 B-7222 P-7221 400 L 400
SCRUBBER N2 HEATER SOLVENT COOLER RECIRCULATING FAN SCRUBBER PUMP HH 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AIA H I
PG TO SAFE LOCATION AND NOMENCLATURE.
400 453
400 AIT O2
P 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
PIT 400 PV 72-P-1237-1SA0S01-2"-IS 15 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.

BLV-647

BLV-631
400 B

BLV-646
400
3"N2 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
2"x1" BLV-627
HEXANE VAPOR TO E-7342
GTV-622 BLV-626 2"x1"
1 3"
N1
1760 73-I-2305
4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
1
72-P-1245-1SD0S01-3"-IS 15 72-P-1246-1SD0S01-3"-IS 15 3"x2" FO

BLV-628
GTV-623
70-P05-001 Hexane/heptane(C6/C7) PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
1"
GTV-621 N3 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
B-7222 1/4"
72-NL-2025-1SD0S01-1/2"-NI GLV-606

1/2"x1/4"
3K4
PSV
TO NORMAL VENTING
SET @ 0.6 barg
403
NOTES:
72-BDG-2212-1CA1S01-4"-NI SI SIC I
74-I-2408 5892 1. VALVE GROUP POSITION SHALL NOT BE TRAP LIQUID.
VFD
486 483 457
6"x3" 2. ELEVATION 20M.
I
FIC

72-P-1245-1SD0S01-6"-IS 15
451
403 3. DELETED.
I XL XL TICA H
HS I
452 488 487 400 L 4. DELETED.
TE 485 450
RUNNING FAULT
405 STOP 5. PK-7201 CONFIRMED BY VENDOR. REFER TO VENDOR'S P&ID 3950-00000-04036-0102.
TE FIT
AS HAZOP COMMENTS OF PACKAGE HASN'T BEEN CLOSED, THIS PART OF P&ID IS HOLD.
TIT TICA TIT TE 496 403
H XL XL HS HS
405 405 I 400 400 6. THE VENTING SHOULD BE SET AT THE HIGHEST POINT.
483 482 480 481
461
2 FAULT RUNNING STOP START
CARRIER GAS 7. FILTER IS ONLY USED IN COMMISSIONING AND START-UP CONDITION. 2
72-P-1240-1SD0S01-3"-IH 25
HH 5818 72-I-2202-A
N3 6" TI
XL XL 3" TO DR-7201

BLV-624
494 495 496 LOW PRESSURE
PG P PURIFIED NITROGEN
FAULT RUNNING 72-NL-2024-1SD0S01-1/2"-NI
404 FIC 6192 72-I-2202-A
FV BLV-623
HS HS TIT TE

72-NL-2023-1SD0S01-1/2"-NI
402
402
490 491 496 496
N2 1-1/2"x1" 1-1/2"x1"
1-1/2" 72-HEM-2258-1SD0S01-1-1/2"-IC 25 N2 3"
STOP START
BLV-610 1" FO BLV-609

BLV-608

1-1/2"x1"
N10 10"
XL XL CONTROL
MW
FIT 496 497 PANEL

1"
GLV-601 402
FAULT RUNNING 3" N1 1"

1-1/2"x1"
N3
1D2

72-NL-1792-1SD0S01-1"-NI
E-7221 FIQ set @ 0.6 barg
I HS
TO SAFE LOCATION

BLV-632
400
453 493 P 72-NL-2127-1SD0S01-2"-NI
FIT
STOP set @ 0.4barg 70-NL-2021-1CS1S01-1/2"-NI
I PV PCV

BLV-622
3 N13 10"
457
400
400 A PSV 400
3
MW 1" LOW PRESSURE
1"x1/2" 400 PURIFIED NITROGEN
I I BLV-621 1/2" BLV-625
450 451 70-I-2004 5822
BLV-620 FC 1" 1"x1/2" 1SD0S01
TIA 1CS1S01
H 70-P01-002 LP purified N2(LPN)
404
HEXANE VAPOR FROM 72-NL-2021-1SD0S01-1/2"-NI
P GLV-605
B-7221
72-P-1244-1SD0S01-3"-IH 25
2066 72-I-2202-A C-7221 HIGH PRESSURE
N1
72-NH-5003-1CS1S01-1/2"-NI PURIFIED NITROGEN
3" TE TIT 72-NH-1005-3CS1S01-1/2"-IC 15 72-NH-1005-1CS1S01-1/2"-NI
FV 70-I-2004 3797
404 404
401 BLV-630 BLV-629
3/4D1 70-P01-001 HP Purified N2(HPN)
3CS1S01 1CS1S01
set @ 15.43 barg
1" 1-1/2"x1"
72-HEM-2259-1SD0S01-1"-IC 15 BLV-611 BLV-612 TI TO WARM FLARE
FO N5 PSV V-7481
1" FO
BLV-613 PG 407 72-BDL-5336-1CA1S01-1"-NI
74-P-1445-1SA0S01-1"-NI 400 401
74-P-1445-1SA0S01-1"-IC 25 405 P 5950 70-I-2007
DISTILLED HEXANE

GTV-624
P-7411 BLV-607 TIT TE TV 70-P02-001 Blowdown off Gas (BG)
1"

2"x3/4"
GTV-613 1" GLV-602
389 74-I-2405 N6 N9 407 407 405
72-P-2471-3CA1S01-2"-IC 25 BLV-617 72-P-2471-3CA1S01-2"-IC 25 COLD HEXANE
N8A N7A LIC
70-P05-001 Hexane/heptane(C6/C7) 1475 74-I-2406-A
2" 2" 400

BLV-619
4 FO BLV-618
TO P-7461 4

GTV-020
1SD0S01 3SD0S01 3SD0S01 1SD0S01
LIA H LIT 1" LIT N3 2"
GLV-604
401 L 401 N11 400 2"x1-1/2" 2"x1-1/2" TI
LL 70-P06-001 Cold Hexane (C6)
406
N1 2"
2" N2
2" 2" N4
E-7223 TIT TE
I
N8B N7B 2" REFERENCE DRAWINGS
406 406
459
N12 2" 72-P-1459-3CA1S01-2"-IC 25 COLD HEXANE DRAWING NO. TITLE
1" N4 72-P-1459-3CA1S01-2"-IC 15
74-I-2406-A 672
72-HEM-2257-1SD0S01-1-1/2"-IC 25

GTV-620
GTV-614

FIC FROM P-7461


GTV-625
GTV-619

LOW PRESSURE 72-NL-2007-50SD0L01-3/8"-IC 25


401
PURIFIED NITROGEN
70-NL-2007-50SD0L01-3/8"-NI 72-BDL-1191-3CA1S01-1"-IC
851 70-I-2004 BLOWDOWN LIQUID
LC LC 72-BDL-1190-1CA1S01-1"-NI
BLV-606 7012 70-I-2007
FIQ BLV-682 BLV-683
70-P01-002 LP purified N2(LPN) 50SD0L01 1SD0S01 70-P02-001 Blowdown off Gas (BG)
Jan 07,
ISSUED FOR CONSTRUCTION LYM MQ YSS
036
0C
72-HEM-2256-1SD0S01-2"-IC 25

3CA1S01 1CA1S01 2021


1-1/2"x1/2" Oct 28, ISSUED FOR CONSTRUCTION LYM YSS
0B MQ
2020
MOTHER LIQUOR TO Sep 03,
5 TK-7412 0A 2020
ISSUED FOR CONSTRUCTION LYM MQ YSS
FIT 72-HEM-2282-1SD0S01-1/2"-IC
P 2035 74-I-2401-A Dec 09,
00 ISSUED FOR CONSTRUCTION TXQ MQ YSS
036 2019
FE FIT Jul 01,
LV 70-P10-001 Mother liquor(ML) B2 ISSUED FOR HAZOP TXQ WL YSS
401 401 2019
400 INS. TYPE
TI TIT 72-HEM-2278-1SD0S01-1/2"-IC 15 HOLD 72-HEM-2280-1SD0S01-1/2"-IC 15 MOTHER LIQUOR REV DATE DESCRIPTION DRAWN CHECKED
BLV-614 BLV-615
408 408 C 594 72-I-2201
FC 72-HEM-2280-1SD0S01-1/2"-IC
BLV-616

1/2"
GTV-618

TO V-7211
TE Engineering and Project Management
408 GTV-617 SD Jubail, Kingdom of Saudi Arabia
7 GLV-603

PG
1-1/2"x1-1/2"

PI SABIC Technology Center


403 402
Jubail, Kingdom of Saudi Arabia
2" XL XL
N2 PROJECT DESCRIPTION
NOTE-7 1-1/2" 472 473
PIT
N1 70-P14-001 Product Powder MP-151000100
FAULT RUNNING
UPP PROJECT
GTV-616

403 GTV-615
P-7221 HS HS
SET @3.2 BARG STC-J UTILITIES PARK & PILOT PLANTS
1CS1S01
1SA0S01

470 471
6 PCV DRAWING TITLE
LOW PRESSURE STOP START
PURIFIED N2 405 DRAWN DATE
72-NL-2085-1CS1S01-1/2"-NI FIT XL XL I LYM 01/07/21 PIPING AND INSTRUMENTATION DIAGRAM
6980 70-I-2004
406 476 475 453 CHECKED DATE POWDER DRYING
BLV-632 BLV-633
BLV-634

MQ 01/07/21
70-P01-002 LP purified N2(LPN) RUNNING PK-7201 APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/21
FI HS I I I DRYING PACKAGE PROJECT NO. STC-J 72 A1
406 474 459 450 451
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
STOP DRAWING NO.
20302PE-DW02-7203 10 72-I-2202-B 1of1 0C
FILE NAME: 72-I-2202-B.PID

A B C D E F G H
A B C D E F G H J K
LOW PRESSURE PURIFIED
NITROGEN GENERAL NOTES˖
V-7231 70-NL-2018-1CS1S01-1/2"-NI
70-I-2004 848 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
COCATALYST MIXING VESSEL
AND NOMENCLATURE.

BLV-149
Type : VERTICAL AGITATED VESSEL A-7231 70-P01-002 LP purified N2(LPN)
Dimension : 750.0 mm(ID) x 1070.0 mm(H-T/T) 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Design Press. : 10.0 barg / -1.0 barg COCATALYST MIXING VESSEL AGITATOR PV
72-P-1239-1SA0S01-1/2"-NI HEXANE VAPOR TO E-7342 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
Design Temp. : 200.00 C MOC : STAINLESS STEEL
HH 048 A

FC 1/2"
MOC Class : STAINLESS STEEL Motor Power : 1.100 kW I PI 299 73-I-2305
H 1D1 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL
Trim : 1SA0S01 104 057 L PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE

BLV-147
SET@ 10 BARG 70-P05-001 Hexane/heptane(C6/C7)
P PV

GLV-018
1/2"
Insulation : NI LL MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
1 1CS1S01 048 B PSV 1

BLV-148
(MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.
HH
1SA0S01 047

GLV-017
PIC H

1/2"
1/2"
FO
P 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
DISTILLED HEXANE/HEPTANE 1SA0S01 3SA0B02 048
BLOWDOWN GAS ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
FROM P-7411A/B

BLV-146
72-P-1446-1SA0S01-1/2"-NI NOTE-2B 72-BDG-2214-1CS1S01-2"-NI (MINIMUM).
390 74-I-2405 S PIT PG PG PIT 1239 70-I-2007

BLV-132
2"x1"

1-1/2"x1"
70-P05-001 Hexane/heptane(C6/C7) BLV-020 103 057 056 049 048 70-P02-001 Blowdown off Gas (BG) 5. "NO POCKET" ON ALL TEAL AND TIBA LINES.

3SD0S01 3SA0B02 6. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
MOTHER LIQUOR FROM P-7213 NOTE-2B
72-HEM-2271-3SD0S01-1/2"-NI BLV-140 72-P-1238-1SA0S01-1-1/2"-IS15
538 72-I-2201 7. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
ACTIVATED
HEXANE/HEPTANE PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
70-P10-001 Mother liquor(ML) S S 72-HEM-2166-1SD0S01-1"-NI DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
103 235 71-I-2125 168
TO SD8
70-NL-4107-1CS1S01-1/2"-NI
3SD0S01
1CS1S01 XY
7025 70-I-2002
NOTES:
020 S S TO SD4 1. P-7233 WILL BE PART OF ANALYZER SAMPLING PREPRATION
LOW PRESSURE 70-NL-4100-1CS1S01-1/2"-NI FROM SPU
PURIFIED NITROGEN 103 235 7018 70-I-2002 UNIT ON 71-I-2125.
LOW PRESSURE
72-NL-2066-1CS1S01-1/2"-NI
6904 70-I-2004 NOTE-2A PURIFIED NITROGEN 2. CHECK VALVE 2A TO BE A DIFFERENT TYPE FROM CHECK VALVES 2B.
XV BLV-168 BLV-169 72-NL-1303-1CS1S01-1/2"-NI
XY
BLV-373

70-P01-002 LP purified N2(LPN) XL 70-I-2004 4200


020
1/2"

019 ZIC ZIO 1SD0S01 1CS1S01 3. DETAILS SHOW ON THE 70-I-2001-D.

72-NL-1308-1CS1S01-1/2"-NI

72-NL-1305-1CS1S01-1/2"-NI
72-NL-1307-1CS1S01-1/2"-NI

72-NL-1304-1CS1S01-1/2"-NI
TIBA FROM P-7421A 031 70-P01-002 LP purified N2(LPN)
2 74-TIB-1075-50SD0L01-1/2"-NI
019 019 2
1775 74-I-2403-B 72-NL-1306-1CS1S01-1/2"-NI
BLV-139 FC

72-HEM-1268-3SD0S01-1/2"-NI
70-P09-001 Co-catalyest (Tiba)
50SD0L01 3SA0B02 XV ZSC ZSO

BLV-144
TEAL FROM P-7421B 74-TEA-1076-50SD0L01-1/2"-NI 019 ZIO ZIC
019 019
PSV 018 018

BLV-167
1774 74-I-2403-B ZSO ZSC
BLV-138 72-HEM-2291-3SA0B02-1"-NI 007
I S 1CS1S01 FIT FIC 018 018
70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT)
FC 2"x1" A7231 001 72-HEM-1625-1SD0S01-1/2"-NI 3SD0S01 L
BLV-130
M

BLV-131
022 022

BLV-001

BLV-175
1/2"X1/2" 72-HEM-1302-50SD0L01-1/4"-NI
8" P1 K1 P3 SET@ 19 BARG
1/2" ACTIVATED HEXANE/HEPTANE
2" P2 BLV-133 BLV-134
2" 1-1/2"
BLV-153 1"x1/2" 296 71-I-2121-A
P4 1-1/2" 72-HEM-1262-1SD0S01-1"-NI BLV-152 1/2" 1/2"

72-SP-013
BLV-171

BLV-172
I TO R-7101

1/2"

1/2"
BLV-191 BLV-192
1SD0S01
104 P-7231 1/2"

3SD0S01
I S
GLV-019

BLV-173
HS PG PIT

1/2"
104 002
052 050

BLV-189
HH 3" 011 50SD0L01

3SA0B02
LIT
LI H LIT 3" S 3SD0S01

BLV-190
K3 014
1"

3SA0B02
002 L 002 K2 105 XL HH
PI H S
LL V-7231 72-HEM-1266-3SD0S01-1/2"-NI
007 050 105
3 72-HEM-1309-3SA0B02-1/2"-NI
SIC 3
S
903
103 72-HEM-1306-3SA0B02-1/2"-NI
FIC L
BLV-177 BLV-178
72-NL-1304-1CS1S01-1/2"-NI 023 ZIO ZIC
017 017

BLV-170 BLV-176
HH 1SD0S01 1CS1S01 PSV 72-HEM-1270-3SD0S01-1/2"-NI
LI 1CS1S01
H 008
014 3SD0S01 FIT ZSO ZSC
A-7231 L 72-HEM-1626-1SD0S01-1/2"-NI
017 72-HEM-1301-50SD0L01-1/4"-NI

1-1/2"x1"
LL 023 017
1/2"X1/2"
SET@ 19 BARG ACTIVATED HEXANE/HEPTANE
P6 K5 72-HEM-1263-1SD0S01-1"-NI BLV-126 BLV-129 BLV-128
1" K6 294 71-I-2122-A
3" 1-1/2" 3" BLV-127
1/2" 1/2" 72-SP-014 TO R-7102

BLV-150

BLV-151
K4 1-1/2"

1/2"
BLV-198

1/2"
P5 P7
P8 1"x1/2" P-7232 1/2"
BLV-421

1/2"

72-HEM-1310-3SA0B02-1/2"-NI

3SA0B02 1SD0S01
1/2"

1-1/2"x1"

