Project Central Expressway Project – Section 2 – Package A

Doc. Title: - 20m girder concrete out line drawings 40+202 to 40+222 (rev01)
Letter No
Doc No
Submission Date

Identification Reference Section /Drg Chec


Comments Reply
No No k
Check the SLS stress analysis for service & confirm
Page 21 – we can …. With tendon … you have adopted in the
drawing & report. Explain
CEP-2/PK- Check for stresses Litting / transporting & stacking as appropriate
1 A/40+202/BD/GN/001/R You may provide adequate of litting ….. for safety
01. Sheet No:01 of 01 Deflections > Mcr < …. You may ensure that long term deflections
based on crack sector
C/W varies the calculations are shown for Max widh of c/w. ensure
& prove us that the girders are satisfactory for mim width of c/w
CEP-2/PK- Provide the curvature diagrams
A/40+202/BD/GD/20.EB Check the tendon duet spacing
2
T 1-1/CO/001/R01.
Ensure that ……. SPACING & CEAN corer for the deaf
Sheet No:01 of 03
CEP-2/PK-
A/40+202/BD/GD/20.EB
3 Confirm us the equating of the prestress
T 1-1/CO/001/R01.
Sheet No:03 of 03
CEP-2/PK-
A/40+202/BD/GD/20.EB
4 Check the spacing
T 1-1/MS/001/R01.
Sheet No:01 of 01
CEP-2/PK-
A/40+202/BD/GD/20.EB
5 Provide the curvature diagram
T 1-1/CO/001/R01.
Sheet No:01 of 03
6 CEP-2/PK- Check the adqued of the prestess
A/40+202/BD/GD/20.EB
T 1-1/CO/001/R01.
Sheet No:03 of 03

Checked by