China State Construction Engineering Corporation.

LTD
Engineering Laboratory,
Head Office - No 38/A/1/1 Anagarika Darmapala Mawatha Kandy,
DYNAMIC CONE PENETRATION (DCP) TEST
TRRL Road Note 8 (600 Cone)

Construction of Upper Elahera Canal from 27+509km to 55+600km Including


Project
27.7km Long Tunnels UECP- ICB-2A (Nothern Access Road)

Client Ministry of Irrigation - Mahaweli Water Security Investment Program


Description Subgrade Sample
Location Carriageway Section/03+250 RHS/1.70m from Existing Center
Lab Reference No DCP/07 Field Reference No DCP/07
Date of Sampling 06.05.2021 Date of Test 06.05.2021

Depth at Start 350 mm Zero Reading 10 mm


CBR Relationship Log10(CBR) = 2.48 -1.057 Log10 (mm/Blows) Soil Condition Dry

Cum. Penetrat 0 20 40 60 80 100 120


Nos of Reading Depth 0.0
Nos of ion
Blows (mm) (mm)
Blows (mm)
100.0
0 0 10 0 350
2 2 25 15 365 200.0

5 7 45 35 385 300.0
5 12 65 55 405
5 17 85 75 425 400.0

5 22 104 94 444
Depth (m)

500.0
5 27 125 115 465
5 32 170 160 510 600.0
5 37 203 193 543
700.0
5 42 250 240 590
5 47 281 271 621 800.0
5 52 301 291 641
900.0
5 57 333 323 673
5 62 390 380 730 1000.0
5 67 410 400 750
5 72 427 417 767 1100.0

5 77 460 450 800 Cumulative Nos of Blows


5 82 490 480 830
5 87 520 510 860 Layer No. Thickness mm/Blows CBR (%)
5 92 569 559 909 1 115 4.3 65.3
5 97 595 585 935 2 265 7.6 35.5
5 102 620 610 960 3 270 6.0 45.4
5 107 660 650 1000

Rebound
Tested by Checked by Certified by