3SD0S01
50SD0L01
BLV-157

PG PIT S
CSO

BLV-158
EL 11.35M I S HS GLV-015

BLV-197

1/2"
053 051 107 3SD0S01
TIT TE 104 107 016

BLV-193
028 028 HH
XL PI

3SA0B02
BLV-194
S H 72-HEM-1267-3SD0S01-1/2"-NI
002 011 051
BLV-458 TI SIC ZIC ZIO
4 72-HEM-1132-1SD0S01-1/2"-NI 028 904 005 005 4
72-HEM-1307-3SA0B02-1/2"-NI FIC
72-HEM-1133-1SD0S01-1/2"-NI
BLV-161 BLV-162 024

72-HEM-1264-1SD0S01-1"-NI
72-HEM-1260-1SD0S01-1-1/2"-NI 72-NL-1305-1CS1S01-1/2"-NI L ZSC ZSO
005 005

BLV-179 BLV-160
1SD0S01 1CS1S01 PSV
1CS1S01
009 FIT
BLV-187

1-1/2"x1"

72-HEM-1627-1SD0S01-1/2"-NI 3SD0S01 72-HEM-1300-50SD0L01-1/4"-NI


ACTIVATED HEXANE/HEPTANE 024
TO V-7342A 1/2"X1/2" ACTIVATED REFERENCE DRAWINGS
72-HEM-1261-3SA0B02-1"-NI BLV-141
73-I-2304 291 SET@ 19 BARG 72-HEM-1271-3SD0S01-1/2"-NI BLV-137 BLV-135 1/2"
HEXANE/HEPTANE
DRAWING NO. TITLE
BLV-159
3SA0B02
1SD0S01

70-P10-001 Mother liquor(ML) BLV-136 1"x1/2" 1771 71-I-2123-A


NOTE-3 BLV-125

BLV-156
72-SP-016

BLV-155
1/2"
1/2"
BLV-199 BLV-200
P-7234 TO R-7103
I
72-HEM-1311-3SA0B02-1/2"-NI

3SD0S01 50SD0L01
3SA0B02 1SD0S01

3SA0B02 3SD0S01
104 PG PIT
S HS HH GLV-016

BLV-154
055 058 S PI 1/2" 72-HEM-3547-3SD0S01-1/2"-NI

1/2"
021 H
BLV-196 BLV-195

002 058
111
Jan 07,
S 0C ISSUED FOR CONSTRUCTION LYM MQ YSS
2021
111 SIC Oct 28,
XL 0B ISSUED FOR CONSTRUCTION LYM MQ YSS
2020
015 905 Sep 03,
5 0A 2020
ISSUED FOR CONSTRUCTION LTM MQ YSS
72-HEM-1308-3SA0B02-1/2"-NI PG Dec 09,
00 2019 ISSUED FOR CONSTRUCTION TXQ ZJ YSS
054
SD Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
8 2019
REV DATE DESCRIPTION DRAWN CHECKED
ACTIVATED HEXANE/HEPTANE
72-HEM-1269-1SD0S01-1"-NI
1638 71-I-2125
BLV-142
70-P07-001 Co-catalyst(Teal/Activated hexane)(Co-CAT) TO SAMPLING Engineering and Project Management
BLV-188

PREPARATION UNIT Jubail, Kingdom of Saudi Arabia

SABIC Technology Center


Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION

MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
P-7231 P-7232 P-7234 LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
ACTIVED HEXANE/HEPTANE PUMP ACTIVED HEXANE/HEPTANE PUMP CHECKED DATE COCATALYST MIXING
ACTIVED HEXANE/HEPTANE PUMP MQ 01/07/20
Type : DIAPHRAGM MEMBRANE Type : DIAPHRAGM MEMBRANE
Type : DIAPHRAGM MEMBRANE
Capacity : 0.0020 m^3/hr Capacity : 0.0020 m^3/hr APPROVED DATE
Capacity : 0.0020 m^3/hr YSS 01/07/20
PLANT NAME AREA/UNIT SIZE
D/P : 16.000 bar D/P : 16.000 bar
D/P : 16.000 bar STC-J A1
Motor Power : 0.750 kW Motor Power : 0.750 kW PROJECT NO. 72
Motor Power : 0.750 kW
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20302PE-DW02-7204 10 72-I-2203 1of1 0C
FILE NAME: 72-I-2203.PID

A B C D E F G H
A B C D E F G H J K
E-7201 V-7202
V-7204 NITROGEN HEATER GENERAL NOTES˖
F-7202 BW-7205 Type : ELECTRIC HEATER POWDER TREATMENT VESSEL (PTV)
OFFGAS TREATMENT VESSEL
TRANSPORT NITROGEN FILTER ROTARY FEEDER PK-7202 Type : VERTICAL VESSEL Heat Duty : 1.400 kW Type : VERTICAL VESSEL
FILTER AREA: 2.26 M2 CAP.: 100(MAX.˅ KG/H Dimension : 900.0 mm(ID) x 3700.0 mm(H-T/T) 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
DESICH. PRESS: -0.2~0.6 (CLEAN)/-0.2~0.98 (DIRTY) BAR.G DESICH. PRESS: 1.50 BAR.G POWDER TRANSPORT PACKAGE UNIT 1 Dimension : 300.0 mm(ID) x 1000.0 mm(H-T/T) Surface Area :
Design Press. : 5.0 barg / -1.0 barg AND NOMENCLATURE.
Design Press. : 10.0 barg / -1.0 barg Shell Design Press. : 10.0 barg / -1.0 barg
DESING TEMP: 120° C DESING TEMP: 190° C DESIGN CAPACITY : 100 KG/H Tube Design Press. : 200.0 barg / Design Temp. : 190.00 C /-5 ć
MOC CLASS: AL/SS Design Temp. : 130.00 C MOC Class : UNSS 31803
MOC CLASS: SS Shell Design Temp. : 235.00 C 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
POWER˖ 0.25KW 70-P14-001 Product Powder MOC Class : NICKEL ALLOY Trim : 1SD0S01 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
Trim : 1SN0B01 Tube Design Temp. : 235.00 C
MOC : CARBON STEEL Insulation : IH HOLD
Insulation : NI 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
Insulation : IH
1 1
F-7221 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
FILTER DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
REMOTE RUNNING FILTER AREA :0.42 M2
PSV
XL XL DESICH. PRESS :5/FV BAR.G NOTES:
LP START DESING TEMP :190° C
210 1. ELBOWS SHOULD HAVE A RADIUS OF R=6~10D ELBOWS.
268 267 REMOTE MOC CLASS :UNSS 31803
PSET=0.60 BARG F7202 STOP
TO NORMAL VENTING INSULATION :IH 2. SHALL FOLLOW SMOTHNESS REQUIREMENT OF RA=0.8 METER FOR EQUIPMENT
72-NL-1077-1CS1S01-2"-NI PSE AND PIPES RELATED TO V-7202.
72-I-2213 6928 PG
210 I KJC HS
212 3. WHEN V-7202 STOPS, THE STOP SIGNAL SHALL BE SENT TO THE
1CS1S01 1SA0B02 401 A 204 278
PSET=0.6 BARG FO SYSTEM PK-7202 AND LINE A OF PK-7203 FROM S-117, SYSTEM PK-7202
216 STOPPED WITH BLOW TIME VIA THE STOP
XY
3" F-7202 LOW PRESSURE PURIFIED SEQUENCE.
NITROGEN 72-NL-1019-1SA0B02-3"-IH N2 204 NITROGEN
N3,1" 72-NL-1067-1SA0B02-1"-NI
72-I-2210 681 72-NL-2125-1CS1S01-1"-NI
70-I-2004 857 S I
TO F-7204 BLV-767 BLV-766 BLV-765 117 401 A
ET SP-709
N8 I HS
3" 401 A 205 1SA0B02 1CS1S01
N9 PSET=1.00 barg 70-P01-002 LP purified N2(LPN)
3" FO
PDIA H NOTE-12 XY PCV 4. IF NITROGEN PRESSURE LOW LOW SIGNAL 70-PALL-007 IS RECEIVED FROM I-201,
2 203 205 214
205 LOW PRESSURE ALL THE RUNNING CONVEYOR LINE OF POWDER TRANSPORTATION PACKAGE SHALL 2
1" PURIFIED NITROGEN BE SHUTDOWN IMMEDIATELY.
BLV-768 72-NL-2027-1CS1S01-1/2"-NI I I
1-1/2" N6 70-I-2004 859 404 B 405 B
HDPE POWDER TIT H TIA
72-POW-1001-1SA0D01-1-1/2"-IH N1 )T SP-710
NOTE-1,11,15 E( 215 215 1CS1S01 S S
279 72-I-2210 1SA0B02 S I I I I I
NOTE-8 117 003 72-SP-002 005 402 B 403 D 403 E 403 F 401 B
FROM BW-7204
HH )
H ( ET 70-NL-1050-1SA0B02-1/2"-NI 72-VA-1643-1CS1S01-2"-NI
I LIC LIT NOTE-17 5. IF V-7202 HIGH HIGH LEVEL SIGNAL IS RECEIVED FROM S-113, SYSTEM PK-7202
PIT TI NOTE-19
401 A 204 204 NOTE-13 HH STOPPED WITH BLOW TIME VIA THE STOP SEQUENCE (I-401A).
L )T 023

72-NL-1638-1CS1S01-2"-NI
IH
E( 064 PI H
064 S I
I
TIT TE 113 401 A
401 A CAUSTIC SODA
023 023 73-KC-3342-1CS2B01-1"-NI
I 73-I-2304 500
1" 6~7. MINIMUM DISTANCE.
401 A THE HIGHEST POINT 72-NIR-1632-1SN0B01-2"-NI P4

72-POW-1004-1SA0B01-3"-IH
3" 70-P11-001 NaOH System FROM P-7342

GLV-001
BLV-002
SI 8. SET ELECTRICAL TRACING.
N5 70-P01-002 LP purified N2(LPN)
205 AL 2"
REMOTE FAULT RUNNING NOTE-2 2"
9. MINIMUM DISTANCE.
P1 P2 P3
XL XL XL 2" 1"
NOTE-24 LG 10. MAX. ANGLE 30° FROM VERTICAL.
266 265 264 V-7204

72-NIR-1631-1SN0B01-2"-ET
SXB-802 003 K4
3 K1
2"
11. MAX. STRAIGHT LENGTH FOR HORIZONTAL CONVEYING PIPES BETWEEN TWO 3
FLANGES =6MDŽ
1CS1S01 1SA0B02 HH
LOW PRESSURE LIT LI H I
PURIFIED NITROGEN 004 004 L 141 13. NECLEAR LEVEL DETECTOR LIT-204 IS NOT IN THE SCOPE OF SUPPLY PK-7202.
BLV-769 SP-711 2" K2 LL
866 70-I-2004 2" 15. COMPLETELY GROUND ALL LINES AND EQUIPMENT.
I I 1" K3
72-NL-2034-1CS1S01-1/2"-NI
401 B 401 A HS PG P5
BW-7205 MIN. 16. BUYER SELLER
70-P01-002 LP purified N2(LPN) 1D2 378 023
SET @ 0.6BARG
BM-7205 EL 15.0M MIN.
72-POW-1005-1SA0B01-3"-IH

17. VENT AT SAFE LOCATION.


PSV START LCSSTART SD
HS HIC

BLV-317
STOP 1SN0B01 18. SELF LIMITING TRACING, TEMPERATURE WILL NOT EXCESS 110 ć FOR PRESS SIDE.
044 NOTE 3 279 205 BM-7205 REMOTE 43
BLOWDOWN GAS PCV SET @ 1 BARG 1CS2B01
19. PIPING ELEVATION TO BE SET SUCH THAT LIQUID WILL OVERFLOW
72-BDG-1678-1CS1S01-2"-NI

72-BDG-2215-1CS1S01-3"-NI XV

72-KC-1337-1CS2B01-1"-NI
STOP HS 016 THROUGH FLARE ARRESTOR 72-SP-002 AND NOT TO F-7201/V-7202.
74-I-2408 1645 FG
PSE 3"x2" 280 128

BLV-203
LOW PRESSURE 72-NL-1068-1SA0B02-1/2"-NI 202 BLV-088
NOTE 2,9 20. AN ALARM FOR HIGH TEMPERATURE OR ANY FALURE OF THIS TRACING
PURIFIED NITROGEN 044
P2 2" IS REQUIRED. ANY GENERAL FAILURE FROM ALL ELECTRIC TRACING.
BLV-213 FC
2"x1"

72-NL-2028-1CS1S01-1/2"-NI 1/2" BLV-214 FG


860 70-I-2004 ZIC S NOTE 21
BV 1/2" 72-NL-1900-1CS1S01-1/2"-NI 033 21. LIQUID IN V-7204 SENT TO V-7342A SPARE NOZZLE P3 BY HOSE .
70-P01-002 LP purified N2(LPN) -0.1 P4 030 117
2" P5 THE DISTANCE SHOULD BE 1.2M FROM THE FIRST FLOOR TO THE HO'SE CONNECTION.
003
72-BDG-1679-1CS1S01-1/2"-NI HH
72-BDG-1677-1CS1S01-2"-NI ELECTRIC PDIA H LOW PRESSURE 22. TO BE CONNECTED AT LOW POINT OF STEAM LINE.
TRACING HH HH
VERTICAL LINE 059 PIT S H PI FIC S
PURIFIED NITROGEN
4 XA
H
XS NOTE-20 NOTE-18 PDIT H 70-NL-2033-1CS1S01-1/2"-NI 23. PK-7202 CONFIRMED BY VENDOR. REFER TO VENDOR'S P&ID D18077 10 04 00 00 - 2204.
4
040 117 040 P
030 L 117 70-I-2004 865
70-P03-001 Flare Gas
023 023 F-7221 059 LL AS HAZOP COMMENTS OF PACKAGE HASN'T BEEN CLOSED, THIS PART OF P&ID IS HOLD.
ZSC 70-P01-002 LP purified N2(LPN)
N1 S S 24. THE ELECTRIC TRACING SHOULD FROM NOZZLE TO THE HIGHEST POINT OF THE LINE
HH N9
P1 6" 030 FO
S S LI LS 117 115 72-NIR-1631. THE ELECTRIC TRACING TEMPERATURE WILL BE SET AT 100ć.
1" N5 N3 6" 1/2" P1 033
113 117 010 010 N4 3" 2" FV FIT
72-NL-1901-1CS1S01-1/2"-NI XV
GNI FG 030 030 LOW PRESSURE
LEVEL SIGNAL TO CA N10 001
RT 034 TG
BW-7206/7207 HH CI R BLV-004 BLV-003 72-SL-1092-1CS1S03-1/2"-IH 25
STEAM FROM V-7605 REFERENCE DRAWINGS
LIC H LIT TC V-7202 021
72-I-2204-B 2210 EL HH C 76-I-2614 1302
L E 1/2" DRAWING NO. TITLE

BLV-218
009 009 TE TIT TI H CSO CSO
LL K1

72-SL-1092-1CS1S03-1/2"-IH 25
018 018 018 L FC 70-P16-001 Low Pressure Steam
1-1/2" S
LL FI
117
031 L
1-1/2" LL
TIT S TI H
K2
70-P14-001 Product Powder 019 115 019 L
LL PI H S
TE 063 SET@ 1.5 BARG
8

FIC
-1

PG H 117 Jan 07,


TE

019 0C ISSUED FOR CONSTRUCTION LYM MQ YSS


2021
NO

FROM BW-7206 121


P
027 L TE TE TT JC
72-NL-5246-1SA0B02-1"-IS 15 PIT PCV Oct 28,
IN IC

FV 020 601 601 600 0B ISSUED FOR CONSTRUCTION LYM MQ YSS


AC TR

5922 72-I-2204-B 059 2020


G
T R LE C

063 FIT FO
5 027 Sep 03,
BLV-001

70-P01-002 LP purified N2(LPN)


TIT TE TT
E

FIT E-7201 0A ISSUED FOR CONSTRUCTION LYM MQ YSS


CSO

031 031 2020


027 020 602 602 XV LOW PRESSURE Dec 09,
013 PURIFIED NITROGEN 00 ISSUED FOR CONSTRUCTION TXQ WL YSS
1" BLV-205 BLV-087 2019
LI S LIT N6 C C 70-I-2004 854 Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
1/2" BLV-209 1" 72-SP-030 1" FC 2019
024 L 117 024 72-NL-2074-1CS1S01-1"-IH 25
FC
BLV-208

N7 1" 70-P01-002 LP purified N2(LPN)


LL 1/2" K3 S 70-NL-2022-1CS1S01-1"-NI REV DATE DESCRIPTION DRAWN CHECKED
FIC H
N8 1-1/2" BLV-207 TE
3" N2 025 L 117
TIT 600
PG
P2 3" 061 S Engineering and Project Management
120 P
S S FIT 115 TT Jubail, Kingdom of Saudi Arabia
TE FV HS HS XL XL XL
115 117 XV 025 600
72-SP-008 061 HH 008 007 047 048 049
025
032 TI H START STOP RUNNING FAULT
L LOCAL SABIC Technology Center
TI 020
HS XY C LL REMOTE Jubail, Kingdom of Saudi Arabia
061 FC BLV-206 TIC S
062 A 062 A XV NOTE-6 72-NL-2076-1CS1S01-1/2"-IH 25 PROJECT DESCRIPTION
062 600 117
PG FIC MP-151000100
102 026 UPP PROJECT
962-

