PROJECT NAME : 21MI0076-CONSTRUCTION OF FLOOD MITIGATION

REVISED PRECEDENCE DIAGRAM METHOD NO. 1 (V.O. # 1)


STRUCTURE-CONSTRUCTION OF KABACAN RIVER
FLOOD CONTROL PROJECT (CARABAO CENTER, PHASE
"CONSTRUCTION SCHEDULE"
II), USM, KABACAN, NORTH COTABATO
ORIG. CONT. DURATION : 160 CALENDAR DAYS
REVISED CONT. DUR. : 171 CALENDAR DAYS
-A.1.1(8) -B.5
-B.7 (1) -B.8 2 175 F-F
-CONST'N. OF FIELD OFC. FOR THE ENG'R.
-PROJECT BILLBOARD/SIGN BOARD
-OCCUP. SAFETY & HEALTH PROGRAM
-TRAFFIC MANAGEMENT
1704(1)b) 12 25

0 175 F-S
EMBANK. FROM BORROW

114 139
0 175 (-)50
134 159
F-S
-200
-201 5 75
B.9 1 4 1700(4) 3 12 105(1)a 4 0 A.1.1(3) 6 40 1717(5)a1 7 80 902(1)a 10 0 900(1)b1 11 0 508(1) 13 0 1712(2) 14 12 B.9 17 4
F-S F-S - AGGREGATE SUBBASE COURSE F-S F-S F-S F-S F-S F-S
INDIV. REMOVAL SUBGRADE PREP., CHANNEL EXCAV. FURNISHED & DRIVEN REINF. STEEL STRUCTURAL CONCRETE HAND-LAID ROCK CONCRETE SLOPE
MOBILIZATION F-S (-)9 COMMON MATERIAL (-)50 - AGGREGATE BASE COURSE (New Item) (-)55 (UNSUITABLE EXCAV.) (-)18 OF STEEL SHT PILE (-)45 (DEFORMED), GRADE 40 (-)50 CLASS A, 14 DAYS (-)50 EMBANKMENT
(-)15 PROTECTION F-S DEMOBILIZATION
OF TREES

0 4 4 16 7 67 17 92 37 77 59 139 94 154 104 164 114 174 159 171 171 175
0 4 4 16 7 67 17 92 37 77 59 139 94 154 104 164 114 174 159 171 171 175
S-S F-F
1710(2)a
(+)1 1711(1) 15 12
-GROUTED RIPRAP (CLASS A)
LEGEND: F-S
-STONE MASONRY, CLASS A

ACTIVITY
ITEM NR.
NR.
DURATION
LAG TIME: (+) (-)11 F-F 160 172
DESCRIPTION
(+)32
EARLY START

LATE START
EARLY FINISH

LATE FINISH
LEAD TIME: (-) 160 173
1702(1)a 8 1 A.1.1(3) 9 12 S-S F-F
F-S (+)1
CRITICAL PATH: F-S: FINISH-TO-START STRUCTURE EXCAV.
(-)11 PIPE CULVERTS
A.1.1(3) 16 12
NON-CRITICAL (COMMON SOIL)
S-S: START-TO-START RECTANGULAR FLAP
PATH:

NODE:
F-F: FINISH-TO-FINSIH 66 82 71 83 GATE, 610MMØ (FAB.)

S-F: START-TO-FINISH 122 138 127 139 161 173


161 173
BAR CHART AND S-CURVE

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

CONTRACTOR: PREPARED & SUBMITTED BY: PROJECT TITLE/LOCATION: CHECKED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED:
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF FLOOD MITIGATION
MARCUS OFFICE OF THE DISTRICT ENGINEER
COTABATO 3RD DISTRICT ENGINEERING OFFICE STRUCTURE-CONSTRUCTION OF KABACAN RIVER FLOOD
CONSTRUCTION AND
MARLYN T. CUSTODIO LANAO, KIDAPAWAN CITY CONTROL PROJECT (CARABAO CENTER, PHASE II), USM, JAIME Q. MENDOZA, JR. NASSER A. DARANDAS WEALTHO M. MERILLANA EDDIE M. AMIR