NATIONAL WATER SUPPLY & DRAINAGE BOARD.
POLGAHAWELA, POTHUHERA AND ALAWWA
INTERGRATED WATER SUPPLY PROJECT
Tel 0372248930
Mobit 070 665177 /
2243941 Fax: 08 72243931
7 2412075 Email: pdboainsp@emal com
‘My No: PD/PPAIWSP/Design/202 1/215 oxvionom
The Project Director
Mis Vatech Wabag Ld
Dese Sir,
Contract No:
Subject: Comments on Submission of Fencing, Road, Drain and Landscaping Drawing for
Alawoa Ground Reservoir Rev 4
Reference: 1, WAB/SL/10P104'SG/PD2019/2005 dated on 28% February 2019
2, PD/PPAIWSP/Design/2019/130 dated on 11 March 2019
3. WABISL/IOPI04/SG/PD2019/3107 dated 23° October 2019
4. PDIPPAIWSP/Design/20191476 dated on 04% November 2019
‘5, WABISL/1OP104/SG/PD/2019/4810 dated 12" September 2019
6, PD/PPALWSP/Design/2020/219 dated on 05 October 2020
7, WABISLMOPIOUSG/PD/2021/6128 dated 15" September 2021
‘8. PDIPPAIWSP/General2021/C/1571 dated 21st September 2021
This refers to above lester regarding the above subject.
Please note that we have already responded for your submission via shove mentioned leer no 8
However, please find our comments below on your above submission.
1. Asper Clause 8.3.24 Drainage shouldbe constructed t satisfaction of the Engineer. Hence, Site
Dain and Strom Dra shall be connected to nearest dun, It isnot allowed to discharge dicey
to road. Please submit together with landscaping drawing,
Finishing eve is not match with sheet no 2of and $ ofS. (F-G-L -130501130.00).
iii iii
Polgahawel,Pothuers nd Alnwwa Integrated Water Supply Project
"No 31, Kurunegit Road, Honda, PolanhawelEyewash area detail drawing isnot available, Please provide
Provide the fence foundation dels along the inlet pipe side.
Des B mentioned wrongly inthe key plan. Please correct,
Dain section A-A, extend the wall rebar upto top ofthe wall with sufficient cover.
Section B-B of detail A, EL, PGL are same lev! (102,00) Please eorect.
Detail B plan ~ BOP of 90-depree bend is 102.1, thrust block eannot be constructed. Please
confirm and give more elevation details with level,
9. Detail B plan step slope width shouldbe 1200mm.
10. Section c- of deal B, slope 1:2 protection should be gras or ble, Please mention in the
drawing.
Thanking You.
dn
Project Director (PPAIWSP)
Proje Deion
Polgabvel,Pothubers ac awa intgrated Water Suply Pract,
"No 30, Kurunegalt Road, Bandawa,Polgahawel,