HS XY FT
062 B 062 B D PG STC-J UTILITIES PARK & PILOT PLANTS
VL B

T
122
BLV-270

P
6 ZIT ZST DRAWING TITLE
172-

FIT DRAWN DATE


062 062 FV
VL B

026 LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM


026
CHECKED DATE POWDER PURIFICATION
ZID ZSD 72-NL-2079-1CS1S01-1/2"-IH 25 MQ
L=635MM

01/07/20
062 062 C APPROVED DATE
POWDER 72-POW-3295-1SA0B01-3"-IS 15 PRESSURE SIGNAL TO
BLV-255 FC BLV-206 YSS 01/07/20 PLANT NAME AREA/UNIT SIZE
72-I-2204-B 2212 SD 72-PDIT-209
PROJECT NO. STC-J 72 A1
30
TO BW-7206 70-P14-001 Product Powder
2211 72-I-2204-B 17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20302PE-DW02-7205 10 72-I-2204-A 1of1 0C
FILE NAME: 72-I-2204-A.PID

A B C D E F G H
A B C D E F G H J K

HP-7203 BW-7206 BW-7207 GENERAL NOTES˖


F-7203
LEAK GAS HOPPER ROTARY FEEDER ROTARY FEEDER
LEAK GAS FILTER 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
SIZE: 650MM ID X 950MM TL CAP.: 100(MAX.˅ KG/H CAP.: 100(MAX.˅ KG/H
FILTER AREA: 0.38 M2 AND NOMENCLATURE.
DESICH. PRESS: -20/98 KPA.G VOLUME: 0.15M3 DESICH. PRESS: 150 KPA.G DESICH. PRESS: 150 KPA.G PK-7203
DESICH. PRESS: -20/98 KPA.G DESING TEMP: 190° C DESING TEMP: 190° C
DESING TEMP: 120° C 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
MOC CLASS: SA-240M 304 DESING TEMP: 120° C MOC CLASS: AL/SS MOC CLASS: AL/SS POWDER TRANSPORT PACKAGE UNIT 2 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
MOC CLASS: SA-240M 304 POWER˖ 0.25KW POWER˖ 0.25KW
DESIGN CAPACITY : 100 KG/H
3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE, 1
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.

FROM LIC009 NOTES:


72-I-2204-A 2210
POWDER 72-POW-3295-1SA0B01-3"-IS 15 1. ELBOWS SHOULD HAVE A RADIUS OF R=6~10D ELBOWS.
2212 72-I-2204-A
2. SHALL FOLLOW SMOTHNESS REQUIREMENT OF RA=0.8 METER FOR EQUIPMENT
FROM V-7202 70-P14-001 Product Powder AND PIPES RELATED TO V-7202.
I
TO V-7202 72-NL-5246-1SA0B02-1"-IS 15 3. WHEN V-7202 STOPS, THE STOP SIGNAL SHALL BE SENT TO THE
402 A
72-I-2204-A 5922 SYSTEM PK-7202 AND LINE A OF PK-7203 FROM S-117, SYSTEM PK-7202
I
STOPPED WITH BLOW TIME VIA THE STOP
70-P01-002 LP purified N2(LPN) 402 A SEQUENCE.
SL
AL 206 S I I
RUNNING FAULT REMOTE

SXB-803
SP-741
117 401 A 402 A
PSET=1.00 barg XL XL XL
BW-7206 260 261 262
I HS PCV
215 4. IF NITROGEN PRESSURE LOW LOW SIGNAL 70-PALL-007 IS RECEIVED FROM I-201,
2 402 A 205
ALL THE RUNNING CONVEYOR LINE OF POWDER TRANSPORTATION PACKAGE SHALL
2
FO I I
M BE SHUTDOWN IMMEDIATELY.
I I
206 XV NOTE 14 402 A 402 C
LOW PRESSURE
PURIFIED NITROGEN 206 404 B 405 B
70-NL-2029-1CS1S01-1/2"-NI BLV-093 SP-712 I
861 70-I-2004 BM-7206 402 B S I I I I I
005 402 B 403 D 403 E 403 F 401 B
1SA0B02 72-NL-1051-1SA0B02-1/2"-NI

72-POW-1007-1SA0B01-3"-IH
1CS1S01
72-NL-1078-1CS1S01-2"-NI 5. IF V-7202 HIGH HIGH LEVEL SIGNAL IS RECEIVED FROM S-113, SYSTEM PK-7202
PSV STOPPED WITH BLOW TIME VIA THE STOP SEQUENCE (I-401A).
TO NORMAL VENTING
START LCS START PRESSURE SIGNAL
72-I-2213 6929 215 HIC HS FROM V-7202
STOP S I
REMOTE BM-7206 206 281

1CS1S01
PSET=60KPag 72-I-2204-A 2211

1SA0B02
113 401 A
HS STOP
1" PDIT
70-P01-002 LP purified N2(LPN)
282 6~7. SET ELECTRICAL TRACING.
209 PDICA H
209 8. SET ELECTRICAL TRACING.
L
9. MINIMUM DISTANCE.
I
P 10. MAX. ANGLE 30° FROM VERTICAL.
I
3 P PDV 3
11. MAX. STRAIGHT LENGTH FOR HORIZONTAL CONVEYING PIPES BETWEEN TWO
PDV 209 B FLANGES =6MDŽ
NITROGEN TO F-7215
LOW PRESSURE 209 A 2"x1" 2"x1" 72-NL-1037-1SA0B02-2"-IS
72-NL-1037-1SA0B02-2"-IS
PURIFIED NITROGEN 70-NL-2030-1CS1S01-1"-NI BLV-771 72-NL-1052-1SA0B02-1"-NI 3550 72-I-2211-B 13. NECLEAR LEVEL DETECTOR LIT-204 IS NOT IN THE SCOPE OF SUPPLY PK-7202.
1" 1"
BLV-716 FC BLV-731

NOTE-2
862 70-I-2004
FC 15. COMPLETELY GROUND ALL LINES AND EQUIPMENT.
SP-713 BLV-772 BLV-773 72-NL-1037-1SA0B02-2"-IS
2"
BLV-774

3/4"

1CS1S01 1SA0B02
16. BUYER SELLER
1" GLV-705
REMOTE RUNNING
GLV-704 XL XL 17. PK-7202 CONFIRMED BY VENDOR. REFER TO VENDOR'S P&ID D18077 10 04 00 00 - 2204.
LP START AS HAZOP COMMENTS OF PACKAGE HASN'T BEEN CLOSED, THIS PART OF P&ID IS HOLD.
270 269 REMOTE
F7203 STOP

F-7203 I KJC HS
402 A 207 283
1/2" FO
?
XY 217
IS

LOW PRESSURE
207 SP-714 PURIFIED NITROGEN
SXB-804 3" N4 1" 72-NL-1053-1SA0B02-1"-NI 70-NL-2123-1CS1S01-1"-NI
PDIA H 70-I-2004 855
204 BLV-776 70-P01-002 LP purified N2(LPN)
4 N4 3"N5 1CS1S01
4
1SA0B02
3" 3"
1" N1 N3 168MM
IS
72-NL-1039-1SA0B02-1"-IS

N5
HP-7203

3" N2

REFERENCE DRAWINGS
72-POW-1086-1SA0B01-3"-IH

I
I
402 A DRAWING NO. TITLE
402 A
SXB-805

NOTE-10 SL RUNNING FAULT REMOTE


247

207
-P

AL XL XL XL
S

70-P14-001 Product Powder


PSET=1.30 barg 233 232 231

PCV I HS BW-7207 PK-7203 Jan 07,


215 I I 0C ISSUED FOR CONSTRUCTION LYM MQ YSS
402 A 208 2021
FO 402 A 402 C Oct 28,
M 0B 2020
ISSUED FOR CONSTRUCTION LYM MQ YSS
207 XV
5 LOW PRESSURE I May 15,
PURIFIED NITROGEN 208 0A ISSUED FOR CONSTRUCTION LYM MQ YSS
70-NL-2031-1CS1S01-1/2"-NI BLV-777 SP-715 402 B 2020
863 70-I-2004 BM-7207 Dec 09,
00 2019 ISSUED FOR CONSTRUCTION TXQ WL YSS
70-P01-002 LP purified N2(LPN)
Jul 01,
1CS1S01 1SA0B02 72-NL-1054-1SA0B02-1/2"-NI START LCS
HIC HS START B2 ISSUED FOR HAZOP TXQ WL YSS
STOP 2019
REMOTE BM-7207 207 284 REV DATE DESCRIPTION DRAWN CHECKED

LOW PRESSURE HS STOP


PURIFIED NITROGEN 72-NL-1006-1SA0B02-3"-IH 3"x1-1/2" SP-7207 285 POWDER
NOTE 9 NOTE-1,11,15 72-POW-1003-1SA0D01-1-1/2"-IH Engineering and Project Management
3497 72-I-2212 635 72-I-2211-A
Jubail, Kingdom of Saudi Arabia
FROM E-7212 1SA0B02 1SA0D01 TO SI-7211 / SI-7212 / SI-7213

SABIC Technology Center


Jubail, Kingdom of Saudi Arabia
PROJECT DESCRIPTION

MP-151000100
UPP PROJECT
STC-J UTILITIES PARK & PILOT PLANTS
6 DRAWING TITLE
DRAWN DATE
LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
CHECKED DATE POWDER PURIFICATION
MQ 01/07/20
APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/20
PROJECT NO. STC-J 72 A1
17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
20302PE-DW02-7206 10 72-I-2204-B 1OF1 0C
FILE NAME: 72-I-2204-B.PID

A B C D E F G H
A B C D E F G H J K
GENERAL NOTES˖
72-NL-1046-1SA0B02-1"-NI SE-7201 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
AND NOMENCLATURE.
VIBRATING SCREEN 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
FO DESIGN CAPACITY: 75 KG/H
XY HS 72-NL-1019-1SA0B02-3"-IH RETURN GAS UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
210 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
256 256 72-I-2204-A 681
4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PSET=0.80 barg FROM BAG FILTER F-7202 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
PCV DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
TO NORMAL VENTING
256 RUNNING REMOTE 72-NL-1005-1CS1S01-2-1/2"-NI
FO N4,1" 6911 72-I-2213 NOTES:
XL XL
1 LOW PRESSURE 72-NL-1046-1SA0B02-1"-NI
XV 209
PG
N8,G1/2" 72-NL-1024-1SA0B02-2"-IH TO NORMAL VENTING
1. WHEN V-7202 STOPS, THE STOP SIGNAL SHALL BE SENT TO THE SYSTEM PK-7202 AND LINE 1
256 213 214 A OF PK-7203 FROM S-117, SYSTEM PK-7202 AND LINE A OF PK-7203 STOPPED
PURIFIED NITROGEN 72-NL-1075-1CS1S01-2"-NI
BLV-710 SP-703 204 START 6927 72-I-2213 WITH BLOW TIME VIA THE STOP SEQUENCE (I-401B/I-402B).
872 72-I-2213 N9,1/2" NPT LCS
REMOTE I I
FC PDG

72-NL-1047-1SA0B02-1/2"-NI
KJC-201 STOP

FC BLV-738
XY
410 401 A TO NORMAL VENTING
201 201 72-NL-1093-1CS1S01-1-1/4"-NI
PIC H 6925 72-I-2213
KJC HS F-7201A PIC
L XV 2. IF NITROGEN PRESSURE LOW LOW SIGNAL 70-PALL-007 IS RECEIVED FROM I-201,

1"
201 264 216 210 PSET=0.32 barg
LL 252 ALL THE RUNNING CONVEYOR LINES OF POWDER TRANSPORTATION PACKAGE SHALL

IH
PSV PG BE SHUTDOWN IMMEDIATELY..

BLV-739
BLV-707

2"
GTV-741 I I I I I

EFO/AFL
209 207
NOTE-5 E-7204 BTV-703 PIT PIT I 401 B 402 B 403 D 403 E 403 F
TG 72-NL-1021-1SA0B02-3"-IH
AIA H AIT F2 N4 BLV-706 216 210 201
203 IH XY HS
3/4" 1" I I

BLV-737A
202 202 72-NL-1022-1SA0B02-3"-IH 3" 252 252
H2O H2O N2 BTV-704 404 B 405 B
N1 N3 FA-7204 SP-801B NOTE 15
HH 3" 3"

72-NL-1026-1SA0B02-2"-IH
CSO A F-7204 3. ALL COMPONENTS SHALL BE INSTALLED ON COMMON SKID WITH NOISE ENCLOSURE AND
AIA H AIT N3 E1 BLV-709

GTV-744
3" SUPPPLIED AS BLOWER PACKAGE.

GTV-742
204 204 E2 1" 3/4"

IH
GTV-740

PSET=6.00 barg N5 4. SHORT DISTANCE.

IH
GTV-743
O2 O2 3/4" SP-801A
72-NL-1025-1SA0B02-2"-IH 5. SETTING LEG FOR DISCHARGING CONDENSATE, SEE "DETAIL A".
3/4" 3/4" PSV PDIA H 3" BTV-702
I I N6 6. ALL POWDER CONVEYING LINES ELBOWS SHOULD HAVE A RADIUS OF R=6~10D
204 201 REMOTE FAULT RUNNING FM-7204B ELBOWS.

72-WM-1001-1CS1S02-1"-IC 15
401 E 401 B GTV-704 GTV-703 N1 BLV-708
F-7201B 7. MAX. STRAIGHT LENGTH FOR HORIZONTAL CONVEYING PIPES BETWEEN TWO
72-NL-1023-1SA0B02-3"-IH

TO GRADE N7 N2 3" LO XL XL XL I I

BLV-737B
72-WL-1001-1CS1S02-1"-IC 15

2 HH 72-WM-1004-1CS1S02-1"-NI 2" FLANGES =6M. 2


AIA AIT LA H LS 10" 212 211 210 401 A 401 B 8. FULL PORT BALL VALVE WITH BLIND, AND LOCATE EASY ACCESS LOCATION.
H
TG 201 201 9. COMPLETELY GROUND ALL LINES AND EQUIPMENT.
206 206
HC HC 214 10. ROTARY VALVE BW-7204 OPERATES AT MAX.FREQUENCY
SI 11. IF AREA ESD SHUTDOWN SIGNAL IS RECEIVED FROM ACP PLANT S-005,
72-POW-1035-1SA0B04-10"-IS I START
HS 201 ALL THE RUNNING CONVEYOR LINES OF POWDER TRANSPORTATION PACKAGE
I I 401 A
GTV-702

GTV-701 TV 265 SHALL BE SHUTDOWN IMMEDIATELY AT THE SAME TIME.


