Professional Documents
Culture Documents
Emergency Scrubber Design
Emergency Scrubber Design
G1 250 Kg/hr
Molar average mass 67.68 Kg/Kmol
G1 3.69 Kg/kmol
y1 0.380
Y1 0.613
y2 0.008 Assume 98% scrubbing
Y2 0.008
y Y x X
0.000 0.000 0.000 0.000
0.008 0.008 0.014 0.014
0.082 0.089 0.144 0.169
0.156 0.185 0.275 0.379
0.230 0.299 0.405 0.681
0.304 0.437 0.536 1.153
0.380 0.613 0.669 2.025
For Absorber the pressure drop ranges varies from 16 to 40 mmwc/mtr of packing height
Let say pressure drop=30 mmwc/mtr of packing height
K=0.8 at 30 mmwc/mtr of packing height (at design condition) 0.8
K=4.2 at flooding condition 4.2
NtOG= 10
Height(Z)= 5.90 M
X/1+X
L2
L1
Emergency scrubber design
G1 400 Kg/hr
Molar average mass 67.68 Kg/Kmol
G1 5.91 Kg/kmol
y1 0.380
Y1 0.613
y2 0.008 Assume 98% scrubbing
Y2 0.008
y Y x X
0.000 0.000 0.000 0.000
0.008 0.008 0.014 0.014
0.082 0.089 0.144 0.169
0.156 0.185 0.275 0.379
0.230 0.299 0.405 0.681
0.304 0.437 0.536 1.153
0.380 0.613 0.669 2.025
Find out the minimum solvent rate:
Ls(X1-X2)=Gs(Y1-Y2)
For Absorber the pressure drop ranges varies from 16 to 40 mmwc/mtr of packing height
Let say pressure drop=30 mmwc/mtr of packing height
K=0.8 at 30 mmwc/mtr of packing height (at design condition) 1
K=4.2 at flooding condition 3.8
NtOG= 7
Height(Z)= 4.35 M
Technical specification unit
Off gases flow rate 400 Kg/hr
Solvent flow rate 452.42 Kg/hr
solution flow rate 754.03 Kg/hr
Centrifugal pump 1.00 m3/hr
Diameter 300 mm
Height 5.5 m
Flooding velocity 13.4 m/s
% Flooding 51
Actual vapour velocity 7 m/s
222
G1=3.7Kmol/hr
852 400
976
114.4596
X/1+X
ρ
Avg. molar mass of gas-vapour mixture:
ρv 3.167016 Kg/m3
Density of APN= 860 Kg/m3
Density of Dimethyl Disulphide= 840 Kg/m3
Density of Dimethyl sulphide= 1006 Kg/m3
Density of average mixture= 923 Kg/m3
Line sizing
0.52558139535
inlet gas 126.3019 0.00014599483
0.035084 7.2997416E-05
0.003508 9.2990339E-05
0.004469 0.00964314984
0.066853 9.64314984224
66.85268 mm 2.59
80 mm 25mm 2227.4
24
2.474444
1260.863
1589777 0.9919
1576899
916.8019
788.4497
0.3125
0.0081
0.9919
G2
452
L2
754
L1
Emergency scrubber design
G1 400 Kg/hr
Molar average mass 67.68 Kg/Kmol
G1 5.91 Kg/kmol
y1 0.380
Y1 0.613
y2 0.008 Assume 98% scrubbing
Y2 0.008
y Y x X
0.000 0.000 0.000 0.000
out 0.008 0.008 0.014 0.014
0.082 0.089 0.144 0.169
0.156 0.185 0.275 0.379
0.230 0.299 0.405 0.681
0.304 0.437 0.536 1.153
in 0.380 0.613 0.669 2.025
For Absorber the pressure drop ranges varies from 16 to 40 mmwc/mtr of packing height
Let say pressure drop=30 mmwc/mtr of packing height
K=0.8 at 30 mmwc/mtr of packing height (at design condition) 0.8
K=3 at flooding condition 3.1
NtOG= 8
Height(Z)= 4.74 M
Technical specification unit
Off gases flow rate 400 Kg/hr
Solvent flow rate 351.88 Kg/hr
solution flow rate 653.49 Kg/hr
Centrifugal pump 2.00 m3/hr
Diameter 400 mm
Height 7.6 m
Flooding velocity 13.4 m/s
% Flooding 51
Actual vapour velocity 7 m/s
0.76
0.38
G1=3.7Kmol/hr
X/1+X
754
873.5
For IMTP( 40 NB) metal Line sizing
Kg/m.sec
inlet gas 126.3019 inlet solvent
Lm= 4.30 kmol/hr 0.035084
Gm= 4.80 kmol/hr 0.003508
A=Lm/mGm 0.004469
A= 1.58 0.066853
66.85268 mm
100
0.736533
0.000205
0.000136
29.16667 0.000174
0.013181
13.18149
G2
L2
L1
0.8631940469
0.0002397761
0.0002997202
0.0003818091
0.0195399364
19.53993641 MM
25 MM
N=ln((y1/y2)(1-1/A)+1/A))/(1-1/A)