Download as pdf
Download as pdf
You are on page 1of 2
NATIONAL WATER SUPPLY & DRAINAGE BOARD. POLGAHAWELA, POTHUHERA AND ALAWWA INTERGRATED WATER SUPPLY PROJECT Tel 0372248930 Mobit 070 665177 / 2243941 Fax: 08 72243931 7 2412075 Email: pdboainsp@emal com ‘My No: PD/PPAIWSP/Design/202 1/215 oxvionom The Project Director Mis Vatech Wabag Ld Dese Sir, Contract No: Subject: Comments on Submission of Fencing, Road, Drain and Landscaping Drawing for Alawoa Ground Reservoir Rev 4 Reference: 1, WAB/SL/10P104'SG/PD2019/2005 dated on 28% February 2019 2, PD/PPAIWSP/Design/2019/130 dated on 11 March 2019 3. WABISL/IOPI04/SG/PD2019/3107 dated 23° October 2019 4. PDIPPAIWSP/Design/20191476 dated on 04% November 2019 ‘5, WABISL/1OP104/SG/PD/2019/4810 dated 12" September 2019 6, PD/PPALWSP/Design/2020/219 dated on 05 October 2020 7, WABISLMOPIOUSG/PD/2021/6128 dated 15" September 2021 ‘8. PDIPPAIWSP/General2021/C/1571 dated 21st September 2021 This refers to above lester regarding the above subject. Please note that we have already responded for your submission via shove mentioned leer no 8 However, please find our comments below on your above submission. 1. Asper Clause 8.3.24 Drainage shouldbe constructed t satisfaction of the Engineer. Hence, Site Dain and Strom Dra shall be connected to nearest dun, It isnot allowed to discharge dicey to road. Please submit together with landscaping drawing, Finishing eve is not match with sheet no 2of and $ ofS. (F-G-L -130501130.00). iii iii Polgahawel,Pothuers nd Alnwwa Integrated Water Supply Project "No 31, Kurunegit Road, Honda, Polanhawel Eyewash area detail drawing isnot available, Please provide Provide the fence foundation dels along the inlet pipe side. Des B mentioned wrongly inthe key plan. Please correct, Dain section A-A, extend the wall rebar upto top ofthe wall with sufficient cover. Section B-B of detail A, EL, PGL are same lev! (102,00) Please eorect. Detail B plan ~ BOP of 90-depree bend is 102.1, thrust block eannot be constructed. Please confirm and give more elevation details with level, 9. Detail B plan step slope width shouldbe 1200mm. 10. Section c- of deal B, slope 1:2 protection should be gras or ble, Please mention in the drawing. Thanking You. dn Project Director (PPAIWSP) Proje Deion Polgabvel,Pothubers ac awa intgrated Water Suply Pract, "No 30, Kurunegalt Road, Bandawa,Polgahawel,

You might also like