401 E 401 B HIC LCS START
002 HS I I I I I

KGV-701
201 STOP FM-7204B STOP
CHILLED WATER MIN. 1" 266 S 401 B 402 B 403 D 403 E 403 F
GLV-706 MIN.
SUPPLY 72-WL-1001-1CS1S02-1"-IC 15 005 I I I
1543 72-I-2213 NOTE-22 900MM
PSV POWDER FROM 443 B 404 B 405 B
72-VA-2080-1CS1S01-2"-NI 130 12. BUYER SELLER

KGV-702
BW-7202
CHILLED WATER RETURN NOTE-17 13. BEFORE THE SYSTEM PK-7202 STOPS INTERLOCKING TRIGGER (I-401A/B),
72-WM-1001-1CS1S02-1"-IC 15 1-1/2 F 2 72-I-2202-A 2067 INFORM THE UPSTREAM SYSTEM TO SHUT DOWN SE-7201 AND DRYER
72-I-2213 282 2" SET @ 0.2 BARG 72-POW-1281-1SA0B01-6"-IS 15
70-P14-001 Product Powder SYSTEM(I-450).
001 FO 14. VENT TO SAFE LOCATION.
NOTE-14 LOW PRESSURE
PSE 145 PURIFIED NITROGEN "DETAIL A"
I 72-P-2079-1CS1S01-2"-NI 2"x1-1/2" BLV-223
401 E P
72-SP-201 70-I-2004 4068
PV BLV-240 70-NL-4401-1CS1S01-1"-NI
BLV-343

BLV-343
72-NL-1005-1SA0B02-2-1/2"-NI 201 B 70-P01-002 LP purified N2(LPN)

BLV-342
3 BTV-706 BTV-707 3
PG

MIN.
FO 1CS1S01 NOTE-18 068 PK-7203 LINE A
2-1/2" 2-1/2" NOTE-18
NOTE-8

BLV-712 1SA0B02 1CS1S01 1SA0B01


3/4"
2"

TIA H 2-1/2" 3 MIN. 72-SP-020 TARGET SILO SELECTION


BLV-711 -00

E
HS

OP
LOW PRESSURE SP
72-

SL
202 L

BTV-003
PURIFIED NITROGEN LL HH BTV-708 203A SI-7211/7212/7213
PIC H 6
870 72-I-2213
T E-1 2"x1" 72-NL-2078-1CS1S01-2"-NI HS START HS START
201 L NO
TIT
PIT LL 203B 201A
202
72-NL-1045-1SA0B02-1"-NI

70-P14-001 Product Powder 72-SP-007 72-SP-006


201 HS I HS I
LOW PRESSURE TE S

72-POW-1285-1SA0B01-6"-IS
PURIFIED NITROGEN 203C STOP 402A 201B STOP 401A
202 004
5887 72-I-2213 I P3 HS I HS I
LO
401 B P6 6" 120MM 1" 203D 402B 201C 401B
72-NL-1063-1SA0B02-1/2"-NI

BTV-705

P HS
SE-7201 SHUT DOWN SHUT DOWN
3"

PV SE7201 P2
201 A XV 15. ADJUST THE VALVE OPENING DURING THE DEBUGGING.
XL 3" 16. LINE MUST HAVE A MAX. ANGLE OF 10 DEG FROM THE VERTICAL.
BLV-717 251 NOTE-16 17. TO SAFE LOCATION.
SE7201
2"

FC 1" 18. SLOPE 20 DEGREE FROM VERTICAL.THE F-7201A/B SHOULD CLOSE TO THE INCLINED PIPE.
EFO/AFL

1" 1"
BLV-715

BLV-714 SP-704 A-STOP/TRIP 6" P1 19. GROUNDING REQUIRED WITH ROD.


3/4"

BLV-713 NOTE-4
20. CONFIRMED BY VENDOR. REFER TO D18077 10 04 00 00 - 2210.
4 XY HS HS I 4
72-SP-004 21. AS HAZOP COMMENTS OF PACKAGE HASN'T BEEN CLOSED, THIS PART OF P&ID IS HOLD.
GLV-702 1" 251 251 72-POW-1282-1SA0B01-6"-IS 15 015 410
22. F-7204 STORAGE VOLUME IS 0.035M3, AND THE VOLUME BETWEEN TWO VALVES IS
BLV-718

72-NL-1063-1SA0B02-1/2"-NI

0.05M3, WHICH CAN MEET THE SINGLE DISCHARGE REQUIREMENT.


PG

72-SP-025

72-NL-1027-1SA0B02-1"-IH
XY 22. OXYGEN ANALYZER: ELECTROCHEMICAL;
72-NL-1003-1SA0B02-2"-IS 069
SP-705 I XV HYDROCARBON ANALYZER: FLAME IONICATION DETECTOR (FID);
FC 015
NOTE 8 423 B I WATER ANALYZER: CAPACITANCE
PSET=0.50 barg 2" 015 3"
BLV-719 401 A I
FO 72-SP-004
50ST0L01 1SA0B01

L= 300 MM
PSV 401 A
224
REFERENCE DRAWINGS
207 72-POW-1092-50SD0L01-3/8"-NI

BLV-231
PSET=1.00 barg RUNNING REMOTE FAULT RUNNING DRAWING NO. TITLE

BLV-230
72-SP-202
1SA0B02
1CS1S01

PCV XL XL XL XL SL 3"
240 204 209 208 207 204 AL 72-POW-1284-1SA0B01-3"-NI
72-NL-1004-1SA0B02-2"-IS
72-NL-1074-1SA0B02-2"-IS

6"x3"

0
-74
3" NOTE-19

SP
PG 1" BIG BAG
I N1 N3
241 BM-7204 BW-7204
FC 72-SL-1001-1CS1S03-1"-IH 25
72-NL-1023-1SA0B02-3"-IH

401 B
M I I HS Jan 07,
401 B I I 0C ISSUED FOR CONSTRUCTION LYM MQ YSS
N2 401 A 202 STEAM FROM SL-094 2021
I 401 C 401 A SP-701 Oct 28,
I NOTE 10 FO 72-I-2213 6910 0B ISSUED FOR CONSTRUCTION LYM MQ YSS
401 C XV PSET=1.30 barg 2020
FM-7203 401 A 3" PCV 208 BLV-701 Sep 03,
5 I 202
208
LOW PRESSURE
PURIFIED NITROGEN 0A 2020
ISSUED FOR CONSTRUCTION LYM MQ YSS
TV START LCS START BLV-705
FG 401 B TIA H HS HIC Dec 09,
201 70-I-2004 5888 ISSUED FOR CONSTRUCTION TXQ WL YSS
204 FA-7203 206 267 204 BM-7204 STOP 00 2019
HH 72-NL-1048-1SA0B02-1/2"-NI SP-702
72-POW-1002-1SA0D01-3"-IH

ΔP=0.45BARG HH Jul 01,


ISSUED FOR HAZOP TXQ WL YSS
PIA H HS TIA 72-NL-1246-1CS1S01-1/2"-NI B2
P STOP H 2019
202 L L
PG TIT I 268 210 70-P01-002 LP purified N2(LPN)
G 1/2" LL 1SA0B02
REV DATE DESCRIPTION DRAWN CHECKED
LL 1CS1S01
233 206 401 B
PG TIT TIC TIT I
BLV-702

PSV
PIT 202 TE 201 201 210 401 A
203 E-7203 Engineering and Project Management
202 206
BLV-733

TG 1" TE TE TG Jubail, Kingdom of Saudi Arabia


3/4" IH
201 N3 3" 201 210 202
72-NL-1001-1SA0B02-3"-IH 72-POW-1001-1SA0D01-1-1/2"-IH POWDER
F1 3"x1-1/2"
B-7203 N1 3"
N2
HS E2 3/4"
279 72-I-2204-A SABIC Technology Center
STOP F2 BTV-701 72-NL-1002-1SA0B02-3"-IH 72-SP-7204 NOTE 6,7,9 Jubail, Kingdom of Saudi Arabia
TO F-7202
261
BLV-734

BLV-736

E1 N4 3/4" LO 3"
BLV-735

BM-7203 3/4" 1" PROJECT DESCRIPTION


I MP-151000100
START 401 B 72-SCL-1001-1CS1S03-1"-IS
LCS UPP PROJECT
BM-7203 STOP STC-J UTILITIES PARK & PILOT PLANTS
BLV-703
BLV-704

6 SP-730
3/4"

DRAWING TITLE
I XL XL DRAWN DATE
LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
401 B 202 201
CHECKED DATE TRANSPORT POWDER 1
FAULT RUNNING BW-7204 E-7203 E-7204 MQ 01/07/20
FA-7204 TRANSPORT NITROGEN HEATER BLOWER SUCTION COOLER F-7201A/B F-7204
B-7203 ROTARY FEEDER APPROVED DATE
LEAKAGE GAS FAN TYPE: SHELL AND TUBE TYPE TYPE: SHELL AND TUBE TYPE INLINE FILTER BAG FILTER PLANT NAME AREA/UNIT SIZE
TRANSPORT NITROGEN BLOWER CAP: 100(MAX.)KG/H PK-7202 YSS 01/07/20
CAP: 180NM3/H DUTY: 1.915 KW DUTY: 2.736 KW FILTER AREA: ~3.5 M2 FILTER AREA: ~2.26 M2
CAP: 120NM3/H DESICH. PRESS: 1.50BAR.G POWDER TRANSPORT PACKAGE UNIT 1 STC-J 72 A1
DESICH. PRESS: 0.3BAR.G DESICH. PRESS: 10.00 /FV/-0.20/ 7.70 BAR.G DESICH. PRESS: 15.40 / -0.20/12.00 BARG DESICH. PRESS: -0.2/0.6 BAR.G DESICH. PRESS: -0.2/0.6 BAR.G PROJECT NO.
DESICH. PRESS: 0.4BAR.G DESING TEMP: 120° C CAP.: 25(NOR.)/ 100 (MAX.) KG/H 17093
MOC: AL DESING TEMP: 250/250° C DESING TEMP: 90/150° C DESING TEMP: 120° C DESING TEMP: 120° C A.I.D. DRAWING NUMBER SHT. NO. REVISION
POWER: 3.0KW MOC: AL/SS
POWER: 4.0KW MOC CLASS: SS MOC CLASS: SS MOC: SS MOC CLASS: SS DRAWING NO.
POWER: 0.25KW 20302PE-DW02-7207 10 72-I-2210 1of1 0C
FILE NAME: 72-I-2210.PID

A B C D E F G H
A B C D E F G H J K

LOW PRESSURE GENERAL NOTES˖


72-NL-1020-1SA0B02-5"-IS PURIFIED NITROGEN
72-NL-1020-1SA0B02-5"-IS 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
1904 72-I-2211-B AND NOMENCLATURE.
LOW PRESSURE
HS XY XV
PURIFIED NITROGEN
72-NL-2046-1CS1S01-1"-NI BLV-779 72-NL-1070-1SA0B02-1"-NI I ZIT ZST 220 A 220 A 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
879 70-I-2004 220 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
404 A 220 220
1CS1S01 1SA0B02
70-P01-002 LP purified N2(LPN) 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
LOW PRESSURE ZID ZSD HS XY
PURIFIED NITROGEN
72-NL-2081-1CS1S01-1"-NI BLV-778 72-NL-1069-1SA0B02-1"-NI 220 220 220 B 220 B 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
1 6997 70-I-2004 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP. 1
1CS1S01 1SA0B02 72-POW-1019-1SA0D01-1-1/2"-IH T 2"x1-1/2" 72-POW-1019-1SA0D01-1-1/2"-IH POWDER DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
1932
NOTE 6,8,9 2"x1-1/2"
72-I-2211-B
NOTES:
XV XV D FL FROM XV-219
1/2" 1. NOT USED.
POWER FROM 230 231 x1 -
BW-7207 2"x1-1/2" 2" POWER
72-POW-1003-1SA0D01-1-1/2"-IH 2"x1-1/2" T 72-POW-1003-1SA0D01-1-1/2"-IH T 2. MAX. ANGLE 20° FROM VERTICAL.
72-POW-1003-1SA0D01-1-1/2"-IH
635 72-I-2204-B 1906 72-I-2211-B
NOTE 6,8,9 2"x1-1/2" NOTE 6,8,9 2"x1-1/2"
FL " 2/ 1- FL" 2/ 1- TO SI-7213 3. MAX. ANGLE 30° FROM VERTICAL.
D1x" 2 I I 1Dx" 2 I
HS XY RUNNING REMOTE HS XY RUNNING REMOTE
230 A 230 A 404 B 403 D 231 A 231 A 404 B 4. NOT USED.
XL XL XL XL
72-NL-1035-1SA0B02-3"-IS 72-NL-1034-1SA0B02-3"-IS
I I

NOTE 6
279 278 272 273 5. LOCATE EASY ACCESS LOCATION.

72-POW-1009-1SA0D01-1-1/2"-IH
START START

72-POW-1008-1SA0D01-1-1/2"-IH

72-POW-1019-1SA0D01-1-1/2"-IH

72-POW-1021-1SA0D01-1-1/2"-IH
HS XY 402 B I I LP HS XY 403 E I I LP
REMOTE REMOTE

NOTE 5

NOTE 5
6. ELBOWS SHOULD HAVE A RADUIS OF R=5~8D. ELBOWS AND STRAIGHT PIPES HAVE TO

BTV-721

BTV-722
230 B 230 B HH 404 A 405 A F-7211 STOP 231 B 231 B 404 A 405 A F-7212 STOP
I

NOTE 6
PIA BE INSTALLED WITH COLLAR.
H
206 L I I KJC HS PG 402 B I I KJC HS
I ZID ZSD I ZID ZSD 7. NOT USED.
403 A 402 A 210 286 219 HH 403 B 402 A 212 287
402 A 230 230 402 A 231 231 PIA H PG 8. MAX. STRAIGHT LENGTH FOR HORIZONTAL CONVEYING PIPES BETWEEN TWO FLANGES
PIT FO 207 L 223
XY =6MDŽ

SXB-826
ZIT ZST 206 XY 218 ZIT ZST FO
A~B 212 A~B
230 230 F-7211 231 231 N9,1/2" NPT 219 9. COMPLETELY GROUND ALL LINES AND EQUIPMENT.
2 PSET
3"
210 N9,1/2" NPT
SP-743
PIT
3" F-7212 BLV-786/787
N3,1" 2
=-0.10BARG BLV-784/785 N3,1" SP-716 BLV-788/789 SP-744 SP-717
N2 207 PSET= N2 10. ELECTRIC HEAT TRACING IS EQUIPPED WITH TEMPERATURE CONTROLLER, WHICH
NOTE 4 -0.10BARG DOES NOT NEED THE CONTROL SIGNAL OF DCS.
N4 FC 1" BLV-782/783 N4 FC 1"
72-NL-1069-1SA0B02-1"-NI PSV 72-NL-1070-1SA0B02-1"-NI
PSET 3" 3" 11. BUYER SELLER
PSV PSV 212 NOTE-4
=0.6BARG N8,G1/2" PSET= N8,G1/2"

EP

EP

SXB-823
SXB-813

SXB-824
211 0.60BARG PK-7203 LINE B1 PK-7203 LINE B2

OL

OL
ge ge

SXB-814
TO NORMAL VENTING d 221 PDIA H
d
PDIA H

S
0. 0 0. 0

PE

PE
6 6
72-NL-1095-1CS1S01-3"-NI 72-NL-1100-1CS1S01-3"-NI

O
deg deg

SL

SL
72-I-2213 6921 60.
0
N5 205 60.
0
PCV N5 206 HS Start HS Start
1CS1S01
3" 1CS1S01 222 3" 204 A 207 A
1SA0B02
N1,800 1SA0B02 N1,800
1-1/2" SXB-815 1-1/2"
SXB-825 HS I HS I
N13 N8 N1 N2 N10 N12 N5,800 N3 NOTE-14 PSE 1-1/2" N13 N8 N1 N2 N10 N12 N5,800 N3
1-1/2" 1-1/2" 1-1/2" 2" 2" NOTE-13 1-1/2" NOTE-14 1-1/2" 1-1/2" 2" 2" 1-1/2" 204 B stop 403 A 207 B Stop 403 B
TO NORMAL VENTING
72-NL-1100-1CS1S01-3"-NI 212
72-I-2213 6922 LS LA H LS LA H HS I HS I
ET N6 ET N6
2" 205 205 2" 207 207 204 C shut down 403 D 207 C shut down 403 E
F-7211/7212
72-NL-1041-1SA0B02-1-1/2"-IS

72-NL-1042-1SA0B02-1-1/2"-IS
TYPE:POWDER SILO FILTER
SI-7211 SI-7212 PK-7203 LINE B3
I I I I
CAPACITY: ̚ 5.42 M2 ET ET Start
IH

IH
402 A 404 A 70-P14-001 Product Powder 402 A 404 A HS
DESIGN PRESSURE: -0.20/0.60 BAR.G NOTE 10 TIT TIA NOTE 10 TIT TIA
GNI CA H GNI CA H 209 A
DESIGN TEMPERATURE: 120ć RT CI RT CI
RT CE 211 211 RT CE 212 212
MOC CLASS: SS LE I I LE I I
NOTE 9 NOTE 9 HS I
402 A 404 A 402 A 404 A
3 SI-7211/7212 ET ET 209 B stop 403 C 3

72-POW-1017-1SA0D01-1-1/2"-IS
TYPE:POWDER SILO HH HH
DIMENSION: 1300MM OD X 1200MM TT HS I PK-7203 LINE C
WIT WIA H WIT WIA H
CAPACITY: ̚ 2.2M3 L L 209 C shut down 403 F
DESIGN PRESSURE: -0.20/0.60 BAR.G 201 201 202 202 HS Source Silo Selection
N9 N9
DESIGN TEMPERATURE: 120ć

72-POW-1016-1SA0D01-1-1/2"-IS
16" ET 16" ET 210 A
MOC CLASS: SS NOTE 10 NOTE 10 SI-7211/7212/7213
PK-7203 LINE D HS target Silo Selection
LS LA HS XY LS LA 210 B
HS XY N7 L N7 L HS Source Silo Selection
BW-7211/7212 206 206 239 239 208 208
238 238 SP-747 2" SP-748 2" SI-7211/7212/7213 start
TYPE:ROTARY FEEDER 1" 1" 212 A HS
CAPACITY: 750(MAX.) KG/H 210 C
DESIGN PRESSURE: 1.50 BAR.G 72-NL-1060-1SA0B02-1"-NI XV FC N11 FC N11 HS SI-7211/7212/7213 start
DESIGN TEMPERATURE: 120ć 1" ZSO ZIO I I 1" ZSO ZIO I I
238 XV 212 B HS I
FO 10" 223 223 403 A 404 A FO 10" 224 224 403 B 404 A
MOC CLASS: AL /SS 239
201 N4 202 N4 210 D Stop 404 A
POWER: 0.3KW PG HS I
NOTE 5 ZSC ZIC I NOTE 5 ZSC ZIC I
212 C Stop 404 A HS I
10"x6" KGV-705

242 PG

KGV-706
72-POW-1031-1SA0B04-3"-IS 223 223 405 A 224 224 405 A
LOW PRESSURE 243 210 E Shut down 404 B
NOTE 2 3" XV NOTE 2 06 XV I HS I
PURIFIED NITROGEN 72-NL-1060-1SA0B02-1"-NI 72-NL-1061-1SA0B02-1"-NI 72-NL-1061-1SA0B02-1"-NI -8
2 BLV

10"x6"
SXB-812 223 - 82 224 403 B 212 E Shut down 404 B
1908 72-I-2211-B
V-804 I I I HS SXB 3"
BL I
FROM SI7213 I I I HS BLV-812 405 A 404 A 403 B 213 13. THE FILTER IS ON TOP OF THE POWDER SILO.
BLV-805

BLV-807
NOTE 9 XY HS I I XY HS
4 405 A 4

BLV-815
405 A 404 A 403 A 211 BLV-814 EFC/AFL NOTE 9
BLV-813

25
EFC/AFL 223 223 403 A 404 A 224 224

7-
72-POW-1030-1SA0B04-6"-IS 14. THE NOZZLE N3 IS ON TOP OF THE POWDER SILO.

