Professional Documents
Culture Documents
Commercial Proposal For Supply, Electromechanical Installation
Commercial Proposal For Supply, Electromechanical Installation
________________________________________
Commercial Proposal for:
________________________________________
Commercial Proposal for:
Sumário
COMMERCIAL PROPOSAL ................................................................................................... 3
QUANTITIES MAP .................................................................................................................. 6
SCHEDULE B - BILL OF QUANTITIES ............................... Erro! Indicador não definido.
ACTIVITY SCHEDULE .......................................................... Erro! Indicador não definido.
ENVRONMENT COMMITMENT .......................................... Erro! Indicador não definido.
LEGAL FILE ............................................................................ Erro! Indicador não definido.
________________________________________
Commercial Proposal for:
COMMERCIAL
PROPOSAL
________________________________________
Commercial Proposal for:
TO
VALE MOZAMBIQUE
ELECTRO RIO, LDA., proposes the Contracting of Services for supply, electromechanical
installation, commissioning, testing and certification of three firefighting working packs
(WP) Ref. 10052611 RT-5536ME-G-00016, by the contractual regime of Global Price of
according to the details accompanying this proposal, for the contract price of: USD
2,414,343.34 (Two million, four hundred and fourteen thousand, three hundred and forty-
three, thirty-four cents).
The price proposed above includes VAT and other tax obligations.
The present proposal and its acceptance, in writing, through the Adjudication note, will
constitute a commitment between the parties, until a formal contract is signed.
We hereby confirm that this proposal is valid for 90 days and that it meets all the
requirements specified in your application.
________________________________________
Commercial Proposal for:
Electrorio met with its managers on July 4, 2021, with the following agenda purpose in point
1.
1. The appointment of Andrade Dinda Junior to sign Vale's tender letter for supply,
electromechanical installation, commissioning, testing and certification of three
firefighting working packs (wp) ref. 10052611 rt-5536me-g-00016.
________________________________________________________
Dionisio Lacerda
_______ _________________________________________________
Walter Muchanga
________________________________________________________
Felício Sigaúque
________________________________________
Commercial Proposal for:
QUANTITIES MAP
________________________________________
Commercial Proposal for:
PQ-5536ME-B- 1 OF 1
15371
1.1 Formwork
Smooth off shutter to 300 x 300 X 470 High Plinths m2 7 0,02% 59,77 418,30
Smooth off shutter to 300 x 300 X 470 High Plinths m2 9 0,03% 59,77 537,81
1.1.1 Smooth off shutter to 300 x 300 X 600 High Plinths m2 32,5 0,09% 59,77 1 942,09
1.1.1 Rough Off Shutter to Foundation Bases m2 70,0 0,20% 59,77 4 182,97
1.2 Reinforcement
1.2.1 High tensile steel bar reinforcement kg 1791 0,45% 5,26 9 425,75
1.6.1 Rip And Recompact Existing Material to 95% MOD AASHTO m3 10,5 0,03% 57,63 605,10
2.2 Delivery
Delivery to Site kg 801,0 0,03% 0,83 667,50
WP2 - EXTEND THE INSTALLATION OF THE HYDRANT SYSTEM (WAREHOUSES) (CONTRACTOR) No. REV.
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq LOSS ALLOWANCE SUPPLY UNIT INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY PRICE
XX YY BBNN
1.1.1 55 36 Preliminary and General costs Sum 1 0,98% $ 12 721,57 $ 7 886,00 $ 20 607,57
1.1.2 55 36 Insurance and Guarantees Sum 1 0,20% $ 4 166,67 $ 44,67 $ 4 211,33
1.1.3 55 36 Tools and equipment Sum 1 0,30% $ 3 700,00 $ 2 550,00 $ 6 250,00
1.1.4 55 36 Access Sum 1 0,39% $ 5 109,67 $ 3 118,67 $ 8 228,33
1.1.5 55 36 Medicals, Inductions (RAC´s), Safety Training and Sum 1 0,29% $ 5 950,00 $ 189,67 $ 6 139,67
medical
1.1.6 55 36 VISA, work permit, licences Sum 1 0,73% $ 15 231,67 $ 15 231,67
1.2.4 55 36 OTHERS (costs not considered in the other items) sum 1 0,18% $ 3 789,33 $ 3 789,33
2.1.1 55 36 Supply Piping - AWWA C151, Class 54, 350 PSI, rates
are inclusive of all handling.
2.1.2 55 36 Supply 90deg Elbows - AWWA C110, Class 54, 350 PSI,
rates are inclusive of all handling
CLASSIFICATION
VALE MOATIZE FIREFIGHTING BASIC ENGINEERING (FIRE
DETECTION AND SUPPRESSION) C2015-02.2
INTERNAL
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq LOSS ALLOWANCE SUPPLY UNIT INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY PRICE
XX YY BBNN
Supply and Install Threaded Flanges - AWWA C115,
2.1.3 55 36 A215, ANSI B16.1, rates are inclusive of all handling.
