NATIONAL WATER SUPPLY & DRAINAGE BOARD
POLGAHAWELA, POTHUHERA AND ALAWWA
INTERGRATED WATER SUPPLY PROJECT
224011 Fae: 097 243031
242078 El: dariofamalc
Tek - 0372243080 /0
Mobil: 070 2658177
My No;PDIPPAIWSP/Design/2021/057 03/2001
‘The Project Dirstor
Mis Vatech Wabag Lid
Dear Si,
Polgahawela,Pothuhera and Abwwa Integrated Water Supply Project
‘Contract No: SP-NWP/POLGAHAWELA/W/DB/201 01
‘Subject: Submission of shop drawing for Car Park at Karadana Quarters
Reference: WABISL/1OPI04/PD/2021/S219 Dated on 164 February 2021,
“This refers to your above subject and reference. The Karadana staff quarters car park drawings were
‘viewed. Following comments shouldbe incorporated for your next submission
Vehicle taming fait space forthe efy parking shouldbe provided in front ofthe capa. 4
= The proposed Fencing line inside of the land should be appmved by the clint before the seting
‘out Fut Families living inthe karadana sta quarters, Therefore, you have Fixed the fencing
line as per the approval ofthe Client.
~The rofin the rear side othe ear park should be extended to avoid rain water coming in
‘Therefor, gutters shoud he arranged accordingly
Pease note tha the design ond but contractor is responsible athe cnformiy ofthe design with
furctionl requirements
“Thank Vou. RKEwnone
fn va TECHWABAG LTD
Rag af Thiakarathne 0.9 MAR 2021
Projet Director (PPATWSP)
RECEIVED:
Sign. Sisal.
rojas Dive
Polgahavel,Pohuher and Alana Integrated Water Supply Project,
‘No 301, Kuureala Road, Banda, Polzahawel