SXB-821
PS
72-POW-1010-1SA0B04-6"-IS I
NOTE 3 PSET=1.35 barg NOTE 3
SL I I I I XY NOTE-16 SL I I I 404 A 15. CONFIRMED BY VENDOR. REFER TO VENDOR'S P&ID D18077 10 04 00 00 - 2211A.
NOTE-16 SD 1-1/2" 6" 6"
FO PSET=1.35 barg N3 N1 211 403 A 404 A 405 A 405 A I FO PCV 213 1-1/2" 212 403 B 404 A 405 A I
BIG BAG 31 AL BIG BAG SD
N3 N1
AL 16. GROUNDING REQUIRED WITH BIG BAG.
1CS1S01 1SA0B02 PCV XY 224
LOW PRESSURE 211 N2 6" RUNNING FAULT REMOTE 405 A 212 N2 6" RUNNING FAULT REMOTE 405 A
221 32
PURIFIED NITROGEN
BLV-798 211 BW-7211 BW-7212
BM-7211 XL XL XL I I BM-7212 XL XL XL I I
6995 70-I-2004 M 234 235 236 403 A 404 A
M 237 238 239 403 B 404 A REFERENCE DRAWINGS
70-P01-002 LP purified N2(LPN) 72-NL-2082-1CS1S01-1/2"-NI SP-720 72-NL-1055-1SA0B02-1/2"-NI 72-NL-1056-1SA0B02-1/2"-NI
1CS1S01 1SA0B02 ZIT ZST ZIT ZST DRAWING NO. TITLE
LOW PRESSURE
I I I 232 232 I I I I I I I I 233 233 I I I
PURIFIED NITROGEN
BLV-799 SI
403 A 404 A 405 A 403 A 403 D 403 C 404 A 404 B 403 B 404 A 405 A SI 403 B 403 E 403 H
6996 70-I-2004 221
SP-721 ZID ZSD ZID ZSD 222
72-NL-2042-1CS1S01-1/2"-NI HH START LCS I I I I HH START I I I
232 232 HIC HS START 233 233 HIC HS
I I PIA H REMOTE I I PIA H START LCS
HS XY 405 C 405 B 405 A 404 C HS XY 212 292 404 A 404 B 404 C
L STOP BM-7211 211 290 L STOP
403 G 403 D 211 403 H 403 E 212
LL 232 A 232 A LL 233 A 233 A REMOTE BM-7212 I I I
HS HS
XV STOP STOP 405 A 405 B 405 C
291 PIT XV 293 Jan 07,
LYM
PIT 232 0C ISSUED FOR CONSTRUCTION MQ YSS
I ZIO ZSO I ZIO ZSO
FL

FL
HS XY HS XY 233 I 2021
211 212 Oct 28,
403 D 250 250 232 B 232 B D 72-POW-1027-1SA0B04-6"-IS 403 E 247 247 233 B 233 B D 72-POW-1028-1SA0B04-6"-IS 405 J 0B ISSUED FOR CONSTRUCTION LYM MQ YSS
T T 2020
5 72-SP-011A 72-SP-012A I I I Sep 03,
ZIC ZSC 72-NL-1015-1SA0B02-2"-IS ZIC ZSC 72-NL-1016-1SA0B02-2"-IS 0A ISSUED FOR CONSTRUCTION LYM MQ YSS
72-POW-1013-1SA0B04-6"-IS

72-POW-1014-1SA0B04-6"-IS
2020
250 250 247 247 405 I 405 E 405 C Dec 09,
EFC/AFL

EFC/AFL

2"x1-1/2" 2"x1-1/2" 00 ISSUED FOR CONSTRUCTION TXQ WL YSS


2"

2"

LA-7211 ZST ZIT I I LA-7212 ZST ZIT I I 2019


I I I
72-POW-1024-1SA0B04-6"-IS

72-POW-1025-1SA0B04-6"-IS
Jul 01,
235 235 405 A 404 A 236 236 405 A 404 A 405 H 405 F 405 B B2 ISSUED FOR HAZOP TXQ WL YSS
PG PG 2019
HS XY 236 ZIO ZSO HS XY ZIO ZSO
I ZSD ZID 237 ZSD ZID I I I REV DATE DESCRIPTION DRAWN CHECKED
250 250 XV 243 A 243 A 247 247 XV 244 A 244 A
404 A 235 235 HS 236 236 405 G 405 D 405 A
250 247
ZIC ZSC XY HS 244 A I I ZIC ZSC XY HS
HH XV XV
PIA I 235 A 235 A 236 A 236 A Engineering and Project Management
I I H 243 A 243 A 405 A 404 A 244 A 244 A
FL

FL
I I 235 I I 236 XY
215 L 405 A Jubail, Kingdom of Saudi Arabia
404 C 404 B S
403 D 403 A LL D 403 E 403 B D 249
HS T XY T
XY HS XY HS
EFC/AFL

EFC/AFL
243 A 244 A 12. INTERLOCKS AS FOLLOW:
PIT PG 235 B 235 B 236 B 236 B
ZSO ZIO ZSO ZIO SABIC Technology Center
215 235 XY
243 B 243 B 244 B 244 B Jubail, Kingdom of Saudi Arabia
243 A XV XV
I I ZIO ZSO PROJECT DESCRIPTION
72-NL-1018-1SA0B02-2"-IH 243 A 72-POW-1019-1SA0B02-1-1/2"-IH 243 A I I
404 B 404 B 246 246 ZSC ZIC I I ZSC ZIC
405 A 404 A
MP-151000100
243 B 243 B 405 A 404 A 244 B 244 B
72-SP-011B 72-SP-012B UPP PROJECT
EFC/AFL

EFC/AFL
I ZIC ZSC I ZIO ZSO PG POWDER
404 A I 234 72-POW-1019-1SA0B02-1-1/2"-IH STC-J UTILITIES PARK & PILOT PLANTS
246 246 405 B 249 249 72-I-2211-B 1933
405 B
6 72-NL-1040-1SA0B02-2"-IS XV XY HS XV XY HS DRAWING TITLE
EFC/AFL

TO BW-7213
2"

I LA-7215 243 B 243 B 243 B 72-POW-1022-1SA0D01-2"-IH 244 B 244 B 244 B DRAWN DATE
ZIC ZSC LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
405 A POWDER
XY 249 249
2"

72-SP-011C I 72-SP-012C CHECKED DATE POWDER HOMOGENIZATION SILOS


EFC/AFL

246 XV HH 1964 72-I-2211-B MQ 01/07/20

HS 246
PIA H 405 B PK-7203 TO BW-7213 APPROVED DATE
HS XY 214 L PLANT NAME AREA/UNIT SIZE
246 XV PIT LL I POWDER TRANSPORT PACKAGE 2 YSS 01/07/20
249 249 PROJECT NO. STC-J 72 A1
NITROGEN 72-NL-1007-1SA0B02-3"-IH 249 214 405 C 72-NL-1007-1SA0B02-3"-IH POWDER
17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
6152 72-I-2212 1907 72-I-2211-B
DRAWING NO.
FROM E-7211 TO SI-7213 20302PE-DW02-7208 10 72-I-2211-A 1of1 0C
FILE NAME: 72-I-2211-A.PID

A B C D E F G H
A B C D E F G H J K
GENERAL NOTES˖
RETURN GAS TO 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
RETURN GAS 72-NL-1020-1SA0B02-5"-IS F-7215 PK-7203 AND NOMENCLATURE.
1904 72-I-2211-A 6151 72-I-2212 POWDER TRANSPORT PACKAGE-2
2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
TO FROM F-7211/7212
I ZIT ZST DESIGN CAPACITY : 100 KG/HR UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
404 A 219 219
RETURN GAS 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
72-NL-1037-1SA0B02-2"-IS
3550 72-I-2204-B ZID ZSD
4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
FROM BAG FILTER F-7203 219 219 PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
1 LOW PRESSURE
70-P01-002 LP purified N2(LPN)
HS XY
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE. 1
PURIFIED NITROGEN 1CS1S01 1SA0B02 219 A 219 A
1905 70-I-2004
72-NL-2080-1CS1S01-1"-NI NOTES:
LOW PRESSURE BLV-780 1. NOT USED.
PURIFIED NITROGEN HS XY
72-NL-1072-1SA0B02-1"-NI 2. MAX. ANGLE 20° FROM VERTICAL.
219 B 219 B
6915 72-I-2213
XV

BTV-724 72-NL-1032-1SA0B02-3"-IS
POWDER 3. MAX. ANGLE 30° FROM VERTICAL.
72-POW-1019-1SA0D01-1-1/2"-IH 219 T 72-POW-1019-1SA0D01-1-1/2"-IH
72-I-2211-A 1932 4. NOT USED.
NOTE 6,8,9 2"x1-1/2"
TO XV-220 FL
D
1 - 1 /2" RUNNING REMOTE RUNNING REMOTE 5. LOCATE EASY ACCESS LOCATION.
2"x I XL XL XL XL
72-NL-1033-1SA0B02-3"-IS 6. ELBOWS SHOULD HAVE A RADUIS OF R=5~8D. ELBOWS AND STRAIGHT PIPES HAVE TO
404 B

72-POW-1020-1SA0D01-1-1/2"-IH
274 275 276 277 BE INSTALLED WITH COLLAR.
LP START LP START
I I I REMOTE REMOTE

NOTE 5
NOTE 5
BTV-723
F7213 F7214 7. NOT USED.
403 F 404 A 405 A STOP STOP

I I I KJC HS PG I KJC HS PG 8. MAX. STRAIGHT LENGTH FOR HORIZONTAL CONVEYING PIPES BETWEEN TWO FLANGES

NOTE 6
HH =6MDŽ
402 B 403 C 402 A 214 288 226 H PIA 405 A 216 289 228
HH L 209 9. COMPLETELY GROUND ALL LINES AND EQUIPMENT.
FO FO

SXB-836
PIA H SXB-846
2 POWER 72-POW-1003-1SA0D01-1-1/2"-IH 208 L XY 220 I XY 221 10. ELECTRIC HEAT TRACING IS EQUIPPED WITH TEMPERATURE CONTROLLER, WHICH 2
A~B A~B
1906 72-I-2211-A 214 N9,1/2" NPT 405 B F-7214 216 N9,1/2" NPT
DOES NOT NEED THE CONTROL SIGNAL OF DCS.
NOTE 6,8,9 3" F-7213 SP-745 3" SP-719 BLV-781
FROM BW-7207 BLV-792/793 N3,1" SP-718 BLV-796/797 BLV-794/795 N3,1"
PIT N2 PIT N2 11. BUYER SELLER
209 PSET=-0.10BARG PK-7203 LINE B1 PK-7203 LINE B2
PSV 208 N4 FC 1" BLV-790/791 72-POW-1022-1SA0D01-2"-IH N4 FC 1" SP-746
PSET= 72-NL-1072-1SA0B02-1"-NI

72- -11916-1CS1S01-2"-IH
3" 3" HS Start HS Start
213 -0.10BARG PSV
N8,G1/2" PSET=0.60BARG N8,G1/2"

EP
PSET=0.60BARG NOTE-4 204 A 207 A

OL
ge
TO NORMAL VENTING d
NOTE-4 PDIA H 214 PDIA H

S
0. 0

PE
72-NL-1099-1CS1S01-3"-NI 6
72-NL-1098-1CS1S01-3"-NI

O
eg

SXB-833

SXB-834
SL
0d
72-I-2213 6923 60.
N5 207 SXB-843 PSV N5 208 HS I HS I
PSV
1CS1S01 3" 1CS1S01 224 3" 204 B stop 403 A 207 B Stop 403 B
223 N1,800 N1,800
1SA0B02 1-1/2" 1SA0B02 NOTE-14
SXB-835 HS I HS I
PSE 1-1/2" N13 N8 N1 N2 N10 N12 N5,800 N3 PSE N1 N10 N12 N5,800
N13 204 C shut down 403 D 207 C shut down 403 E
TO NORMAL VENTING 213 1-1/2" 1-1/2" 2" 2" 1-1/2" 214 1-1/2" 2" 2" 2" F-7213/7214
72-NL-1098-1CS1S01-3"-NI
72-I-2213 6924 LS LA LS LA TYPE:POWDER SILO FILTER PK-7203 LINE B3
ET H ET H
N6 N6 CAPACITY: ̚ 5.42 M2
2" 209 209 2" 211 211 HS Start
DESIGN PRESSURE: -0.20/0.60 BAR.G
DESIGN TEMPERATURE: 120ć
72-NL-1043-1SA0B02-1-1/2"-IS

SI-7213 H LA TT SI-7214 209 A


I I I MOC CLASS: SS
ET 211 212 ET
IH

402 A 404 A 405 A HS I


NOTE 10 TIT TIA H NOTE 10 TIT TIA H
GNI CA GNI CA SI-7213/7214 209 B stop 403 C
RT CI 213 213 RT CI 214 214 TYPE:POWDER SILO PK-7203 LINE C
RT CE RT CE
3 LE I I LE I DIMENSION: 1300MM OD X 1200MM TT 3
NOTE 9 HS I Source Silo Selection
402 A 404 A 405 A CAPACITY: ̚ 2.2M3 HS
209 C shut down 403 F

IH
ET ET DESIGN PRESSURE: -0.20/0.60 BAR.G 210 A
HH HH DESIGN TEMPERATURE: 120ć SI-7211/7212/7213
WIT WIA H WIT WIA H MOC CLASS: SS PK-7203 LINE D HS target Silo Selection
203 203 L 204 204 L 210 B
HS Source Silo Selection
N9 N9
SI-7211/7212/7213 start

72-POW-1018-1SA0D01-1-1/2"-IH

72-POW-1019-1SA0D01-1-1/2"-IH
NITROGEN 72-NL-1060-1SA0B02-1"-NI BW-7213 212 A HS
16" ET 16" ET
72-I-2211-A 1908 NOTE 10 NOTE 10 TYPE:ROTARY FEEDER
SI-7211/7212/7213 start 210 C
CAPACITY: 750(MAX.) KG/H HS
TO SI-7211/7212 LS LA HS XY LS LA
HS XY N7 N7 DESIGN PRESSURE: 1.50 BAR.G 212 B HS I
210 210 L 241 241 212 212 L DESIGN TEMPERATURE: 120ć
240 240 2" I 1" SP-750 2" 210 D Stop 404 A
1" SP-749 MOC CLASS: AL /SS HS I
PSET=2.00 barg 405 A POWER: 0.3KW
72-NL-1062-1SA0B02-1"-NI 212 C Stop 404 A HS I
FC N11 XV FC N11
PCV XV 1" ZSO ZIO I 1" 210 E Shut down 404 B
PSET=2.00 barg HS I
231 FO 10" 225 225 FO 241 10"
240 404 A BW-7214
PCV 203 N4 224 N4 212 E Shut down 404 B
SP-726

NOTE 5 TYPE:ROTARY FEEDER


1SA0B02

KGV-708
242 PG ZSC ZIC I
KGV-707

70-P01-002 LP purified N2(LPN) CAPACITY: 750(MAX.) KG/H


BLV-803

-10
33-
-PO
72
W
A0B
1S
04
-3"-
IS 244 13. THE FILTER IS ON TOP OF THE POWDER SILO.
225 225 403 C DESIGN PRESSURE: 1.50 BAR.G
LOW PRESSURE PG
NOTE 2 -808 DESIGN TEMPERATURE: 120ć
NOTE 2
BLV XV 14. THE NOZZLE N3 IS ON TOP OF THE POWDER SILO.
PURIFIED NITROGEN 245
SP-725 MOC CLASS: AL /SS
SXB-832 810
10"x6"

225 V-
878 70-I-2004
3" BL 3" POWER: 0.25KW
15. CONFIRMED BY VENDOR. REFER TO VENDOR'S P&ID D18077 10 04 00 00 - 2211B.
4 BLV-802 I SXB-842 XV 4
BLV-809

72-NL-2045-1CS1S01-1"-NI BLV-817 AS HAZOP COMMENTS OF PACKAGE HASN'T BEEN CLOSED, THIS PART OF P&ID IS HOLD.

