COMPLIANCE STATEMENT

POLGAHAWELA, POTHUHERA AND ALAWWA INTEGRATED WATER


Project
SUPPLY PROJECT
Client NATIONAL WATER SUPPLY & DRAINAGE BOARD, SRI LANKA

Location POLGAHAWELA, SRI LANKA

Doc. Title Submission of MEP Drawings and calculation for store room - WTP
Commented Doc.
Rev No. 0
No.

Comments Ref : PD/PPAIWSP/ Design/2021/113, dated 18th May, 2021

Sl No Client Comments WABAG reply

Workshop and store buildings are


Although workshop and store buildings are
industrial buildings as per the
industrial building, there is no industrial
contract. However, you have
usage water is connected to this plumbing
followed the code of practice
1. system. Bathrooms’ waste water is only
reference is SLS 745: 2004. It is for
connected to this plumbing system. So code
domestic and shop & office except
of practice SLS 745:2004 values can be used
industrial buildings. Please clarify
for the calculation.
it.
Workshop building Waste water is
with grease and oil. Hence it should Oil and grease trap is used in only oil &
be removed before connecting to grease wastage line.
the system. Therefore, to remove Here only bathrooms’ waste water is
the grease and oil it should be connected to this plumbing system. If you
2. provided with grease and oil trap connected oil and grease trap to this
as per the contract document. bathroom waste water line, there will be
Plumbing arrangement should be regular blockage and regular maintenance
updated as per the changes done in have to be done. So oil and grease trap is not
the rest room and workshop technically feasible for this system.
building.

Complied by (Signature): Date: 16.05.2021


Page 1
Name: K. Sulakxan Department: Engineering