Professional Documents
Culture Documents
Revised Precedence Diagram Method No. 1: (V.O. # 1) "Construction Schedule"
Revised Precedence Diagram Method No. 1: (V.O. # 1) "Construction Schedule"
Revised Precedence Diagram Method No. 1: (V.O. # 1) "Construction Schedule"
0 175 F-S
EMBANK. FROM BORROW
114 139
0 175 (-)50
134 159
F-S
-200
-201 5 75
B.9 1 4 1700(4) 3 12 105(1)a 4 0 A.1.1(3) 6 40 1717(5)a1 7 80 902(1)a 10 0 900(1)b1 11 0 508(1) 13 0 1712(2) 14 12 B.9 17 4
F-S F-S - AGGREGATE SUBBASE COURSE F-S F-S F-S F-S F-S F-S
INDIV. REMOVAL SUBGRADE PREP., CHANNEL EXCAV. FURNISHED & DRIVEN REINF. STEEL STRUCTURAL CONCRETE HAND-LAID ROCK CONCRETE SLOPE
MOBILIZATION F-S (-)9 COMMON MATERIAL (-)50 - AGGREGATE BASE COURSE (New Item) (-)55 (UNSUITABLE EXCAV.) (-)18 OF STEEL SHT PILE (-)45 (DEFORMED), GRADE 40 (-)50 CLASS A, 14 DAYS (-)50 EMBANKMENT
(-)15 PROTECTION F-S DEMOBILIZATION
OF TREES
0 4 4 16 7 67 17 92 37 77 59 139 94 154 104 164 114 174 159 171 171 175
0 4 4 16 7 67 17 92 37 77 59 139 94 154 104 164 114 174 159 171 171 175
S-S F-F
1710(2)a
(+)1 1711(1) 15 12
-GROUTED RIPRAP (CLASS A)
LEGEND: F-S
-STONE MASONRY, CLASS A
ACTIVITY
ITEM NR.
NR.
DURATION
LAG TIME: (+) (-)11 F-F 160 172
DESCRIPTION
(+)32
EARLY START
LATE START
EARLY FINISH
LATE FINISH
LEAD TIME: (-) 160 173
1702(1)a 8 1 A.1.1(3) 9 12 S-S F-F
F-S (+)1
CRITICAL PATH: F-S: FINISH-TO-START STRUCTURE EXCAV.
(-)11 PIPE CULVERTS
A.1.1(3) 16 12
NON-CRITICAL (COMMON SOIL)
S-S: START-TO-START RECTANGULAR FLAP
PATH:
NODE:
F-F: FINISH-TO-FINSIH 66 82 71 83 GATE, 610MMØ (FAB.)
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
CONTRACTOR: PREPARED & SUBMITTED BY: PROJECT TITLE/LOCATION: CHECKED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED:
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF FLOOD MITIGATION
MARCUS OFFICE OF THE DISTRICT ENGINEER
COTABATO 3RD DISTRICT ENGINEERING OFFICE STRUCTURE-CONSTRUCTION OF KABACAN RIVER FLOOD
CONSTRUCTION AND
MARLYN T. CUSTODIO LANAO, KIDAPAWAN CITY CONTROL PROJECT (CARABAO CENTER, PHASE II), USM, JAIME Q. MENDOZA, JR. NASSER A. DARANDAS WEALTHO M. MERILLANA EDDIE M. AMIR
SUPPLY