10"x6"
I I I HS NOTE 9 XY HS
3"

405 A 226

BLV-811
LOW PRESSURE 405 A 404 A 403 C 215 EFC/AFL 225 225 72-POW-1034-1SA0B04-3"-IS
BLV-816

NOTE 3 72-POW-1011-1SA0B04-6"-IS NOTE 9 16. GROUNDING REQUIRED WITH BIG BAG.


BLV-819

3"
PURIFIED NITROGEN SXB-831 I I BLV-818
72-NL-1059-1SA0B02-1"-NI NOTE-16 SI I I I EFC/AFL
6914 72-I-2213 BIG BAG 1-1/2" 6" 404 A 403 C XY HS
FO PSET=1.35 barg SD SP-753 N3 N1 213 403 C 404 A 405 A 72-POW-1012-1SA0B04-6"-IS 226 226
72-NL-2043-1CS1S01-1/2"-NI AL BIG BAG SD HS
LOW PRESSURE 213 PCV XY 33 N2 6" RUNNING FAULT REMOTE PCV RUNNING
1CS1S01 1SA0B02 34 217 NOTE-16
PURIFIED NITROGEN
SP-723 227 215 BW-7213 BM-7213 XL XL XL I I I 230 SI XL
REFERENCE DRAWINGS
XY 6"
1931 70-I-2004 M 240 241 242 403 C 404 A 405 A FO PSET=0.80 barg N1 214 243 DRAWING NO. TITLE
BLV-800 72-NL-1057-1SA0B02-1/2"-NI 217 AL
70-P01-002 LP purified N2(LPN) ZIT ZST 214 N2 6" RUNNING FAULT
I I I 234 234 I I I I I
72-NL-1058-1SA0B02-1/2"-NI BLV-801 SP-724 BM-7214 XL XL
405 A 404 A 403 C SI 403 C 403 F 403 I 404 A 404 B M 243 244
ZID ZSD 223
HH START LCS START I I I I 72-NL-1058-1SA0B02-1/2"-NI
234 234 HIC HS BW-7214
I I PIA H STOP SI
HS XY 405 C 405 B 405 A 404 C I
LOW PRESSURE
403 I 403 F 213 L REMOTE BM-7213 213 294 224
PURIFIED NITROGEN 234 A 234 A 550
LL LCS HIC HS START Jan 07,
HS START 0C ISSUED FOR CONSTRUCTION LYM MQ YSS
6917 72-I-2213
XV STOP STOP BM-7214
2021
295 214 296 Oct 28,
PIT REMOTE 0B ISSUED FOR CONSTRUCTION LYM MQ YSS
FL

HS XY 234 2020
213 D HS
5 234 B 234 B 72-POW-1029-1SA0B04-6"-IS STOP Sep 03,
T 297 0A ISSUED FOR CONSTRUCTION LYM MQ YSS
2020
72-SP-013A
I 72-POW-1017-1SA0B02-2"-IS Dec 09,
72-POW-1015-1SA0B04-6"-IS

ZIO ZSO 00 2019 ISSUED FOR CONSTRUCTION TXQ WL YSS


403 F
248 248 2"x1-1/2" Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
EFC/AFL LA-7213

ZST ZIT I 2019


72-POW-1026-1SA0B04-6"-IS

I
ZIC ZSC 237 237 404 A
404 A PG REV DATE DESCRIPTION DRAWN CHECKED
248 248
238 ZSD ZID I
I
2"

ZIO ZSO 237 237 405 A


405 A 72-POW-1012-1SA0B04-6"-IS POWDER
XY HS Engineering and Project Management
245 A 245 A XV 1277 75-I-2501
HS XY 237 A 237 A
Jubail, Kingdom of Saudi Arabia
XV
FL

237
248 248 ZIC ZSC
TO EXTRUSION W-7511
248
245 A 245 A D T
XY HS SABIC Technology Center
EFC/AFL

I I 237 B 237 B Jubail, Kingdom of Saudi Arabia


ZSO ZIO
403 F 403 C 245 B 245 B PROJECT DESCRIPTION
HS XY XV I
POWDER 245 A 245 A 245 A 404 A MP-151000100
72-POW-1019-1SA0D01-1-1/2"-IH ZSC ZIC
UPP PROJECT
EFC/AFL

1933 72-I-2211-A 245 B 245 B I 70-P14-001 Product Powder


FROM BW-7212
72-SP-013B
405 A
STC-J UTILITIES PARK & PILOT PLANTS
6 XV
PK-7203 DRAWING TITLE

POWDER TRANSPORT PACKAGE 2


DRAWN DATE
XY HS
245 B LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
POWDER 72-POW-1022-1SA0D01-2"-IH 245 B 245 B
CHECKED DATE POWDER HOMOGENIZATION SILOS
1964 72-I-2211-A MQ 01/07/20
72-SP-013C
FROM BW-7212 APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/20
NITROGEN 72-NL-1007-1SA0B02-3"-IH PROJECT NO. STC-J 72 A1
1907 72-I-2211-A 17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
FROM B-7201 DRAWING NO.
10 72-I-2211-B 1of1 0C
20302PE-DW02-7209
FILE NAME: 72-I-2211-B.PID

A B C D E F G H
A B C D E F G H J K

START GENERAL NOTES˖


LP
REMOTE
F7215 STOP 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
REMOTE RUNNING AND NOMENCLATURE.
XL XL KJC HS PG
2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
SL-7215 215 216 203 277 210 UNIT NUMBER CODE "72" UNLESS OTHERWISE SPECIFED.
BLV-761
NOTE-5 E-7215 BTV-714 72-NL-1028-1SA0B02-5"-IS FO
TG F2 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
AIA H AIT 72-NL-1030-1SA0B02-5"-IH 1"
1 201 201
209 3/4" IS N4
F-7215 XY 1~3
215 1
BTV-713 5" LOW PRESSURE 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
H2O H2O N2 72-NL-1029-1SA0B02-5"-IS LO 203 N9,1/2" NPT PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
N1 N3 PURIFIED NITROGEN
BLV-757~759 N4,1" SP-707 BLV-725 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
HH 5" 5"
AIA AIT CSO E1 72-I-2213 6166
H N3

BLV-764
I I 3" FC 72-NL-1066-1SA0B02-1"-NI

BLV-760
E2 1" 3/4" BLV-754~756

BLV-762

BLV-763
203 203
409 A 405 B O2 O2 3/4" F1 N5 1" NOTES:

IS
3/4" 3"
PSET=6.00 barg PDIA N8,G1/2"

72-NL-1008-1SA0B02-2"-IS
H BTV-712

72-NL-1038-1SA0B02-3"-IS
72-NL-1020-1SA0B02-5"-IS RETURN GAS

72-NL-1014-1SA0B02-2-1/2"-NI
I I I I I 3/4" 3/4" PSV N6
202 72-I-2211-B 6151
404 B 403 F 403 E 403 D 402 B 205 N1 1~4. NOT USED.
LO

72-WM-1003-1CS1S02-1"-IC 15
GTV-707 N7 N2 5" FROM BAG FILTER F-7211~7214

72-WL-1003-1CS1S02-1"-IC 15
GTV-708 TO GRADE 2" 5. SETTING LEG FOR DISCHARGING CONDENSATE, SEE "DETAIL A".
AIT LA H LS 10"
72-WM-1005-1CS1S02-1"-NI 15
205 NOTE-10 202 202 6. FULL PORT BALL VALVE WITH BLIND, AND LOCATE EASY ACCESS LOCATION.
I I P
TG
HC PV
409 B 405 B 210 72-POW-1036-1SA0B04-10"-IS
FO 7. ALL COMPONENTS SHALL BE INSTALLED ON COMMON SKID WITH NOISE ENCLOSURE
203 B
HH BTV-715 BTV-716 72-NL-1014-1CS1S01-2-1/2"-NI TO NORMAL VENT AND SUPPLIED AS BLOWER PACKAGE.
I I I I I

GTV-706

GTV-705
AIA H 223
404 B 403 F 403 E 403 D 402 B 6134 72-I-2213
205 FO 8. NOT USED.

NOTE 6

BLV-726
HC 2-1/2" 2-1/2" NOTE 8

KGV-703
1SA0B02 1CS1S01

3/4"
BLV-727
MIN.

2"
2-1/2" 1" MIN. 9. BUYER SELLER
CHILLED WATER
CHILLED WATER SUPPLY 1000MM RETURN 10. VENT TO SAFE LOCATION.
72-WL-1003-1CS1S02-1"-IC 15 BTV-717 72-WM-1003-1CS1S02-1"-IC 15
GLV-707
2 6909 72-I-2213 6908 72-I-2213 2

KGV-704
"DETAIL A"

HH
PIT PICA

72-NL-1010-1SA0B02-2"-IS
H
L

2"
203 203

EFO/AFL
PV
LL
BLV-718

203 A
LOW PRESSURE 72-NL-1049-1SA0B02-1-1/2"-NI
5"

PURIFIED NITROGEN LO I I I XY HS
BLV-732 BLV-729 BLV-728
6912 72-I-2213 409 B 405 B 402 B XV 254 254
1-1/2" 1-1/2" FC 1-1/2" 254
SP-708 I I I I 11. DURING CONVEYING, IF BLOWER OUTLET TEMPERATURE REACHED TIAH-208
I
3/4"

BLV-730 (HIGH TEMPERATURE) OR PRESSURE REACHES PICHH-205 (HIGH HIGH PRESSURE),


404 B 403 F 403 E 403 D 433 B
GLV-703 THE SHUT DOWN INTERLOCKS ARE TRIGGERED SIMULTANEOUSLY TO STOP THE
72-NL-1009-1SA0B02-3"-IS RUNNING CONVEYING LINE
1-1/2" (I-430D/403E/403F/404B/405B) AND STOP THE BLOWER B-7201 (I-443B).
TE PSV PSET=0.50 barg TO NORMAL VENTING
203 208 72-NL-1076-1CS1S01-3"-NI 12. OXYGEN ANALYZER: ELECTROCHEMICAL
6926 72-I-2213
HYDROCARBON ANALYZER: FLAME IONIZATION DETECTOR (FID);
TIA H TIT 1CS1S01 2" WATER ANALYZER: CAPACITANCE.
72-NL-1088-1SA0B02-2"-IS
3 203 L 203 1SA0B02 3
BLV-724 I

72-NL-1009-1SA0B02-3"-IS

72-NL-1038-1SA0B02-3"-IS
72-NL-1076-1SA0B02-2"-NI NOTE 6
402 B
STEAM 72-SL-1002-1CS1S03-1"-IH
72-SL-1002-1CS1S03-1"-IH BLV-720
4151 72-I-2213 I
FROM V-7605 SP-706 HH I 402 A
M RUNNING PIA H 402 C TV

72-NL-1008-1SA0B02-2"-IS
XL 204 L TIA H
204
LL I 207
72-NL-1030-1SA0B02-5"-IH

221
BM-7202B 402 B I

FC
P
402 A
PIT TIT I
72-NL-1031-1SA0B02-3"-NI

NOTE 7 PSV 204 207 402 B HH


PG TIC H TIT I

BLV-721
FA-7202B 202
ΔP=0.45BARG 208 TE E-7212 204 L 204 402 A
PG

BLV-745
232 207
TG 3/4" 1" TE TG
IS
204 F1 N3 204 205
3"
72-NL-1006-1SA0B02-3"-IH NITROGEN
LCSSTART N2
N1 3497 72-I-2204-B
BM-7202 STOP BTV-719
72-NL-1011-1SA0B02-3"-IH F2 E2
3" 3/4" BTV-709 TO BW-7207
B-7202 LO

BLV-748
N4 3/4"

BLV-747
BLV-746
E1
4 STOP HS 3/4" 1" 4
272 72-SCL-1002-1CS1S03-1"-IS
BM-7202
I I PV
BLV-722 XV
402 B 205

BLV-723
402 B

3/4"
253
XL XL I I

FC

3"
HH P

EFO/AFL
218 219 404 B 403 D
I I TIC H REFERENCE DRAWINGS
RUNNING FAULT
72-NL-1094-1SA0B02-2"-IS

I I 404 B 403 D 205 L


TIA H XY HS DRAWING NO. TITLE
403 E 409 B NOTE-11
208 I I 253 253
RUNNING HH I I
I I PICA H NOTE-11 403 E 409 B 405 A 404 A 3"
XL TIT BTV-711
403 F 405 B 205 L I

72-NL-1013-1SA0B02-3"-IH
TIT I I
72-NL-1030-1SA0B02-5"-IH

227 LL I I I 205
443 B
208 403 F 405 B 403 C 403 B 403 A TE TG
PIT PG TE 205 207
M E-7211 NITROGEN Jan 07,
BLV-749

205 209 208 3" 72-NL-1007-1SA0B02-3"-IH LYM


TG 3/4" 0C 2021
ISSUED FOR CONSTRUCTION MQ YSS
N4 IS 6152 72-I-2211-A

IS
206 1" F2 N2 Oct 28,
3" BTV-710 LO TO BW-7211~7213 0B ISSUED FOR CONSTRUCTION LYM MQ YSS
3" 2020
BM-7201B N2 Sep 03,
5 N1
E2 HP-7211 0A 2020 ISSUED FOR CONSTRUCTION LYM MQ YSS
3" F1 3/4" 3/4" N1
3" Dec 09,
BLV-752

00 ISSUED FOR CONSTRUCTION TXQ WL YSS


BLV-750

E1 N3
72-WL-1002-1CS1S02-1"-IC 15 BLV-751

NOTE 7 ΔP=1.05BARG 2019


PG 3/4" 1" BLV-753 Jul 01,
3/4" B2 ISSUED FOR HAZOP TXQ WL YSS
FA-7201B PSET=6.00 barg
FO72-WM-1002-1CS1S02-1"-IC 15

231 3/4" 2019


PSV GTV-712 REV DATE DESCRIPTION DRAWN CHECKED
PSV GTV-711
START 206
LCS
5"x3"

201 70-P14-001 Product Powder


BM-7201 STOP
BTV-720 Engineering and Project Management
72-NL-1012-1SA0B02-3"-IS 72-WM-1006-1CS1S02-1"-NI
B-7201 TG Jubail, Kingdom of Saudi Arabia
STOP HS 208
276
BM-7201 P SABIC Technology Center
GTV-709

I
GTV-710

TV Jubail, Kingdom of Saudi Arabia


409 B 205 PROJECT DESCRIPTION
I I XL XL MIN. 1" MIN. MP-151000100
403 D 404 B 225 224 CHILLED WATER
GLV-708 SUPPLY UPP PROJECT
72-WL-1002-1CS1S02-1"-IC 15
I I I FAULT RUNNING STC-J UTILITIES PARK & PILOT PLANTS
72-I-2213 1040
6 403 E 403 F 405 B
CHILLED WATER
DRAWING TITLE
DRAWN DATE
72-WM-1002-1CS1S02-1"-IC 15 RETURN LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
E-7211 E-7212 E-7215 251 72-I-2213 CHECKED DATE POWDER TRANSPORT 2
B-7201 BLOWER DISCHARGE COOLER HP-7211
B-7202 TRANSPORT NITROGEN HEATER BLOWER SYCTION COOLER F-7215 MQ 01/07/20
TRANSPORT NITROGEN BLOWER TYPE: SHELL AND TUBE TYPE NITROGEN BUFFER HOPPER
TRANSPORT NITROGEN BLOWER TYPE: SHELL AND TUBE TYPE TYPE: SHELL AND TUBE TYPE BAG FILTER
CAP: 580NM3/H DUTY: 8.927 KW SIZE: 600 MM ID X800 MM TT APPROVED DATE
CAP: 120NM3/H DUTY: 2.177 KW DUTY: 13.87 KW FILTER AREA: 11.88 M2 PK-7202 YSS 01/07/20 PLANT NAME AREA/UNIT SIZE
DESICH. PRESS: 1BAR.G DESICH. PRESS: 15.40 / -0.20/12.00 BAR.G VOLUME: 0.3 M3 PK-7203
DESICH. PRESS: 0.40BAR.G DESICH. PRESS: 10.00 / FV/-0.20/7.70 BAR.G DESICH. PRESS: 15.40 / -0.20/12.00 BAR.G DESICH. PRESS: -0.20/0.60 BAR.G POWDER TRANSPORT PACKAGE UNIT 1 STC-J A1
POWER: 30KW DESING TEMP: 90/160° C DESICH. PRESS: -0.20/1.65 BAR.G POWDER TRANSPORT PACKAGE UNIT 11 PROJECT NO. 72
POWER: 3.0KW DESING TEMP: 250/250° C DESING TEMP: 90/150° C DESING TEMP: 120° C 25(NOR.)/ 100 (MAX.) KG/H
MOC CLASS: SS DESING TEMP: 120° C 750 KG/H 17093
MOC CLASS: SS MOC CLASS: SS MOC CLASS: SS A.I.D. DRAWING NUMBER SHT. NO. REVISION
MOC CLASS: SS DRAWING NO.
20302PE-DW02-7210 10 72-I-2212 1 0C
FILE NAME: 72-I-2212.PID