2.1.4 55 36 Supply Reducing Tee - AWWA C110, Class 54, 350 PSI,
rates are inclusive of all handling.
3.1.1 55 36 Supply Piping - ASTM A53 Gr B Schedule STD, rates
are inclusive of all handling.
3.1.2 55 36 Supply Piping - ASTM A53 Gr B Schedule 20, rates are
inclusive of all handling.
3.1.3 55 36 Supply 45deg Elbows - ASTM A234 WPB Schedule 20,
3.1.4 55 36 Supply 90deg Elbows - ASTM A234 WPB Schedule Std,
3.1.5 55 36 Supply 90deg Elbows - ASTM A234 WPB Schedule 20,
3.1.6 55 36 Supply Equal Tee - ASTM A234 WPB SCH 20, rates are
inclusive of all handling.
CLASSIFICATION
VALE MOATIZE FIREFIGHTING BASIC ENGINEERING (FIRE
DETECTION AND SUPPRESSION) C2015-02.2
INTERNAL
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq LOSS ALLOWANCE SUPPLY UNIT INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY PRICE
XX YY BBNN
3.1.7 55 36 Supply Reducing Tee - ASTM A234 WPB SCH Std, rates
are inclusive of all handling.
3.1.9 55 36 Supply Concentric Reducer - ASTM A234-WPB SCH No
Std, rates are inclusive of all handling.
3.1.10 55 36 Supply Concentric Reducer - ASTM A234-WPB SCH 20, No
rates are inclusive of all handling.
3.1.11 55 36 Supply Blind Flanges - ASTM A105 150# RF, rates are
inclusive of all handling.
3.1.12 55 36 Supply Slip-on Flanges - ASTM A105 150# RF, rates are
inclusive of all handling.
3.1.13 55 36 Supply Threadolets - 3000#, rates are inclusive of all
3.1.14 55 36 Supply Cap - ASTM A234-WPB SCH Std, rates are
inclusive of all handling.
4,1 VALVES
4.1.1 55 36 Supply Ball Valve
(Threaded Connection) (See Datasheet)
CLASSIFICATION
VALE MOATIZE FIREFIGHTING BASIC ENGINEERING (FIRE
DETECTION AND SUPPRESSION) C2015-02.2
INTERNAL
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq LOSS ALLOWANCE SUPPLY UNIT INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY PRICE
XX YY BBNN
4.1.2.1 55 36 100NB No 6 0,18% $ 586,67 $ 33,33 $ 3 720,00
5,1 CLOSE-OUT
SUMMARY
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND LOSS NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq ALLOWANCE SUPPLY UNIT PRICE INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY
XX YY BBNN
1.1.1 55 36 Preliminary and General costs Sum 1 0,97% 12 721,60 7 666,67 20 388,26
1.1.2 55 36 Offices, stores, workshops, laboratories, fences, etc Sum 1 1,03% 9 954,00 11 590,00 21 544,00
1.1.3 55 36 Accommodation, ablution and latrine facilities Sum 1 0,67% 14 021,67 14 021,67
1.1.4 55 36 Office´s Furniture Sum 1 8,67% 180 208,33 1 219,33 181 427,67
1.1.5 55 36 Insurance and Guarantees Sum 1 0,31% 6 218,33 185,33 6 403,67
1.1.6 55 36 Tools and equipment Sum 1 0,46% 9 552,67 9 552,67
1.1.7 55 36 Access Sum 1 0,40% 8 187,67 218,00 8 405,67
1.1.8 55 36 Medicals, Inductions (RAC´s), Safety Training and Sum 1 0,28% 5 950,00 5 950,00
medical
1.1.9 55 36 VISA, work permit, licences Sum 1 0,74% 15 231,67 328,33 15 560,00
1.1.10 55 36 Removal of site establishment. Sum 1 0,53% 6 552,67 4 552,67 11 105,33
1.2.7 55 36 OTHERS (costs not considered in the other items) sum 1 0,28% 5 854,33 5 854,33
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND LOSS NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq ALLOWANCE SUPPLY UNIT PRICE INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY
XX YY BBNN
Recieve and Install Piping - AWWA C151, Class 54, 350
2.1.1 55 36 PSI, rates are inclusive of all handling, fitting and installation.
Recieve and Install Threaded Flanges - AWWA C115,
2.1.3 55 36 A215, ANSI B16.1, rates are inclusive of all handling, fitting,
machining and installation.
