Professional Documents
Culture Documents
Design Develop Analysis: Phase 1 Phase 2 Phase 3 Phase 4
Design Develop Analysis: Phase 1 Phase 2 Phase 3 Phase 4
Design Develop Analysis: Phase 1 Phase 2 Phase 3 Phase 4
CLO 2 Develop hi-fidelity prototype of information system for the real-world case study application
using structured methodology.
CLO 2 Develop a logical database design using entity-relationship diagram (ERD) and normalization
techniques.
W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15
PHASE 1 PHASE 2 PHASE 3 PHASE 4
SYSTEM Project Proposal & Planning Information Gathering & System Analysis & Design Prototype System Design
Requirement
ANALYSIS
P3-P4 SAD
& DESIGN Iterative process
(multiple discussion/submission)
SUBMISSION 3
SAD
SYSTEM
DESIGN (DFD) SUBMISSION 4 (SAD)
&
SUBMISSION 5 (DB)
SUBMISSION 2
SUBMISSION 1 (SAD & DB)
(SAD & DB)
REPORT REQUIREMENT ALTERNATIVE
PROPOSAL ASSESSMENT
SUBMISSION ANALYSIS
SUBMISSION 3 SUBMISSION 4 (INDIVIDUAL)
TIMELINE (DB) DB
LOGICAL
DB DESIGN & SQL
CONCEPTUAL (DDL)
DESIGN
P3-P5 DB
Iterative process
(multiple discussion/submission)
W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15
DATABASE MIDTERM
BREAK