A B C D E F G H
A B C D E F G H J K

FROM PSV-214
72-NL-1098-1CS1S01-3"-NI
6924 72-I-2211-B
NITROGEN FEED-OUT UNIT
FROM PSV-209
6925 72-I-2210 72-NL-1093-1CS1S01-1-1/4"-NI

1 FROM PSV-207
72-NL-1075-1CS1S01-2"-NI 1
6927 72-I-2210

FROM PSV-208
72-NL-1076-1CS1S01-3"-NI
6926 72-I-2212

TO NORMAL VENTING
72-NL-1098-1CS1S01-3"-NI 72-NL-1101-1CA1S01-3"-NI
6919 74-I-2408
FROM PSV-213 1CS1S01 1CA1S01
72-NL-1099-1CS1S01-3"-NI
6923 72-I-2211-B

FROM PSV-212
72-NL-1100-1CS1S01-3"-NI
6922 72-I-2211-A
2020.12.15
FROM PSV-211 72-NL-1095-1CS1S01-3"-NI
6921 72-I-2211-A

FROM PSV-210
72-NL-1077-1CS1S01-2"-NI
6928 72-I-2204-A
2 2
TO NORMAL VENTING
72-NL-1095-1CS1S01-3"-NI 72-NL-1102-1CA1S01-3"-NI
6931 74-I-2408

1CS1S01 1CA1S01

1CS1S01 1CA1S01
FROM PSV-215 TO NORMAL VENTING
72-NL-1078-1CS1S01-2"-NI 72-NL-1103-1CA1S01-2"-NI
6929 72-I-2204-B 6930 74-I-2408

FROM SL-7215 OUTLET 3"x2-1/2" TO NORMAL VENTING


72-NL-1014-1CS1S01-2-1/2"-NI 72-BDG-2122-1CS1S01-3"-NI
6134 72-I-2212 5886 74-I-2408

3 3
FROM SL-7204 OUTLET
72-NL-1005-1CS1S01-2-1/2"-NI
6911 72-I-2210

STEAM PIPING UNIT


STEAM FROM V-7605 TO E-7203
72-SL-1094-1CS1S03-1"-IH 25
4149 72-SL-1001-1CS1S03-1"-IH 25 6910
76-I-2614 72-I-2210
70-P16-001 Low Pressure Steam

TO E-7212
76-SL-1002-1CS1S03-1"-IH 25
4151 72-I-2212
CHILLED WATER UNIT
CHILLED WATER
SUPPLY TO E-7204
72-WL-1200-1CS1S02-2"-IC 15 72-WL-1001-1CS1S02-2"-IC 15 72-WL-1001-1CS1S02-1"-IC 15
5890 70-I-2005 1543 72-I-2210
2"x1"
70-P01-009 Chilled water supply/return (CW)
TO E-7211
70-WL-1002-1CS1S02-1"-IC 15
1040 72-I-2212

TO E-7215
4 72-WL-1003-1CS1S02-1"-IC 15 4
6909 72-I-2212
CHILLED WATER
FROM E-7204 RETURN
72-WM-1001-1CS1S02-1"-IC 15 72-WM-1200-1CS1S02-2"-IC 15
282 72-I-2210 5891 70-I-2005
2"x1"
FROM E-7211 70-P01-009 Chilled water supply/return (CW)
72-WM-1002-1CS1S02-1"-IC 15
251 72-I-2212
REFERENCE DRAWINGS
FROM E-7215
72-WM-1003-1CS1S02-1"-IC 15 DRAWING NO. TITLE
6908 72-I-2212

NITROGEN FEED-IN UNIT


72-NL-1072-1SA0B02-1"-NI TO F-7214
6915 72-I-2211-B

TO BW-7214
72-NL-1058-1SA0B02-1/2"-NI Jan 07,
5 6917 72-I-2211-B 0C 2021
ISSUED FOR CONSTRUCTION LYM MQ YSS
Oct 28,
0B 2020 ISSUED FOR CONSTRUCTION LYM MQ YSS
TO SI-7214 Sep 03,
72-NL-1059-1SA0B02-1"-NI
0A 2020 ISSUED FOR CONSTRUCTION LYM MQ YSS
6914 72-I-2211-B
REV DATE DESCRIPTION DRAWN CHECKED

LOW PRESSURE
PURIFIED NITROGEN 2"x1-1/2" TO NL-1030
72-NL-4435-1CS1S01-2"-NI 72-NL-1049-1SA0B02-2"-NI Engineering and Project Management
1540 70-I-2004 6912 72-I-2212
Jubail, Kingdom of Saudi Arabia
70-P01-002 LP purified N2(LPN)
TO F-7204
72-NL-1046-1SA0B02-1"-NI
872 72-I-2210 SABIC Technology Center
Jubail, Kingdom of Saudi Arabia
TO F-7215
72-NL-1066-1SA0B02-1"-NI PROJECT DESCRIPTION
6166 72-I-2212
MP-151000100
UPP PROJECT
TO NL-1023 STC-J UTILITIES PARK & PILOT PLANTS
72-NL-1045-1SA0B02-1"-NI
6 870 72-I-2210 DRAWING TITLE
DRAWN DATE
LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
1"x1/2" CHECKED DATE POWDER TRANSPORTATION PIPING SYSTEM
TO B-7203 MQ 01/07/20
72-NL-1063-1SA0B02-1/2"-NI
5887 72-I-2210 APPROVED DATE
PLANT NAME AREA/UNIT SIZE
YSS 01/07/20
PROJECT NO. STC-J 72 A1
17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO. 72-I-2213
10 1of1 0C
20302PE-DW02-7211
FILE NAME: 72-I-2213.PID

A B C D E F G H
A B C D E F G H J K

E-7312 E-7311 GENERAL NOTES˖


LOW PRESSURE PURIFIED V-7311 COLUMN FEED CONDENSER
NITROGEN
70-NL-2049-1CS1S01-1/2"-NI BLV-016 BLV-017
MOTHER LIQUOR EVAPORATOR
HEXANE SEPARATOR VESSEL Type : SHELL & TUBE / BEU Type : SHELL & TUBE / BEM
1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
1378 70-I-2004 AND NOMENCLATURE.
Type : VERTICAL VESSEL Heat Duty : 36.200 kW Heat Duty : 51.000 kW
70-P01-002 LP purified N2(LPN) 1CS1S01 1SA0S01 Dimension : 800.0 mm(ID) x 1800.0 mm(H-T/T) Surface Area : 1.370 m^2 Surface Area : 2.916 m^2
Design Press. : 10.0 barg / -1.0 barg Shell Design Press. : 12.0 barg / -1.0 barg 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Shell Design Press. : 13.5 barg / -1.0 barg
DISTILLED HEXANE Design Temp. : 200.00 C Tube Design Press. : 15.4 barg / -1.0 barg UNIT NUMBER CODE "73" UNLESS OTHERWISE SPECIFED.
Tube Design Press. : 13.0 barg / -1.0 barg
FROM P-7411 74-P-1434-1SA0S01-1/2"-NI MOC Class : STAINLESS STEEL Shell Design Temp. : 170.00 C / -5.00 C Shell Design Temp. : 235.00 C / -5.00 C
4671 74-I-2405 Trim : 1SD0S01 Tube Design Temp. : 170.00 C / -5.00 C Tube Design Temp. : 235.00 C / -5.00 C
1 Insulation : IH 3. ALL SUSPENSION (SUS NAMED) LINES, WAX (WAX NAMED) LINES SHOULD USE FULL 1
70-P05-001 Hexane/heptane(C6/C7)
3/4"X1" BLV-022 BLV-023 MOC : STAINLESS STEEL / STAINLESS STEEL MOC : CARBON STEEL / STAINLESS STEEL PORT BALL, AND USE 5D ELBOW AND AS LESS ELBOWS AS POSSIBLE, KEEP 5 DEGREE
Insulation : IS /IC Insulation : IH /IH
PSV SET@15.4 BARG MINIMUM SLOP. THE BREAKUP FLANGES SHOULD BE SUPPLIED FOR EACH 5 METER
CSO (MAXIMUM) LINE SECTIONS FOR CLEARING MAINTENANCE.
021
73-VA-2039-1CS1S02-1"-IS 15 P
PG 4. ALL MOTHER LIQUOR LINES (HEM NAMED) SHOULD USE FULL PORT BALL , AND USE 3D
NOTE-6 70-P10-001 Mother liquor(ML) BLV-026
017 ELBOW(MINIMUM) AND AS LESS ELBOWS AS POSSIBLE, AND KEEP 3 DEGREE SLOP
PV
(MINIMUM).
73-WM-1077-1CS1S02-3/4"-IC 15 003 B VAPOR HEXANE
CHILLED WATER
1-1/2"x1" 70-P10-001 Mother liquor(ML) BLV-005 BLV-004
TO E-7342 5. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
RETURN 73-P-1904-1SA0S01-1"-IS 15
70-WM-1068-1CS1S02-2"-IC 15 1989 73-I-2305
70-I-2005 1177 FO 6. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,

73-P-1330-1SA0S01-2"-IH 25
GLV-008 2"x1-1/2" 2" E-7312 1" 70-P05-001 Hexane/heptane(C6/C7)
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
1-1/2" P3 NOTE-4 PIT PIC
P2 P5 DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
P GLV-007

GTV-007
1-1/2" 003 003

1/2"
TG LIT PV
70-P01-009 Chilled water supply/return (CW)
012 024 003 A LOW PRESSURE
PURIFIED NITROGEN
NOTES:
BLV-024 3/4"x1/2" 73-NL-1680-1CS1S01-3/4"-NI
CHILLED WATER NOTE-1 1. E-7312 SHALL BE POSITIONED OVER FEED TO C-7301.

GTV-015
1-1/2" P1 P6 2" P4 70-I-2004 1802
SUPPLY 2"x1-1/2" 3/4" TG BLV-012 FC BLV-003
73-WL-1040-1CS1S02-2"-IC 25 NOTE-7 1SA0S01 1CS1S01 2. DELETED.
002 70-P01-002 LP purified N2(LPN)
1042 70-I-2005
GLV-003 1/2" 3. LINE SHALL HAVE FLANGED ELBOWS AND SHALL BE EASILY DEMOUNTABLE.
3D BEND
2 GLV-008 2
4. MAXIMIZE VERTICAL RUN WITHOUT ADDING POCKETS.
NOTE-9
PSV 5. PAD FLANGE AT ALL BOTTOM VESSEL FLANGES.
1-1/2 G 3
022 6. TO 73-VA-2938.
BLOWDOWN GAS SET@10 BARG LIC H
70-BDG-2310-1CS1S01-3"-IH 40 P
70-I-2007 1179 024 7. HIGHER THAN E-7312.
1CS1S01 LV

GLV-006
70-P02-001 Blowdown off Gas (BG) 8. PROVIDE LIQUID SEAL UP TO THE E-7311 TUBE BUNDLE LEVEL.
1SA0S01 PSE 024

1/2"
CSC
022 BLV-022 MOTHER LIQUOR TO C-7301 9. ADD BREACK-UP FLANGES EVERY 2M.
2"x1" 73-HEM-1363-1SD0S01-1"-IS 15 CSO BLV-023
1990 73-I-2301-B

BLV-027
GLV-002 FC 10. DELETED.
70-P10-001 Mother liquor(ML)
GLV-009 11.DETAILS SHOW ON THE 70-I-2001-A.
1" HOT OIL RETURN

73-BDG-2317-1SA0S01-1-1/2"-IH 25
73-HOR-1798-3CS1S01-1-1/2"-IH 25
HH 997 70-I-2006
HHH S PI H
HH 129 013
HHH LI H
PRESSURE SIGNAL HH
S 010
5797 70-I-2001-A LI H
224
006 L PIT
3 LL 3
013
PG
S S LIT 011
224 127 010
PDI
L HH
GTV-003

007 H S LIT S S I
LL I LIC 70-P01-010 Hot oil supply/return (HO)
132 005 L 127 006 224 204 130

GTV-013
LL 2" 1-1/2"
S 1-1/2" S S I

GTV-011
P1

1-1/2"
4" P2 2" PG
224 K1 K8 K2 129 127 132
019
I
3" K5
207 V-7311 TG FIC
3" 001 010
P7
FIC P4 2"
S 73-HEM-1362-1SD0B01-2"-ET 25
FIT
008
73-HEM-1465-3SD0S01-1"-ET 25 129 LIT BLV-040
CSO
P 010
P
1SD0B01 3SA0B01 P2 2" FV
005
FV FIT S 010 XV
MOTHER LIQUOR 008 008 127 NOTE-8 2" 009 HOT OIL SUPPLY
4 P3 GTV-006 1-1/2"x1" 1-1/2"x1" GTV-009 GTV-001 4
FROM P-7412 1"x1/2" 1"x1/2"
BLV-013 BLV-002 P6 3/4''
70-I-2006 978
GTV-010

GTV-002

GTV-012
1253 74-I-2405
K6 2"x1-1/2" FC FC

3/4"
3"x1"
BLV-015 P6 P3 P5 K7
BLV-041

FC FC 3" K4 73-HOS-1758-3CS1S01-1-1/2"-IH 25
XV 3" 1-1/2" 2" 1-1/2" E-7311 1-1/2"
1" 3"
007 TIT S EL 11.2M
GTV-004

GLV-005
BLV-011

GLV-004
BLV-323

70-P10-001 Mother liquor(ML) 004 204 2"x1-1/2"


NOTE-5
TE GTV-005 P4 2"
REFERENCE DRAWINGS
GTV-276
P5 3/4''

1/2"
MOTHER LIQUOR BLV-172 004 HH DRAWING NO. TITLE
FROM P-7213 TI H
72-HEM-2270-3SD0S01-1/2"-NI 2"
3371 72-I-2201 004
73-WAX-3302-6SA0S01-2"-ET 25 P1
BLV-031

GLV-010 6SA0S01
3SA0B01
I FI

MIN.
L PG WAX TO V-7342 A/B
132 030 73-WAX-3301-3SA0B01-1"-ET 25
LL 015 1176 73-I-2302
Jan 07,
LYM
0C ISSUED FOR CONSTRUCTION ZJ YSS
2021
FIT BLV-006
73-WAX-1360-1SA0B01-3"-ET 40

CSO 3SA0B01 70-P18-001 Wax System Oct 28,


50SD0L01 0B ISSUED FOR CONSTRUCTION LYM ZJ YSS
030 2020
PG LOW PRESSURE Sep 03,
5 035 BLV-019 BLV-018 PURIFIED NITROGEN 0A 2002
ISSUED FOR CONSTRUCTION LYM ZJ YSS
70-NL-1110-50SD0L01-3/8"-NI
70-I-2004 881 Dec 15,
MIN. 00 2019 ISSUED FOR CONSTRUCTION MCG WL YSS
BLV-025
70-P01-002 LP purified N2(LPN)
2" Jul 01,
B2 ISSUED FOR HAZOP TXQ WL YSS
2019
BLV-381 BLV-382 MIN. BLV-037 BLV-038
REV DATE DESCRIPTION DRAWN CHECKED

1SA0B01 3SA0B01 MIN.