Recieve and Install Piping - ASTM A53 Gr B Schedule
3.1.2 55 36 20, rates are inclusive of all handling, fitting, installation and
welding
CLASSIFICATION
VALE MOATIZE FIREFIGHTING BASIC ENGINEERING (FIRE
DETECTION AND SUPPRESSION) C2015-02.2
INTERNAL
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND LOSS NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq ALLOWANCE SUPPLY UNIT PRICE INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY
XX YY BBNN
Recieve and Install 45deg Elbows - ASTM A234 WPB
3.1.3 55 36 Schedule 20, rates are inclusive of all handling, fitting,
installation and welding
Recieve and Install 90deg Elbows - ASTM A234 WPB
55 36 Schedule Std, rates are inclusive of all handling, fitting
3.1.4
and installation, welding measured seperately
Recieve and Install 90deg Elbows - ASTM A234 WPB
3.1.5 55 36 Schedule 20, rates are inclusive of all handling, fitting, installation
and welding
Recieve and Install Equal Tee - ASTM A234 WPB SCH
3.1.6 55 36 20, rates are inclusive of all handling, fitting, installation and
welding
Recieve and Install Reducing Tee - ASTM A234 WPB
3.1.7 55 36 SCH Std, rates are inclusive of all handling, fitting, installation and
welding
Recieve and Install Reducing Tee - ASTM A234 WPB
3.1.8 55 36 SCH 20, rates are inclusive of all handling, fitting, installation and
welding
Recieve and Install Concentric Reducer - ASTM A234-
3.1.9 55 36 WPB SCH Std, rates are inclusive of all handling, fitting, No
installation and welding
Recieve and Install Concentric Reducer - ASTM A234-
3.1.10 55 36 WPB SCH 20, rates are inclusive of all handling, fitting, installation No
and welding
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND LOSS NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq ALLOWANCE SUPPLY UNIT PRICE INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY
XX YY BBNN
Recieve and Install Blind Flanges - ASTM A105 150#
3.1.11 55 36 RF, rates are inclusive of all handling, fitting, installation and
welding
Recieve and Install Slip-on Flanges - ASTM A105 150#
3.1.12 55 36 RF, rates are inclusive of all handling, fitting, installation and
welding
Recieve and Instal Threadolets - 3000#, rates are inclusive of
3.1.13 55 36 all handling, fitting, installation and welding
Recieve and Install Cap - ASTM A234-WPB SCH Std,
3.1.14 55 36 rates are inclusive of all handling, fitting, installation and welding
4,1 VALVES
4.1.1 55 36 Recieve and Install Ball Valve
(Threaded Connection) (See Datasheet)
4.1.2 55 36 Recieve and Install Butterfly Valve (See Datasheet)
4.1.3 55 36 Recieve and Install Flanged Gate Valve (See
Datasheet)
Recieve and Install Hose Connection Valve (See
4.1.4 55 36 Datasheet), including provision of hemp and stag for sealing of
threaded connection
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND LOSS NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq ALLOWANCE SUPPLY UNIT PRICE INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY
XX YY BBNN
5,1 EQUIPMENT
Recieve and Install Fire Hose Cabinet (See Datasheet), including
5.1.1 55 36 supply and installation of 4x M16 x150
chemical anchors per cabinet
5.1.1.1 Stand mounted, lockable, weatherproof hose cabinet & No 6 0,27% 874,48 55,00 5 576,88
Stand / Legs. 530 x 900 x 550
5.1.3 55 36 Recieve and Install Fire Hydrant Nozzle (See Datasheet)
5.1.3.1 Lever operated Light Alloy Industrial fire nozzle; Male No 6 1,45% 5 000,00 53,33 30 320,00
65mm instantaneous coupling
7,1 START-UP
SUMMARY
EAP Asset # ACTIVITY CODE MEASUREMENT CRITERIA ENGINEERING AND LOSS NCM TEC PRICE
K TT UU VVV WWW CMS K TT UU Seq ALLOWANCE SUPPLY UNIT PRICE INSTALL UNIT PRICE TOTAL ($)
ITEM Area Subarea DESCRIPTION OF ACTIVITIES UNIT QUANTITY
XX YY BBNN
___________________________________________________________________________
________________________________________
Commercial Proposal for:
ACTIVITY SCHEDULE
ACTIVITY SCHEDULE
Weeks
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
ACTIVITIES
Mobilization of material,
equipment, and personnel
layby creation
Civil works including
excavations.
general piping
________________________________________
Commercial Proposal for:
________________________________________
Commercial Proposal for:
ENVRONMENT COMMITMENT
\
___________________________________________________________________________
________________________________________
Commercial Proposal for:
LEGAL FILE
1 ALVARA DE ACTIVDADES
2 ALVARA COMERCIAL
3 INICIO DE ACTIVIDADES
4 BOLETIM DA REPUBLICA
5 QUITAÇÃO DAS FINANÇAS
6 QUITAÇÃO DO TRIBUNAL
7 QUITAÇÃO DO INSS
___________________________________________________________________________
________________________________________
Commercial Proposal for:
1.
___________________________________________________________________________
________________________________________
Commercial Proposal for:
________________________________________
Commercial Proposal for:
2.
___________________________________________________________________________
________________________________________
Commercial Proposal for:
3.
___________________________________________________________________________
________________________________________
Commercial Proposal for:
________________________________________
Commercial Proposal for:
4.
___________________________________________________________________________
________________________________________
Commercial Proposal for:
________________________________________
Commercial Proposal for:
5.
___________________________________________________________________________
________________________________________
Commercial Proposal for:
6.
___________________________________________________________________________
________________________________________
Commercial Proposal for:
7.