BLV-001 Engineering and Project Management
FLUSH HEXANE Jubail, Kingdom of Saudi Arabia
74-P-1078-50SD0L01-3/8"-NI 3"x2-1/2"
1738 74-I-2405
SIC
70-P05-001 Hexane/heptane(C6/C7) MIN. NOTE-11
P-7311 011
SABIC Technology Center

BLV-021
BLV-020

Jubail, Kingdom of Saudi Arabia


S XL P-7311
PROJECT DESCRIPTION
127 001 MOTHER LIQUOR EVAPORATOR PUMP
MP-151000100

73-HEM-1368-1SA0B02-1"-NI
Type : CENTRIFUGAL
73-HEM-1367-1SA0B02-1"-NI

HH
JI H HS Capacity : 10.0000 m^3/hr UPP PROJECT
013 001 D/P : 2.060 bar
Motor Power : 15.000 kW STC-J UTILITIES PARK & PILOT PLANTS
6 S
INSULATION: IH DRAWING TITLE
I 224 S DRAWN DATE
01/07/20
BLV-007
74-P-1448-1SA0S01-1/2"-NI LYM PIPING AND INSTRUMENTATION DIAGRAM
BLV-008

132 300
MOTHER LIQUOR TO 3SA0B01 DISTILLED HEXANE CHECKED DATE HEXANE DISTILATION
V-7342A 1SA0B02 FROM P-7411 ZJ 01/07/20
1"x1/2" BLV-021 APPROVED DATE
73-I-2304 2009 74-I-2405 392 YSS 01/07/20 PLANT NAME AREA/UNIT SIZE
73-HEM-1469-1SA0B02-1"-NI
70-P10-001 Mother liquor(ML) 70-P05-001 Hexane/heptane(C6/C7) STC-J 73 A1
PROJECT NO.
1SA0B02 1SA0S01 17093
A.I.D. DRAWING NUMBER SHT. NO. REVISION
DRAWING NO.
10 73-I-2301-A 1of1 0c
20303PE-DW02-7301
FILE NAME: 73-I-2301-A.PID

A B C D E F G H
A B C D E F G H J K

V-7312 E-7314
C-7301 WATER SEPARATOR VESSEL COLUMN CONDENSER GENERAL NOTES˖
C-7302 Type : SHELL & TUBE / BEM
HEXANE DISTILLATION COLUMN TOP Type : VERTICAL VESSEL
Type : VERTICAL CYLINDRICAL PACKED TOWER
HEXANE DISTILLATION COLUMN BOTTOM Dimension : 250.0 mm(ID) x 1200.0 mm(H-T/T) Heat Duty : 59.000 kW 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
Type : VERTICAL CYLINDRICAL PACKED TOWER Surface Area : 5.890 m^2 AND NOMENGCLATURE.
Dimension : 300.0 mm / 600.0 mm x 13646.5 mm(H-T/T) Design Press. : 10.0 barg / -1.0 barg
Dimension : 300.0 mm / 600.0 mm x 12896.5 mm(H-T/T) Design Temp. : 200.00 C Shell Design Press. : 12.0 barg / -1.0 barg
Design Press. : 10.0 barg /-1.0 BARG Tube Design Press. : 15.4 barg / -1.0 barg 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Design Temp. : 200.00 C Design Press. : 10.0 barg /-1.0 BARG MOC Class : STAINLESS STEEL
Shell Design Temp. : 180.00 C / -5.00 C UNIT NUMBER CODE "73" UNLESS OTHERWISE SPECIFED.
MOC Class : STAINLESS STEEL Design Temp. : 200.00 C Trim : 3SD0S01
MOC Class : STAINLESS STEEL Insulation : IH Tube Design Temp. : 180.00 C / -5.00 C
Trim : 1SD0S01 MOC : STAINLESS STEEL 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
Insulation : IH Trim : 1SD0S01
1 Insulation : IH Insulation : IS /IC 1
4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
73-P-1331-1SA0S01-1-1/2"-ET 25 LOW PRESSURE PURIFIED
NITROGEN
2H3 73-NL-2050-1CS1S01-1/2"-NI
70-I-2004 887
SET@10 BARG 70-P01-002 LP purified N2(LPN)
PSV
015 BLOWDOWN GAS
73-BDG-2311-1CS1S01-4"-NI
NOTES:

73-P-1346-1SA0S01-2"-IS 15
1341 70-I-2007
73-P-1333-1SA0S01-1-1/2"-ET 25 4"x3" 70-P02-001 Blowdown off Gas (BG)
VAPOR HEXANE TO 1. DELETED.
E-7342
73-P-1334-1SA0S01-1"-NI 1546 73-I-2305 2. E-7314 AND V-7312 SHALL BE POSITIONED OVER REFLUX TO C-7301
70-P05-001 Hexane/heptane(C6/C7) TO KEEP GRAVITY FLOW. E-7314 SHALL BE HIGHER THAN V-7312.

BLV-070
TO NORMAL VENTING HEADER

BLV-053
73-P-1335-1SA0S01-3"-IS 15 PV 73-P-1331-1SA0S01-1"-ET 25
PIT 1826 74-I-2408 3. LINE SHALL HAVE FLANGED ELBOWS AND SHALL BE EASILY DEMOUNTABLE.
031 A
027

GLV-014
BLV-071 4. DELETED.

1/2"

FC
TE TIT TIC P
S

BLV-051
BLV-052
007 007 007 5. DELETED.
134
2 PIC 2

GLV-015
73-P-1332-1SA0S01-1-1/2"-NI 031 6. TO SAFE LOCATION.

1"
BLV-050 FO
73-HEM-4273-1SD0S01-1"-NI 1CS1S01 P
HH PG 1SA0S01 7. MANUAL DRAIN FOR ACCUMULATED WATER.
BLV-095

1-1/2"
PI H PV
023 PIT
027 031 B 8. KEEP THE HIGH POINT OF BY-PASS HIGH THAN MIN. LEVEL OF V-7312.
GTV-021

BLV-072
TI H 031
H

BLV-096
TI

1-1/2"
GTV-022
P1 9. P-7314 DETAILS SHOW ON THE 70-I-2001-D,
019
006 P4 3" P-7312 DETAILS SHOW ON THE 70-I-2001-A.
1" 1-1/2" 1-1/2"x1" 76-VA-2949-1CS1S01-1"-IS 25

1-1/2"x1"
P4 3/4"X1"
1" 3" P1 1-1/2"x1" PSV 76-I-2613 6988
P8 1-1/2" SET@15.4 BARG P

017 73-VA-2938-1CS1S01-1-1/2"-IS 15 TV
TIT K1 1-1/2" P3
1-1/2" 1-1/2" TIT 007
P2
006 P2 TE 1-1/2" 019 73-WM-1078-1CS1S02-3/4"-IC 15 NOTE-6 CHILLED WATER
RETURN
TE 008 K1 P6 P2 3"x2"
70-WM-1069-1CS1S02-2"-IC 15 GTV-032 2"x1-1/2" 2"x1-1/2"
TE TE
H 3/4" 1" P1 2" 1169 70-I-2005 S
006 K2 TIT TI 019 P5 GTV-034 FO GTV-033
013 1-1/2" 2"x1-1/2" 121

GTV-027
1-1/2"

73-P-1336-1SA0S01-1-1/2"-ET 25

1-1/2"
008 008
P12 K2 TIT TIC H
TG
P15 P10 1-1/2"
013 013 023
6" P13 1-1/2" PG
TE GLV-013
C-7302 6" 70-P01-009 Chilled water supply/return (CW)
73-P-2340-1SA0S01-3"-IH 25

TE 026
009

GTV-026
C-7301 1-1/2" NOTE-2
3 6"
P13 1-1/2" H
001
P4 1-1/2" E-7314 P7 2" S S S S I 3
TIT TI P3
73-P-3427-3SA0S01-1-1/2"-IH 25

P16 P11 K3 TIT TI 3/4" CHILLED WATER 134 148 140 144 A 371
009 009 H 2"x1-1/2"
73-HEM-2376-1SD0S01-1"-IS 15 K3 L L
SUPPLY
P14 1-1/2" 001 001 70-WL-1041-1CS1S02-2"-IC 25
P10 70-I-2005 1785
1" 6"

GTV-023
BLV-047 TIT TI GTV-035
I 1-1/2"
1-1/2" K4 010 010 K9 TIT TI H
70-P10-001 Mother liquor(ML) 6" 206 P12 L
P17 032 032
TE
MOTHER LIQUOR P14 NOTE-2
010 P15 TE 73-HEM-1364-1SD0S01-1-1/2"-NI
FROM E-7312 73-HEM-1363-1SD0S01-1"-IS 15 6"
LI 032

GTV-025
1990 73-I-2301-A L 1SD0S01
025 1CS1S01
BLV-046 LL 3"x2" 1-1/2" TO GAS BOLWDOWN
P7 BLV-056 BLV-057 73-BDG-4517-1CS1S01-1/2"-NI
HH 1" 1" P1 4282 70-I-2007
I LIC H LIT

73-P-1304-3SA0S01-3"-IH 40
K1

BLV-058
P2

BLV-060
BLV-073 340 001 L 001 1" 70-P02-001 Blowdown off Gas (BG)
LL 2"x1-1/2"
73-P-3429-3SA0S01-1-1/2"-IH 25

P9 3" 2"x1-1/2" P5
TE 1" P3 1/2" LV
1/2"

LIT LG 2" 1CS1S01


011 P7 2" 2" P5
2" K6 2" K5 001 GLV-011 BLV-059 1SD0S01
009 010

BLV-061
H K5 2" 2" K4 1" V-7312 GTV-024
10" P11 1" P7

73-P-4519-1SD0S01-1/2"-NI
TI TIT 1" LIT LIT LIT GTV-016 GTV-017 GRAVITY K2 P6
HAND WAY P5 LG GTV-019 1" P8 P3 1/2"x1/2" FIC
011 011 P9 10" 007 1"
4 1-1/2" K8 GTV-020 002 025 008
HAND WAY GTV-029 FO 1" P4
NOTE-2 SET@8 BARG PG 162 4

GTV-018
2" K9 K7 2" 2" K6 73-P-4520-1SA0S01-1/2"-NI
K8 2" 1" 157
1"
1/2"

K7 1"x1/2" EL 19.7M
1/2"

1-1/2" PSV FIT


HH P6
LI 2" 3" 162
H GLV-012 159

BLV-101
P6 TO HEXENE ADSORPTION
009 L NOTE-8
MIN EL 5.0M
BLV-097

TOWER C-7332
BLV-098

LL BLV-081
MIN EL 5.0M

BLV-069
BLV-064 4084 73-I-2303-B
TE TIT I NOTE-9 73-P-4518-1SD0S01-1/2"-NI 70-P05-001 Hexane/heptane(C6/C7)
REFERENCE DRAWINGS
021 021

MIN.
I I I 340
BLV-100 BLV-099 73-P-4517-1SD0S01-1/2"-NI P-7314 DRAWING NO. TITLE
130 207 130
BLV-092
73-P-3426-1SA0S01-2"-IH 25

BLV-065
H
TI XL
FIC
GLV-017

1-1/2"x1" 021 031


1/2"

LIC LV SIC 027 P


H FIT
002 L P 002 915
HS 027 FV
1-1/2"x1"
73-P-1337-1SA0S01-3"-IH 25

036 027 MOTHER LIQUOR TO


V-7341 Jan 07,
BLV-091

BLV-093 73-HEM-1366-1SD0S01-1/2"-NI 0C ISSUED FOR CONSTRUCTION LYM ZJ YSS


1170 73-I-2305 2021

BLV-062
FO 1/2" Oct 28, ISSUED FOR CONSTRUCTION LYM ZJ YSS
FC
0B 2020
002 TO TV-013
5 1SA0S01
NOTE-7 0A
Sep 03,
2020
ISSUED FOR CONSTRUCTION LYM ZJ YSS
2204 73-I-2301-C
BLV-066

Dec 15,
3SA0S01 I 00 2019 ISSUED FOR CONSTRUCTION MCG ZJ YSS
DISTILLED HEXANE
130 FROM E-7313 Jul 16,
B3 ISSUED FOR REVIEW MCG WL YSS
2019
73-I-2301-C 2203
HH REV DATE DESCRIPTION DRAWN CHECKED
H LIC I
HS XL L 007 207
LL TO FIC-016/FV-022
006 005
Engineering and Project Management
BLV-054

2209 73-I-2301-C
BLV-090 Jubail, Kingdom of Saudi Arabia
DISTILLED HEXANE TO
73-SP-001 P-7313
2207 73-I-2301-C
BLV-055

S 70-P05-001 Hexane/heptane(C6/C7) SABIC Technology Center


BLV-102

PG Jubail, Kingdom of Saudi Arabia


121
034
NOTE-9 PROJECT DESCRIPTION
MOTHER LIQUOR TO 73-HEM-1903-3SA0S01-1"-NI MP-151000100
V-7342A
73-HEM-1902-1SA0B02-1"-NI BLV-063 P-7312 UPP PROJECT
73-I-2304 2202
STC-J UTILITIES PARK & PILOT PLANTS
3SA0S01
1SA0B02

6 70-P10-001 Mother liquor(ML)


DRAWING TITLE
P-7314 DRAWN DATE
P-7312 LYM 01/07/20 PIPING AND INSTRUMENTATION DIAGRAM
HEXENE RICH PUMP
DISTILLED HEXANE TRANSFER PUMP Type : DIAPHRAGM MEMBRANE CHECKED DATE HEXANE DISTILLATION
Type : CENTRIFUGAL-SEALESS ZJ 01/07/20
HH HH Capacity : 0.0640 m^3/hr
PI TI H I Capacity : 2.8800 m^3/hr D/P : 4.850 bar APPROVED DATE
PLANT NAME AREA/UNIT SIZE
D/P : 2.600 bar Motor Power : 0.750 kW YSS 01/07/20
900 900 130
Motor Power : 3.400 kW PROJECT NO. STC-J 73 A1
HH XI XI HH 17093 A.I.D. DRAWING NUMBER SHT. NO. REVISION
H H
L 901 900 DRAWING NO.
10 1of1 0c
LL 20303PE-DW02-7302 73-I-2301-B
FILE NAME: 73-I-2301-B.PID

A B C D E F G H
A B C D E F G H J K

E-7315
E-7313 DISTILLED HEXANE COOLER GENERAL NOTES˖
COLUMN REBOILER Type : SHELL & TUBE / BEU
Type : SHELL & TUBE / BGM Heat Duty : 11.680 kW 1. SEE DRAWING 00-I-2001 THRU 00-I-2006 FOR STANDARD SYMBOLS
Heat Duty : 55.000 kW Surface Area : 1.350 m^2 AND NOMENGCLATURE.
Surface Area : 3.676 m^2 Shell Design Press. : 15.4 barg / -1.0 barg
Shell Design Press. : 19.0 barg / -1.0 barg Tube Design Press. : 19.0 barg / -1.0 barg 2. ALL INSTRUMENT AND PIPING SPECIALITY ITEMS ON THIS P&ID ARE PREFIXED BY
Tube Design Press. : 15.0 barg / -1.0 barg UNIT NUMBER CODE "73" UNLESS OTHERWISE SPECIFED.
Shell Design Temp. : 200.00 C / -5.00 C
Shell Design Temp. : 235.00 C / -5.00 C Tube Design Temp. : 200.00 C / -5.00 C
Tube Design Temp. : 235.00 C / -5.00 C 3. PSV OUTLET TO BE SLOPED (NO POCKET DESIGN) TO BLOWDOWN HEADER/SUB-HEADER.
1 MOC : STAINLESS STEEL / STAINLESS STEEL
MOC : CARBON STEEL / STAINLESS STEEL 1
Insulation : IC /IS
Insulation : IH /IH 4. DRAIN VALVE FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM SIDE,
PURGE/FLUSH FOR SLURRY/MOTHER LIQUOR SERVICE TO BE CONNECTED FROM TOP.
DRAIN PURGE AND FLUSHING VALVE TO BE AT MIN. DISTANCE TO PROCESS LINE.
DISTILLED HEXANE TO
C-7302 73-P-1304-3SA0S01-3"-IH 40

73-P-1304-3SA0S01-3"-IH 40
73-I-2301-B 2203

FROM TI-013
2204 73-I-2301-B
S I
134 206

NOTES:
PG
P 1. LINE SHALL HAVE FLANGED ELBOWS AND SHALL BE EASILY DEMOUNTABLE.

BLV-120
021
TV 2. MAXIMIZE VERTICAL RUN WITHOUT ADDING POCKETS.

GTV-034
XV
013

3/4"
011 3. DELETED.
2 HOT OIL SUPPLY
GTV-038 GTV-039 73-HOS-1759-3CS1S01-1-1/2"-IH 25 PSV 1D2 2
979 70-I-2006 SET@19 BARG BLOW DOWN GAS 4. OPERATOR SHALL SELECT TO CONTROL THE FLOW TO TK-7411 OR TK-7412.
225 70-BDG-2312-1CS1S01-2"-NI
GTV-035 FC FC

GTV-031
P5 3/4'' P4 3" 1228 70-I-2007

3/4"
P1 1-1/2'' 5. DETAILS SHOW ON THE 70-I-2001-A.
70-P02-001 Blowdown off Gas (BG)
1"

73-P-1347-3SA0S01-1"-NI
GLV-020 P7 FIC
P2 1-1/2'' 2" P3 3/4" 014
P6 3/4''
GTV-037

70-P01-010 Hot oil supply/return (HO) P


1-1/2"

E-7313 FIT
FV
014
TG

You might also like